S_MN PASS-09 — Custody, account controls, records, reconciliation, and security
Research/access date: October 27, 2026, America/Los_Angeles.
Scope: Minnesota debt-management and debt-settlement custody; necessary account controls, records and reporting; and the statutory bond/security gateway.
Disposition: The principal statutory controls are established within the version limits below. Important implementation questions remain unresolved, particularly the treatment of in-transit funds and auxiliary accounts under the actual-cash requirement, the meaning and measurement period of the DMP renewal bond metric, and the currently accepted electronic bond and prescribed reporting forms.
P01’s historical coverage remains preserved. P06’s reviewed fee findings are context—not permission to withdraw a fee. P04’s checklist/status limitations remain unchanged. P07 supplies no custody premise, and P08 is not a premise.
Throughout this report, S001 means S_MN-P09-S001. Claim identifiers C001–C060 belong to this pass.
A. Principal conclusions
DMP receipt, availability, distribution and earning are separate events. Section 332A.13(8) requires the trust deposit when funds become available. Subdivision 9 measures creditor-distribution timing from receipt, ordinarily within 42 days or earlier if necessary to meet the creditor agreement. Neither event establishes fee entitlement. [C007–C012.] MN Revisor
Settlement custody is purpose-limited as well as time-limited. Section 332B.06(8) permits holding debtor funds for writing exchange checks for no longer than 42 days. It does not establish general permission to accumulate settlement savings in the provider’s trust account. [C014–C016.] MN Revisor
Minnesota expressly tests actual trust cash against individual debtor balances. Section 332A.08(10) identifies failure to maintain sufficient actual cash for the sum of each debtor’s escrow balance as a ground for denial. The enforcement provisions extend that consequence to existing registrants and incorporate it into Chapter 332B. A bond, provider receivable, or another debtor’s money is not automatically a substitute for the missing cash. [C017–C018, C041.] MN Revisor+1
The DMP and settlement renewal bond texts differ. Section 332A.06 permits a commissioner-required amount tied to the largest prior-year trust accrual. Section 332B.04(6) requires continuous security through its stated cross-reference but does not reproduce that prior-year formula. It must not be silently imported. [C037–C039.] MN Revisor+1
Public blank bonds were recovered, but their operational status is limited. Both are undated, one-page Commerce-hosted forms containing cancellation and aggregate-liability terms. Commerce’s current public instructions call for an electronic surety bond in NMLS. The blank PDFs do not establish the wording or acceptance of a current electronic instrument. [C042–C044, C057.] mn.gov // Minnesota's State Portal+2
B. Actors, models, and account status
B1. Coverage and custody matrix
| Actor or model |
Relevant statutory predicate |
Custody consequence or necessary distinction |
| DMP provider receiving and distributing consumer payments |
Chapter 332A’s service definition concerns periodic distribution of debtor-received funds for full repayment of primarily personal, family or household debt. |
Apply the DMP trust, distribution, records and security provisions. |
| Remote DMP or settlement provider |
The provider definitions expressly reach services to Minnesota-domiciled debtors without requiring a Minnesota office. |
Moving the office or processor out of state does not itself remove the statutory duties. |
| Delegate or subcontractor |
Both provider definitions include delegated services; “registrant” also reaches service performers when used with required or prohibited conduct. |
A processor label does not conclusively remove provider responsibility or establish federal independence. |
| Settlement provider holding debtor funds |
Section 332B.06(8) imposes the exchange-check purpose, time limit and separate-account requirement. |
Ordinary settlement advice does not imply unrestricted provider custody. |
| Settlement provider advising accumulation in a customer account |
Accumulation advice can itself be a settlement service. |
Whether the provider actually holds or controls the funds, and whether a federal independent-account arrangement exists, require separate facts. |
| Genuinely noncustodial/direct-creditor model |
Classification depends on actual receipt, distribution, advice, holding out and delegation. |
Direct creditor payments are not provider trust receipts merely because the provider tracks them. Other provider duties may still apply. |
| Unregistered service performer |
The “registrant” definitions extend specified duties to persons performing the services. |
Lack of registration is not a defense to mishandling debtor funds. |
| Business-only, mixed-purpose, tax or excluded-actor model |
The applicable definition and exclusion must actually fit. |
No universal exclusion or custody permission is decided here; those factual boundaries remain held. |
Sources: S001–S002; C004–C006. MN Revisor+1
B2. Ownership and account control: what is established
Minnesota calls the money debtor funds, requires trust segregation in the identified circumstances, restricts commingling, and requires accounting and return obligations. Those provisions do not make a receipt provider revenue. Conversely, the limited permission to disburse a fee from trust does not establish that a particular fee has been earned.
The federal dedicated-account provision is more explicit about ownership: the customer owns the funds and receives accrued interest, if any. Neither the state provisions nor the federal account rule, as read here, resolves every bankruptcy, bank-setoff, deposit-insurance, tracing or priority question. [C007, C019, C047.] MN Revisor+2
Bank-documentation gap
The necessary evidence for a real account would include its legal title, depository agreement, authorized signers, beneficial-owner records, withdrawal permissions, processor agreements, settlement mechanics, minimum-balance requirement and actual transaction records.
Those are evidence needs, not an assertion that the statutes prescribe a particular signature-card form or accounting standard.
The opened state clauses do not themselves establish:
- a required bank charter or Minnesota branch location;
- a complete account-title convention;
- dual-signature or approval thresholds;
- an insured-deposit limit or pass-through-insurance conclusion;
- an interest-allocation rule equivalent to the federal dedicated-account text;
- authorization for sweeping customer cash into provider operating accounts; or
- the treatment of every processor reserve or in-transit asset.
Those questions remain held rather than supplied from unrelated banking or collection-agency rules.
C. Custody, clocks, and permissible routes
C1. DMP and settlement controls are not interchangeable
| Event/control |
DMP—Chapter 332A |
Settlement—Chapter 332B |
Operational evidence needed |
| Funds received but not available |
Deposit duty expressly uses availability; receipt remains relevant to distribution timing. |
No equivalent availability sentence was identified in §332B.06(8). |
Receipt date, instrument status, bank availability, reversals and actual control. |
| Trust segregation |
Separate trust account required. |
Separate trust account required if debtor funds are held. |
Account agreement, statements and debtor-level records. |
| Provider cash in account |
Only the amount necessary to maintain a bank-required minimum to avoid fees or penalties. |
Same narrow purpose, expressly described as an imprest fund. |
Actual bank requirement and calculation of necessary amount—not an arbitrary cushion. |
| Disbursement route |
Debtor, creditor and provider disbursements originate from trust. A separate account may be used solely for disbursements to debtors and creditors. |
No matching auxiliary-disbursement authorization was established in the inspected settlement clause. |
Originating account, destination, beneficiary and purpose. |
| Provider fee transfer |
The routing sentence does not decide earning or authorization. The debtor/creditor-only auxiliary route is not a general provider-fee sweep route. |
Fee entitlement remains separate from custody permission. |
Independent support for the fee and transfer authorization. |
| Creditor payment deadline |
Within 42 days after receipt, or earlier to comply with the debtor-creditor agreement, subject to stated exceptions. |
Custody permission is limited to exchange-check purpose and no longer than 42 days. |
Actual creditor due date, actual payment and continued custody. |
| Longer holding |
Specified reasonable sum-certain accumulation and returned-payment/net-interest circumstances can matter. |
No automatic import of the DMP exceptions. |
Facts satisfying the actual exception; no generic “program savings” rationale. |
| Interrupted transfer |
Does not automatically restart the receipt clock or establish creditor payment. |
Does not automatically extend the custody purpose or time. |
Bank debit, rejection, returned funds and creditor posting evidence. |
| Uncashed check |
Issuance, bank debit and creditor receipt are distinct. |
The effect of an outstanding exchange check on the custody endpoint remains unresolved. |
Instrument terms and responsive legal interpretation. |
Sources: S003–S004, S022–S023; C008–C016. MN Revisor+1
The narrow minimum-balance exception
A provider cannot justify a large operating reserve in trust by calling it “imprest.” The statutory condition is a financial institution’s minimum-balance requirement to avoid fees or penalties, and the allowed commingling extends only as far as necessary for that purpose.
The statutory text does not establish that all provider expenses, anticipated chargebacks, future refunds, payroll reserves or bond collateral may be mixed with debtor funds. Model M01 demonstrates an exactly stipulated minimum-balance branch; it does not approve a general buffer. [C009, C015.] MN Revisor+1
“Exchange checks” remains a genuine interpretive boundary
The enacted 2009 provision contains the same exchange-check purpose now displayed in §332B.06(8). No responsive opened authority defined the term for every modern payment method or determined whether a particular electronic transfer qualifies.
Therefore:
- a 20-day hold is not necessarily permitted if its purpose is merely accumulating future settlement money;
- issuing an instrument does not conclusively establish that custody ended;
- transferring funds between provider-controlled accounts does not establish a new 42-day period; and
- federal permission to use a qualifying independent account does not enlarge state provider-custody authority.
These are limits on what this research establishes, not a determination that every electronic equivalent is prohibited. [C014–C016.] MN Revisor+1
C2. Creditor withdrawal and undistributed money
For DMPs, §332A.13(6) requires the specified notice following failure to obtain creditor consent. Subdivision 7 separately requires prompt notice of withdrawal or refusal, no later than 15 days after learning of it, including the creditor identity, monthly amount and cancellation right.
Those notices do not themselves authorize spending the affected allocation, transferring it to another debtor, or retaining it indefinitely. The agreement, distribution rule, actual exception and cancellation provisions must be reconciled. The commissioner-prescribed failure-of-consent notice form was not obtained. [C013.] MN Revisor
C3. Closing and return obligations
| Event |
DMP result |
Settlement result |
| Debtor cancellation |
Ten days’ written notice; within ten days after cancellation, notify creditors and return unexpended funds. |
Ten days’ written notice; notify contacted creditors within ten days after cancellation. The statute separately addresses excess-fee refunds. |
| Provider cancellation |
Good cause and 30 days’ written notice; within ten days after cancellation, notify creditors and return unexpended funds. |
Good cause and 30 days’ notice; creditor notice within ten days after cancellation. |
| Automatic termination |
When all listed debts and fees are paid, immediately return unexpended funds. |
When all listed or settled debts and fees are paid, immediately return held funds exceeding allowed fees. |
| Federal dedicated-account exit, where applicable |
Separately test the federal arrangement. |
Consumer may withdraw without penalty and receive the account balance, less qualifying earned fees, within seven business days of the request. |
Do not transplant the DMP’s express ten-day unexpended-funds sentence into §332B.07. The settlement section’s ordinary-cancellation language is different. Its custody restriction, contract obligations, applicable federal account rule and other law may still require return, but the precise state-law ordinary-cancellation principal-return rule was not resolved by substituting Chapter 332A language. P05’s fee/refund interpretation holds remain unchanged. [C020–C021, C049.] MN Revisor+2
D. Records, aggregate reconciliation, statements, and supervision
D1. Actual cash versus the sum of debtor balances
Section 332A.08(10) supplies a concrete statutory test:
Plain text
Actual trust cash must not be less than
the sum of the escrow balances of the individual debtors.
Its placement is in denial grounds. Sections 332A.09 and 332B.05 supply the necessary existing-registrant and settlement enforcement connections. [C017, C041.] MN Revisor+2
A debtor-level schedule is therefore necessary to demonstrate the denominator. A bank statement alone cannot identify whose money it contains.
The following are analytical consequences, not additional statutory accounting standards:
- Do not net a negative balance for one debtor against money owed to another.
- Do not substitute a provider receivable, bond face amount or expected recovery for actual trust cash.
- Do not show a pending debit as both available cash and a separate receivable.
- Do not reduce creditor debt merely because money reached the provider.
- Reconcile actual bank movements with debtor allocations and creditor/return evidence.
Unresolved: The exact treatment of funds in the expressly permitted DMP disbursement account, outstanding checks, processor settlement accounts and in-transit transfers under the actual-cash test was not resolved by an opened controlling interpretation. Permission to use a disbursement account does not, by itself, answer when money in it counts as statutory trust cash. Model M02 exposes that issue rather than hiding it. [C018–C019.]
D2. Different records serve different purposes
| Record/control |
Responsible actor, content and clock |
What it does not establish |
| Individual debtor records |
Provider must maintain records enabling each debtor’s creditor payments to be ascertained; retain the required income/expense analysis. |
A successful payment or fee entitlement without supporting evidence. |
| Aggregate cash/subledger comparison |
Needed to demonstrate the actual-cash-versus-individual-balances condition. |
No fixed daily, weekly or monthly reconciliation frequency was located in the relied-on provisions. |
| Monthly debtor statement |
At least monthly: debtor receipts, creditor disbursements, agreed full-payment amounts, deductions and prescribed additional information. |
That the account is fully reconciled or independently audited. |
| Settlement activity statement |
Also identify activities, nature of communications and negotiation progress for each creditor during the period. |
Completion or success merely because activity occurred. |
| Cancellation/termination statement |
Required in addition to monthly statements. |
That closing cash or fees have been correctly determined. |
| Retention |
At least six years after the final entry on a recorded transaction. |
Six years from account opening or a universal permission to destroy every record at contract closure. |
| Debtor access |
Reasonable access without cost to applicable file information; statutory confidentiality restrictions remain. |
Public access to borrower records. |
| Annual regulator report |
Due March 15 for the preceding calendar year, on the commissioner-prescribed form. |
A substitute for monthly statements, cash reconciliation or bond continuity. |
| CPA audit on demand |
Commissioner may require one during a calendar year; a qualifying audit prepared within the prior year for another purpose may satisfy the demand. |
An automatic statutory annual-audit requirement for every provider. |
| Examination/investigation |
Reasonable-time examination under the chapters; additional access and request powers under §45.027. |
An assurance opinion merely because a regulator can inspect. |
Sources: S009–S012, S018; C022–C030. MN Revisor+3
Request-specific clocks
Under §45.027, ordered regulated-transaction reports have a ten-day response provision. Other department requests use the specified deadline, or 30 days after mailing if none is specified. These are not substitutes for the annual March 15 deadline. Examination costs are provider-government obligations through the incorporated §46.131 framework; no actual assessment or daily rate was determined. [C028–C029.] MN Revisor+1
D3. Current prescribed forms and a historical extension
Commerce’s public page says the annual report is sent to the MU1 email contact in November and is due March 15. It did not expose the current prescribed report’s full fields in the material retrieved here.
A responsive historical document was found: Regulatory Guidance 20-09, March 30, 2020, extended the specified 2020 annual-report deadlines to April 30, 2020 and described NMLS submission. That is a dated emergency measure, not a current extension or proof of the 2026 form’s contents. Its referenced underlying order was not separately retrieved. [C025–C026, C057.] mn.gov // Minnesota's State Portal+1
No current report field, trust reconciliation frequency, reporting cutoff, CPA assurance standard or bond-metric reporting instruction was invented.
E. Bond and security gateway
E1. Statutory requirements
| Issue |
DMP |
Settlement |
Limitation |
| Application bond amount |
Commissioner-determined, at least $5,000 |
§332B.04(3) incorporates §332A.04(3)–(5) |
$5,000 is a minimum, not a universal maximum. |
| Principal and surety |
Applicant is obligor; surety is an insurer duly authorized in Minnesota for fidelity and surety business |
Incorporated |
A broker quote is not an issued qualifying bond. |
| Substitute security |
Commissioner may accept qualifying cash/securities of equal market value, deposited with Management and Budget |
Incorporated |
Acceptance is not presumed; debtor trust funds are not substituted for provider security. |
| Employee fidelity protection |
Commissioner may additionally require an appropriate fidelity bond |
Incorporated |
Not automatically included in the statutory surety bond. |
| Branches |
Each in-state branch/additional place must be bonded as provided |
Incorporated |
Number of instruments and allocation require actual commissioner/instrument evidence. |
| Amount factors |
Financial responsibility, experience, character/fitness, volume, geography, past performance, examinations/reports and other-state conduct |
Incorporated through §332A.04(4) |
No threshold tiers or automatic premium formula were found. |
| Continuous security |
Required by §332A.06 |
Required by §332B.04(6) |
A registration expiration date is not proof that the bond remained in force. |
| Prior-year trust measure |
Commissioner may require a different amount at least equal to the largest prior-year trust accrual |
Not repeated in settlement renewal text |
Do not import §332A.06 wholesale into Chapter 332B. |
Sources: S013–S015; C031–C040. MN Revisor+2
E2. What the DMP renewal metric does—and does not—say
The text authorizes the commissioner to require a different amount tied to the largest amount accrued in the trust account during the previous year. It does not supply automatic published tiers.
The opened authority does not conclusively resolve:
- calendar year versus a rolling renewal-year period;
- intraday versus end-of-day measurement;
- whether “accrued” means a defined regulator balance measure;
- treatment of permitted provider minimum-balance money;
- aggregation of multiple trust or branch accounts;
- funds moved into the authorized disbursement account;
- unsettled receipts, outstanding checks or in-transit payments; or
- a required adjustment date whenever balances rise during the year.
A peak-balance reading is consistent with the wording, but this report does not turn that reading into a complete prescribed calculation. Model M04 expressly supplies a fictional commissioner measurement instruction so its arithmetic does not masquerade as an unstated rule. [C037–C039.] MN Revisor
E3. Beneficiaries, defaults, and claims
The statutory bond runs to Minnesota for the use of the state and qualifying persons with causes of action arising from the covered activity involving Minnesota-domiciled debtors. Its conditions include lawful, nonfraudulent performance and payment of amounts due under the chapter.
The DMP claim gateway identifies failures to account, distribute required amounts or perform promised services. The settlement gateway separately identifies failures to account or perform promised services. The debtor, specified representatives/receiver, commissioner or attorney general may pursue the stated action in the debtor’s name, for loss not exceeding the face amount, without joining the registrant. [C035–C036.] MN Revisor+1
That is not automatic reimbursement. The actual bond, covered conduct, loss, defenses, aggregate limit and procedural requirements remain relevant. No priority or allocation among competing claimants is decided here.
E4. Public blank forms versus current electronic instruments
The two Commerce-hosted PDFs are visibly titled for DMP and settlement providers, notwithstanding the retrieval system’s generic collection-agency metadata title. Each is one page and has no printed revision date.
| Public form term |
What was actually read |
Qualification |
| Identification |
Principal, organization, office, surety, penal amount and effective date blanks |
No actual party or instrument identified |
| Execution |
Owner/officer and surety attorney-in-fact signatures, power-of-attorney attachment and acknowledgments |
Not proof of execution or acceptance |
| Duration/cancellation |
Earlier of registration expiration or surety cancellation; cancellation effective 30 days after certified-mail notice to the obligee |
Form term, not a newly discovered statutory grace period |
| Prior liability |
Cancellation does not affect liability incurred before its effective date |
Actual claim coverage still requires the issued instrument and facts |
| Aggregate liability |
One continuing obligation; aggregate claims do not exceed the penal sum regardless of years or claim count |
Not a separate full penal sum for every consumer |
| Claim-payment notice |
Surety must notify Commerce before paying a claim |
No claim was filed or evaluated |
Sources: S026–S027; C042–C044. mn.gov // Minnesota's State Portal+1
Commerce currently instructs providers to file electronic surety bonds in NMLS. The current accepted ESB wording, endorsements and renewal mechanics were not obtained. The undated forms therefore support only their visible terms and a comparison framework. They do not cure P04’s current-form limitations. mn.gov // Minnesota's State Portal
E5. Lapse, changes, and consequences
Current §332A.07(1) and §332B.04(7) require application-information updates within ten days after the triggering event. That update period is not permission to operate for ten days without required continuous security.
Failure to maintain required security, insolvency, improper withholding/conversion, inadequate trust cash and creditor-payment defaults are statutory grounds connected to denial and sanctions. The statutes also provide a receiver route in specified revocation/nonrenewal circumstances. This report does not predict automatic revocation, automatic contract voidness, receivership priority or surety payment. [C040–C041.] MN Revisor+3
Money categories that must remain separate
| Category |
Meaning |
| Penal sum |
Stated limit of the bond obligation, subject to the actual instrument and law |
| Premium |
Price paid to the surety; not established by the statutory penal sum |
| Collateral |
Separate contractual security the surety may require; not quantified here |
| Substitute statutory security |
Commissioner-accepted cash/securities deposited through the prescribed route |
| Government charge |
Registration, renewal or examination obligation; not a consumer-fee allowance |
| Debtor trust cash |
Money held and allocated for debtor purposes |
| Consumer loss/claim |
Fact-dependent amount; not automatically equal to the bond face or account balance |
The 2008 amendment expressly removed the old application wording referring to payment of the bond premium. Current law requires the qualifying bond, not proof that a particular premium amount equals the bond requirement. [C045.] MN Revisor
F. Necessary federal comparison
This comparison applies only where the TSR’s actual seller, telemarketer, service, campaign and exemption predicates are met. The definitions and relevant exemptions were freshly read. No blanket federal coverage is inferred from a website, nonprofit label, DMP label or third-party processor. [C046.] eCFR+1
F1. Independent dedicated-account requirements
Under §310.4(a)(5)(ii), the relevant accumulation arrangement must satisfy all five conditions:
| Condition |
Required fact |
Not established by |
| Insured institution |
Funds held at an insured financial institution |
Merely using “trust” in the account title |
| Ownership and interest |
Customer owns the money and receives accrued interest, if any |
Provider bookkeeping that labels a receipt “customer funds” while giving the provider beneficial use |
| Independence |
Administrator not owned, controlled by or affiliated with the debt-relief service |
A separate corporate name or outsourcing contract alone |
| Referral compensation |
Administrator neither gives nor accepts the specified referral compensation |
Compliance with state segregation rules |
| Exit and return |
No-penalty withdrawal; qualifying balance returned within seven business days of the request |
A state cancellation notice period or a private lockup term |
The exception for funds earned under §310.4(a)(5)(i)(A)–(C) is not a determination that Minnesota also permits the proposed fee. This pass uses no recalculated fee entitlement. [C047–C049.] eCFR
The Commission’s 2010 final-rule explanation confirms customer ownership, customer interest, administrator independence and the account safeguards. The provision took effect October 27, 2010. Its account discussion is not a state custody authorization. [C050–C051.] Federal Register
F2. Comparison outcome
A Minnesota provider-controlled trust account with permitted minimum-balance money is not automatically a qualifying independent federal account. Conversely, a federally qualifying account does not establish that the provider may hold the money under Minnesota’s exchange-check provision.
A truly customer-owned, independently administered account may present different state receipt/control facts. Those facts must be proved from the actual bank and administrator documents—not inferred from “noncustodial” marketing.
G. Currentness, amendments, rules, and interpretation limits
| Material |
Established status |
Limit |
| Current Minnesota section displays |
Retrieved pages are labeled 2025 |
Not a fully consolidated October 2026 code |
| 2026 Table 2 |
Targeted Chapter 332A/332B entries show the previously reviewed accreditation/application changes |
No complete later/special-session certification |
| 2007 chapter 57, article 3 |
Relevant original DMP bond, renewal, cash, records and funds provisions read; selected provisions expressly effective January 1, 2008 |
Original wording not substituted for later amendments |
| 2008 chapter 210 |
Sections 4, 5, 7, 8 and 10 read; availability, disbursement-account, annual-report and bond-application changes |
Effective April 22, 2008, following April 21 enactment |
| 2009 chapter 37, article 4 |
Original settlement exchange-check, bond, records and supervision provisions read selectively |
Complete original effective-date chain not reconstructed |
| 2009 chapter 178, article 1, §66 |
Relevant amended agreement text inspected |
It reproduces the exchange-check provision; it is not misidentified as its first enactment |
| Current §§45.027 and 46.131 |
Necessary operative cross-references read |
Complete effective-date history of every general supervisory amendment not reconstructed |
| eCFR |
Display current through October 23, 2026 |
Title-level amendment metadata is not a section-specific amendment date |
| 2020 Guidance 20-09 |
Historical emergency reporting extension read in full |
Not a current deadline extension or complete underlying order |
| Public bond forms |
Freshly read, one-page, undated PDFs |
Current ESB acceptance/version remains unverified |
Sources: S021–S025, S032–S036; C001–C003, C026, C050. MN Revisor+3
Rules and published interpretations
The Commerce agency rule inventory, Chapter 2675 index, Commerce rulemaking page and targeted official-domain searches were examined. No responsive operative rule or binding final interpretation was located and read that resolved:
- “exchange checks” and modern payment substitutes;
- actual-cash treatment across the DMP trust and disbursement accounts;
- in-transit transfers and outstanding instruments;
- the exact prior-year trust-accrual measurement convention; or
- a universal trust-reconciliation frequency.
Unrelated bank/trust-company and collection-agency rules were not imported. The dynamic rulemaking page’s rendered absence of responsive entries is not a certification that no applicable rule or order exists.
Bounded searches also did not locate and open a responsive published judicial-majority decision on those exact issues. No headnote, complaint, consent settlement, unpublished opinion or proposed bill supplies a controlling construction here. [C052.] MN Revisor+2
H. Eighteen new fictional postures
| Posture |
Fictional facts |
Supported result or exact hold |
| P01 — Receipt before availability |
DMP receives a payment instrument Monday; funds become available Tuesday |
Preserve both dates. Tuesday’s deposit duty does not automatically restart the receipt-based distribution clock. |
| P02 — Failed attempt |
Debit instruction fails before any money becomes available |
Record the failed attempt; do not invent cash or creditor payment. |
| P03 — Later reversal |
Previously available receipt is reversed after a creditor payment |
Reconcile the resulting cash shortfall; do not silently charge another debtor. |
| P04 — Two debtors, one pool |
A’s account is short while B has positive funds |
A negative A balance cannot make B’s liability disappear. |
| P05 — Exact bank minimum |
Bank requires $100 to avoid charges; customer returns would otherwise leave zero |
Necessary provider minimum-balance money is the relevant narrow exception. |
| P06 — Operating reserve in trust |
Provider adds $5,000 for payroll and future chargebacks |
No permission established by calling it “imprest.” |
| P07 — Unproved fee sweep |
Ledger labels $50 “earned,” but supporting predicates are unresolved |
Keep the fee transfer unsupported; custody records do not establish earning. |
| P08 — Auxiliary account |
DMP moves money to a debtor/creditor-only disbursement account |
Route is expressly contemplated; actual-cash treatment and provider-fee sweeps remain separate. |
| P09 — Creditor withdraws |
Creditor refuses further DMP participation while $200 remains allocated |
Give applicable notices and reconcile the undistributed money; withdrawal is not a general holding exception. |
| P10 — Sum-certain accumulation |
A documented DMP obligation reasonably requires a longer accumulation period |
Test the actual subdivision 9 exception; do not apply it to settlement custody by analogy. |
| P11 — Exchange check |
Settlement funds are received for identified qualifying exchange checks and promptly cleared |
Purpose and time are both tested; legal qualification of the instrument must be established. |
| P12 — Long savings hold |
Provider holds settlement money for 60 days while searching for an offer |
No authority established under the exchange-check provision. |
| P13 — Interrupted transfer |
Bank debits trust, creditor receives nothing, and funds return next day |
Do not record a completed creditor payment; investigate the interim actual-cash issue. |
| P14 — Closing surplus |
All listed DMP debts and lawful fees are paid, but $80 remains |
Automatic-termination return rule applies; no new maintenance fee is assumed. |
| P15 — Provider insolvency |
Trust is $450 short and provider has only $100 outside assets |
Bond face value does not fill the trust account; insolvency and cash-deficit grounds are separate. |
| P16 — Rising trust measure |
DMP’s stipulated prior-period maximum exceeds its old bond |
Commissioner’s actual determination and measurement instructions matter; no automatic invented tier. |
| P17 — Security lapse |
Old bond ends October 1; replacement begins October 2 |
The ten-day information-update rule does not create a security-gap grace period. |
| P18 — “Independent” affiliate |
Administrator has a different name but common control; interest is retained by provider |
Federal independence and customer-interest predicates are not established. |
These postures apply the cited rules conditionally. They are not actual-account findings.
I. Four worked conditional models
Common conventions
All dates, debtors, debts and accounts below are fictional. Unless stated otherwise, amounts are USD, no interest or additional creditor charges accrue, and transfers shown as creditor payments have actually cleared and been credited.
All figures calculate exactly to cents. No statutory rounding convention is inferred.
The basic reconciliation is:
Plain text
Opening bank cash
+ actual incoming cash
− actual outgoing cash
= closing bank cash.
Separately:
Plain text
Customer-funded custody
= sum of individual debtor fund liabilities,
subject to identified lawful distributions, returns and independently established fees.
A pending transfer, creditor principal, provider receivable, surety obligation and customer-fund liability are different balances.
M01 — Two-debtor reconciliation, unavailable funds, a fee hold, and exact minimum cash
Inputs
On October 1, 2026:
- Trust cash: $600
- Debtor A funds: $360
- Debtor B funds: $240
- Provider-owned money in trust: $0
- Creditor debt principal: A $5,000; B $8,000
- Main branch: no fee entitlement has been established
- Valid closing/return instructions are stipulated; the model does not calculate notice-service deadlines.
| Date/event |
Bank movement |
Trust cash |
A funds |
B funds |
Provider minimum-balance money |
| Oct. 1 opening |
— |
$600 |
$360 |
$240 |
$0 |
| Oct. 2 A instrument received, not available |
$0 |
$600 |
$360 |
$240 |
$0 |
| Oct. 3 A’s $400 becomes available and is deposited |
+$400 |
$1,000 |
$760 |
$240 |
$0 |
| Oct. 4 B’s $200 becomes available |
+$200 |
$1,200 |
$760 |
$440 |
$0 |
| Oct. 5 creditor A receives $500; creditor B receives $300 |
−$800 |
$400 |
$260 |
$140 |
$0 |
| Oct. 6 proposed A $30/B $20 fees remain unproved |
$0 |
$400 |
$260 |
$140 |
$0 |
| Oct. 7 return $260 to A |
−$260 |
$140 |
$0 |
$140 |
$0 |
| Oct. 8 paired closing transactions: provider adds required $100; B receives $140 |
+$100 −$140 |
$100 |
$0 |
$0 |
$100 |
The October 2 instrument is tracked separately as pending. It is not counted twice as both cash and a funded debtor balance.
The October 8 exception assumes an actual bank agreement requiring a $100 minimum to avoid charges, with the top-up limited to the amount necessary for the remaining account. If that factual requirement is absent, the commingling justification is absent.
Plain text
Cash:
$600 + $400 + $200 + $100 − $800 − $400 = $100.
Before closing returns:
Actual cash $400 = A $260 + B $140.
After closing returns:
Actual cash $100 = debtor liabilities $0 + provider minimum money $100.
Creditor principal:
A: $5,000 − $500 = $4,500.
B: $8,000 − $300 = $7,700.
Total remaining principal = $12,200.
The $400 returned to debtors does not reduce creditor principal.
Separate fee-assumption branch
Only if the $30 A fee and $20 B fee are independently established as lawful may that branch be modeled:
Plain text
At Oct. 6:
$400 cash − $50 fees = $350 cash.
A liability: $260 − $30 = $230.
B liability: $140 − $20 = $120.
Closing returns = $230 + $120 = $350.
Overall:
$600 + $600 customer receipts + $100 provider minimum
− $800 creditors − $50 fees − $350 returns
= $100.
This branch is arithmetically consistent. This pass has not established its fee premise. If the premise fails, M01’s main no-fee branch remains the supported analytical treatment. [C053.]
M02 — Returned debit, interrupted outgoing payment, and a cash shortfall
Main branch
Opening October 1:
- Trust cash $500, entirely attributable to D.
- C’s trust balance $0.
- Creditor principal: C $4,000; D $6,000.
| Date/event |
Actual bank movement |
Bank cash |
C fund liability |
D fund liability |
Separate unsettled item |
| Oct. 1 C’s $600 debit attempt is pending |
$0 |
$500 |
$0 |
$500 |
Pending attempt $600 |
| Oct. 2 attempt fails |
$0 |
$500 |
$0 |
$500 |
$0 |
| Oct. 4 replacement $600 becomes available |
+$600 |
$1,100 |
$600 |
$500 |
$0 |
| Oct. 5 outgoing C payment debited; creditor has not received it |
−$450 |
$650 |
$600 |
$500 |
In-transit asset $450 |
| Oct. 6 transfer rejected; $450 returns |
+$450 |
$1,100 |
$600 |
$500 |
$0 |
| Oct. 7 C’s replacement receipt is reversed; C’s originating account restored |
−$600 |
$500 |
$0 |
$500 |
$0 |
| Oct. 8 D receives authorized closing return |
−$500 |
$0 |
$0 |
$0 |
$0 |
For the interrupted-transfer row, the model deliberately does not treat an uncredited instruction as completed creditor payment.
Plain text
Cash:
$500 + $600 + $450 − $450 − $600 − $500 = $0.
At Oct. 5:
Bank cash = $650.
Debtor fund liabilities = $600 + $500 = $1,100.
Cash difference = $450.
Bank cash + in-transit asset = $1,100,
but that asset equation does not establish compliance with
the statute's actual-cash language.
The lawful treatment of that interval—especially under an authorized disbursement structure—remains a specific interpretive/control gap. Creditor principal remains C $4,000 and D $6,000, because the attempted creditor transfer failed.
Adverse alternative: creditor was actually paid before the reversal
Instead suppose C’s $450 creditor payment became final on October 5:
Plain text
After creditor payment:
Bank cash $650.
C unspent funds $150.
D funds $500.
After the later $600 incoming reversal:
Bank cash $50.
D funds still owed $500.
C has no remaining funded balance.
Actual cash shortfall against D = $450.
A possible $450 recovery claim against C is not actual trust cash and is not adjudicated here. It cannot be represented as negative C escrow offsetting D.
If the provider has only $100 of outside assets, even assuming a lawful, documented restoration of that $100:
Plain text
$50 + $100 = $150 cash.
$500 owed to D − $150 = $350 still missing.
The restoration route itself requires proper legal/accounting treatment; the minimum-balance exception is not a general authorization to conceal a shortage. Bond coverage is not an automatic cash deposit.
In this adverse branch only, C’s creditor principal falls to $3,550, assuming the creditor payment remains final. D’s stays $6,000. [C054.]
M03 — Settlement exchange-check purpose versus unsupported long holding
Conditional permitted-purpose facts
- October 2, 2026: E provides $1,500, F provides $900.
- Identified instructions call for exchange checks of $1,400 for E and $900 for F.
- It is expressly assumed that the instruments legally qualify as exchange checks; this pass does not define every electronic substitute.
- No provider fee is claimed.
- The bank requires no provider minimum-balance deposit.
- Creditor principal before resolution: E $3,000, F $2,000.
- Written creditor releases are stipulated to become effective upon actual payment.
| Date/event |
Receipt |
Creditor payment |
Debtor return |
Closing trust |
E liability |
F liability |
| Oct. 2 |
$2,400 |
$0 |
$0 |
$2,400 |
$1,500 |
$900 |
| Oct. 6 E check clears and creditor credits it |
$0 |
$1,400 |
$0 |
$1,000 |
$100 |
$900 |
| Oct. 9 F check clears and creditor credits it |
$0 |
$900 |
$0 |
$100 |
$100 |
$0 |
| Oct. 10 unused E money returned |
$0 |
$0 |
$100 |
$0 |
$0 |
$0 |
Plain text
$0 + $2,400 − $2,300 creditors − $100 return − $0 fees = $0.
The remaining creditor liabilities become zero because of the stipulated effective creditor releases, not merely because the provider received $2,400. No consumer-fee earning is computed.
Adverse long-hold branch
Suppose F’s $900 is instead retained from October 2 through December 16 while the provider searches for a future offer. That is not the stipulated exchange-check execution purpose, and the period exceeds 42 days.
Neither an account labeled “trust,” a bond, moving the money to a second provider account, nor a DMP accumulation exception establishes authority for that hold. A genuinely independent customer-owned federal account would require different facts and would not automatically answer the state-control question. [C055.]
M04 — Trust measure, bond amount, provider outlay, competing losses, and lapse
A. Fictional prior-year trust history
For this model only, assume the commissioner’s written measurement instruction expressly selects January 1–December 31, 2025 and maximum actual customer cash in one trust account. There is no provider minimum money, interest, unsettled transfer or second account. This is a hypothetical instruction—not a finding that the statute universally defines “previous year” this way.
| Date/event |
Cash movement |
Trust balance |
A funds |
B funds |
| Opening |
— |
$0 |
$0 |
$0 |
| Jan. 5 A receipt |
+$12,000 |
$12,000 |
$12,000 |
$0 |
| Jan. 7 A creditor payment |
−$7,000 |
$5,000 |
$5,000 |
$0 |
| Mar. 3 B receipt |
+$18,000 |
$23,000 |
$5,000 |
$18,000 |
| Mar. 5 B creditor payment |
−$14,000 |
$9,000 |
$5,000 |
$4,000 |
| June 2 A receipt |
+$4,000 |
$13,000 |
$9,000 |
$4,000 |
| Dec. 10 A return |
−$3,000 |
$10,000 |
$6,000 |
$4,000 |
Plain text
Gross receipts = $12,000 + $18,000 + $4,000 = $34,000.
Creditor payments = $7,000 + $14,000 = $21,000.
Debtor returns = $3,000.
Closing trust = $34,000 − $21,000 − $3,000 = $10,000.
Maximum measured balance = $23,000.
It is not gross receipts of $34,000 or year-end cash of $10,000.
If starting creditor principal was A $50,000 and B $40,000:
Plain text
A remaining principal = $43,000.
B remaining principal = $26,000.
Total = $69,000.
The $10,000 held at year-end has not yet reduced those debts.
B. Commissioner-required change
Assume the previous required bond was $20,000 and the commissioner expressly sets the next requirement at $25,000:
Plain text
$25,000 required amount ≥ $23,000 selected trust measure.
Increase over old requirement = $25,000 − $20,000 = $5,000.
No automatic statutory tier is inferred. The old bond’s adequacy during 2025 is not decided merely by comparing it with a later peak. The DMP metric is not automatically applied to a settlement registrant.
C. Provider outlay is not the penal sum
Let:
- PPP = actual quoted premium, unknown;
- KKK = actual required collateral, unknown;
- verified renewal government charge = $250.
Plain text
Identified surety-route cash components = P + K + $250.
This is not automatically $25,000 + $250. Other unresearched charges are not assumed zero.
If the commissioner instead accepts $25,000 of qualifying cash/security, that is a restricted security asset, not an expensed premium and not debtor trust cash. The hypothetical $10,000 customer balance is not used as provider collateral.
D. Claim amounts and aggregate form limit
Assume a later issued bond contains the publicly read aggregate-limit term and two otherwise asserted losses—already net of any trust recovery—are:
Plain text
Claim A: $9,000.
Claim B: $21,000.
Total asserted net losses: $30,000.
Penal sum: $25,000.
Arithmetic difference: $5,000.
This does not determine entitlement, priority, pro rata allocation, defenses or payment. It demonstrates why a $25,000 continuing aggregate bond is not automatically $25,000 for each claimant or each year.
E. Lapse
Assume a valid cancellation under the actual instrument becomes effective October 1, 2026, while replacement security begins October 2. The model contains a one-day gap. The ten-day information-update rule does not make that gap compliant.
The public form preserves liability incurred before its cancellation date; it does not establish coverage for all later conduct or cure the gap. Actual notices, endorsements and governing instruments are required. [C056.]
J. Source register
Access convention: Every entry marked fresh was accessed during the October 27, 2026 research session through public web tools. Individual fetch timestamps were not exposed. Statutory sections and multiple uses of one enactment are not treated as independent corroborating authorities.
| Source ID |
Issuer and complete literal HTTPS URL |
Actual read scope, version/effect and limitation |
| S_MN-P09-S001 |
Minnesota Revisor — https://www.revisor.mn.gov/statutes/cite/332A.02 |
Fresh relevant definitions: subds. 5, 8–10, 12; remote/delegated services and debtor-purpose predicates. 2025 display; exclusions not rerun. |
| S_MN-P09-S002 |
Minnesota Revisor — https://www.revisor.mn.gov/statutes/cite/332B.02 |
Fresh relevant subds. 10, 13, 16 and warnings. 2025 display; no actual exemption determination. |
| S_MN-P09-S003 |
Minnesota Revisor — https://www.revisor.mn.gov/statutes/cite/332A.13 |
Fresh operative body; reliance confined to necessary subds. 6–9. Fee calculations not rerun. |
| S_MN-P09-S004 |
Minnesota Revisor — https://www.revisor.mn.gov/statutes/cite/332B.06 |
Fresh targeted subds. 5–6 and complete subd. 8; exact exchange-check purpose and commingling condition. |
| S_MN-P09-S005 |
Minnesota Revisor — https://www.revisor.mn.gov/statutes/cite/332A.08 |
Fresh complete operative grounds; relied particularly on clauses (2), (7)–(11). |
| S_MN-P09-S006 |
Minnesota Revisor — https://www.revisor.mn.gov/statutes/cite/332B.05 |
Fresh complete subds. 1–3 and cross-references. |
| S_MN-P09-S007 |
Minnesota Revisor — https://www.revisor.mn.gov/statutes/cite/332A.11 |
Fresh complete cancellation/termination body. No real notice computation. |
| S_MN-P09-S008 |
Minnesota Revisor — https://www.revisor.mn.gov/statutes/cite/332B.07 |
Fresh complete body; relied narrowly on principal-return/termination distinctions. Unusual fee exception preserved, not reconstructed. |
| S_MN-P09-S009 |
Minnesota Revisor — https://www.revisor.mn.gov/statutes/cite/332A.12 |
Fresh complete records, annual-report and debtor-statement provisions. |
| S_MN-P09-S010 |
Minnesota Revisor — https://www.revisor.mn.gov/statutes/cite/332B.08 |
Fresh complete records, reporting, activity-statement and access provisions. |
| S_MN-P09-S011 |
Minnesota Revisor — https://www.revisor.mn.gov/statutes/cite/332A.19 |
Fresh complete operative examination/audit/investigation paragraph. |
| S_MN-P09-S012 |
Minnesota Revisor — https://www.revisor.mn.gov/statutes/cite/332B.14 |
Fresh complete operative examination/audit/investigation paragraph. |
| S_MN-P09-S013 |
Minnesota Revisor — https://www.revisor.mn.gov/statutes/cite/332A.04 |
Fresh subds. 1(3), 3–6; bond amount, qualifications, alternatives, conditions and claim gateway. Old accreditation text not reapplied. |
| S_MN-P09-S014 |
Minnesota Revisor — https://www.revisor.mn.gov/statutes/cite/332A.06 |
Fresh complete renewal, continuous-bond, prior-year measure and waiver language. |
| S_MN-P09-S015 |
Minnesota Revisor — https://www.revisor.mn.gov/statutes/cite/332B.04 |
Fresh subds. 3–4, 6–7; exact incorporated subdivisions and settlement-specific claim/renewal text. |
| S_MN-P09-S016 |
Minnesota Revisor — https://www.revisor.mn.gov/statutes/cite/332A.07 |
Fresh current ten-day update rule and registration-inspection provision. Historical 90-day text not used. |
| S_MN-P09-S017 |
Minnesota Revisor — https://www.revisor.mn.gov/statutes/cite/332A.09 |
Fresh complete sanctions/procedure/receiver body; full administrative litigation not analyzed. |
| S_MN-P09-S018 |
Minnesota Revisor — https://www.revisor.mn.gov/statutes/cite/45.027 |
Fresh necessary subd. 1 and 1a; examination access and request/report clocks. 2025 history noted; not full amendment-chain certification. |
| S_MN-P09-S019 |
Minnesota Revisor — https://www.revisor.mn.gov/statutes/cite/46.131 |
Fresh relevant assessment/examination provisions, especially subds. 2–4, 8–9. No actual rate, assessment or interest calculation. |
| S_MN-P09-S020 |
Minnesota Revisor — https://www.revisor.mn.gov/statutes/cite/332A.10 |
Fresh narrow required refund/service terms and subd. 4 cross-reference relevant to nonwaiver; no arbitration or suitability rerun. |
| S_MN-P09-S021 |
Minnesota Legislature/Revisor — https://www.revisor.mn.gov/laws/2007/0/57/ |
Fresh selected article 3 §§47, 49, 51, 54–56, 61 and applicable express dates. One enacted document, not a full-act sequential read. |
| S_MN-P09-S022 |
Minnesota Legislature/Revisor — https://www.revisor.mn.gov/laws/2008/0/210/ |
Fresh §§4–8, 10 and signature. Effective April 22, 2008; specific availability/disbursement and reporting changes. |
| S_MN-P09-S023 |
Minnesota Legislature/Revisor — https://www.revisor.mn.gov/laws/2009/0/37/ |
Fresh selected article 4 §§21–25, 31, especially §23(8). Original exchange-check text read; full act-level effective-date chain held. |
| S_MN-P09-S024 |
Minnesota Legislature/Revisor — https://www.revisor.mn.gov/laws/2009/0/178/ |
Fresh targeted article 1 §66 custody wording. No claim this act first created the exchange-check rule. |
| S_MN-P09-S025 |
Minnesota Revisor — https://www.revisor.mn.gov/statutes/2026/table2?full=&page=5&per_page=500&year=2026 |
Fresh targeted regular-session index entries around Chapters 332A/332B. Index, not consolidated operative text. |
| S_MN-P09-S026 |
Minnesota Commerce — https://mn.gov/commerce-stat/pdfs/dm-surety-bond.pdf |
Fresh complete one-page DMP blank bond; clauses 1–6 and signature blocks; visually inspected. Undated, no current ESB acceptance established. |
| S_MN-P09-S027 |
Minnesota Commerce — https://mn.gov/commerce-stat/pdfs/debt-settlement-bond.pdf |
Fresh complete one-page settlement blank bond; clauses 1–6 and signature blocks; visually inspected. Same version limitation. |
| S_MN-P09-S028 |
Minnesota Commerce — https://mn.gov/commerce/money/non-depository/debt-services/ |
Fresh narrow ESB/security and annual-report instructions, lines 79–91 and 108–120. No failed-checklist rerun. |
| S_MN-P09-S029 |
Minnesota Revisor rule inventory — https://www.revisor.mn.gov/rules/agency/120 |
Fresh Commerce chapter inventory inspection. Index-only; no inference that all possible orders/rules were exhausted. |
| S_MN-P09-S030 |
Minnesota Revisor — https://www.revisor.mn.gov/rules/2675/ |
Fresh chapter contents/index inspection. Unrelated bank/trust-company rules not adopted as DMP rules. |
| S_MN-P09-S031 |
Minnesota Commerce — https://mn.gov/commerce/business/rulemaking.jsp |
Fresh rulemaking description and rendered page. Dynamic listing limitation; no absence-of-rule certification. |
| S_MN-P09-S032 |
OFR/eCFR — https://www.ecfr.gov/current/title-16/chapter-I/subchapter-C/part-310/section-310.4 |
Fresh complete (a)(5)(ii)(A)–(E), necessary (i) cross-reference and limited billing-consent text. Display through October 23, 2026. |
| S_MN-P09-S033 |
OFR/eCFR — https://www.ecfr.gov/current/title-16/chapter-I/subchapter-C/part-310/section-310.2 |
Fresh relevant customer, debt-relief, person, seller, telemarketer and telemarketing definitions. |
| S_MN-P09-S034 |
OFR/eCFR — https://www.ecfr.gov/current/title-16/chapter-I/subchapter-C/part-310/section-310.6 |
Fresh responsive exemption conditions and carve-outs, particularly (b)(3)–(7). No universal coverage finding. |
| S_MN-P09-S035 |
FTC, 75 FR 48458 — https://www.federalregister.gov/documents/2010/08/10/2010-19412/telemarketing-sales-rule |
Fresh targeted III.C.5(c)–(d), dedicated accounts and effective date, printed pp. 48490–48491. HTML final-rule explanation, not fresh fee-performance analysis. |
| S_MN-P09-S036 |
Minnesota Commerce, Guidance 20-09 — https://mn.gov/commerce-stat/pdfs/comm-reg-guidance-20-09.pdf |
Fresh complete two-page March 30, 2020 guidance; both pages visually inspected. Historical 2020 deadline extension; underlying referenced order not separately read. |
Failed, partial, and discovery routes
An initial historical-act link did not return the needed 2007 text; the direct S021 URL succeeded. The current annual-report body, commissioner-prescribed consent notice, and currently accepted ESB instrument were not obtained. The retrieved agency page describes distribution of the report but does not supply its current contents.
Searches for annual reports produced unrelated insurer financial statements; those were not used as DMP templates. Proposed bills and historical summaries concerning settlement custody were discovery only, not substituted for enacted law.
No identified inaccessible judicial opinion is presumed to contain a missing answer. The judicial/administrative gap is a bounded no-responsive-body-found result.
K. Atomic claim register
Confidence: “High—text” means supported by the opened body within its stated version. “Conditional” requires actual facts or interpretation. “Held” identifies a missing construction or instrument.
| Claim |
Actor/predicate, step or clock, consequence |
Authority/pinpoint |
Confidence/limit |
| C001 |
Minnesota and federal currentness is limited to the retrieved displays and targeted index check |
S001–S025, S032–S034 |
High as version finding; broader consolidation held |
| C002 |
Relevant DMP enactment dates and 2008 availability/disbursement changes are established |
S021 selected sections; S022 §§4–8,10 |
High—enacted text |
| C003 |
Settlement exchange-check text originated in the inspected 2009 enactment; complete original date chain remains held |
S023 §23(8); S024 §66 |
Text high; date limitation explicit |
| C004 |
Covered DMP activity includes consumer-purpose periodic receipt/distribution |
S001 subd.9 |
High—text; actual model needed |
| C005 |
Settlement activity can include accumulation advice; custody is separately restricted |
S002 subd.10; S004 subd.8 |
High—text |
| C006 |
Remote/delegated service and statutory “registrant” definitions prevent label-only avoidance |
S001 subds.8,12; S002 subds.13,16 |
High—text; exclusions not decided |
| C007 |
Receipt does not establish fee earning or provider beneficial use |
S003(8); S004(8); necessary fee cross-references |
Conditional analytical consequence; fee earning held |
| C008 |
DMP payments enter trust when funds are available |
S003(8); S022 §8 |
High—text |
| C009 |
DMP provider-money commingling is limited to necessary bank minimums avoiding charges |
S003(8) |
High—text; actual bank condition required |
| C010 |
DMP disbursements originate in trust; auxiliary account is debtor/creditor-only |
S003(8); S022 §8 |
High—text; fee-sweep permission not supplied |
| C011 |
DMP creditor timing runs from receipt, ordinarily within42 days or earlier creditor due date |
S003(9) |
High—text |
| C012 |
DMP longer holds require the stated reasonable accumulation or returned-payment/net-interest facts |
S003(9) |
High—text; not settlement permission |
| C013 |
DMP consent failure and creditor withdrawal have distinct notice predicates and clocks |
S003(6)–(7) |
High—text; prescribed form unavailable |
| C014 |
Settlement custody requires exchange-check purpose and no more than42 days |
S004(8); S023 §23(8) |
High—text; term/application gaps remain |
| C015 |
Settlement separate trust and imprest exception have the exact minimum-balance limitation |
S004(8) |
High—text |
| C016 |
No authority established for importing DMP hold exceptions or auxiliary route into settlement |
S003–S004 comparison |
Textual boundary; broader law not exhausted |
| C017 |
Actual trust cash must cover summed debtor escrow balances; B incorporates the relevant grounds |
S005(10); S006(1)–(2) |
High—text |
| C018 |
Negative debtor balances, provider receivables and bond amounts do not demonstrate actual cash coverage |
C017; models |
Analytical consequence; no accounting-standard claim |
| C019 |
Multi-account/in-transit treatment and detailed bank-control requirements remain unresolved |
S003–S005; search record |
Held |
| C020 |
DMP cancellation and termination impose the specified unexpended-funds returns |
S007(1),(3),(4) |
High—text; actual notice facts needed |
| C021 |
Settlement cancellation wording differs; no automatic A.11 principal-return transplant |
S008(1),(3),(4) |
High textual distinction; exact ordinary return application held |
| C022 |
Records retained at least six years after final transaction entry |
S009(1); S010(1) |
High—text |
| C023 |
Both regimes require monthly/final statements, debtor access and retained feasibility analysis |
S009(2); S010(3) |
High—text; actual records absent |
| C024 |
Settlement statements additionally report activities and creditor communications/progress |
S010(3)(a)(2) |
High—text |
| C025 |
Annual report due March15 for preceding calendar year on prescribed form |
S009(1a); S010(2) |
High—text; form contents held |
| C026 |
Guidance20-09’s April30 extension was for specified2020 reports |
S036 pp.1–2 |
High historical finding; not current extension |
| C027 |
CPA audit may be required once per calendar year; qualifying prior audit may suffice |
S011–S012 |
High—text; not automatic yearly audit |
| C028 |
Regulator examinations and requests have the read access/report-response provisions |
S018(1),(1a) |
High—text; broader enforcement deferred |
| C029 |
Examination/assessment costs are provider-government obligations |
S009–S010(1); S019(2)–(4),(8)–(9) |
High—text; no actual amount |
| C030 |
No fixed reconciliation cadence, cutoff or assurance standard was established |
S005,S009–S012; search |
Bounded finding, not absence of all rules |
| C031 |
Application bond is commissioner-determined, minimum$5,000 |
S013(4); S015(3) |
High—text |
| C032 |
Applicant is obligor; surety must have stated Minnesota authorization |
S013(4); S015(3) |
High—text; no actual insurer checked |
| C033 |
Substitute cash/securities require commissioner acceptance and prescribed deposit |
S013(4); S015(3) |
High—text; no automatic alternative |
| C034 |
Branch bonding and possible employee fidelity requirements are distinct |
S013(4) |
High—text; actual instrument arrangement held |
| C035 |
Bond beneficiaries and lawful/nonfraudulent-performance conditions are statutory |
S013(5); S015(3) |
High—text |
| C036 |
Statutory default/claim gateways permit stated actions for loss up to face amount without joining provider |
S013(6); S015(4) |
High—text; no recovery determination |
| C037 |
DMP renewal permits commissioner-required amount tied to largest prior-year trust accrual |
S014 |
High—text; measurement conventions held |
| C038 |
Settlement renewal does not reproduce A.06’s prior-year formula |
S015(6) |
High textual distinction |
| C039 |
Calendar/rolling period, multiple accounts, imprest and in-transit inclusion are not defined by read metric text |
S014; search |
Held |
| C040 |
Continuous-security duty and ten-day information updates are separate |
S014; S015(6)–(7); S016(1) |
High—text; no lapse grace inferred |
| C041 |
Security failure, insolvency and cash/payment failures connect to sanctions and possible receiver procedure |
S005–S006; S017 |
High gateway finding; full enforcement deferred |
| C042 |
Public blank bonds are undated; current page requires ESB |
S026–S028 |
High as retrieved-public-material finding |
| C043 |
Blank forms provide30-day certified-mail cancellation and preserve earlier liability |
S026–S027, clause4 |
Form-only; actual issued instrument needed |
| C044 |
Blank forms use one aggregate penal limit and pre-payment notice to Commerce |
S026–S027, clauses5–6 |
Form-only; no automatic per-consumer amount |
| C045 |
Penal sum, premium, collateral, security and government charges are distinct |
S013–S015; S022 §4; forms |
High distinction; unknown costs remain variables |
| C046 |
Federal account comparison requires actual TSR coverage/exemption predicates |
S033–S034 |
Conditional; no universal reach |
| C047 |
Federal qualifying account requires insured institution, customer ownership and customer interest |
S032(a)(5)(ii)(A)–(B) |
High—text |
| C048 |
Federal administrator independence and no-referral-compensation conditions are separate |
S032(a)(5)(ii)(C)–(D) |
High—text; actual control facts absent |
| C049 |
Federal exit/return provision uses seven business days and qualifying fee exception |
S032(a)(5)(ii)(E) |
High—text; state earning not established |
| C050 |
Relevant federal account provision’s adoption/effect was read |
S035 III.C.5(c)–(d) |
Historical Commission explanation; current text controls |
| C051 |
State segregation/imprest and federal independence do not establish one another |
S003–S004; S032 |
Conditional combined analysis |
| C052 |
No responsive controlling interpretation was located and opened for identified control/metric gaps |
Search and index record |
Bounded result, not no-authority certificate |
| C053 |
M01 reconciles two debtors and a necessary minimum; fee branch remains conditional |
M01; C008–C010,C017 |
Arithmetic checked; no fee approval |
| C054 |
M02 distinguishes failed, in-transit and reversed transfers and exposes a shortfall |
M02; C011,C017–C019 |
Hypothetical; transfer-finality law deferred |
| C055 |
M03 tests exchange purpose/time separately from creditor release |
M03; C014–C016 |
Qualifying instrument/release stipulated |
| C056 |
M04 separates metric, required bond, provider outlay, losses and lapse |
M04; C031–C045 |
Hypothetical commissioner/instrument facts essential |
| C057 |
Current report, consent-notice and ESB contents remain unverified |
S028, S036; retrieval record |
Exact missing documents identified |
| C058 |
Prior P01/P06 rows retain their original status/provenance |
Supplied reviewed context |
Reuse, not newly accepted coverage |
| C059 |
Missing/inaccessible evidence is not treated as nonexistent authority |
Research limitations |
Express limitation |
| C060 |
No actual account, provider, fee, bond recovery or parent-state acceptance is established |
Entire scope |
Express limitation |
L. Granular coverage and next evidence
| Requested workflow or issue |
Status |
Claims/models |
Exact missing evidence or next action |
| DMP actor/model/consumer-purpose predicate |
Answered textually |
C004–C006 |
Actual service and debtor facts |
| Settlement actor/model predicate |
Answered textually |
C005–C006 |
Actual custody/control and service facts |
| Remote Minnesota-domiciled debtor |
Answered textually |
C006 |
Actual domicile and connections |
| Business/mixed-purpose activity |
Partial |
C004–C006 |
Purpose evidence and applicable service limb |
| Delegates/processors |
Partial application |
C006,C019 |
Agreements, control and actual funds flow |
| Noncustodial/direct-creditor model |
Partial |
C005–C006 |
Proof provider does not receive/control funds |
| Debtor money versus provider assets |
Answered at statutory-control level |
C007,C047 |
Insolvency, tracing and bank-law ownership issues deferred |
| Receipt versus availability |
Answered |
C008,C011 |
Actual receipt and availability records |
| Failed initial transfer |
Answered in model |
M02,P02 |
Real bank finality facts |
| Later reversal |
Answered in model; law boundary held |
M02,P03 |
Actual reversal rights and liability allocation |
| DMP separate trust |
Answered |
C008 |
Actual account documents |
| DMP minimum-balance commingling |
Answered conditionally |
C009,M01 |
Bank-required minimum and necessary amount |
| Settlement imprest |
Answered conditionally |
C015 |
Same factual proof |
| Provider operating reserve in trust |
No authority established |
P06 |
Any claimed separate authority |
| DMP authorized disbursement routes |
Answered narrowly |
C010 |
Actual account purpose and transfers |
| Provider-fee routing versus entitlement |
Separated; earning deferred |
C007,C010,M01 |
Independent fee authorization |
| Auxiliary account under actual-cash test |
Unresolved |
C019 |
Responsive interpretation or regulator instruction |
| DMP42-day/earlier-creditor clock |
Answered |
C011 |
Actual creditor due dates |
| DMP sum-certain exception |
Answered textually |
C012,P10 |
Reasonableness and obligation evidence |
| Returned-payment/net-interest exception |
Answered textually |
C012 |
Actual exception facts |
| Creditor consent failure |
Answered; form held |
C013 |
Current prescribed notice |
| Creditor withdrawal/undistributed balance |
Answered conditionally |
C013,P09 |
Notice, remaining obligation and funds decision |
| Settlement exchange-check purpose |
Answered textually |
C014 |
Instrument qualification |
| Meaning of exchange checks/electronic substitute |
Unresolved |
C016,M03 |
Controlling definition or interpretation |
| Settlement42-day endpoint/outstanding check |
Unresolved application |
C014,C016 |
Holding/clearance facts and authority |
| Settlement long-term accumulation |
No permission established |
P12,M03 |
Distinct lawful model/authority required |
| DMP exceptions imported to settlement |
Not adopted |
C016 |
Actual incorporation or other authority |
| Individual debtor subledgers |
Required support established |
C017,C022–C024 |
Actual records |
| Aggregate actual-cash comparison |
Answered |
C017–C018,M01–M02 |
Real bank and debtor balances |
| Negative-balance netting/cross-debtor use |
Not justified |
C018,M02 |
No substitute for intact debtor funds |
| In-transit asset versus actual cash |
Unresolved legal treatment |
C019,M02 |
Responsive authority and bank mechanics |
| Monthly debtor statements |
Answered |
C023 |
Actual statements |
| Settlement activity statements |
Answered |
C024 |
Actual activity/communication records |
| Final/cancellation statements |
Answered |
C023 |
Closing records |
| Six-year retention trigger |
Answered |
C022 |
Actual final-entry identification |
| Debtor access/confidentiality |
Answered narrowly |
C023 |
Broader privacy/data law deferred |
| Reconciliation cadence/cutoff |
Unresolved |
C030 |
Prescribed rule, order or examination instruction |
| Annual report deadline/period |
Answered |
C025 |
Current prescribed form |
| Current annual-report fields |
Unresolved |
C057 |
Official current form/version |
| Historical2020 extension |
Answered as historical |
C026 |
Not applied to current reporting |
| Optional CPA audit requirement |
Answered |
C027 |
Any actual demand and scope |
| Regulator inspection/request clocks |
Answered narrowly |
C028 |
Actual request/order |
| Examination costs |
Answered as obligation |
C029 |
Actual assessment/rate |
| DMP cancellation returns |
Answered |
C020 |
Actual notice/effective date |
| Settlement ordinary-cancellation principal return |
Partial |
C021 |
Exact contract/other applicable law and interpretation |
| Automatic termination return |
Answered textually |
C020–C021 |
Proof debts and lawful fees paid |
| Bond minimum/commissioner amount |
Answered |
C031 |
Actual required amount |
| Surety qualifications/obligor |
Answered |
C032 |
Actual insurer and issued bond |
| Substitute security |
Answered conditionally |
C033 |
Commissioner acceptance and deposit evidence |
| Branch/additional office bonding |
Answered textually |
C034 |
Actual locations and approved structure |
| Employee fidelity requirement |
Answered as discretionary |
C034 |
Actual commissioner requirement |
| Beneficiary/condition |
Answered |
C035 |
Actual covered loss |
| Limited statutory claim gateway |
Answered |
C036 |
Claim facts; full litigation deferred |
| DMP prior-year bond measure |
Partial |
C037,C039,M04 |
Measurement period and inclusion instructions |
| Settlement bond metric distinction |
Answered |
C038 |
Any separately imposed commissioner amount |
| Peak versus cumulative receipts |
Illustrated conditionally |
M04 |
No universal accounting convention declared |
| Continuous bond/security |
Answered |
C040 |
Actual effective dates/endorsements |
| Cancellation notice terms |
Public form read; current instrument held |
C043 |
Accepted ESB/issued bond |
| Aggregate penal limit |
Public form read |
C044,M04 |
Actual instrument and competing claims |
| Premium/collateral/government charges |
Separated |
C045,M04 |
Actual quote/contract; no invented price |
| Lapse and update duty |
Answered as separate obligations |
C040–C041,P17 |
Actual notices and regulatory action |
| Provider insolvency/shortfall |
Gateway established |
C017,C041,M02 |
Actual solvency, restitution and enforcement facts |
| Federal ownership/interest |
Answered conditionally |
C046–C047 |
Coverage and account facts |
| Federal administrator independence |
Answered conditionally |
C048,P18 |
Ownership/control/affiliation evidence |
| Federal referral-compensation condition |
Answered narrowly |
C048 |
Actual account-related consideration |
| Federal exit/return clock |
Answered conditionally |
C049 |
Request, account and independently lawful fee facts |
| State trust versus federal account |
Distinguished |
C051 |
Actual arrangement needed |
| P01–P18 fictional postures |
Completed individually above |
Section H |
No actual transaction approval |
| M01 aggregate/two-debtor/minimum ledger |
Completed conditionally |
C053 |
Fee branch expressly held |
| M02 return/reversal/shortfall ledger |
Completed with control gap exposed |
C054 |
Finality and cash-test interpretation |
| M03 exchange-purpose/closing ledger |
Completed conditionally |
C055 |
Qualifying instruments stipulated |
| M04 bond measure/outlay/claim/lapse |
Completed conditionally |
C056 |
Actual commissioner/instrument facts |
| Current operative rules/adoption coverage |
Partial |
C052 |
Responsive body/order not located; broader search remains |
| Published judicial/binding administrative construction |
Not located/read for exact gaps |
C052 |
Responsive published authority; no citator clearance |
| P01/P06 contribution crosswalk |
Preserved below |
C058 |
No duplicate accepted coverage |
| Ordinary fees/earning |
Deferred |
C007,C060 |
P05/P06 holds unchanged |
| Referrals/credit repair/CROA |
Deferred |
C060 |
Separate components; P08 not used |
| Actual registry/provider/NMLS checklist |
Deferred |
C057,C060 |
P04 scope and holds preserved |
| Full contract suitability |
Deferred |
C060 |
Actual contract and separate requirements |
| Full surety litigation/priority/defenses |
Deferred |
C036,C044,C060 |
Separate remedies dossier |
| Banking/UCC/insolvency/deposit insurance/money transmission |
Individually deferred |
C019,C060 |
Necessary jurisdiction-specific operative bodies |
| Federal recordkeeping |
Deferred |
C060 |
Separate rule/currentness review |
| Collection/validation/service/default/vacatur/limitations |
Individually deferred |
C060 |
Separate parent-state components |
| Wage/bank/other-property enforcement |
Deferred |
C060 |
No account seizure or exemption analysis |
| Secured debt/sector issues |
Deferred |
C060 |
Actual product/activity facts |
| Local/tribal/territorial/sovereign issues |
Unresolved/deferred |
C006,C060 |
Specific jurisdiction and governing authority |
| Full state/parent/A066/A097/A098 acceptance |
Not established |
C060 |
Remaining dimensions remain open |
M. Contribution crosswalk—original rows preserved
| Original record |
Original status |
Original claims |
Exact original next action/hold |
| P01 — Custodial DMP |
Partial |
C004–C005 |
Complete statutory funds requirements in later pass |
| P06 — Trust-to-provider/creditor/debtor routing |
Answered narrowly |
C020 |
Full trust controls and bank documentation deferred |
| P06 — Full trust/bond compliance |
Deferred |
C045 |
Account-control, bond and broader supervision component |
PASS-09 contribution: Fresh statutory custody, actual-cash, records, supervision and security findings now supplement those rows. They do not rewrite the originals or convert narrow prior conclusions into full acceptance.
The supplied P06 review of October 27, 2026, 10:32:00.653068Z remains a same-coordinator scoped review. P04’s dated public operational review and unverified current checklist/instrument findings remain separate. No fee entitlement, account approval or complete bond compliance is inherited from them.
N. Researcher self-check and final disposition
Actually read: The identified current statutory bodies and necessary cross-references; selected material enacted amendments; the targeted 2026 index; the complete public blank bond forms; narrow current Commerce reporting/security instructions; the historical 2020 reporting guidance; current federal account conditions; and the responsive final-rule explanation. The bond forms and reporting-guidance PDF pages were visually inspected.
Not established: A complete current ESB instrument, current prescribed annual-report or consent-notice form, a controlling interpretation of exchange checks or multi-account actual cash, a prescribed reconciliation frequency, complete bond-metric conventions, or a responsive controlling judicial/administrative construction. Broader banking, insolvency, payment-finality, insurance and surety-remedy law remains separate.
The models preserve unsettled items, debtor-specific liabilities, actual creditor payments, provider money and bond obligations as different categories. Correct arithmetic does not establish lawful custody, withdrawal, earning or recovery.
Bottom line: Minnesota requires more than a separate account and a $5,000 bond. The custody purpose, timing, debtor-level liabilities, actual cash, permitted routing, reporting and continuous security must each be supported. The principal statutory controls are now documented; the identified account-document, instrument and interpretation gaps remain explicit.
No actual account, provider, claimant, fee, bond recovery, operational permission, full-state or parent acceptance is established.
END S_MN PASS-09