SettleADebt.

FIND THE EXPLANATION

Which place’s debt rules apply—and who can help?

Use the notice, agreement, and places connected to the debt to find the right court, regulator, or legal-help service.

Explore Washington information →

This address preserves a dated source document behind the guide. The complete explanation covers the questions, comparisons and next steps for this subject.

If you came here to check a specific citation, open the original archive below. It includes its source dates and recorded qualifications.

Original source archive (optional)Original working documents, complete tables and revision history
About this archive

The explanation above is written for readers. These original working documents preserve the evidence trail, including technical language, dated passages and known corrections. They have not all received independent professional review. Use the marked limits before relying on a particular rule or figure.

DETAILED RESEARCH · EVIDENCE & LIMITS INCLUDED

SWA Regulated residential electricity and natural-gas arrears, disconnection and restoration

S_WA · pass-14Captured 2026-10-2819 tables · 114 claim records · 19 source recordsScoped coordinator review completed

Read the evidence with its boundaries. These are saved research components, including revisions. A scoped coordinator review checks selected evidence; it does not certify every claim, a complete jurisdiction, current law or individual applicability. Dates and access limits remain attached to the records.

How to read the research →

Read the related correction supplements

These components repair their stated scope. They do not replace every other finding in this research series.

SWA correction of the C070 coverage pinpoint →
SWA exact original-row completion →
Two bounded source corrections →
1. Exact two-cell replacements →

S_WA PASS-14 — Regulated residential electricity and natural-gas arrears, disconnection and restoration

The Washington statutory and administrative-code framework was freshly read for this component. It establishes conditional billing, notice, payment-plan, medical and restoration protections for service within the Utilities and Transportation Commission’s jurisdiction. It does not establish a uniform rule for every Washington utility.

A material currentness hold remains on collecting residential deposits and certain fees. The current WAC still displays deposit formulas and tariff-dependent fee provisions. An official commission announcement located during research describes temporary fee and deposit suspensions, but its body was inaccessible. A freshly read 2026 rulemaking agenda concerns possible permanent changes; an agenda is not an adopted rule or proof that an earlier suspension ended. Accordingly, this report identifies the codified formulas without treating them as verified present authority to collect the affected charges. See C017, C048, C107 and B005.

Other important distinctions are:

  • The statutory heat-alert provisions expressly include electric service, but do not list natural-gas service. Both administrative chapters separately require inclement-weather tariff provisions. Those are different sources and different conditions. See C078–C081.
  • Winter protection concerns residential space heating and requires the statutory assistance, income-verification and payment-plan conditions. It is not an unconditional seasonal moratorium. See C069–C077.
  • Medical protection has notification, certification, duration, repayment and further-notice conditions. The 2020 amendment removed an older restriction on repeat medical claims; the deleted restriction is not presented as current law. See C082–C088.
  • The 2016 adoption order expressly explains how the six-month underbilling restriction interacts with the older meter-test adjustment rule. That explanation resolves a specific source-level ambiguity; it does not supply judicial construction or an actual billing determination. See C035–C045. app.leg.wa.gov+4

Actual public-source access: October 28, 2026, America/Los_Angeles. Access date is separate from publication, filing, effectiveness and displayed source currency.

No earlier pass supplies a substantive premise here. Earlier findings, provenance and holds remain unchanged.

Reading key and limits

The source IDs identify instruments or official publications. Different sections and formats of the same instrument retain the same source ID. In the tables:

  • S008 means the selected provisions of chapter 480-100 WAC, Electric companies.
  • S009 means the selected provisions of chapter 480-90 WAC, Gas companies.
  • A reference such as S008/S009, -128(8) means the separately read electric and gas provisions, with their differences preserved.
  • Text established means the identified public text was read and supports the bounded proposition. It does not establish actual jurisdiction, entitlement, factual compliance or the absence of an overriding order.
  • Held means the identified evidence, incorporation, status or construction issue remains unresolved.

All abbreviated references such as C017, B005 and Q010 belong to this pass. Their full prefixes are S_WA-P14-C, S_WA-P14-B and S_WA-P14-Q.

1. Source and usage register

1.1 Statutes: instruments, literal URLs and read bounds

All entries below were freshly accessed on October 28, 2026. “Current” describes the official codified rendition retrieved, subject to the expressly identified status gaps.

Source ID Issuer, instrument and complete literal HTTPS URL Actual read bounds and use Displayed credits, status and limits
S_WA-P14-S001 Washington Legislature, RCW 80.01.040, Commission powers and duties. https://app.leg.wa.gov/RCW/default.aspx?cite=80.01.040 Complete (1)–(4), credits. Used for commission authority and rulemaking jurisdiction. Current codification; latest displayed credit 2007 c 234 §1, with earlier 1985/1961 credits. Historical originals not independently completed.
S_WA-P14-S002 Washington Legislature, selected chapter 80.04 RCW provisions. https://app.leg.wa.gov/RCW/default.aspx?cite=80.04.010; https://app.leg.wa.gov/RCW/default.aspx?cite=80.04.110; https://app.leg.wa.gov/RCW/default.aspx?cite=80.04.160; https://app.leg.wa.gov/RCW/default.aspx?cite=80.04&full=true Complete §.010 definitions and displayed notes; complete §.110(1)–(5), §.160, §.220, §.230, §.440 and §.500. Section .240 was read to identify the special exclusive recovery-procedure boundary; its limitation analysis is excluded. The whole chapter was not read. §.010 latest credit 2025 c 263 §1, preceded by 2024 c 348 §1 and 2021 c 65 §93; §.110 latest 2021 c 65 §94; §§.160/.500 latest 2011 c 214 §§8/10; §§.220/.230/.240/.440 carry 1961 codification and earlier enactment credits. The 2025 funding-condition issue is retained in S013/B026.
S_WA-P14-S003 Washington Legislature, RCW 54.16.040, PUD electric powers. https://app.leg.wa.gov/RCW/default.aspx?cite=54.16.040 Complete section, including provisos and credits. Used only for the electric rate/service jurisdiction boundary. Current codification; latest displayed credit 1955 c 390 §5. No PUD-specific customer policy or tariff read.
S_WA-P14-S004 Washington Legislature, RCW 54.48.040. https://app.leg.wa.gov/RCW/default.aspx?cite=54.48.040 Complete section and credit; cooperative/public-utility jurisdiction-preservation clause. Current codification; 1969 c 102 §4. Does not itself complete every cooperative classification.
S_WA-P14-S005 Washington Legislature, RCW 23.86.400. https://app.leg.wa.gov/RCW/default.aspx?cite=23.86.400 Complete (1)–(3), including the locally regulated utility definition and no-new-jurisdiction clause. Current; 1996 c 32 §1. Pole-attachment subject matter was not converted into retail arrears rules.
S_WA-P14-S006 Washington Legislature, RCW 24.06.600. https://app.leg.wa.gov/RCW/default.aspx?cite=24.06.600 Complete (1)–(3), including locally regulated cooperative/mutual scope. Current; 1996 c 32 §2. Same bounded use as S005.
S_WA-P14-S007 Washington Legislature, selected chapter 80.28 RCW provisions. https://app.leg.wa.gov/RCW/default.aspx?cite=80.28.010 Complete §.010(1)–(14), credits and displayed notes. Core winter, heat-alert, budget-plan and nonwaiver source. Current page credits 2026 c 137 §8; 2025 c 263 §4; 2023 c 105 §6, followed by earlier enactments. Material originals are separately registered below.
S_WA-P14-S007, additional usages https://app.leg.wa.gov/RCW/default.aspx?cite=80.28.050; https://app.leg.wa.gov/RCW/default.aspx?cite=80.28.060; https://app.leg.wa.gov/RCW/default.aspx?cite=80.28.080; https://app.leg.wa.gov/RCW/default.aspx?cite=80.28.110 Complete §.050; §.060(1)–(2); §.080(1)–(2), including exceptions and definitions; §.110(1)–(2), credits and notes. §§.050/.060/.080 latest credits 2025 c 263 §§8/9/14. Section .110 displays 2025 c 1 §2, Initiative 2066, and 2024 c 348 §6. Its initiative-dependent service branch is not given an unqualified validity/status conclusion. Emergency-power and utility-theft incorporations were not completed.

The jurisdiction conclusions rely on the statutory exclusions as well as the broad definitions. In particular, the inclusion of cities and towns in a definition does not erase RCW 80.04.500’s rate/service-order limitation. app.leg.wa.gov+5

1.2 Administrative-code instruments and section-by-section usage

Source ID Issuer/instrument and complete literal HTTPS URL Actual extent and status
S_WA-P14-S008 Washington Utilities and Transportation Commission; Washington Code Reviser, chapter 480-100 WAC. https://app.leg.wa.gov/WAC/default.aspx?cite=480-100&full=true Selected complete sections listed below, read through section renditions and chapter windows. The whole chapter was not read. Current codified text; individual section credits control, not the chapter’s latest-update marker.
S_WA-P14-S009 Washington Utilities and Transportation Commission; Washington Code Reviser, chapter 480-90 WAC. https://app.leg.wa.gov/WAC/default.aspx?cite=480-90&full=true Same bounded approach, independently reading the gas provisions. Gas -008 and -168 were completed through this chapter rendition after individual-route failures.
S_WA-P14-S010 Washington UTC; Code Reviser, selected chapter 480-07 WAC provisions. https://app.leg.wa.gov/WAC/default.aspx?cite=480-07-110; https://app.leg.wa.gov/WAC/default.aspx?cite=480-07-305; https://app.leg.wa.gov/WAC/default.aspx?cite=480-07-910; https://app.leg.wa.gov/WAC/default.aspx?cite=480-07&full=true Complete -110(1)–(4), -305(1)–(5), -910(1)–(5), and -370(1)–(8) through the chapter rendition. Used only for exemption and complaint-process boundaries. Latest relevant credits: WSR 17-06-051, effective March 31, 2017, and WSR 18-18-041, effective September 29, 2018, for -910. Full adjudicative practice is excluded.

Section usage matrix for S008 and S009

Each row records complete operative section text and displayed credits read, except where the row expressly limits use. The two URLs represent separate electric and gas provisions; neither is assumed from the other.

Section and title Literal electric URL — S008 Literal gas URL — S009 Relevant displayed version credit and use
-003, Application of rules https://app.leg.wa.gov/WAC/default.aspx?cite=480-100-003 https://app.leg.wa.gov/WAC/default.aspx?cite=480-90-003 WSR 03-24-028, filed November 24, 2003, effective January 1, 2004; earlier 2001 credits. Jurisdiction, tariffs, exemptions.
-008, Exemptions https://app.leg.wa.gov/WAC/default.aspx?cite=480-100-008 https://app.leg.wa.gov/WAC/default.aspx?cite=480-90&full=true, exact §480-90-008 WSR 05-06-051, filed February 28, 2005, effective March 31, 2005; -07-110 incorporation read.
-013, Additional requirements https://app.leg.wa.gov/WAC/default.aspx?cite=480-100-013 https://app.leg.wa.gov/WAC/default.aspx?cite=480-90-013 WSR 01-11-004 / 01-11-003, filed May 3, 2001, effective June 3, 2001. Statutory duties preserved.
-023, Definitions https://app.leg.wa.gov/WAC/default.aspx?cite=480-100-023 https://app.leg.wa.gov/WAC/default.aspx?cite=480-90-023 WSR 20-16-077, effective August 29, 2020; earlier 2005/2001 credits. Privacy-law incorporations remain partly open.
-028, Tariffs and special contracts https://app.leg.wa.gov/WAC/default.aspx?cite=480-100-028 https://app.leg.wa.gov/WAC/default.aspx?cite=480-90-028 2001 credits above. Chapter 480-80 filing/special-contract framework not completed.
-103, Information to consumers https://app.leg.wa.gov/WAC/default.aspx?cite=480-100-103 https://app.leg.wa.gov/WAC/default.aspx?cite=480-90-103 WSR 11-06-032, filed February 25, 2011, effective March 28, 2011; earlier 2001 credits. Generic information duties only.
-108, Application for service https://app.leg.wa.gov/WAC/default.aspx?cite=480-100-108 https://app.leg.wa.gov/WAC/default.aspx?cite=480-90-108 2001 credits. Used for service/application and resale boundaries; no application examined.
-113, Residential deposits https://app.leg.wa.gov/WAC/default.aspx?cite=480-100-113 https://app.leg.wa.gov/WAC/default.aspx?cite=480-90-113 WSR 02-21-066, filed October 16, 2002, effective January 1, 2003; earlier 2001 credits. Original-access and current suspension holds apply.
-123, Refusal of service https://app.leg.wa.gov/WAC/default.aspx?cite=480-100-123 https://app.leg.wa.gov/WAC/default.aspx?cite=480-90-123 WSR 03-24-028; earlier 01-24-076 / 01-24-077, filed December 3, 2001, effective January 3, 2002. Different subsection numbering preserved.
-128, Disconnection https://app.leg.wa.gov/WAC/default.aspx?cite=480-100-128 https://app.leg.wa.gov/WAC/default.aspx?cite=480-90-128 Complete (1)–(11). WSR 20-16-077, filed July 29, 2020, effective August 29, 2020; earlier 2001 credits. Central notice/medical/dispute source.
-133, Reconnection https://app.leg.wa.gov/WAC/default.aspx?cite=480-100-133 https://app.leg.wa.gov/WAC/default.aspx?cite=480-90-133 Complete (1)–(3); WSR 20-16-077. Fee/deposit currentness hold retained.
-138, Payment arrangements https://app.leg.wa.gov/WAC/default.aspx?cite=480-100-138 https://app.leg.wa.gov/WAC/default.aspx?cite=480-90-138 Complete (1)–(3); 2001 credits. Stale -128(2)(f) reference identified.
-143, Winter program https://app.leg.wa.gov/WAC/default.aspx?cite=480-100-143 https://app.leg.wa.gov/WAC/default.aspx?cite=480-90-143 Complete (1)–(3); 2001 credits. Must be read with newer RCW 80.28.010 and S014.
-153, Customer information https://app.leg.wa.gov/WAC/default.aspx?cite=480-100-153 https://app.leg.wa.gov/WAC/default.aspx?cite=480-90-153 Complete (1)–(21); latest WSR 20-16-077, preceding 2011 and older privacy-rule credits. Only necessary medical/account-information safeguards used.
-168, Access; identification https://app.leg.wa.gov/WAC/default.aspx?cite=480-100-168 https://app.leg.wa.gov/WAC/default.aspx?cite=480-90&full=true, exact §480-90-168 Complete (1)–(2); 2001 credits. No actual access authorization inferred.
-173, Complaints/disputes https://app.leg.wa.gov/WAC/default.aspx?cite=480-100-173 https://app.leg.wa.gov/WAC/default.aspx?cite=480-90-173 Complete (1)–(4); WSR 03-24-028, earlier 2001 credits.
-178, Billing/payment date https://app.leg.wa.gov/WAC/default.aspx?cite=480-100-178 https://app.leg.wa.gov/WAC/default.aspx?cite=480-90-178 Complete (1)–(8); WSR 20-16-077, 16-06-038, 11-06-032, earlier 2001 credits. Billing-correction original read in S015.
-179, Electronic information https://app.leg.wa.gov/WAC/default.aspx?cite=480-100-179 https://app.leg.wa.gov/WAC/default.aspx?cite=480-90-179 Complete introduction and (1)–(7); WSR 11-06-032, effective March 28, 2011.
-183, Complaint meter tests https://app.leg.wa.gov/WAC/default.aspx?cite=480-100-183 https://app.leg.wa.gov/WAC/default.aspx?cite=480-90-183 Complete (1)–(6); 2001 credits. Read with newer -178 and S015; stale references retained.
-188, Payment locations https://app.leg.wa.gov/WAC/default.aspx?cite=480-100-188 https://app.leg.wa.gov/WAC/default.aspx?cite=480-90-188 Complete (1)–(4); 2001 credits. No actual location searched.
-193, Posting tariffs https://app.leg.wa.gov/WAC/default.aspx?cite=480-100-193 https://app.leg.wa.gov/WAC/default.aspx?cite=480-90-193 Complete (1)–(2); latest 02-11-081, filed May 14, 2002, effective June 17, 2002.
-194, Proposed tariff changes https://app.leg.wa.gov/WAC/default.aspx?cite=480-100-194 https://app.leg.wa.gov/WAC/default.aspx?cite=480-90-194 Complete electric introduction/(1)–(4) and gas introduction/(1)–(5). WSR 11-06-032, earlier 02-11-081. Gas purchased-gas-adjustment exception is separate; no actual rate proposal read.
-195, Other tariff-change notices https://app.leg.wa.gov/WAC/default.aspx?cite=480-100-195 https://app.leg.wa.gov/WAC/default.aspx?cite=480-90-195 Complete (1)–(3); 02-11-081. Notice requirement, not independent fee authorization.
-197, Public-testimony notice https://app.leg.wa.gov/WAC/default.aspx?cite=480-100-197 https://app.leg.wa.gov/WAC/default.aspx?cite=480-90-197 Complete (1)–(4); 02-11-081. Read because -194 incorporates its alternative notice route.
-338, Meter accuracy https://app.leg.wa.gov/WAC/default.aspx?cite=480-100-338 https://app.leg.wa.gov/WAC/default.aspx?cite=480-90-338 Complete electric (1)–(2) and complete gas section; 2001 credits. Technical standards/incorporated ANSI material not completed; no actual accuracy classification or tolerance calculation supplied.

The rules’ written-exemption mechanism does not make an inconsistent tariff automatically valid. Additional-requirements provisions expressly preserve statutory obligations. app.leg.wa.gov+5

1.3 Adopted originals and official supporting publications

Source ID Issuer/title and complete literal HTTPS URL Actual read bounds Version, effectiveness and limitation
S_WA-P14-S011 Washington UTC, WSR 20-16-077, permanent rules. Filing notice: https://lawfilesext.leg.wa.gov/law/wsr/2020/16/20-16-077.htm. Adopted text: https://lawfilesext.leg.wa.gov/law/wsr/2020/17/20-16-077.htm. Issue PDF: https://app.leg.wa.gov/documents/laws/wsr/2020/17/20-17PERM.pdf Filing notice; adoption/status discussion, especially ¶¶24–28; selected adopted -023, -128 and -133 clauses, including new notices, remote provisions, medical provisions and deletion of the former repeat-medical restriction. PDF printed p.1/index 0 header material only. Current complete operative sections independently read as S008/S009. Filed July 29, 2020; stated effective August 29, 2020. Full comment matrix and all appendices were not a substantive foundation. HTML/PDF are one instrument, not independent corroboration.
S_WA-P14-S012 Washington Legislature, 2026 c 137, EHB 2575, session law. https://lawfilesext.leg.wa.gov/biennium/2025-26/Pdf/Bills/Session%20Laws/House/2575.SL.pdf?cite=2026+c+137+s+8 Cover/index 0; complete §8, printed pp.16–20/PDF indices 16–20; final §10, printed p.25/index 25, and enactment tail. Stated effective June 11, 2026. Section 8 reenacts RCW 80.28.010 and changes the reporting/savings provision; it does not replace the winter/heat conditions with an unconditional assistance entitlement. Parsed text, not page-pixel review.
S_WA-P14-S013 Washington Legislature, 2025 c 263, 2SHB 1514. https://lawfilesext.leg.wa.gov/biennium/2025-26/Pdf/Bills/Session%20Laws/House/1514-S2.SL.pdf?cite=2025+c+263+s+4 Cover/index 0; material §4 winter/heat amendments within printed pp.10–14/indices 10–14; complete §26, printed p.28/index 28. A later attempt to complete an additional §4 tail window failed; that failure does not undo the earlier reads. Cover states July 27, 2025. Section 26 contains a funding-specific null-and-void condition tied to June 30, 2025. Enacted-budget fulfillment was not authenticated. Thermal-energy expansion is not treated as completed in this electricity/natural-gas pass.
S_WA-P14-S014 Washington Legislature, 2023 c 105, ESHB 1329. https://lawfilesext.leg.wa.gov/biennium/2023-24/Pdf/Bills/Session%20Laws/House/1329-S.SL.pdf?cite=2023+c+105+s+6 Cover/index 0; complete §6, printed pp.12–16/indices 12–16. Read additions/deletions in the winter and heat provisions. Stated effective July 23, 2023. Material deletion of winter deposit/reconnect-charge language and addition of heat protections authenticated. Other provider regimes in the act not completed.
S_WA-P14-S015 Washington UTC, WSR 16-06-038, billing corrections. Filing notice: https://lawfilesext.leg.wa.gov/law/wsr/2016/06/16-06-038.htm. Adopted original: https://lawfilesext.leg.wa.gov/law/wsr/2016/07/16-06-038.htm Header; material explanatory paragraphs, especially ¶¶15–22, 28–31, 34–39, adoption/effect paragraphs and ¶¶43–44; complete Appendix B adopted -178(1)–(8) for both services. Filed February 23, 2016; stated effective March 25, 2016. Formal agency adoption explanation, not a judicial decision. Proposed alternatives and commenter examples are not current rules or examples in this report.
S_WA-P14-S016 Washington UTC, WSR 26-14-084, semiannual rule-development agenda. https://lawfilesext.leg.wa.gov/law/wsr/2026/14/26-14-084.htm Header and complete relevant “customer notice and fees” agenda entry; surrounding agenda read for status. Filed June 29, 2026, agenda for July–December 2026. It identifies contemplated permanent fee/deposit changes and projected rulemaking milestones. Not an adoption, operative suspension, or proof of completion.
S_WA-P14-S017 Washington Department of Commerce, Low-Income Home Energy Assistance Program. https://www.commerce.wa.gov/community-opportunities/liheap/ Generic program services, eligibility-guide qualification, FAQs and links to plan material; no provider map or participant information investigated. Official program guidance, not the adopted state-plan body. Numerical guide information is not substituted for the statute’s incorporated current plan.
S_WA-P14-S018 Washington Department of Commerce, Help shape the future of energy assistance in Washington. https://www.commerce.wa.gov/help-shape-the-future-of-energy-assistance-in-washington/ Complete substantive announcement and draft-plan status language. Announces a 2027 draft model plan published June 29, 2026. It does not establish final adoption/approval or current operative eligibility. Linked draft retrieval failed.

The 2016 original expressly addresses the meter-test interaction; the 2020 original shows the replaced notice structure and removed medical repetition restriction. These are substantive original-text checks, not reliance on a page’s general update date. lawfilesext.leg.wa.gov+5

2. Substantive findings and atomic claim register

2.1 Scope, jurisdiction and service categories — Questions 1 and 7

Claim ID Precise assertion Authority, conditions and confidence limits
S_WA-P14-C001 The UTC has statutory authority over covered public-service utility operations and to adopt implementing rules; the electric/gas consumer chapters expressly require commission jurisdiction. S001 §80.01.040; S002 §80.04.160; S008/S009 -003, -023. Actual provider/service jurisdiction is not established.
S_WA-P14-C002 “Electrical company” and “electric plant” depend on the enacted ownership/operation/for-hire criteria, with railroad and specified cogeneration exceptions. S002 §80.04.010(4), (9), (11)–(12), (19). Cogeneration solely for own/tenant use or specified wholesale recipients is excluded on the stated conditions, unless otherwise an electrical company.
S_WA-P14-C003 The gas chapter’s utility definition requires commission jurisdiction, a Washington gas plant and public compensated gas service. Natural gas is a defined subset of the chapter’s broader “gas” category. S002 §80.04.010(14)–(15); S009 -023, complete gas/natural-gas/utility definitions. Other fuels are not completed here.
S_WA-P14-C004 Ownership or operation of a cogeneration facility alone does not establish public-service-company status. S002 §80.04.010(23). This is not a blanket landlord, master-meter or private-generation exclusion.
S_WA-P14-C005 RCW 80.04.500 restricts UTC orders affecting specified city/town utility rates, charges, contracts and service; it does not declare all Title 80 provisions inapplicable to municipal utilities. S002 §.500, complete paragraph. Its separate safety wording is narrower than its rate/service wording; no complete municipal gas-safety regime is determined.
S_WA-P14-C006 PUD electric rate and service authority has an express statutory independence from UTC jurisdiction. S003 §54.16.040, complete section. The UTC arrears rules therefore are not transferred to PUD service merely because it is residential electricity.
S_WA-P14-C007 The read cooperative statutes preserve locally regulated electric-utility categories and do not confer new UTC rate/service jurisdiction. S004 §54.48.040; S005 §23.86.400(2)–(3); S006 §24.06.600(2)–(3). A cooperative label alone does not finish legal classification.
S_WA-P14-C008 Inconsistent tariff provisions are not automatically validated by filing or acceptance. Rule exemptions require the specified commission process, and statutory duties remain. S008/S009 -003, -008, -013; S010 -110. RCW 80.28.010(12) separately prevents an oral/written agreement from waiving that chapter’s protections.
S_WA-P14-C009 “Applicant” and “customer” include specified jointly responsible applicants; “customer” can include an involuntarily disconnected person seeking reconnection. S008/S009 -023. These definitions do not prove actual acceptance, joint liability or a balance.
S_WA-P14-C010 These chapters define a business day as Monday–Friday, 8 a.m.–5 p.m., excluding official state holidays. S008/S009 -023. This does not convert an unqualified “day” into a business day or supply every computation rule.
S_WA-P14-C011 Covered charges must be just, fair, reasonable and sufficient; covered service and utility rules must meet the statute’s safety, adequacy and reasonableness standards. S007 §80.28.010(1)–(3), (11). No rate reasonableness or service-entitlement determination is made.
S_WA-P14-C012 The filed-and-effective schedule supplies the general rate/charge baseline, subject to the statute’s express exceptions and uniform-treatment provision. S007 §§.050, .080(1)–(2); S008/S009 -028. Listed free/reduced-rate exceptions were read; the utility-theft damages incorporation is not a completed ordinary-arrears fee pathway.
S_WA-P14-C013 The electric application rule permits resale only as authorized by tariff; the gas application rule prohibits customer remetering/submetering for resale. S008/S009 -108. This is a rule for covered utility service, not a completed landlord-rebilling or tenancy analysis.
S_WA-P14-C014 Refusal of new/additional service is governed by enumerated safety, standards, protective-device, rights-of-way and other conditions, with commission approval required for the additional refusal route. S008 -123(1)–(2), (5)–(6); S009 -123(1), (4)–(5); S007 §.110. Technical incorporations and the initiative-dependent gas branch remain held.
S_WA-P14-C015 The residential “prior obligation” rule limits refusal of new/additional service because of billed debt existing at a prior nonpayment disconnection; deposits are excluded from that defined amount. S008 -123(3); S009 -123(2). Winter-plan-default customers are expressly excepted. Fee/deposit conditions remain subject to C017.
S_WA-P14-C016 Prior-occupant debt alone is not a refusal ground; the rule requires objective evidence of the specified cooperative fraud to use that exception. S008 -123(4); S009 -123(3). A deposit criterion involving a prior customer living at the premises is a different provision, not debt succession.
S_WA-P14-C017 Present authority to collect residential deposits and identified late/disconnection/reconnection/site fees is not fully authenticated in this pass. Current S008/S009 text; S016 agenda; failed official suspension-announcement route F006. This is a currentness hold, not a finding that every listed charge is currently allowed or currently forbidden.

The source distinctions above prevent three erroneous transfers: municipal/PUD rules from UTC rules, landlord rent allocation from utility billing, and a tariff reference from statutory permission. app.leg.wa.gov+4

2.2 Billing, payment, deposits, corrections and charge boundaries — Question 2

Claim ID Precise assertion Authority, conditions and confidence limits
S_WA-P14-C018 Bills must meet the prescribed issuance interval and identify the amount due, delinquency date, contact information, usage/read information, applicable charges and required tax/proration/estimate information. S008/S009 -178(1). Electric units and gas units differ. Content does not prove correct usage or a lawful amount.
S_WA-P14-C019 For fractional billing periods, the default proration rules distinguish flat-rate service from metered service and the full basic/minimum charge. S008/S009 -178(1)(h). Express tariff variation remains possible; no amount calculated.
S_WA-P14-C020 Estimated billing must be identified, use a tariff-described method and observe the four-consecutive-month restriction unless a listed exception applies. S008/S009 -178(1)(i): inclement weather, terrain or a previous customer arrangement.
S_WA-P14-C021 The ordinary bill-payment minimum is measured from mailing, with different inside/outside WA–OR–ID periods; a satisfactory reason requires accommodation of a changed due date before the next billing date. S008/S009 -178(2)–(3). Receipt is not substituted for mailing.
S_WA-P14-C022 Electronic billing and related communications require the specified affirmative consent, records and format safeguards; electronic timing is treated as mailing from Washington. S008/S009 -178(4), -179 introduction, (1)–(3). Separate services require separate affirmative consent.
S_WA-P14-C023 Disconnection notices and specified winter-protection information cannot be delivered solely electronically. Ordinary electronic-document paper-request limits do not erase that requirement. S008/S009 -179(4)–(6); -128(4). Specialized-format disputed billing must be understandable to the reviewer.
S_WA-P14-C024 Undeliverable electronic information triggers corrective communication and, if unresolved, paper delivery and return to mail notification under the rule’s alternative time branches. S008/S009 -179(7). A sent electronic message is not assumed received.
S_WA-P14-C025 Cash payments require receipts, and designated payment-agency arrangements must provide the prescribed reasonably accessible, no-charge payment opportunity. S008/S009 -138(3), -188. This does not establish a universal free-credit-card-payment rule.
S_WA-P14-C026 The codified existing-customer deposit grounds are at least three delinquency notices in the prior twelve months, nonpayment disconnection, or the stated indebted prior customer living at the residence. S008/S009 -113(1). Codified criteria only; C017 remains controlling as a hold.
S_WA-P14-C027 Applicant deposit criteria separately include the specified prior history, conjunctive employment/income condition, ownership/purchase condition, resident prior-customer debt and overdue residential utility balance. S008/S009 -113(2). The employment clause is not reduced to unemployment alone. No applicant classified.
S_WA-P14-C028 The codified residential deposit ceiling uses estimated annual billings: two-twelfths for monthly billing or three-twelfths for bimonthly billing. S008/S009 -113(3). Customer/location wording is preserved; no new per-request allowance or actual estimate assumed. C017.
S_WA-P14-C029 The deposit installment option is half before service and the remainder in equal amounts over the next two months on mutually agreed dates; other mutually acceptable arrangements are permitted. S008/S009 -113(4). It is not proof that a deposit may presently be demanded.
S_WA-P14-C030 Inability to pay a deposit invokes the listed alternatives: qualifying prepayment, satisfactory guarantor, winter-program route or the conditioned similar-utility reference opportunity. S008/S009 -113(5). Guarantor exposure is bounded by the notice/deposit terms unless an additional amount is agreed as specified.
S_WA-P14-C031 Additional deposits require written reasons and the existing-customer criteria; deposit-plus-interest transfer/refund is subject to the old-address balance offset stated in the rule. S008/S009 -113(6)–(7). No new numerical cap is created by an additional request. C017.
S_WA-P14-C032 Deposit interest uses the rule’s annual one-year Treasury Constant Maturity reference and runs from deposit to refund/application. S008/S009 -113(9). The referenced annual rate, compounding and rounding are not calculated or supplied.
S_WA-P14-C033 Satisfactory-payment release requires twelve consecutive months, no initiated disconnection process and no more than two delinquency notices; termination release permits the stated amount-due offset. S008/S009 -113(10). Collection suspension does not establish that an existing held deposit has no interest/refund duties.
S_WA-P14-C034 Deposit demand timing after service and satisfactory-payment refund methods have distinct mailing/delivery and billing-month triggers. S008/S009 -113(8), (11). Quantities are registered below; the fifteen-day satisfactory-payment check rule is not declared a universal termination-refund deadline.
S_WA-P14-C035 A qualifying billing correction must use the rates applicable during the affected billing periods and be issued within sixty days of discovery. S008/S009 -178(5)(a). Meter failure, malfunction, unassigned usage and other inaccurate/unbilled usage are covered as defined.
S_WA-P14-C036 The ordinary underbilling collection restriction is six months under the source’s “from the date the error occurred” wording, subject to express exceptions. S008/S009 -178(5)(a), (7); S015 ¶¶28–31. No actual first/last included billing period is selected.
S_WA-P14-C037 Six years is the maximum period for which -178 requires overbilling adjustment. S008/S009 -178(5)(a). This is not presented as a universally applicable suit limitation or a prohibition on every other possible refund remedy.
S_WA-P14-C038 Specified interference/illegal-connection/fraud underbilling is excepted from the six-month restriction; nonresidential good-cause extensions are a separate branch; recovery of underbilling below fifty dollars may be forgone. S008/S009 -178(7). Nonresidential flexibility is not imported into ordinary residential billing. “Below” is strict.
S_WA-P14-C039 Corrected-bill information must explain the reason, monthly breakdown, total correction, covered period and applicable payment-arrangement availability. S008/S009 -178(6), incorporating -138(1). An explanation does not establish that the correction is accurate.
S_WA-P14-C040 A compliant estimated-reading true-up is not treated as a corrected bill under -178(5)(a). S008/S009 -178(8), with (1)(i). The classification predicate must be established before applying this exception.
S_WA-P14-C041 The initial requested meter test has a twenty-business-day test/report duty and one-free-test-in-twelve-months baseline, subject to the stated commission waiver/extension/charge route. S008/S009 -183(1)–(2). Access and witness/sealing provisions were read; no test or access step performed.
S_WA-P14-C042 Additional-test charges depend on tariff authority and a finding within the incorporated accuracy tolerance; an out-of-tolerance additional test cannot be charged under this clause. S008/S009 -183(3), -338. Full technical incorporation and actual accuracy remain held.
S_WA-P14-C043 Commission notification of a meter complaint restricts alteration of the meter without commission authorization; a violation may support the customer’s dispute. S008/S009 -183(4). This is discretionary evidentiary treatment, not an automatic adjudicated billing result.
S_WA-P14-C044 An excessive meter error triggers repair/replacement without customer cost and adjustment using the best available information, subject to the complete adjustment framework. S008/S009 -183(5), -178; S015. The -183 payment-arrangement reference is to -138(2), while -178(6)(e) refers to -138(1).
S_WA-P14-C045 The 2016 adoption order explains that the newer underbilling restriction also limits collection after an older meter-test rule identifies an earlier defective-meter date. S015 ¶¶28–31, Appendix B; current S008/S009 -178(5). Formal agency explanation established; full judicial construction and other adjustment issues remain open.
S_WA-P14-C046 Delayed residential billing requires a payment-arrangement length equal to the delay, subject to the stated unauthorized-use exception. S008/S009 -138(1). Its citation to -128(2)(f) is stale; that subsection now concerns detrimental equipment. Do not silently substitute a new exception pointer.
S_WA-P14-C047 Equal-payment plans use historical or projected usage; the WAC states particular refusal conditions, while RCW 80.28.010(7) contains a residential offer duty and additional low-income availability protections. S008/S009 -138(2); S007 §.010(7). The interaction is not treated as unconditional permission to deny a statutory option.
S_WA-P14-C048 No general numerical residential late-fee, returned-payment or collection-charge amount was established from the selected generic provisions. Payment-allocation priority beyond express clauses also remains unestablished. S007 §§.050/.080; S008/S009 -128, -178, -195; C017. Unknown amounts are not unlimited-charge permission; combined-service attribution is not a complete partial-payment allocation rule.
S_WA-P14-C049 Tariff-change notice depends on classification under -194 versus -195. A -195 notice accompanying the first bill after an effective change does not independently authorize the charge. S008/S009 -193 through -197; S007 §.060. Electric “per-occurrence” wording and gas purchased-gas-adjustment exceptions are not flattened into one rule.

The complete deposit rules support the formulas and return conditions as codified. The unresolved suspension issue affects present collection authority, so the formulas cannot be used as an independent permission to demand money. app.leg.wa.gov+5

2.3 Ordinary and exceptional disconnection — Question 3

Claim ID Precise assertion Authority, conditions and confidence limits
S_WA-P14-C050 Delinquent covered-service charges are a codified notice-based ground, subject to the medical and maintained winter-plan exceptions and other applicable protections. S008/S009 -128(2)(a). Inclusion of “required deposit” does not overcome C017.
S_WA-P14-C051 Other notice-based grounds include unauthorized purpose/property, increased flat-rate use, required-access problems, rule/agreement/tariff violations and detrimental equipment, on the stated conditions. S008/S009 -128(2)(b)–(f); -168. Access is limited to the rule’s authorized-representative, reasonable-hours and necessary-function terms.
S_WA-P14-C052 Nonregulated-service debt is not a disconnection ground under -128(3); combined gas/electric accounts require a reason attributable to the service being disconnected and distinct identification of affected services. S008/S009 -128(3), (4)(e). Neither every fee nor every combined-account balance is classified here.
S_WA-P14-C053 The ordinary process requires at least two notices. The first is paper mail or primary-door delivery, with the source’s minimum timing and additional consented electronic copy. S008/S009 -128(4)(a)(i), (5). Outside WA/OR/ID mailing uses “eleven days,” not “eleven business days.”
S_WA-P14-C054 The second notice combines an electronic copy where contact information/consent exist with one authorized door, mail or telephone branch. S008/S009 -128(4)(a)(ii). Electronic consent does not eliminate the prescribed other branch.
S_WA-P14-C055 Telephone second notice requires at least two attempts during regular business hours, the prescribed lead time and retained call records; unsuccessful actual contact requires paper fallback. S008/S009 -128(4)(a)(ii)(C). An attempted call alone does not complete every branch.
S_WA-P14-C056 Notices must identify cause, regulated-service amount, avoidance/assistance/payment information, relevant charges and utility contact information; winter and electric-remote notices have additional content. S008/S009 -128(4)(b); S007 §.010(5)(a), (9)(a). No notice was prepared or evaluated.
S_WA-P14-C057 Inaccurate/incomplete notices require correction and necessary date recalculation; failure to disconnect within the stated ten-business-day window requires restarting notices unless a payment arrangement was agreed. S008/S009 -128(4)(c)–(d). The gas wording’s cross-reference to required information differs from the electric wording; no factual sufficiency determination follows.
S_WA-P14-C058 Different billing/service users and master-meter occupants have additional notification protections; the specified service-user request triggers at least five extra days. S008/S009 -128(4)(f), (i). This regulates the covered utility’s conduct, not the complete landlord/tenant relationship.
S_WA-P14-C059 Except danger to life or property, disconnection is barred on weekends, legal holidays and days when restoration cannot occur the same or following day. S008/S009 -128(4)(g). No universal ordinary-disconnection hour window beyond the actual text is supplied.
S_WA-P14-C060 A dispatched disconnection representative must accept delinquent-account payment; change need not be supplied, but overpayment must be credited. S008/S009 -128(4)(h). A tariff-mentioned visit fee remains subject to C017 and actual tariff authority.
S_WA-P14-C061 Third-party designation must be offered; specified incapacity concerns require reasonable inquiry, third-party notice and the additional delay. S008/S009 -128(4)(k). No incapacity or responsible agency is presumed.
S_WA-P14-C062 Listed licensed/certified medical-facility categories require notice to the specified state department and customer, with a request-dependent delay; electric remote disconnection is additionally restricted. S008/S009 -128(4)(j). Facility status and full licensing regimes are not verified.
S_WA-P14-C063 Electric remote nonpayment disconnection has a morning-only window, same-day payment/restoration opportunity, particular pre-disconnection visit duties and a no-site/no-fee rule. S008 -128(6). Critical-infrastructure incorporation and actual implementation remain held.
S_WA-P14-C064 Gas remote disconnection and reconnection require commission authorization under the respective rules. S009 -128(6), -133(2). No authorization or actual remote capability was investigated.
S_WA-P14-C065 The without-prior/further-notice branch is confined to enumerated investigation, vacancy, hazard, dishonored-payment, broken-arrangement and unauthorized-use conditions. S008/S009 -128(7)(a). Some branches expressly require prior compliant notice; ordinary delinquency is not transformed into immediate-action authority.
S_WA-P14-C066 Dishonored payment alone is not fraud. The utility bears the stated fraud burden; first and repeated theft/tampering/fraud branches differ. S008/S009 -128(7)(a)(i). Tariff-estimated service, resulting costs and any required deposit are source categories, not verified charges or findings here.
S_WA-P14-C067 After a qualifying no-prior-notice disconnection, reasonable efforts to explain the reason and dispute route are required within five business days. S008/S009 -128(7)(b)–(c). The subsection expressly does not eliminate civil/criminal responsibility.
S_WA-P14-C068 Disconnection is prohibited while the customer pursues a remedy/appeal provided by these rules or qualifying discussions, subject to payment of undisputed amounts and correction of dangerous conditions. S008/S009 -128(10). This is not a conclusion that every communication, lawsuit or unpaid disputed account creates an unconditional stay.

The paper, telephone and electronic branches are source-stated alternatives and supplements. They are not operational service instructions or a conclusion that a particular notice would be effective. app.leg.wa.gov+3

2.4 Payment arrangements, winter and heat — Question 4

Claim ID Precise assertion Authority, conditions and confidence limits
S_WA-P14-C069 Residential space-heating protection operates during the November 15–March 15 period only when the statutory conditions are met. Notice of inability should ordinarily follow within five business days of an overdue notice, but lateness does not permanently foreclose regaining protection. S007 §.010(4)(a); S008/S009 -143(1). Extenuating circumstances and statutory reconnection language preserved.
S_WA-P14-C070 The winter income predicate uses prior-twelve-month household self-certification to the designated Commerce grantee and the maximum under the incorporated state energy-assistance plan. S007 §.010(4)(b); S008/S009 -143(1)(b). Grantee verification is permitted; current final-plan threshold remains held.
S_WA-P14-C071 The winter route also requires applications for applicable heating assistance, commitment of assistance to current/future utility bills, and weatherization application if available for the dwelling. S007 §.010(4)(c)–(d); S008/S009 -143(1)(c)–(d). Availability, application and benefit approval are different predicates.
S_WA-P14-C072 The statutory winter required-payment ceiling combines seven percent of monthly income with one-twelfth of qualifying post-application arrearage. S007 §.010(4)(e). Older -143 wording uses “billings” in one sentence and “past-due amounts” in another; exact reconciliation is held rather than silently broadening the statutory base.
S_WA-P14-C073 Agreement to pay a higher winter percentage does not make a payment below that voluntary promise a default unless it falls below the statutory threshold. S007 §.010(4)(e); S008/S009 -143(1)(e). No payment amount or income supplied.
S_WA-P14-C074 The winter plan must address continued service and payment of the past-due bill by the following October 15; nonpayment by that target affects future protection, and moving does not erase the obligation. S007 §.010(4)(e)–(f); S008/S009 -143(1)(e), (g). No actual future eligibility determined.
S_WA-P14-C075 Utilities must assist with winter requirements and provide the required information/plan; the WAC requires same-service-area plan transfer and recalculation when qualifying assistance is received. S007 §.010(5); S008/S009 -143(1)(f), (2). The statute’s transfer authorization and rule’s duty are identified separately.
S_WA-P14-C076 A qualifying winter-plan defaulter can regain protection through the statute’s amount that would have been due under the plan, absent default, at reconnection. S007 §.010(5)(d)–(e). This is not automatically the entire historical account balance. Other lawful nonpayment-independent grounds remain separate.
S_WA-P14-C077 The 2023 original removed winter deposit/reconnection-charge wording that remains in the older WAC text. S014 §6; S007 §.010(4)(a), (5)(d); S008/S009 -143(1)(a), (2)(e). Current charge collection is held; the older text is not used to restore deleted statutory conditions.
S_WA-P14-C078 RCW 80.28.010(8) requires an approved tariff prohibiting nonpayment termination of covered residential electric service on the specified NWS heat-alert day; natural-gas service is not listed in that subsection. S007 §.010(8), complete; S014 §6; S012 §8. Includes issued or announced-intended alerts for the relevant area. No actual alert checked.
S_WA-P14-C079 The statutory heat route permits a nonpayment-disconnected residential user to request reconnection; the utility must promptly make a reasonable attempt and may require a compliant payment plan. S007 §.010(9). The approved notice/request process and actual request are unestablished; no guaranteed physical restoration time is invented.
S_WA-P14-C080 A payment plan required under the heat-reconnection branch cannot require monthly payments exceeding six percent of monthly income; its May 15 target can extend as specified to preserve that ceiling. S007 §.010(10). Voluntary higher payments, the lower default threshold and later-assistance reformulation are expressly preserved.
S_WA-P14-C081 Both electric and gas rules require tariff conditions under which nonvoluntary disconnections cease during inclement weather. S008/S009 -128(11). No actual tariff was read; no temperature threshold, statewide gas heat moratorium or universal winter shutdown is inferred.

The statutory winter and heat relations are distinct. The heat repayment provision does not incorporate the winter income-eligibility ceiling merely because both use income-based payments. app.leg.wa.gov+4

2.5 Medical and protected-customer safeguards — Question 5

Claim ID Precise assertion Authority, conditions and confidence limits
S_WA-P14-C082 A qualifying verbal or written medical notification triggers a five-business-day postponement/reinstatement grace period when residential service is subject to disconnection or has been disconnected. S008/S009 -128(8), opening paragraph. The condition must require continued electricity/gas; no condition label is treated as sufficient.
S_WA-P14-C083 The medical restoration clause uses same-day/same-business-day language for a timely request and otherwise noon the next business day; upfront reconnection/deposit payment is not a prerequisite under that clause. S008/S009 -128(8), second paragraph. Later billing language does not establish that a fee is presently lawful; C017 remains.
S_WA-P14-C084 Certification may be required within five business days from the source-defined medical professional, with only the listed residence, aggravation explanation, expected duration and certifier information. S008/S009 -128(8)(a). The codified professional definition is preserved; no medical-license or certification determination is made.
S_WA-P14-C085 Certification lasts only for the certified health-endangerment period, at most sixty days unless renewed. S008/S009 -128(8)(b). Renewal is not inferred to be automatic or indefinite.
S_WA-P14-C086 Medical protection does not excuse delinquent or ongoing charges; the rule permits the specified ten-percent payment, remaining-balance arrangement within 120 days and ongoing-bill promise, while forbidding demands exceeding the prescribed requirements. S008/S009 -128(8)(c). Alternate plans may be agreed. “Minimum” wording is read together with the no-more-than-prescribed sentence.
S_WA-P14-C087 The medical plan must be confirmed within two business days; specified certification/payment/plan failures require the prescribed second-notice process, including an additional second notice if one was previously given. S008/S009 -128(8)(c)–(d). Failure does not itself establish an immediate lawful cutoff.
S_WA-P14-C088 The older twice-in-120-days restriction was deleted in the 2020 amendment and is absent from the current medical subsection. S011 adopted -128 replacement; current S008/S009 -128(8). This removes that historical restriction as a current premise; it does not establish unlimited protection regardless of other conditions.
S_WA-P14-C089 Medical/low-income status falls within account-and-usage information; utility safeguards, limited collection/use/disclosure and consent requirements apply, with express lawful-demand and other exceptions. S008/S009 -023 and -153(1)–(8). RCW 19.29A/19.255, special-contract and federal medical/disability interfaces are not fully completed. No absolute-confidentiality claim.

The medical-professional definition in the read rule is a licensed physician, nurse practitioner, or physician’s assistant authorized to diagnose and treat the condition without physician supervision. That is a transcription of the legal category, not a determination about any professional or household. app.leg.wa.gov+3

2.6 Restoration, disputes and narrow remedy boundaries — Question 6

Claim ID Precise assertion Authority, conditions and confidence limits
S_WA-P14-C090 Ordinary restoration requires every reasonable effort within the source-stated time after the applicable charge is paid or agreed to be billed and one of the specified cause-removal/payment/arrangement branches is satisfied. S008/S009 -133(1)(a)–(c). Electric remote restoration has a separate four-hour relation. Fee/deposit currentness and “prior obligation” distinctions remain.
S_WA-P14-C091 Electric disconnection/reconnection fees are prohibited by the specified clauses when no site visit is required. S008 -128(6)(e), -133(2). This is an express codified no-fee rule, not permission to charge whenever a visit occurs.
S_WA-P14-C092 The commission may require reconnection pending a dispute over the propriety of disconnection. S008/S009 -133(3). A request or informal complaint is not itself such an order.
S_WA-P14-C093 Utilities must acknowledge, investigate, report on and appropriately correct complaints, with supervisor and commission-escalation information under the stated sequence. S008/S009 -173(1)–(2). “Promptly” is not replaced with an invented fixed deadline.
S_WA-P14-C094 Commission-referred informal complaints have separate two-/three-business-day reporting branches and a minimum three-year utility complaint-record retention duty. S008/S009 -173(3)–(4). Commission extensions/specified dates are preserved.
S_WA-P14-C095 The informal commission process investigates and seeks compliance but does not result in a hearing or order; a formal proceeding ends informal processing of that subject. S010 -910(3)–(5). No actual complaint or debt determination.
S_WA-P14-C096 Formal complaints require the statutory/rule jurisdictional and pleading predicates; the commission’s commencement decision and final merits are separate from submission. S002 §.110; S010 -305, -370. Only the indispensable generic interface was read, not full litigation/adjudication.
S_WA-P14-C097 A complaint attacking the reasonableness of a rate schedule has the special statutory sponsorship threshold, distinct from an ordinary service/billing complaint. S002 §.110(1)(b): commission’s own motion, specified municipal sponsorship, at least twenty-five consumers/purchasers, or at least twenty-five percent.
S_WA-P14-C098 The reparations statute requires investigation and specified findings of an excessive/exorbitant charge and entitlement before the commission orders the excess with interest from collection. S002 §.220. Interest rate and completed recovery procedure are not established here.
S_WA-P14-C099 The unlawful-overcharge statute permits a refund order after investigation and a finding that collection exceeded the lawful rate, with interest from collection. S002 §.230. “May” is preserved; no automatic refund from an allegation.
S_WA-P14-C100 RCW 80.04.440 provides liability for loss caused by the stated unlawful act or required-act omission; a wilful finding permits a discretionary reasonable attorney fee in a recovery. S002 §.440, complete. Causation, recovery, wilfulness and court jurisdiction are unestablished.
S_WA-P14-C101 A complete court-overcharge recovery pathway is not established: RCW 80.04.240 contains a special exclusive procedure and deadline provisions that remain outside this pass’s limitation/court scope. S002 §.240, read to preserve this boundary. No deadline, election or cumulative-recovery conclusion.
S_WA-P14-C112 Customer-directed termination has separate notice and usage-liability conditions, including a different electric remote-capability branch. Moving without a qualifying request does not automatically end responsibility under the rule. S008/S009 -128(1). No move, termination request or final bill is supplied.
S_WA-P14-C113 Payment at a designated agency counts under the disconnection rule when the customer informs the utility and the utility verifies it; verification must be prompt. S008/S009 -128(9). Dispatch, deposit of funds and verified payment are not treated as identical events.
S_WA-P14-C114 Generic consumer-information and tariff-access duties exist, including descriptions of credit, deposits, billing, disconnection and disputes. S008/S009 -103, -193. No actual brochure, tariff, private policy or provider compliance was inspected.

The ordinary, medical, winter and heat restoration routes have different triggers. None is reduced here to “pay the entire balance first,” “make any partial payment,” or “file a complaint and restoration is automatic.” app.leg.wa.gov+5

2.7 Version and unresolved-source claims — Question 7

Claim ID Precise assertion Authority and limit
S_WA-P14-C102 WSR 20-16-077 expressly adopted the identified amendments with an August 29, 2020 effective date. S011 filing notice, ¶¶25–28 and selected adopted clauses. Publication in a later Register issue is not a different effective date.
S_WA-P14-C103 WSR 16-06-038 expressly adopted the billing-correction amendments effective March 25, 2016. S015 header, adoption/effect provisions and Appendix B. Current -178 was also separately read.
S_WA-P14-C104 The 2023 heat/winter changes are enacted text with the session law’s stated July 23, 2023 effective date. S014 cover and §6; current S007. No application to an invented historical event.
S_WA-P14-C105 The 2025 original contains a specific funding condition; fulfillment was not authenticated through an enacted budget body. S013 §26; F011/F015. No inference of either failure or fulfillment from the failed route.
S_WA-P14-C106 The 2026 original reenacts the operative winter/heat provisions and substitutes encouragement concerning savings from reporting removal. S012 §8 and cover; S007 §.010(14). Effective June 11, 2026 as stated; encouragement is not an approved assistance award.
S_WA-P14-C107 The 2026 fee/customer-notice agenda is planning material and does not prove adoption, suspension expiration or present fee authority. S016 relevant agenda row. Projected dates are not accomplished legal events.
S_WA-P14-C108 The current operative LIHEAP-plan threshold incorporated by the winter statute was not authenticated. S017 guide; S018 draft announcement; failed linked plan routes F008/F009. No guide figure substituted.
S_WA-P14-C109 Stale rule references remain visible in the current text and must not be silently repaired. S008/S009 -123’s -128(2) reference; -138(1)’s -128(2)(f); -183(3)’s -128(9); -183(5)’s -138(2) compared with -178(6)(e)’s -138(1).
S_WA-P14-C110 No complete federal, local, tribal, public-provider, tariff, disability or judicial-construction conclusion is supplied. Deliberate scope boundary and B001–B030. Only the state text’s express incorporations are identified.
S_WA-P14-C111 The read protections regulate continuation/restoration and payment conditions; they do not themselves establish cancellation of an actual service debt. Especially S007 §.010(4)(f); S008/S009 -128(8)(c), -133, -143. No debt validity or discharge determination.

3. Material category and event comparisons

Comparison Source-supported distinction Claims
UTC-regulated service / municipal-PUD-cooperative service Jurisdictional statutes and definitions must be satisfied before using these WAC rules. Separate public-provider protection statutes may exist; they were not completed. C001–C008
Natural gas / electricity The consumer chapters are parallel but not identical. Electric remote-disconnection safeguards and electric heat-alert coverage cannot be copied into gas rules. C003, C063–C064, C078–C081
Utility customer / service user / landlord The rules contain occupant and master-meter notice protections without completing landlord rent allocation, tenancy or rebilling law. C009, C013, C058
Service charge / deposit / disputed charge / nonregulated debt Distinct billing and disconnection treatment; neither a combined bill nor a deposit criterion establishes an inherited or collectible debt. C015–C017, C026–C034, C052, C068
Codified deposit formula / current collection permission The formula was read; current suspension and tariff conditions remain unresolved. C017, C028, C048, C107
Equal-payment budget plan / delayed-bill arrangement / winter plan / medical plan / heat plan Different eligibility, payment base, timing and duties. No universal arrears plan or zero-payment entitlement was established. C046–C047, C069–C087
Ordinary nonpayment / fraud or dangerous-condition branch Ordinary notice requirements cannot be bypassed by relabeling a delinquent bill. Exceptional branches have their own predicates. C050–C067
Mailing / delivery / receipt / verification The provisions use different events. In particular, ordinary bill payment begins from mailing; medical grace begins from notification received; agency payment has a verification condition. C021, C024, C053–C055, C082, C113
Informal complaint / formal proceeding / reconnection order Informal processing produces no order; formal initiation and a commission reconnection order are separate. C092–C097
Billing-adjustment period / suit limitation The correction rule’s periods are not imported into the excluded limitation or special court-recovery analysis. C035–C045, C101

4. Quantity, formula and trigger register

No financial values, calendar dates for a customer, rates, thresholds from an unverified plan, or rounding assumptions are substituted.

Symbols below describe only source relations:

  • A: estimated annual billings under the deposit rule.
  • D: a deposit that is otherwise lawfully required.
  • Iₘ: monthly income under the applicable statutory provision, without calculating it from another income measure.
  • Aₚ: the statute’s qualifying post-application arrearage.
  • P: payment under the relevant plan.

These are not populated worksheet entries.

Quantity ID Source-stated quantity/relation Base, trigger, boundary and exception Authority/claims
Q001 Business day: Monday–Friday, 8 a.m.–5 p.m. Official state holidays excluded. No universal conversion of “days” into business days. S008/S009 -023; C010
Q002 Bills at intervals no longer than two one-month billing cycles Utility may establish good cause for delay. Not a disconnection-notice period. -178(1)(a); C018
Q003 Flat-rate fractional-period charge uses the proportionate part of the service period; metered service uses metered amount with full basic/minimum charge Default relation only; tariff can specify otherwise. No rate or rounding supplied. -178(1)(h); C019
Q004 No more than four consecutive months of estimated billing Inclement weather, terrain or previous arrangement exceptions; tariff method required. -178(1)(i); C020
Q005 At least 15 days after mailing within WA/OR/ID; 18 days if mailed from outside Mailing origin, not recipient residence, selects this branch. “Days” are not labeled business days here. -178(2); C021
Q006 Changed due date must be before the next billing date Satisfactory reason required. No fixed number of extra days. -178(3); C021
Q007 Return from electronic to printed billing within two billing cycles Customer request; electronic consent record retained. -178(4); C022
Q008 Ordinary paper-document requests may be limited to three in twelve months while electronic delivery continues Does not remove mandatory paper treatment of disconnection/winter material; free opt-out preserved. -179(2)(d), (4)–(5); C023
Q009 Undeliverable electronic correction by next business day, or within five business days if bill due date is extended five business days Trigger is returned/otherwise known undeliverable information; unresolved problem requires mail and format reversion. -179(7); C024
Q010 Existing-customer deposit criterion: three or more notices in prior twelve months Separate from nonpayment-disconnection and resident-prior-customer-debt grounds. Collection status held. -113(1); C026
Q011 Applicant employment inquiry: twelve consecutive months Lack of proof operates together with neither current employment nor regular income; not an unemployment-only test. -113(2)(b); C027
Q012 D ≤ (2/12) × A, monthly billing; D ≤ (3/12) × A, bimonthly billing Source says deposits for a customer/location. No new allowance per demand; no current permission inferred. -113(3); C028
Q013 Deposit option: 50% before service, remainder equally over next two months Mutually agreed dates; other mutually acceptable arrangement possible. -113(4); C029
Q014 Guarantor amount: notice amount, ordinarily not exceeding the deposit ceiling Additional agreed guarantee under the specified provision is separate. No guaranty created. -113(5)(b), (7); C030
Q015 Deposit transfer/termination relation: deposit + accrued interest − specified amounts owing Transfer within service territory and termination have distinct wording. No negative-refund or additional-liability formula invented. -113(6), (10)(b); C031–C033
Q016 After-service deposit due no earlier than 5 p.m. on sixth business day after qualifying mailed notice; ninth business day for outside WA/OR/ID mailing Personal delivery: no earlier than 5 p.m. sixth business day from delivery. Exact application and current collection held. -113(8); C034
Q017 Interest reference: one-year Treasury Constant Maturity, published in H.15 on January 15 of each calendar year If nonbusiness day, next following business-day rate. Runs deposit date to refund/application. Actual rate, compounding and rounding not supplied. -113(9); C032
Q018 Satisfactory payment: twelve consecutive months, no disconnection process, no more than two delinquency notices Conditions conjunctive. Different from the deposit-trigger threshold. -113(10)(a); C033
Q019 Satisfactory-payment check mailed within 15 days after completion; alternative credit begins thirteenth month Customer’s indicated method. No universal termination-refund deadline inferred from this clause. -113(11); C034
Q020 Corrected bill issued within 60 days of discovery Historical applicable rates; qualifying inaccurate/unbilled usage required. -178(5)(a); C035
Q021 Ordinary underbilling collection period not greater than six months Source phrase “from the date the error occurred”; express exceptions; no actual included months selected. -178(5), (7); S015 ¶¶28–31; C036, C045
Q022 Mandatory overbilling adjustment period: maximum six years Not treated as an all-purpose limitation or mandatory debt-discharge period. -178(5)(a); C037
Q023 Utility may forgo corrected-bill recovery where underbilling is less than $50 Strictly < $50, not ≤ $50; discretionary, not automatic forgiveness of every small balance. -178(7)(c); C038
Q024 Initial meter test/report within 20 business days; one free test per twelve months Commission waiver, extension or charge authorization route preserved. -183(1); C041
Q025 Additional meter test/report within 20 business days; commission-required additional test/report within 10 business days Different request/order predicates. Tariff/tolerance conditions govern a charge. -183(3)–(4); C042–C043
Q026 Unknown defective-meter start: adjustment not exceeding six months in older -183 wording Read with newer -178 and S015; known-start wording is not unlimited underbilling collection. -183(5); C044–C045
Q027 Delayed-billing arrangement length equals length of billing delay Stated unauthorized-use exception; stale cross-reference held. -138(1); C046
Q028 Equal-plan refusal wording: removal for nonpayment within past six months, or more than a two-month past-due balance More than, not at least; discretion to offer remains; statutory interaction held. -138(2); C047
Q029 Ordinary tariff publication/notice baseline 30 days; alternative individual notice 15 days plus specified concurrent publication steps RCW .060 commission exceptions; -194 classification and -197 suspension route. Not an arrears or disconnection clock. S007 §.060; S008/S009 -194/-197; C049
Q030 -195 notice on or with first bill after effective change Only changes within -195 after excluding -194; no fee authorization. -195(1)–(2); C049
Q031 At least two separate disconnection notices Ordinary branch; express -128(7) exceptions separate. -128(4)(a); C053
Q032 First paper notice: at least eight business days before disconnection; outside WA/OR/ID mail wording: eleven days before Mail or primary-door delivery; consented electronic copy contemporaneous. Mailing day excluded under (5). No conversion of eleven days to business days. -128(4)(a)(i), (5); C053
Q033 Second notice: electronic copy, if applicable, at least two business days before; door two, mail three, outside-region mail six business days Electronic copy supplements the chosen authorized branch. -128(4)(a)(ii); C054
Q034 Telephone branch: at least two attempts, during regular business hours, at least three business days before Unsuccessful conversation requires paper fallback; records retained at least 90 calendar days. No separate unstated retention-clock convention added. -128(4)(a)(ii)(C); C055
Q035 Restart if no disconnection within ten business days from stated disconnection date Agreed payment arrangement exception; inaccurate notice independently requires correction. -128(4)(c)–(d); C057
Q036 Service-user/master-meter request: at least five days past original date Source does not say business days in this clause. -128(4)(i); C058
Q037 Listed facility or third-party branch: at least five business days past original date Facility delay requires specified department request; third-party clause has its own notice predicate. -128(4)(j)–(k); C061–C062
Q038 Electric remote nonpayment window 8 a.m.–noon; known low-income assistance lookback prior two years Same-day payment/restoration opportunity; required visit branches. Critical-infrastructure clause also refers to limiting remote disconnections within a 24-hour period, without supplying a universal numerical count. S008 -128(6); C063
Q039 No-prior-notice explanation/dispute information within five business days Reasonable-effort duty following qualifying action. -128(7)(b); C067
Q040 Winter period November 15 through March 15; inability notice should ordinarily be within five business days after receipt of overdue notice Extenuating circumstances and regained protection preserved; calendar endpoints not converted into a customer deadline. S007 §.010(4); C069
Q041 Income history prior twelve months; grantee provides the prescribed 7% household-income dollar figure within thirty days under the WAC Grantee determination and incorporated plan required. No automatic annual-to-monthly calculation supplied; precise application of the grantee clock remains contextual. -143(1)(b); S007 §.010(4)(b); C070
Q042 Winter required monthly amount P ≤ 0.07 × Iₘ + (1/12) × Aₚ Aₚ is qualifying statutory post-application arrearage, not assumed total debt. Older “billings” wording held. S007 §.010(4)(e); C072
Q043 Voluntary higher winter promise: default threshold uses P < statutory 7%-plus-one-twelfth relation No default merely because P is below a voluntarily higher promise while meeting the statutory threshold. Same; C073
Q044 Winter target following October 15; reconnection amount is what would be due under the plan absent default at reconnection Later assistance requires reformulation; moving does not erase amounts owed. S007 §.010(4)–(5); C074–C077
Q045 Heat protection attaches to any day covered by the specified issued/intended NWS alert Area-specific predicate; no temperature number or actual weather supplied. S007 §.010(8)–(9); C078–C079
Q046 Heat required monthly payment P ≤ 0.06 × Iₘ; voluntary higher-promise default threshold P < 0.06 × Iₘ Applies to plan required under heat reconnection subsection, not all utility plans. S007 §.010(10); C080
Q047 Heat plan target following May 15, or as soon after as necessary to retain the 6% ceiling Also designed for continued service; later assistance reformulates plan. Same; C080
Q048 Medical grace five business days after verbal/written notification received Continued energy must be required by the condition/emergency. -128(8); C082
Q049 Medical restoration: electric same day, gas same business day, for timely same-day request; otherwise noon next business day Before close of business is the stated timely-contact condition. No upfront reconnect/deposit demand under this branch. -128(8); C083
Q050 Certification may be required within five business days; validity no longer than sixty days unless renewed Limited to certified endangerment duration; a universal starting-date convention or automatic renewal is not supplied. -128(8)(a)–(b); C084–C085
Q051 Medical payment requirement: stated 10% of delinquent balance, agreement for remainder within 120 days, ongoing bills when due Requirements within grace period; alternate agreement allowed; no demand beyond prescribed terms. Exact 120-day starting-event construction is not supplied beyond the clause. -128(8)(c); C086
Q052 Medical payment-plan confirmation within two business days of agreement Further default/certificate failure requires prescribed second notice, not automatic cutoff at grace expiration. -128(8)(c)–(d); C087
Q053 Historical only: twice within 120 days medical-claim restriction Deleted in 2020; not a current repetition limit. S011; C088
Q054 Ordinary restoration: reasonable efforts within 24 hours; electric remotely disconnected service four hours; or mutually agreed other time Conditional -133(1) triggers; not a guarantee from any partial payment. Gas has no copied four-hour remote branch. C090
Q055 UTC-referral utility report two business days; additional information three business days or UTC-specified date; records at least three years Extensions may be granted. Initial direct customer complaint uses promptness, not automatically the two-day rule. -173(3)–(4); C093–C094
Q056 Rate-schedule reasonableness sponsorship: at least 25 consumers/purchasers or at least 25%, with stated governmental/commission alternatives Not a threshold for every ordinary billing complaint. S002 §.110(1)(b); C097
Q057 Reparations/overcharge measure: identified excess or overcharge, plus interest from collection Required agency findings differ; no interest rate or award computed. S002 §§.220–.230; C098–C099
Q058 Private statutory loss measure: loss/damage/injury caused by prohibited act or required-act omission; discretionary reasonable attorney fee on wilful finding in recovery No fixed statutory amount, multiplier, fee percentage or automatic recovery established. S002 §.440; C100
Q059 Customer-directed electric dispatched notice at least three days; electric remote-capable notice up to 24 hours; gas at least three days Rule and tariff conditions govern end of usage responsibility; no actual termination date. -128(1); C112
Q060 Unquantified relations retained “Promptly,” “reasonable effort,” “satisfactory reason,” “reasonable judgment,” tariff-dependent charges, technical accuracy and undefined rounding remain source-specific. C014, C021, C042, C079, C090, C093
Q061 Legislative/rule effective dates Exact dates and material conditional application are recorded in S011–S016 and C102–C107. These are legal-version facts, not customer-event calculations. Version register above

5. Conditional branches and exact unresolved dependencies

Branch ID Missing predicate or authority Supported consequence if the predicate is established Adverse inference to avoid; precise next generic inquiry
B001 Actual statutory provider/service jurisdiction The relevant UTC chapter may govern covered service. Do not apply it to all Washington electricity/gas. Separate generic municipal, PUD and cooperative authority must be read for those categories.
B002 Master-meter, resale and landlord/service-user classification Utility-side notice protections may apply independently of customer-of-record identity. Do not decide rent allocation or landlord authority. Later inquiry: applicable housing/rebilling statutes and exact generic resale authorization.
B003 Prior obligation versus current account debt, deposits and prior-occupant debt Different refusal/restoration rules apply. Do not infer debt succession or mandatory payment of every old balance. Compare -123, -113 and -133 without supplying facts.
B004 Operative status/construction of initiative-dependent RCW 80.28.110 gas branch Only a validated branch can support its particular service-obligation conclusion. Do not declare a gas-service entitlement from codification alone. Later generic status inquiry must establish amendment/validity/application without prohibited party or case investigation.
B005 Complete operative fee/deposit suspension text and present endpoint Current collection treatment could differ from the unrepealed codified formula. Do not infer permission, expiration or universal prohibition. Obtain a readable generic official operative suspension/superseding-rule text and its application/termination clauses.
B006 Effective tariff, approved exception/order, charge category and earned basis A charge can be assessed only within applicable authority and conditions. A tariff mention or fee-change notice is not authorization. Actual tariffs/private policies remain excluded; generic tariff-rule/status inquiry remains open.
B007 Lawfully held/required deposit, qualifying estimate and annual interest reference Codified cap, installment, interest and release relations can be analyzed conditionally. Do not substitute an annual estimate, H.15 rate, compounding or rounding. The incorporated annual rate remains unverified by design.
B008 Partial-payment allocation and combined-service accounting rule Express service-attribution and credit provisions still constrain disconnection. Do not infer customer election, first-in-first-out allocation or allocation to fees before service. Exact generic allocation authority/tariff dependency remains open.
B009 Corrected bill versus estimate true-up; discovery/error event; residential versus exceptional classification -178’s correction and collection restrictions apply to their branch. Do not convert six months/six years into universal debt limitations. S015 resolves only the identified meter-test underbilling interaction.
B010 Complete technical meter standard and necessary adoption-by-reference text Test-charge and correction consequences can follow a valid technical finding. Do not classify a meter from a headline tolerance. Later inquiry: -338, -999 and the exact incorporated standard/version.
B011 Formal correction/construction of stale references Substantive text can be reported, but pointer-dependent exceptions remain bounded. Do not silently change -128(2)(f) to (7)(a)(vi), or -128(9) to (10). Seek generic corrective amendment or formal interpretation.
B012 Relationship between mandatory budget-plan offer and WAC refusal wording Offer duties and stated refusal criteria must be reconciled. Do not use -138(2)(b) as unqualified statutory-denial permission. Exact inquiry: RCW .010(7), -013, adoption explanation or formal generic interpretation.
B013 Mailing origin, authorized notice branch, consent, content and applicable computation Source-specific advance periods can be identified. No actual notice effectiveness or calendar result. Holiday and unqualified-day computation beyond read text remain open.
B014 Properly established exceptional condition and required earlier notice -128(7) may supply a distinct branch. Delinquency or a dishonored payment alone is not fraud. No operational immediate-disconnection conclusion.
B015 Medical energy-dependence, authorized certification category and timely required steps The medical grace/restoration framework can apply. No diagnosis, certificate or professional qualifies merely by a label. Medical-licensing and federal/disability-law interfaces remain open.
B016 Certified duration, renewal and interaction with safety conditions Current duration and repayment provisions govern their branch. Deleted repeat limits do not apply; absence of that limit is not an indefinite service guarantee. Exact generic renewal/safety construction remains open.
B017 Third-party responsibility, listed facility status or incorporated critical-infrastructure category Additional notice/delay/remote safeguards may apply. Do not classify an actual protected customer/facility. Read the exact public infrastructure-plan incorporation only in a later bounded inquiry.
B018 Current final Washington LIHEAP state plan and its operative eligibility provisions Statutory winter income eligibility can be matched to the incorporated plan. A program webpage or draft is insufficient. Retrieve the final approved plan and material 42 U.S.C. 8624 scope/application clauses.
B019 Statutory “arrearage” versus older WAC “billings,” income measure and qualifying application event The statute supplies a bounded ceiling using its own base. Do not substitute all historical debt or divide annual household income mechanically. Seek a formal generic reconciliation of the differing text.
B020 Winter reconnection fee status after 2023 amendment and any current suspension Statutory counterfactual plan-due amount remains the identified relation. Do not reinsert deleted statutory charge conditions from an older rule. Exact inquiry: operative amendments and generic conforming interpretation/order.
B021 Covered electric-service category, qualifying alert and approved request process Heat nontermination/requested-restoration provisions can operate. Do not apply the listed-service statute to gas or invent a weather event. Actual tariff/process and weather facts were not examined.
B022 Applicable inclement-weather tariff conditions Both chapters require such conditions. No temperature, duration or universal moratorium inferred. Tariff-specific terms remain expressly excluded.
B023 Correct restoration branch, lawful charges and completion of specified predicates The corresponding reasonable-effort restoration period applies. Do not treat any payment, all-old-debt demand or informal complaint as a completed restoration trigger.
B024 Complaint category, formal prerequisites and any commission action Complaint duties and possible commission relief remain available as public-law categories. Informal submission is not an order or discharge. Special rate-schedule sponsorship is not applied to every complaint.
B025 Causation, findings, recovery procedure and interaction of specific remedies RCW .220/.230/.440 provide different bounded powers/claims. No automatic damages, stacking or outcome. Section .240’s exclusive procedure and clocks remain a separate inquiry.
B026 2025 funding-condition fulfillment and historical application Only authenticated operative versions can be applied to a historical/legal branch. Failed budget access proves neither funding nor nullity. Thermal expansion remains outside the completed electric/gas conclusions.
B027 Federal energy assistance, bankruptcy, collection/reporting, disability and military scope No positive federal outcome is stated here. Later generic inquiries: final LIHEAP plan/42 U.S.C. 8624; applicable Bankruptcy Code utility/stay/discharge clauses; actual FDCPA/FCRA scope; applicable disability and military protections, with full exceptions.
B028 Public-provider, water/sewer/telecom, thermal, local/tribal/interstate rules Separate regimes may supply different protections. Do not infer no protection from exclusion here. Read each applicable generic enabling/protection statute before extending this report.
B029 Company contracts/tariffs, physical outage/restoration capability and actual facts None supplied or investigated. No operational instruction, eligibility, cutoff, reconnection, liability or outcome decision follows.
B030 Later amendments, operative general orders and judicial construction outside retrieved bodies Current code text and verified adopted originals remain bounded evidence. No “no later change” conclusion from search silence; no case/opinion/docket investigation was performed.

6. Wholly blank conceptual worksheet

All response cells are intentionally blank.

Analytical field Entry
Public-law service category
Governing jurisdiction provision
Applicable statutory definition
Applicable administrative chapter
Material exclusion or alternative regime
Source ID and complete section
Source version and effective/application clause
Charge category
Deposit or security distinction
Disputed/undisputed distinction
Payment-allocation authority
Applicable notice branch
Notice event and source-stated unit
Payment-arrangement category
Seasonal-protection authority
Medical-protection authority
Restoration branch
Symbolic relation reference
Unread incorporation
Currentness or suspension dependency
Construction dependency
Exact next generic authority inquiry

7. Granular coverage and retained scope

“Answered—text” denotes the bounded public text, not a completed actual application or acceptance of the whole component.

Scope item Disposition Source/claim/branch links Exact remaining evidence or retained boundary
1: Commission identity and authority Answered—text S001–S002; C001; B001 Actual jurisdiction not determined.
1: Electric actor/plant definitions and exclusions Answered—text S002; C002, C004 No actual operation classified.
1: Natural-gas service/actor definitions Answered—text S002, S009; C003 Other gas/fuel categories excluded.
1: Customer/applicant/joint responsibility Answered—text S008/S009 -023; C009 Definition is not proof of liability.
1: Washington territorial/service nexus Partial C001–C003; B001–B002 Actual nexus, service territory and tariff excluded.
1: Municipal/PUD/cooperative boundaries Answered—boundary only S002–S006; C005–C007 Separate arrears/protection regimes remain open.
1: Master meter/landlord rebilling Partial C013, C058; B002 Only covered-utility gateway/notice text; housing allocation excluded.
1: Commercial/water/sewer/telecom/thermal Excluded except boundaries C003, C005, C038, C105; B028 No category transfer.
2: Generic bill contents and billing interval Answered—text -178; C018–C020 Usage and rate correctness not determined.
2: Mailing/payment due dates Answered—text C021; Q005–Q006 No calendar computation.
2: Electronic consent/delivery failure Answered—text -179; C022–C024 No actual consent or delivery.
2: Cash receipts/payment locations Answered—text C025, C113 No universal card-payment conclusion.
2: Deposit criteria/ceiling/installments Answered—codified baseline; current collection held C026–C031; B005–B007 Operative suspension/status and tariff conditions.
2: Deposit interest/refund/offset Answered—relation; numerical rate held C032–C034 H.15 value, rounding/compounding and actual deposit facts absent.
2: Billing correction/credit/refund duties Answered—text and adoption explanation C035–C045; S015 Technical classification and exact event application held.
2: Late/returned-payment/collection charges Unresolved current amount/permission C017, C048–C049 Generic suspension text and effective tariff authority.
2: Partial-payment allocation Partial C048, C052, C060, C113; B008 No general allocation priority authenticated.
2: Fee-change notices Answered—conditional text C049; -193 through -197 Classification overlap, purchased-gas branch and actual tariff excluded.
3: Ordinary nonpayment grounds Answered—text C050–C052 No actual delinquency or charge classification.
3: First/second notice sequence/content Answered—text C053–C057 No notice preparation or sufficiency determination.
3: Mailing/delivery/telephone/electronic distinctions Answered—text C053–C055; Q031–Q035 General unqualified-day computation held.
3: Service-user/master-meter notices Answered—text C058 Tenancy consequences excluded.
3: Days/hours/closures/final contact Answered—bounded text C059–C064 No ordinary universal hourly window inferred.
3: Disputes/protests Answered—conditional text C068 Undisputed payment and dangerous-condition qualifications retained.
3: Theft/tampering/hazard/no-prior-notice Answered—boundary text C065–C067 Full theft remedies, technical standards and facts excluded.
4: Delayed-bill arrangements Partial C046; B011 Stale unauthorized-use pointer needs formal correction/construction.
4: Equal-payment/budget options Partial C047; B012 Statutory offer/WAC refusal interaction held.
4: Winter seasonal scope Answered—text C069–C071 Current final state-plan threshold unresolved.
4: Winter payment/default/reinstatement Partial C072–C077 Statute/WAC base and fee-language differences retained.
4: Heat-alert electric protection Answered—statutory text C078–C080 Approved process/tariff and actual alert absent.
4: Gas/extreme-weather terms Partial C081; B021–B022 No copied heat statute; actual inclement-weather tariff excluded.
4: Temporary/emergency protections Unresolved relevant fee overlay C017, C107; F006 No universal current emergency moratorium declared.
5: Medical trigger/certification Answered—text C082–C085 No medical condition, certifier or eligibility evaluation.
5: Medical repayment/restoration/further notice Answered—text C083, C086–C087 Fee collection and exact application held.
5: Historical repeat-medical limit Answered—version distinction C088; S011 Deleted restriction not applied.
5: Life-support/facility/third-party safeguards Partial C061–C064; B016–B017 Critical-infrastructure incorporation and licensing classifications open.
5: Confidentiality/disability interfaces Partial C089; B015, B027 State incorporated privacy statutes and federal/disability regimes uncompleted.
6: Ordinary restoration timing/conditions Answered—conditional text C090–C092 Actual completion and tariff/fee predicates absent.
6: Utility and UTC informal disputes Answered—text C093–C095 No complaint or order exists in this inquiry.
6: Formal commission gateway Partial, intentionally bounded C096–C097 Full adjudication, service, evidence and review excluded.
6: Refund/damage/remedy boundaries Partial C098–C101 Exclusive court-overcharge procedure, clocks and full remedies remain separate.
6: Assistance information versus approval Answered—boundary C070–C071, C108 Guide/draft not current final eligibility or approval evidence.
6: Federal/public/local/tribal/interstate interfaces Excluded with exact dependencies B001, B027–B030 Separate generic investigations required.
7: Current operative RCW/WAC reading Answered within listed bounds S001–S010 Not a complete search of every general order or judicial status.
7: 2016/2020 material rule originals Answered within actual read bounds S011, S015; C102–C103 Older originals not all retrieved; no wholesale historical assurance.
7: 2023/2025/2026 enactment/application Partial S012–S014; C104–C106 2025 funding condition and partial-source gap remain.
7: Proposed/agenda versus adopted status Answered—distinction S016; C107 No projected milestone treated as actual adoption.
7: Failed routes/currentness limitations Fully disclosed below F001–F015 Failure is not absence of law or protection.
Registry dimension 6 / whole Washington / A066 Open; no acceptance C110; all branches This is one sector component only. Earlier passes and holds remain unchanged.

8. Read, search and failure log

8.1 Read/search log

Successful section-window reads are consolidated by instrument; their complete operative bounds and URLs appear in the source register. Reopening a successful source to complete a subsection or verify a pinpoint is not treated as independent corroboration.

Log ID Route actually used Result and disposition
R001 Direct official RCW 80.01, 80.04 and 80.28 section/chapter reads Jurisdiction, definitions, rates, winter/heat, complaint and narrow remedy provisions read as S001/S002/S007.
R002 Direct official electric and gas WAC chapter indexes, then individual consumer-rule bodies Selected sections completed separately for both services; source table records every relied section. Whole chapters not claimed read.
R003 Generic primary searches for "20-16-077" "PERMANENT" and 2025/2026 disconnection amendments Located adopted 2020 original and enacted 2023/2025/2026 sources. General guides remained discovery rather than operative substitutes.
R004 Generic jurisdiction searches for electric cooperatives, PUDs and UTC rate/service authority S003–S006 opened and read; no provider, roster or service territory queried.
R005 Generic searches for residential late fees, deposits, disconnection protections and 2025/2026 changes Located the official 2022 fee-suspension announcement lead and 2026 agenda. No current operative suspension conclusion obtained.
R006 Exact-title alternate search for the official fee-ban announcement; ordinary official rulemaking-agenda route No readable operative suspension text authenticated. The readable agenda resolves only its own planning-status question.
R007 Commerce LIHEAP/current-plan searches, official program page and draft announcement, links to 2026 plan/2027 draft Guidance bodies read; linked plan retrievals failed. No final current plan or income ceiling established.
R008 Generic searches for 2025 c 263 funding and enacted operating-budget text Enacted budget HTML exceeded access limits. Bill-history page was discovery/status material, not proof of the required appropriation.
R009 WAC history index for -023; attempted -113 history index; exact WSR 02-21-066 search Current deposit bodies read. Original deposit-amendment HTML and official issue-PDF routes failed; historical-original gap retained.
R010 Exact WSR 16-06-038 search, filing notice, official linked later-issue HTML PDF timed out; linked adopted HTML succeeded. Material explanation and complete Appendix B billing rules read.
R011 Current -183 meter-test clauses compared with -178 and 2016 adoption paragraphs Formal explanation found for six-month underbilling interaction. Stale pointer and other application issues retained.
R012 Current -194/-195 notice clauses and their -193/-197 and RCW .060 incorporations Material notice classifications read; no actual tariff or proposed customer rate inspected.
R013 Chapter text searches for "partial payment" and "allocation" No partial-payment phrase match; allocation hits concerned other subjects. This does not establish absence of every allocation rule. No regulatory-fee percentage was transferred to customer charges.
R014 Completion/verification windows for -128, -113, -143, -153, -179, -123, -173 and current RCW .010 Exact triggers, differences, credits and qualifications checked. No actual participant documents, certificates or notices examined.

Discovery-only material kept separate

Discovery item Literal URL Actual status/use
Current-rule history index for electric definitions https://apps.leg.wa.gov/WaC/registerfiling.aspx?cite=480-100-023 Filing index read to locate originals; not the operative consumer rule.
Operating-budget bill history https://app.leg.wa.gov/billsummary/?BillNumber=5167&Year=2025 Read history/status and attempted ordinary document link. Did not authenticate the funding clause needed by S013.
2002 official Register directory https://lawfilesext.leg.wa.gov/Law/WSR/2002/21/ Read only to locate the published issue PDF after the individual original failed. Directory dates are not legal effective dates.
Official 2022 fee-ban announcement search result https://www.utc.wa.gov/news/2022/utc-extends-customer-protections-fee-bans-energy-customers Search result identified a suspension issue requiring verification. Body inaccessible; not registered as an operative source read.
Other generic guides, historical reproductions and irrelevant search hits Not used as claim authority No secondary wording, named-provider result, party-specific order or actual record supplies a finding.

8.2 Bounded access/failure log

Failure ID Exact attempted ordinary route Observed result Materially different route and disposition
F001 https://app.leg.wa.gov/RCW/default.aspx?cite=80.04.500 Internal/inaccessible response. Official full chapter at https://app.leg.wa.gov/RCW/default.aspx?cite=80.04&full=true supplied complete .500. Exact body gap resolved.
F002 https://app.leg.wa.gov/WAC/default.aspx?cite=480-90-008 Internal/inaccessible response. Official gas chapter supplied complete -008. No broader access conclusion.
F003 https://app.leg.wa.gov/WAC/default.aspx?cite=480-90-168 Internal/inaccessible response. Official gas chapter supplied complete -168.
F004 https://app.leg.wa.gov/WAC/default.aspx?cite=480-07-370 Internal/inaccessible response. https://app.leg.wa.gov/WAC/default.aspx?cite=480-07&full=true supplied complete -370.
F005 https://app.leg.wa.gov/RCW/default.aspx?cite=80.04.440 Internal/inaccessible response. Complete .440 available through the already-read official chapter rendition.
F006 https://www.utc.wa.gov/news/2022/utc-extends-customer-protections-fee-bans-energy-customers 403. Ordinary alternate official discovery did not supply a readable operative suspension/end-date instrument. Current fee/deposit authority remains held.
F007 https://www.utc.wa.gov/sites/default/files/2026-01/Jan-July%202026%20Rule%20Development%20Agenda.pdf 403. Official WSR 26-14-084 later-half agenda read. Resolves agenda evidence only, not an operative suspension.
F008 https://deptofcommerce.box.com/s/008hcxgv860alo4gx45lxbknnb7lxywg Server/redirect failure to the corresponding deptofcommerce.app.box.com public link. Ordinary Commerce-source searches supplied guidance, not the final operative plan. No authenticated plan threshold.
F009 https://deptofcommerce.box.com/s/5jgeglnyyzvqd0iikydlxiswsnf57pzh Server/redirect failure to corresponding public Box rendition. Draft-announcement body read; no final adopted-plan inference.
F010 https://apps.leg.wa.gov/WaC/registerfiling.aspx?cite=480-100-113 Internal/inaccessible response. Exact WSR search located the original, followed by F012/F013. Current codified -113 itself was readable.
F011 https://lawfilesext.leg.wa.gov/biennium/2025-26/Htm/Bills/Session%20Laws/Senate/5167-S.SL.htm Content-too-large error on open/find in the same batch. Official bill-history/document route did not expose the necessary operative appropriation text in the returned rendition. No funding/nullity conclusion.
F012 https://lawfilesext.leg.wa.gov/law/wsr/2002/21/02-21-066.htm Internal/inaccessible response. Official directory located the issue-PDF alternative; see F013. Search excerpts were not treated as full original reading.
F013 https://lawfilesext.leg.wa.gov/Law/WSR/2002/21/02-21.pdf Content-too-large error. No further retry. Deposit original remains uncompleted; codified text and displayed credits are identified separately.
F014 https://lawfilesext.leg.wa.gov/law/wsr/2016/07/16-07PERM.pdf Fetch timeout. Filing notice’s ordinary link opened the adopted HTML at S015. Relevant original-body gap resolved without PDF pixels.
F015 Additional body-window read of the S013 session-law PDF Inaccessible response after earlier successful cover/material-section reads. No identical retry. Earlier read bounds retained; additional tail and funding verification not claimed complete. Current 2026 §8 was separately read, without claiming it resolves every 2025 issue.

9. Researcher self-check and continuation boundary

This is a researcher self-check, not independent review.

  • Actually read: the selected current RCW and WAC bodies listed above; both electric and gas versions; material 2023/2026 enactment text; selected 2025 amendment/funding language; the 2020 adopted rule changes; the 2016 billing-correction original and its formal explanation; official Commerce guidance and the relevant 2026 agenda.
  • Not represented as read: inaccessible suspension text, inaccessible linked LIHEAP plans, inaccessible deposit-rule original, the uncompleted enacted-budget funding clause, company tariffs, private policies, actual accounts or notices, and full incorporated technical standards.
  • Newly resolved source issue: the 2016 adoption explanation supplies the specific meter-test/underbilling reconciliation identified in C045. It does not resolve other stale references or judicial construction.
  • Material holds preserved: present fee/deposit collection authority; current incorporated LIHEAP threshold; tariff-dependent amounts and inclement-weather conditions; older winter-rule language versus amended statute; budget-plan interaction; technical meter incorporation; initiative-dependent gas-service status; full remedies and judicial construction.
  • No numerical application: no income, bill, deposit, rate, balance, medical fact, weather event or customer date was supplied or generated. The worksheet is blank.
  • No operational or acceptance conclusion: no disconnection, restoration, payment, complaint, eligibility, liability or outcome was authorized or determined. The other provider classes, sectors, federal regimes, local/tribal/interstate issues and earlier pass holds remain open.

END S_WA PASS-14.

Every captured table

Captured cells with original header handling and explicitly labeled bounded correction overlays. Downloaded JSON retains original cells. Tables may contain source limitations, historical examples and identified corrections; the complete reading supplies context.

Read the evidence with its boundaries. These are saved research components, including revisions. A scoped coordinator review checks selected evidence; it does not certify every claim, a complete jurisdiction, current law or individual applicability. Dates and access limits remain attached to the records.

How to read the research →

Read the related correction supplements

These components repair their stated scope. They do not replace every other finding in this research series.

SWA correction of the C070 coverage pinpoint →
SWA exact original-row completion →
Two bounded source corrections →
1. Exact two-cell replacements →

Captured table 01

Source ID · Issuer, instrument and complete literal HTTPS URL · Actual read bounds and use · 8 data rows

Source IDIssuer, instrument and complete literal HTTPS URLActual read bounds and useDisplayed credits, status and limits
S_WA-P14-S001Washington Legislature, RCW 80.01.040, Commission powers and duties. https://app.leg.wa.gov/RCW/default.aspx?cite=80.01.040Complete (1)–(4), credits. Used for commission authority and rulemaking jurisdiction.Current codification; latest displayed credit 2007 c 234 §1, with earlier 1985/1961 credits. Historical originals not independently completed.
S_WA-P14-S002Washington Legislature, selected chapter 80.04 RCW provisions. https://app.leg.wa.gov/RCW/default.aspx?cite=80.04.010; https://app.leg.wa.gov/RCW/default.aspx?cite=80.04.110; https://app.leg.wa.gov/RCW/default.aspx?cite=80.04.160; https://app.leg.wa.gov/RCW/default.aspx?cite=80.04&full=trueComplete §.010 definitions and displayed notes; complete §.110(1)–(5), §.160, §.220, §.230, §.440 and §.500. Section .240 was read to identify the special exclusive recovery-procedure boundary; its limitation analysis is excluded. The whole chapter was not read.§.010 latest credit 2025 c 263 §1, preceded by 2024 c 348 §1 and 2021 c 65 §93; §.110 latest 2021 c 65 §94; §§.160/.500 latest 2011 c 214 §§8/10; §§.220/.230/.240/.440 carry 1961 codification and earlier enactment credits. The 2025 funding-condition issue is retained in S013/B026.
S_WA-P14-S003Washington Legislature, RCW 54.16.040, PUD electric powers. https://app.leg.wa.gov/RCW/default.aspx?cite=54.16.040Complete section, including provisos and credits. Used only for the electric rate/service jurisdiction boundary.Current codification; latest displayed credit 1955 c 390 §5. No PUD-specific customer policy or tariff read.
S_WA-P14-S004Washington Legislature, RCW 54.48.040. https://app.leg.wa.gov/RCW/default.aspx?cite=54.48.040Complete section and credit; cooperative/public-utility jurisdiction-preservation clause.Current codification; 1969 c 102 §4. Does not itself complete every cooperative classification.
S_WA-P14-S005Washington Legislature, RCW 23.86.400. https://app.leg.wa.gov/RCW/default.aspx?cite=23.86.400Complete (1)–(3), including the locally regulated utility definition and no-new-jurisdiction clause.Current; 1996 c 32 §1. Pole-attachment subject matter was not converted into retail arrears rules.
S_WA-P14-S006Washington Legislature, RCW 24.06.600. https://app.leg.wa.gov/RCW/default.aspx?cite=24.06.600Complete (1)–(3), including locally regulated cooperative/mutual scope.Current; 1996 c 32 §2. Same bounded use as S005.
S_WA-P14-S007Washington Legislature, selected chapter 80.28 RCW provisions. https://app.leg.wa.gov/RCW/default.aspx?cite=80.28.010Complete §.010(1)–(14), credits and displayed notes. Core winter, heat-alert, budget-plan and nonwaiver source.Current page credits 2026 c 137 §8; 2025 c 263 §4; 2023 c 105 §6, followed by earlier enactments. Material originals are separately registered below.
S_WA-P14-S007, additional usageshttps://app.leg.wa.gov/RCW/default.aspx?cite=80.28.050; https://app.leg.wa.gov/RCW/default.aspx?cite=80.28.060; https://app.leg.wa.gov/RCW/default.aspx?cite=80.28.080; https://app.leg.wa.gov/RCW/default.aspx?cite=80.28.110Complete §.050; §.060(1)–(2); §.080(1)–(2), including exceptions and definitions; §.110(1)–(2), credits and notes.§§.050/.060/.080 latest credits 2025 c 263 §§8/9/14. Section .110 displays 2025 c 1 §2, Initiative 2066, and 2024 c 348 §6. Its initiative-dependent service branch is not given an unqualified validity/status conclusion. Emergency-power and utility-theft incorporations were not completed.
Source links captured in this table

Captured table 02

Source ID · Issuer/instrument and complete literal HTTPS URL · Actual extent and status · 3 data rows

Source IDIssuer/instrument and complete literal HTTPS URLActual extent and status
S_WA-P14-S008Washington Utilities and Transportation Commission; Washington Code Reviser, chapter 480-100 WAC. https://app.leg.wa.gov/WAC/default.aspx?cite=480-100&full=trueSelected complete sections listed below, read through section renditions and chapter windows. The whole chapter was not read. Current codified text; individual section credits control, not the chapter’s latest-update marker.
S_WA-P14-S009Washington Utilities and Transportation Commission; Washington Code Reviser, chapter 480-90 WAC. https://app.leg.wa.gov/WAC/default.aspx?cite=480-90&full=trueSame bounded approach, independently reading the gas provisions. Gas -008 and -168 were completed through this chapter rendition after individual-route failures.
S_WA-P14-S010Washington UTC; Code Reviser, selected chapter 480-07 WAC provisions. https://app.leg.wa.gov/WAC/default.aspx?cite=480-07-110; https://app.leg.wa.gov/WAC/default.aspx?cite=480-07-305; https://app.leg.wa.gov/WAC/default.aspx?cite=480-07-910; https://app.leg.wa.gov/WAC/default.aspx?cite=480-07&full=trueComplete -110(1)–(4), -305(1)–(5), -910(1)–(5), and -370(1)–(8) through the chapter rendition. Used only for exemption and complaint-process boundaries. Latest relevant credits: WSR 17-06-051, effective March 31, 2017, and WSR 18-18-041, effective September 29, 2018, for -910. Full adjudicative practice is excluded.
Source links captured in this table

Captured table 03

Section and title · Literal electric URL — S008 · Literal gas URL — S009 · 25 data rows

Section and titleLiteral electric URL — S008Literal gas URL — S009Relevant displayed version credit and use
-003, Application of ruleshttps://app.leg.wa.gov/WAC/default.aspx?cite=480-100-003https://app.leg.wa.gov/WAC/default.aspx?cite=480-90-003WSR 03-24-028, filed November 24, 2003, effective January 1, 2004; earlier 2001 credits. Jurisdiction, tariffs, exemptions.
-008, Exemptionshttps://app.leg.wa.gov/WAC/default.aspx?cite=480-100-008https://app.leg.wa.gov/WAC/default.aspx?cite=480-90&full=true, exact §480-90-008WSR 05-06-051, filed February 28, 2005, effective March 31, 2005; -07-110 incorporation read.
-013, Additional requirementshttps://app.leg.wa.gov/WAC/default.aspx?cite=480-100-013https://app.leg.wa.gov/WAC/default.aspx?cite=480-90-013WSR 01-11-004 / 01-11-003, filed May 3, 2001, effective June 3, 2001. Statutory duties preserved.
-023, Definitionshttps://app.leg.wa.gov/WAC/default.aspx?cite=480-100-023https://app.leg.wa.gov/WAC/default.aspx?cite=480-90-023WSR 20-16-077, effective August 29, 2020; earlier 2005/2001 credits. Privacy-law incorporations remain partly open.
-028, Tariffs and special contractshttps://app.leg.wa.gov/WAC/default.aspx?cite=480-100-028https://app.leg.wa.gov/WAC/default.aspx?cite=480-90-0282001 credits above. Chapter 480-80 filing/special-contract framework not completed.
-103, Information to consumershttps://app.leg.wa.gov/WAC/default.aspx?cite=480-100-103https://app.leg.wa.gov/WAC/default.aspx?cite=480-90-103WSR 11-06-032, filed February 25, 2011, effective March 28, 2011; earlier 2001 credits. Generic information duties only.
-108, Application for servicehttps://app.leg.wa.gov/WAC/default.aspx?cite=480-100-108https://app.leg.wa.gov/WAC/default.aspx?cite=480-90-1082001 credits. Used for service/application and resale boundaries; no application examined.
-113, Residential depositshttps://app.leg.wa.gov/WAC/default.aspx?cite=480-100-113https://app.leg.wa.gov/WAC/default.aspx?cite=480-90-113WSR 02-21-066, filed October 16, 2002, effective January 1, 2003; earlier 2001 credits. Original-access and current suspension holds apply.
-123, Refusal of servicehttps://app.leg.wa.gov/WAC/default.aspx?cite=480-100-123https://app.leg.wa.gov/WAC/default.aspx?cite=480-90-123WSR 03-24-028; earlier 01-24-076 / 01-24-077, filed December 3, 2001, effective January 3, 2002. Different subsection numbering preserved.
-128, Disconnectionhttps://app.leg.wa.gov/WAC/default.aspx?cite=480-100-128https://app.leg.wa.gov/WAC/default.aspx?cite=480-90-128Complete (1)–(11). WSR 20-16-077, filed July 29, 2020, effective August 29, 2020; earlier 2001 credits. Central notice/medical/dispute source.
-133, Reconnectionhttps://app.leg.wa.gov/WAC/default.aspx?cite=480-100-133https://app.leg.wa.gov/WAC/default.aspx?cite=480-90-133Complete (1)–(3); WSR 20-16-077. Fee/deposit currentness hold retained.
-138, Payment arrangementshttps://app.leg.wa.gov/WAC/default.aspx?cite=480-100-138https://app.leg.wa.gov/WAC/default.aspx?cite=480-90-138Complete (1)–(3); 2001 credits. Stale -128(2)(f) reference identified.
-143, Winter programhttps://app.leg.wa.gov/WAC/default.aspx?cite=480-100-143https://app.leg.wa.gov/WAC/default.aspx?cite=480-90-143Complete (1)–(3); 2001 credits. Must be read with newer RCW 80.28.010 and S014.
-153, Customer informationhttps://app.leg.wa.gov/WAC/default.aspx?cite=480-100-153https://app.leg.wa.gov/WAC/default.aspx?cite=480-90-153Complete (1)–(21); latest WSR 20-16-077, preceding 2011 and older privacy-rule credits. Only necessary medical/account-information safeguards used.
-168, Access; identificationhttps://app.leg.wa.gov/WAC/default.aspx?cite=480-100-168https://app.leg.wa.gov/WAC/default.aspx?cite=480-90&full=true, exact §480-90-168Complete (1)–(2); 2001 credits. No actual access authorization inferred.
-173, Complaints/disputeshttps://app.leg.wa.gov/WAC/default.aspx?cite=480-100-173https://app.leg.wa.gov/WAC/default.aspx?cite=480-90-173Complete (1)–(4); WSR 03-24-028, earlier 2001 credits.
-178, Billing/payment datehttps://app.leg.wa.gov/WAC/default.aspx?cite=480-100-178https://app.leg.wa.gov/WAC/default.aspx?cite=480-90-178Complete (1)–(8); WSR 20-16-077, 16-06-038, 11-06-032, earlier 2001 credits. Billing-correction original read in S015.
-179, Electronic informationhttps://app.leg.wa.gov/WAC/default.aspx?cite=480-100-179https://app.leg.wa.gov/WAC/default.aspx?cite=480-90-179Complete introduction and (1)–(7); WSR 11-06-032, effective March 28, 2011.
-183, Complaint meter testshttps://app.leg.wa.gov/WAC/default.aspx?cite=480-100-183https://app.leg.wa.gov/WAC/default.aspx?cite=480-90-183Complete (1)–(6); 2001 credits. Read with newer -178 and S015; stale references retained.
-188, Payment locationshttps://app.leg.wa.gov/WAC/default.aspx?cite=480-100-188https://app.leg.wa.gov/WAC/default.aspx?cite=480-90-188Complete (1)–(4); 2001 credits. No actual location searched.
-193, Posting tariffshttps://app.leg.wa.gov/WAC/default.aspx?cite=480-100-193https://app.leg.wa.gov/WAC/default.aspx?cite=480-90-193Complete (1)–(2); latest 02-11-081, filed May 14, 2002, effective June 17, 2002.
-194, Proposed tariff changeshttps://app.leg.wa.gov/WAC/default.aspx?cite=480-100-194https://app.leg.wa.gov/WAC/default.aspx?cite=480-90-194Complete electric introduction/(1)–(4) and gas introduction/(1)–(5). WSR 11-06-032, earlier 02-11-081. Gas purchased-gas-adjustment exception is separate; no actual rate proposal read.
-195, Other tariff-change noticeshttps://app.leg.wa.gov/WAC/default.aspx?cite=480-100-195https://app.leg.wa.gov/WAC/default.aspx?cite=480-90-195Complete (1)–(3); 02-11-081. Notice requirement, not independent fee authorization.
-197, Public-testimony noticehttps://app.leg.wa.gov/WAC/default.aspx?cite=480-100-197https://app.leg.wa.gov/WAC/default.aspx?cite=480-90-197Complete (1)–(4); 02-11-081. Read because -194 incorporates its alternative notice route.
-338, Meter accuracyhttps://app.leg.wa.gov/WAC/default.aspx?cite=480-100-338https://app.leg.wa.gov/WAC/default.aspx?cite=480-90-338Complete electric (1)–(2) and complete gas section; 2001 credits. Technical standards/incorporated ANSI material not completed; no actual accuracy classification or tolerance calculation supplied.
Source links captured in this table

Captured table 04

Source ID · Issuer/title and complete literal HTTPS URL · Actual read bounds · 8 data rows

Source IDIssuer/title and complete literal HTTPS URLActual read boundsVersion, effectiveness and limitation
S_WA-P14-S011Washington UTC, WSR 20-16-077, permanent rules. Filing notice: https://lawfilesext.leg.wa.gov/law/wsr/2020/16/20-16-077.htm. Adopted text: https://lawfilesext.leg.wa.gov/law/wsr/2020/17/20-16-077.htm. Issue PDF: https://app.leg.wa.gov/documents/laws/wsr/2020/17/20-17PERM.pdfFiling notice; adoption/status discussion, especially ¶¶24–28; selected adopted -023, -128 and -133 clauses, including new notices, remote provisions, medical provisions and deletion of the former repeat-medical restriction. PDF printed p.1/index 0 header material only. Current complete operative sections independently read as S008/S009.Filed July 29, 2020; stated effective August 29, 2020. Full comment matrix and all appendices were not a substantive foundation. HTML/PDF are one instrument, not independent corroboration.
S_WA-P14-S012Washington Legislature, 2026 c 137, EHB 2575, session law. https://lawfilesext.leg.wa.gov/biennium/2025-26/Pdf/Bills/Session%20Laws/House/2575.SL.pdf?cite=2026+c+137+s+8Cover/index 0; complete §8, printed pp.16–20/PDF indices 16–20; final §10, printed p.25/index 25, and enactment tail.Stated effective June 11, 2026. Section 8 reenacts RCW 80.28.010 and changes the reporting/savings provision; it does not replace the winter/heat conditions with an unconditional assistance entitlement. Parsed text, not page-pixel review.
S_WA-P14-S013Washington Legislature, 2025 c 263, 2SHB 1514. https://lawfilesext.leg.wa.gov/biennium/2025-26/Pdf/Bills/Session%20Laws/House/1514-S2.SL.pdf?cite=2025+c+263+s+4Cover/index 0; material §4 winter/heat amendments within printed pp.10–14/indices 10–14; complete §26, printed p.28/index 28. A later attempt to complete an additional §4 tail window failed; that failure does not undo the earlier reads.Cover states July 27, 2025. Section 26 contains a funding-specific null-and-void condition tied to June 30, 2025. Enacted-budget fulfillment was not authenticated. Thermal-energy expansion is not treated as completed in this electricity/natural-gas pass.
S_WA-P14-S014Washington Legislature, 2023 c 105, ESHB 1329. https://lawfilesext.leg.wa.gov/biennium/2023-24/Pdf/Bills/Session%20Laws/House/1329-S.SL.pdf?cite=2023+c+105+s+6Cover/index 0; complete §6, printed pp.12–16/indices 12–16. Read additions/deletions in the winter and heat provisions.Stated effective July 23, 2023. Material deletion of winter deposit/reconnect-charge language and addition of heat protections authenticated. Other provider regimes in the act not completed.
S_WA-P14-S015Washington UTC, WSR 16-06-038, billing corrections. Filing notice: https://lawfilesext.leg.wa.gov/law/wsr/2016/06/16-06-038.htm. Adopted original: https://lawfilesext.leg.wa.gov/law/wsr/2016/07/16-06-038.htmHeader; material explanatory paragraphs, especially ¶¶15–22, 28–31, 34–39, adoption/effect paragraphs and ¶¶43–44; complete Appendix B adopted -178(1)–(8) for both services.Filed February 23, 2016; stated effective March 25, 2016. Formal agency adoption explanation, not a judicial decision. Proposed alternatives and commenter examples are not current rules or examples in this report.
S_WA-P14-S016Washington UTC, WSR 26-14-084, semiannual rule-development agenda. https://lawfilesext.leg.wa.gov/law/wsr/2026/14/26-14-084.htmHeader and complete relevant “customer notice and fees” agenda entry; surrounding agenda read for status.Filed June 29, 2026, agenda for July–December 2026. It identifies contemplated permanent fee/deposit changes and projected rulemaking milestones. Not an adoption, operative suspension, or proof of completion.
S_WA-P14-S017Washington Department of Commerce, Low-Income Home Energy Assistance Program. https://www.commerce.wa.gov/community-opportunities/liheap/Generic program services, eligibility-guide qualification, FAQs and links to plan material; no provider map or participant information investigated.Official program guidance, not the adopted state-plan body. Numerical guide information is not substituted for the statute’s incorporated current plan.
S_WA-P14-S018Washington Department of Commerce, Help shape the future of energy assistance in Washington. https://www.commerce.wa.gov/help-shape-the-future-of-energy-assistance-in-washington/Complete substantive announcement and draft-plan status language.Announces a 2027 draft model plan published June 29, 2026. It does not establish final adoption/approval or current operative eligibility. Linked draft retrieval failed.
Source links captured in this table

Captured table 05

Claim ID · Precise assertion · Authority, conditions and confidence limits · 17 data rows

Claim IDPrecise assertionAuthority, conditions and confidence limits
S_WA-P14-C001The UTC has statutory authority over covered public-service utility operations and to adopt implementing rules; the electric/gas consumer chapters expressly require commission jurisdiction.S001 §80.01.040; S002 §80.04.160; S008/S009 -003, -023. Actual provider/service jurisdiction is not established.
S_WA-P14-C002“Electrical company” and “electric plant” depend on the enacted ownership/operation/for-hire criteria, with railroad and specified cogeneration exceptions.S002 §80.04.010(4), (9), (11)–(12), (19). Cogeneration solely for own/tenant use or specified wholesale recipients is excluded on the stated conditions, unless otherwise an electrical company.
S_WA-P14-C003The gas chapter’s utility definition requires commission jurisdiction, a Washington gas plant and public compensated gas service. Natural gas is a defined subset of the chapter’s broader “gas” category.S002 §80.04.010(14)–(15); S009 -023, complete gas/natural-gas/utility definitions. Other fuels are not completed here.
S_WA-P14-C004Ownership or operation of a cogeneration facility alone does not establish public-service-company status.S002 §80.04.010(23). This is not a blanket landlord, master-meter or private-generation exclusion.
S_WA-P14-C005RCW 80.04.500 restricts UTC orders affecting specified city/town utility rates, charges, contracts and service; it does not declare all Title 80 provisions inapplicable to municipal utilities.S002 §.500, complete paragraph. Its separate safety wording is narrower than its rate/service wording; no complete municipal gas-safety regime is determined.
S_WA-P14-C006PUD electric rate and service authority has an express statutory independence from UTC jurisdiction.S003 §54.16.040, complete section. The UTC arrears rules therefore are not transferred to PUD service merely because it is residential electricity.
S_WA-P14-C007The read cooperative statutes preserve locally regulated electric-utility categories and do not confer new UTC rate/service jurisdiction.S004 §54.48.040; S005 §23.86.400(2)–(3); S006 §24.06.600(2)–(3). A cooperative label alone does not finish legal classification.
S_WA-P14-C008Inconsistent tariff provisions are not automatically validated by filing or acceptance. Rule exemptions require the specified commission process, and statutory duties remain.S008/S009 -003, -008, -013; S010 -110. RCW 80.28.010(12) separately prevents an oral/written agreement from waiving that chapter’s protections.
S_WA-P14-C009“Applicant” and “customer” include specified jointly responsible applicants; “customer” can include an involuntarily disconnected person seeking reconnection.S008/S009 -023. These definitions do not prove actual acceptance, joint liability or a balance.
S_WA-P14-C010These chapters define a business day as Monday–Friday, 8 a.m.–5 p.m., excluding official state holidays.S008/S009 -023. This does not convert an unqualified “day” into a business day or supply every computation rule.
S_WA-P14-C011Covered charges must be just, fair, reasonable and sufficient; covered service and utility rules must meet the statute’s safety, adequacy and reasonableness standards.S007 §80.28.010(1)–(3), (11). No rate reasonableness or service-entitlement determination is made.
S_WA-P14-C012The filed-and-effective schedule supplies the general rate/charge baseline, subject to the statute’s express exceptions and uniform-treatment provision.S007 §§.050, .080(1)–(2); S008/S009 -028. Listed free/reduced-rate exceptions were read; the utility-theft damages incorporation is not a completed ordinary-arrears fee pathway.
S_WA-P14-C013The electric application rule permits resale only as authorized by tariff; the gas application rule prohibits customer remetering/submetering for resale.S008/S009 -108. This is a rule for covered utility service, not a completed landlord-rebilling or tenancy analysis.
S_WA-P14-C014Refusal of new/additional service is governed by enumerated safety, standards, protective-device, rights-of-way and other conditions, with commission approval required for the additional refusal route.S008 -123(1)–(2), (5)–(6); S009 -123(1), (4)–(5); S007 §.110. Technical incorporations and the initiative-dependent gas branch remain held.
S_WA-P14-C015The residential “prior obligation” rule limits refusal of new/additional service because of billed debt existing at a prior nonpayment disconnection; deposits are excluded from that defined amount.S008 -123(3); S009 -123(2). Winter-plan-default customers are expressly excepted. Fee/deposit conditions remain subject to C017.
S_WA-P14-C016Prior-occupant debt alone is not a refusal ground; the rule requires objective evidence of the specified cooperative fraud to use that exception.S008 -123(4); S009 -123(3). A deposit criterion involving a prior customer living at the premises is a different provision, not debt succession.
S_WA-P14-C017Present authority to collect residential deposits and identified late/disconnection/reconnection/site fees is not fully authenticated in this pass.Current S008/S009 text; S016 agenda; failed official suspension-announcement route F006. This is a currentness hold, not a finding that every listed charge is currently allowed or currently forbidden.

Captured table 06

Claim ID · Precise assertion · Authority, conditions and confidence limits · 32 data rows

Claim IDPrecise assertionAuthority, conditions and confidence limits
S_WA-P14-C018Bills must meet the prescribed issuance interval and identify the amount due, delinquency date, contact information, usage/read information, applicable charges and required tax/proration/estimate information.S008/S009 -178(1). Electric units and gas units differ. Content does not prove correct usage or a lawful amount.
S_WA-P14-C019For fractional billing periods, the default proration rules distinguish flat-rate service from metered service and the full basic/minimum charge.S008/S009 -178(1)(h). Express tariff variation remains possible; no amount calculated.
S_WA-P14-C020Estimated billing must be identified, use a tariff-described method and observe the four-consecutive-month restriction unless a listed exception applies.S008/S009 -178(1)(i): inclement weather, terrain or a previous customer arrangement.
S_WA-P14-C021The ordinary bill-payment minimum is measured from mailing, with different inside/outside WA–OR–ID periods; a satisfactory reason requires accommodation of a changed due date before the next billing date.S008/S009 -178(2)–(3). Receipt is not substituted for mailing.
S_WA-P14-C022Electronic billing and related communications require the specified affirmative consent, records and format safeguards; electronic timing is treated as mailing from Washington.S008/S009 -178(4), -179 introduction, (1)–(3). Separate services require separate affirmative consent.
S_WA-P14-C023Disconnection notices and specified winter-protection information cannot be delivered solely electronically. Ordinary electronic-document paper-request limits do not erase that requirement.S008/S009 -179(4)–(6); -128(4). Specialized-format disputed billing must be understandable to the reviewer.
S_WA-P14-C024Undeliverable electronic information triggers corrective communication and, if unresolved, paper delivery and return to mail notification under the rule’s alternative time branches.S008/S009 -179(7). A sent electronic message is not assumed received.
S_WA-P14-C025Cash payments require receipts, and designated payment-agency arrangements must provide the prescribed reasonably accessible, no-charge payment opportunity.S008/S009 -138(3), -188. This does not establish a universal free-credit-card-payment rule.
S_WA-P14-C026The codified existing-customer deposit grounds are at least three delinquency notices in the prior twelve months, nonpayment disconnection, or the stated indebted prior customer living at the residence.S008/S009 -113(1). Codified criteria only; C017 remains controlling as a hold.
S_WA-P14-C027Applicant deposit criteria separately include the specified prior history, conjunctive employment/income condition, ownership/purchase condition, resident prior-customer debt and overdue residential utility balance.S008/S009 -113(2). The employment clause is not reduced to unemployment alone. No applicant classified.
S_WA-P14-C028The codified residential deposit ceiling uses estimated annual billings: two-twelfths for monthly billing or three-twelfths for bimonthly billing.S008/S009 -113(3). Customer/location wording is preserved; no new per-request allowance or actual estimate assumed. C017.
S_WA-P14-C029The deposit installment option is half before service and the remainder in equal amounts over the next two months on mutually agreed dates; other mutually acceptable arrangements are permitted.S008/S009 -113(4). It is not proof that a deposit may presently be demanded.
S_WA-P14-C030Inability to pay a deposit invokes the listed alternatives: qualifying prepayment, satisfactory guarantor, winter-program route or the conditioned similar-utility reference opportunity.S008/S009 -113(5). Guarantor exposure is bounded by the notice/deposit terms unless an additional amount is agreed as specified.
S_WA-P14-C031Additional deposits require written reasons and the existing-customer criteria; deposit-plus-interest transfer/refund is subject to the old-address balance offset stated in the rule.S008/S009 -113(6)–(7). No new numerical cap is created by an additional request. C017.
S_WA-P14-C032Deposit interest uses the rule’s annual one-year Treasury Constant Maturity reference and runs from deposit to refund/application.S008/S009 -113(9). The referenced annual rate, compounding and rounding are not calculated or supplied.
S_WA-P14-C033Satisfactory-payment release requires twelve consecutive months, no initiated disconnection process and no more than two delinquency notices; termination release permits the stated amount-due offset.S008/S009 -113(10). Collection suspension does not establish that an existing held deposit has no interest/refund duties.
S_WA-P14-C034Deposit demand timing after service and satisfactory-payment refund methods have distinct mailing/delivery and billing-month triggers.S008/S009 -113(8), (11). Quantities are registered below; the fifteen-day satisfactory-payment check rule is not declared a universal termination-refund deadline.
S_WA-P14-C035A qualifying billing correction must use the rates applicable during the affected billing periods and be issued within sixty days of discovery.S008/S009 -178(5)(a). Meter failure, malfunction, unassigned usage and other inaccurate/unbilled usage are covered as defined.
S_WA-P14-C036The ordinary underbilling collection restriction is six months under the source’s “from the date the error occurred” wording, subject to express exceptions.S008/S009 -178(5)(a), (7); S015 ¶¶28–31. No actual first/last included billing period is selected.
S_WA-P14-C037Six years is the maximum period for which -178 requires overbilling adjustment.S008/S009 -178(5)(a). This is not presented as a universally applicable suit limitation or a prohibition on every other possible refund remedy.
S_WA-P14-C038Specified interference/illegal-connection/fraud underbilling is excepted from the six-month restriction; nonresidential good-cause extensions are a separate branch; recovery of underbilling below fifty dollars may be forgone.S008/S009 -178(7). Nonresidential flexibility is not imported into ordinary residential billing. “Below” is strict.
S_WA-P14-C039Corrected-bill information must explain the reason, monthly breakdown, total correction, covered period and applicable payment-arrangement availability.S008/S009 -178(6), incorporating -138(1). An explanation does not establish that the correction is accurate.
S_WA-P14-C040A compliant estimated-reading true-up is not treated as a corrected bill under -178(5)(a).S008/S009 -178(8), with (1)(i). The classification predicate must be established before applying this exception.
S_WA-P14-C041The initial requested meter test has a twenty-business-day test/report duty and one-free-test-in-twelve-months baseline, subject to the stated commission waiver/extension/charge route.S008/S009 -183(1)–(2). Access and witness/sealing provisions were read; no test or access step performed.
S_WA-P14-C042Additional-test charges depend on tariff authority and a finding within the incorporated accuracy tolerance; an out-of-tolerance additional test cannot be charged under this clause.S008/S009 -183(3), -338. Full technical incorporation and actual accuracy remain held.
S_WA-P14-C043Commission notification of a meter complaint restricts alteration of the meter without commission authorization; a violation may support the customer’s dispute.S008/S009 -183(4). This is discretionary evidentiary treatment, not an automatic adjudicated billing result.
S_WA-P14-C044An excessive meter error triggers repair/replacement without customer cost and adjustment using the best available information, subject to the complete adjustment framework.S008/S009 -183(5), -178; S015. The -183 payment-arrangement reference is to -138(2), while -178(6)(e) refers to -138(1).
S_WA-P14-C045The 2016 adoption order explains that the newer underbilling restriction also limits collection after an older meter-test rule identifies an earlier defective-meter date.S015 ¶¶28–31, Appendix B; current S008/S009 -178(5). Formal agency explanation established; full judicial construction and other adjustment issues remain open.
S_WA-P14-C046Delayed residential billing requires a payment-arrangement length equal to the delay, subject to the stated unauthorized-use exception.S008/S009 -138(1). Its citation to -128(2)(f) is stale; that subsection now concerns detrimental equipment. Do not silently substitute a new exception pointer.
S_WA-P14-C047Equal-payment plans use historical or projected usage; the WAC states particular refusal conditions, while RCW 80.28.010(7) contains a residential offer duty and additional low-income availability protections.S008/S009 -138(2); S007 §.010(7). The interaction is not treated as unconditional permission to deny a statutory option.
S_WA-P14-C048No general numerical residential late-fee, returned-payment or collection-charge amount was established from the selected generic provisions. Payment-allocation priority beyond express clauses also remains unestablished.S007 §§.050/.080; S008/S009 -128, -178, -195; C017. Unknown amounts are not unlimited-charge permission; combined-service attribution is not a complete partial-payment allocation rule.
S_WA-P14-C049Tariff-change notice depends on classification under -194 versus -195. A -195 notice accompanying the first bill after an effective change does not independently authorize the charge.S008/S009 -193 through -197; S007 §.060. Electric “per-occurrence” wording and gas purchased-gas-adjustment exceptions are not flattened into one rule.

Captured table 07

Claim ID · Precise assertion · Authority, conditions and confidence limits · 19 data rows

Claim IDPrecise assertionAuthority, conditions and confidence limits
S_WA-P14-C050Delinquent covered-service charges are a codified notice-based ground, subject to the medical and maintained winter-plan exceptions and other applicable protections.S008/S009 -128(2)(a). Inclusion of “required deposit” does not overcome C017.
S_WA-P14-C051Other notice-based grounds include unauthorized purpose/property, increased flat-rate use, required-access problems, rule/agreement/tariff violations and detrimental equipment, on the stated conditions.S008/S009 -128(2)(b)–(f); -168. Access is limited to the rule’s authorized-representative, reasonable-hours and necessary-function terms.
S_WA-P14-C052Nonregulated-service debt is not a disconnection ground under -128(3); combined gas/electric accounts require a reason attributable to the service being disconnected and distinct identification of affected services.S008/S009 -128(3), (4)(e). Neither every fee nor every combined-account balance is classified here.
S_WA-P14-C053The ordinary process requires at least two notices. The first is paper mail or primary-door delivery, with the source’s minimum timing and additional consented electronic copy.S008/S009 -128(4)(a)(i), (5). Outside WA/OR/ID mailing uses “eleven days,” not “eleven business days.”
S_WA-P14-C054The second notice combines an electronic copy where contact information/consent exist with one authorized door, mail or telephone branch.S008/S009 -128(4)(a)(ii). Electronic consent does not eliminate the prescribed other branch.
S_WA-P14-C055Telephone second notice requires at least two attempts during regular business hours, the prescribed lead time and retained call records; unsuccessful actual contact requires paper fallback.S008/S009 -128(4)(a)(ii)(C). An attempted call alone does not complete every branch.
S_WA-P14-C056Notices must identify cause, regulated-service amount, avoidance/assistance/payment information, relevant charges and utility contact information; winter and electric-remote notices have additional content.S008/S009 -128(4)(b); S007 §.010(5)(a), (9)(a). No notice was prepared or evaluated.
S_WA-P14-C057Inaccurate/incomplete notices require correction and necessary date recalculation; failure to disconnect within the stated ten-business-day window requires restarting notices unless a payment arrangement was agreed.S008/S009 -128(4)(c)–(d). The gas wording’s cross-reference to required information differs from the electric wording; no factual sufficiency determination follows.
S_WA-P14-C058Different billing/service users and master-meter occupants have additional notification protections; the specified service-user request triggers at least five extra days.S008/S009 -128(4)(f), (i). This regulates the covered utility’s conduct, not the complete landlord/tenant relationship.
S_WA-P14-C059Except danger to life or property, disconnection is barred on weekends, legal holidays and days when restoration cannot occur the same or following day.S008/S009 -128(4)(g). No universal ordinary-disconnection hour window beyond the actual text is supplied.
S_WA-P14-C060A dispatched disconnection representative must accept delinquent-account payment; change need not be supplied, but overpayment must be credited.S008/S009 -128(4)(h). A tariff-mentioned visit fee remains subject to C017 and actual tariff authority.
S_WA-P14-C061Third-party designation must be offered; specified incapacity concerns require reasonable inquiry, third-party notice and the additional delay.S008/S009 -128(4)(k). No incapacity or responsible agency is presumed.
S_WA-P14-C062Listed licensed/certified medical-facility categories require notice to the specified state department and customer, with a request-dependent delay; electric remote disconnection is additionally restricted.S008/S009 -128(4)(j). Facility status and full licensing regimes are not verified.
S_WA-P14-C063Electric remote nonpayment disconnection has a morning-only window, same-day payment/restoration opportunity, particular pre-disconnection visit duties and a no-site/no-fee rule.S008 -128(6). Critical-infrastructure incorporation and actual implementation remain held.
S_WA-P14-C064Gas remote disconnection and reconnection require commission authorization under the respective rules.S009 -128(6), -133(2). No authorization or actual remote capability was investigated.
S_WA-P14-C065The without-prior/further-notice branch is confined to enumerated investigation, vacancy, hazard, dishonored-payment, broken-arrangement and unauthorized-use conditions.S008/S009 -128(7)(a). Some branches expressly require prior compliant notice; ordinary delinquency is not transformed into immediate-action authority.
S_WA-P14-C066Dishonored payment alone is not fraud. The utility bears the stated fraud burden; first and repeated theft/tampering/fraud branches differ.S008/S009 -128(7)(a)(i). Tariff-estimated service, resulting costs and any required deposit are source categories, not verified charges or findings here.
S_WA-P14-C067After a qualifying no-prior-notice disconnection, reasonable efforts to explain the reason and dispute route are required within five business days.S008/S009 -128(7)(b)–(c). The subsection expressly does not eliminate civil/criminal responsibility.
S_WA-P14-C068Disconnection is prohibited while the customer pursues a remedy/appeal provided by these rules or qualifying discussions, subject to payment of undisputed amounts and correction of dangerous conditions.S008/S009 -128(10). This is not a conclusion that every communication, lawsuit or unpaid disputed account creates an unconditional stay.

Captured table 08

Claim ID · Precise assertion · Authority, conditions and confidence limits · 13 data rows

Claim IDPrecise assertionAuthority, conditions and confidence limits
S_WA-P14-C069Residential space-heating protection operates during the November 15–March 15 period only when the statutory conditions are met. Notice of inability should ordinarily follow within five business days of an overdue notice, but lateness does not permanently foreclose regaining protection.S007 §.010(4)(a); S008/S009 -143(1). Extenuating circumstances and statutory reconnection language preserved.
S_WA-P14-C070The winter income predicate uses prior-twelve-month household self-certification to the designated Commerce grantee and the maximum under the incorporated state energy-assistance plan.S007 §.010(4)(b); S008/S009 -143(1)(b). Grantee verification is permitted; current final-plan threshold remains held.
S_WA-P14-C071The winter route also requires applications for applicable heating assistance, commitment of assistance to current/future utility bills, and weatherization application if available for the dwelling.S007 §.010(4)(c)–(d); S008/S009 -143(1)(c)–(d). Availability, application and benefit approval are different predicates.
S_WA-P14-C072The statutory winter required-payment ceiling combines seven percent of monthly income with one-twelfth of qualifying post-application arrearage.S007 §.010(4)(e). Older -143 wording uses “billings” in one sentence and “past-due amounts” in another; exact reconciliation is held rather than silently broadening the statutory base.
S_WA-P14-C073Agreement to pay a higher winter percentage does not make a payment below that voluntary promise a default unless it falls below the statutory threshold.S007 §.010(4)(e); S008/S009 -143(1)(e). No payment amount or income supplied.
S_WA-P14-C074The winter plan must address continued service and payment of the past-due bill by the following October 15; nonpayment by that target affects future protection, and moving does not erase the obligation.S007 §.010(4)(e)–(f); S008/S009 -143(1)(e), (g). No actual future eligibility determined.
S_WA-P14-C075Utilities must assist with winter requirements and provide the required information/plan; the WAC requires same-service-area plan transfer and recalculation when qualifying assistance is received.S007 §.010(5); S008/S009 -143(1)(f), (2). The statute’s transfer authorization and rule’s duty are identified separately.
S_WA-P14-C076A qualifying winter-plan defaulter can regain protection through the statute’s amount that would have been due under the plan, absent default, at reconnection.S007 §.010(5)(d)–(e). This is not automatically the entire historical account balance. Other lawful nonpayment-independent grounds remain separate.
S_WA-P14-C077The 2023 original removed winter deposit/reconnection-charge wording that remains in the older WAC text.S014 §6; S007 §.010(4)(a), (5)(d); S008/S009 -143(1)(a), (2)(e). Current charge collection is held; the older text is not used to restore deleted statutory conditions.
S_WA-P14-C078RCW 80.28.010(8) requires an approved tariff prohibiting nonpayment termination of covered residential electric service on the specified NWS heat-alert day; natural-gas service is not listed in that subsection.S007 §.010(8), complete; S014 §6; S012 §8. Includes issued or announced-intended alerts for the relevant area. No actual alert checked.
S_WA-P14-C079The statutory heat route permits a nonpayment-disconnected residential user to request reconnection; the utility must promptly make a reasonable attempt and may require a compliant payment plan.S007 §.010(9). The approved notice/request process and actual request are unestablished; no guaranteed physical restoration time is invented.
S_WA-P14-C080A payment plan required under the heat-reconnection branch cannot require monthly payments exceeding six percent of monthly income; its May 15 target can extend as specified to preserve that ceiling.S007 §.010(10). Voluntary higher payments, the lower default threshold and later-assistance reformulation are expressly preserved.
S_WA-P14-C081Both electric and gas rules require tariff conditions under which nonvoluntary disconnections cease during inclement weather.S008/S009 -128(11). No actual tariff was read; no temperature threshold, statewide gas heat moratorium or universal winter shutdown is inferred.

Captured table 09

Claim ID · Precise assertion · Authority, conditions and confidence limits · 8 data rows

Claim IDPrecise assertionAuthority, conditions and confidence limits
S_WA-P14-C082A qualifying verbal or written medical notification triggers a five-business-day postponement/reinstatement grace period when residential service is subject to disconnection or has been disconnected.S008/S009 -128(8), opening paragraph. The condition must require continued electricity/gas; no condition label is treated as sufficient.
S_WA-P14-C083The medical restoration clause uses same-day/same-business-day language for a timely request and otherwise noon the next business day; upfront reconnection/deposit payment is not a prerequisite under that clause.S008/S009 -128(8), second paragraph. Later billing language does not establish that a fee is presently lawful; C017 remains.
S_WA-P14-C084Certification may be required within five business days from the source-defined medical professional, with only the listed residence, aggravation explanation, expected duration and certifier information.S008/S009 -128(8)(a). The codified professional definition is preserved; no medical-license or certification determination is made.
S_WA-P14-C085Certification lasts only for the certified health-endangerment period, at most sixty days unless renewed.S008/S009 -128(8)(b). Renewal is not inferred to be automatic or indefinite.
S_WA-P14-C086Medical protection does not excuse delinquent or ongoing charges; the rule permits the specified ten-percent payment, remaining-balance arrangement within 120 days and ongoing-bill promise, while forbidding demands exceeding the prescribed requirements.S008/S009 -128(8)(c). Alternate plans may be agreed. “Minimum” wording is read together with the no-more-than-prescribed sentence.
S_WA-P14-C087The medical plan must be confirmed within two business days; specified certification/payment/plan failures require the prescribed second-notice process, including an additional second notice if one was previously given.S008/S009 -128(8)(c)–(d). Failure does not itself establish an immediate lawful cutoff.
S_WA-P14-C088The older twice-in-120-days restriction was deleted in the 2020 amendment and is absent from the current medical subsection.S011 adopted -128 replacement; current S008/S009 -128(8). This removes that historical restriction as a current premise; it does not establish unlimited protection regardless of other conditions.
S_WA-P14-C089Medical/low-income status falls within account-and-usage information; utility safeguards, limited collection/use/disclosure and consent requirements apply, with express lawful-demand and other exceptions.S008/S009 -023 and -153(1)–(8). RCW 19.29A/19.255, special-contract and federal medical/disability interfaces are not fully completed. No absolute-confidentiality claim.

Captured table 10

Claim ID · Precise assertion · Authority, conditions and confidence limits · 15 data rows

Claim IDPrecise assertionAuthority, conditions and confidence limits
S_WA-P14-C090Ordinary restoration requires every reasonable effort within the source-stated time after the applicable charge is paid or agreed to be billed and one of the specified cause-removal/payment/arrangement branches is satisfied.S008/S009 -133(1)(a)–(c). Electric remote restoration has a separate four-hour relation. Fee/deposit currentness and “prior obligation” distinctions remain.
S_WA-P14-C091Electric disconnection/reconnection fees are prohibited by the specified clauses when no site visit is required.S008 -128(6)(e), -133(2). This is an express codified no-fee rule, not permission to charge whenever a visit occurs.
S_WA-P14-C092The commission may require reconnection pending a dispute over the propriety of disconnection.S008/S009 -133(3). A request or informal complaint is not itself such an order.
S_WA-P14-C093Utilities must acknowledge, investigate, report on and appropriately correct complaints, with supervisor and commission-escalation information under the stated sequence.S008/S009 -173(1)–(2). “Promptly” is not replaced with an invented fixed deadline.
S_WA-P14-C094Commission-referred informal complaints have separate two-/three-business-day reporting branches and a minimum three-year utility complaint-record retention duty.S008/S009 -173(3)–(4). Commission extensions/specified dates are preserved.
S_WA-P14-C095The informal commission process investigates and seeks compliance but does not result in a hearing or order; a formal proceeding ends informal processing of that subject.S010 -910(3)–(5). No actual complaint or debt determination.
S_WA-P14-C096Formal complaints require the statutory/rule jurisdictional and pleading predicates; the commission’s commencement decision and final merits are separate from submission.S002 §.110; S010 -305, -370. Only the indispensable generic interface was read, not full litigation/adjudication.
S_WA-P14-C097A complaint attacking the reasonableness of a rate schedule has the special statutory sponsorship threshold, distinct from an ordinary service/billing complaint.S002 §.110(1)(b): commission’s own motion, specified municipal sponsorship, at least twenty-five consumers/purchasers, or at least twenty-five percent.
S_WA-P14-C098The reparations statute requires investigation and specified findings of an excessive/exorbitant charge and entitlement before the commission orders the excess with interest from collection.S002 §.220. Interest rate and completed recovery procedure are not established here.
S_WA-P14-C099The unlawful-overcharge statute permits a refund order after investigation and a finding that collection exceeded the lawful rate, with interest from collection.S002 §.230. “May” is preserved; no automatic refund from an allegation.
S_WA-P14-C100RCW 80.04.440 provides liability for loss caused by the stated unlawful act or required-act omission; a wilful finding permits a discretionary reasonable attorney fee in a recovery.S002 §.440, complete. Causation, recovery, wilfulness and court jurisdiction are unestablished.
S_WA-P14-C101A complete court-overcharge recovery pathway is not established: RCW 80.04.240 contains a special exclusive procedure and deadline provisions that remain outside this pass’s limitation/court scope.S002 §.240, read to preserve this boundary. No deadline, election or cumulative-recovery conclusion.
S_WA-P14-C112Customer-directed termination has separate notice and usage-liability conditions, including a different electric remote-capability branch. Moving without a qualifying request does not automatically end responsibility under the rule.S008/S009 -128(1). No move, termination request or final bill is supplied.
S_WA-P14-C113Payment at a designated agency counts under the disconnection rule when the customer informs the utility and the utility verifies it; verification must be prompt.S008/S009 -128(9). Dispatch, deposit of funds and verified payment are not treated as identical events.
S_WA-P14-C114Generic consumer-information and tariff-access duties exist, including descriptions of credit, deposits, billing, disconnection and disputes.S008/S009 -103, -193. No actual brochure, tariff, private policy or provider compliance was inspected.

Captured table 11

Claim ID · Precise assertion · Authority and limit · 10 data rows

Claim IDPrecise assertionAuthority and limit
S_WA-P14-C102WSR 20-16-077 expressly adopted the identified amendments with an August 29, 2020 effective date.S011 filing notice, ¶¶25–28 and selected adopted clauses. Publication in a later Register issue is not a different effective date.
S_WA-P14-C103WSR 16-06-038 expressly adopted the billing-correction amendments effective March 25, 2016.S015 header, adoption/effect provisions and Appendix B. Current -178 was also separately read.
S_WA-P14-C104The 2023 heat/winter changes are enacted text with the session law’s stated July 23, 2023 effective date.S014 cover and §6; current S007. No application to an invented historical event.
S_WA-P14-C105The 2025 original contains a specific funding condition; fulfillment was not authenticated through an enacted budget body.S013 §26; F011/F015. No inference of either failure or fulfillment from the failed route.
S_WA-P14-C106The 2026 original reenacts the operative winter/heat provisions and substitutes encouragement concerning savings from reporting removal.S012 §8 and cover; S007 §.010(14). Effective June 11, 2026 as stated; encouragement is not an approved assistance award.
S_WA-P14-C107The 2026 fee/customer-notice agenda is planning material and does not prove adoption, suspension expiration or present fee authority.S016 relevant agenda row. Projected dates are not accomplished legal events.
S_WA-P14-C108The current operative LIHEAP-plan threshold incorporated by the winter statute was not authenticated.S017 guide; S018 draft announcement; failed linked plan routes F008/F009. No guide figure substituted.
S_WA-P14-C109Stale rule references remain visible in the current text and must not be silently repaired.S008/S009 -123’s -128(2) reference; -138(1)’s -128(2)(f); -183(3)’s -128(9); -183(5)’s -138(2) compared with -178(6)(e)’s -138(1).
S_WA-P14-C110No complete federal, local, tribal, public-provider, tariff, disability or judicial-construction conclusion is supplied.Deliberate scope boundary and B001–B030. Only the state text’s express incorporations are identified.
S_WA-P14-C111The read protections regulate continuation/restoration and payment conditions; they do not themselves establish cancellation of an actual service debt.Especially S007 §.010(4)(f); S008/S009 -128(8)(c), -133, -143. No debt validity or discharge determination.

Captured table 12

Comparison · Source-supported distinction · Claims · 10 data rows

ComparisonSource-supported distinctionClaims
UTC-regulated service / municipal-PUD-cooperative serviceJurisdictional statutes and definitions must be satisfied before using these WAC rules. Separate public-provider protection statutes may exist; they were not completed.C001–C008
Natural gas / electricityThe consumer chapters are parallel but not identical. Electric remote-disconnection safeguards and electric heat-alert coverage cannot be copied into gas rules.C003, C063–C064, C078–C081
Utility customer / service user / landlordThe rules contain occupant and master-meter notice protections without completing landlord rent allocation, tenancy or rebilling law.C009, C013, C058
Service charge / deposit / disputed charge / nonregulated debtDistinct billing and disconnection treatment; neither a combined bill nor a deposit criterion establishes an inherited or collectible debt.C015–C017, C026–C034, C052, C068
Codified deposit formula / current collection permissionThe formula was read; current suspension and tariff conditions remain unresolved.C017, C028, C048, C107
Equal-payment budget plan / delayed-bill arrangement / winter plan / medical plan / heat planDifferent eligibility, payment base, timing and duties. No universal arrears plan or zero-payment entitlement was established.C046–C047, C069–C087
Ordinary nonpayment / fraud or dangerous-condition branchOrdinary notice requirements cannot be bypassed by relabeling a delinquent bill. Exceptional branches have their own predicates.C050–C067
Mailing / delivery / receipt / verificationThe provisions use different events. In particular, ordinary bill payment begins from mailing; medical grace begins from notification received; agency payment has a verification condition.C021, C024, C053–C055, C082, C113
Informal complaint / formal proceeding / reconnection orderInformal processing produces no order; formal initiation and a commission reconnection order are separate.C092–C097
Billing-adjustment period / suit limitationThe correction rule’s periods are not imported into the excluded limitation or special court-recovery analysis.C035–C045, C101

Captured table 13

Quantity ID · Source-stated quantity/relation · Base, trigger, boundary and exception · 61 data rows

Quantity IDSource-stated quantity/relationBase, trigger, boundary and exceptionAuthority/claims
Q001Business day: Monday–Friday, 8 a.m.–5 p.m.Official state holidays excluded. No universal conversion of “days” into business days.S008/S009 -023; C010
Q002Bills at intervals no longer than two one-month billing cyclesUtility may establish good cause for delay. Not a disconnection-notice period.-178(1)(a); C018
Q003Flat-rate fractional-period charge uses the proportionate part of the service period; metered service uses metered amount with full basic/minimum chargeDefault relation only; tariff can specify otherwise. No rate or rounding supplied.-178(1)(h); C019
Q004No more than four consecutive months of estimated billingInclement weather, terrain or previous arrangement exceptions; tariff method required.-178(1)(i); C020
Q005At least 15 days after mailing within WA/OR/ID; 18 days if mailed from outsideMailing origin, not recipient residence, selects this branch. “Days” are not labeled business days here.-178(2); C021
Q006Changed due date must be before the next billing dateSatisfactory reason required. No fixed number of extra days.-178(3); C021
Q007Return from electronic to printed billing within two billing cyclesCustomer request; electronic consent record retained.-178(4); C022
Q008Ordinary paper-document requests may be limited to three in twelve months while electronic delivery continuesDoes not remove mandatory paper treatment of disconnection/winter material; free opt-out preserved.-179(2)(d), (4)–(5); C023
Q009Undeliverable electronic correction by next business day, or within five business days if bill due date is extended five business daysTrigger is returned/otherwise known undeliverable information; unresolved problem requires mail and format reversion.-179(7); C024
Q010Existing-customer deposit criterion: three or more notices in prior twelve monthsSeparate from nonpayment-disconnection and resident-prior-customer-debt grounds. Collection status held.-113(1); C026
Q011Applicant employment inquiry: twelve consecutive monthsLack of proof operates together with neither current employment nor regular income; not an unemployment-only test.-113(2)(b); C027
Q012D ≤ (2/12) × A, monthly billing; D ≤ (3/12) × A, bimonthly billingSource says deposits for a customer/location. No new allowance per demand; no current permission inferred.-113(3); C028
Q013Deposit option: 50% before service, remainder equally over next two monthsMutually agreed dates; other mutually acceptable arrangement possible.-113(4); C029
Q014Guarantor amount: notice amount, ordinarily not exceeding the deposit ceilingAdditional agreed guarantee under the specified provision is separate. No guaranty created.-113(5)(b), (7); C030
Q015Deposit transfer/termination relation: deposit + accrued interest − specified amounts owingTransfer within service territory and termination have distinct wording. No negative-refund or additional-liability formula invented.-113(6), (10)(b); C031–C033
Q016After-service deposit due no earlier than 5 p.m. on sixth business day after qualifying mailed notice; ninth business day for outside WA/OR/ID mailingPersonal delivery: no earlier than 5 p.m. sixth business day from delivery. Exact application and current collection held.-113(8); C034
Q017Interest reference: one-year Treasury Constant Maturity, published in H.15 on January 15 of each calendar yearIf nonbusiness day, next following business-day rate. Runs deposit date to refund/application. Actual rate, compounding and rounding not supplied.-113(9); C032
Q018Satisfactory payment: twelve consecutive months, no disconnection process, no more than two delinquency noticesConditions conjunctive. Different from the deposit-trigger threshold.-113(10)(a); C033
Q019Satisfactory-payment check mailed within 15 days after completion; alternative credit begins thirteenth monthCustomer’s indicated method. No universal termination-refund deadline inferred from this clause.-113(11); C034
Q020Corrected bill issued within 60 days of discoveryHistorical applicable rates; qualifying inaccurate/unbilled usage required.-178(5)(a); C035
Q021Ordinary underbilling collection period not greater than six monthsSource phrase “from the date the error occurred”; express exceptions; no actual included months selected.-178(5), (7); S015 ¶¶28–31; C036, C045
Q022Mandatory overbilling adjustment period: maximum six yearsNot treated as an all-purpose limitation or mandatory debt-discharge period.-178(5)(a); C037
Q023Utility may forgo corrected-bill recovery where underbilling is less than $50Strictly < $50, not ≤ $50; discretionary, not automatic forgiveness of every small balance.-178(7)(c); C038
Q024Initial meter test/report within 20 business days; one free test per twelve monthsCommission waiver, extension or charge authorization route preserved.-183(1); C041
Q025Additional meter test/report within 20 business days; commission-required additional test/report within 10 business daysDifferent request/order predicates. Tariff/tolerance conditions govern a charge.-183(3)–(4); C042–C043
Q026Unknown defective-meter start: adjustment not exceeding six months in older -183 wordingRead with newer -178 and S015; known-start wording is not unlimited underbilling collection.-183(5); C044–C045
Q027Delayed-billing arrangement length equals length of billing delayStated unauthorized-use exception; stale cross-reference held.-138(1); C046
Q028Equal-plan refusal wording: removal for nonpayment within past six months, or more than a two-month past-due balanceMore than, not at least; discretion to offer remains; statutory interaction held.-138(2); C047
Q029Ordinary tariff publication/notice baseline 30 days; alternative individual notice 15 days plus specified concurrent publication stepsRCW .060 commission exceptions; -194 classification and -197 suspension route. Not an arrears or disconnection clock.S007 §.060; S008/S009 -194/-197; C049
Q030-195 notice on or with first bill after effective changeOnly changes within -195 after excluding -194; no fee authorization.-195(1)–(2); C049
Q031At least two separate disconnection noticesOrdinary branch; express -128(7) exceptions separate.-128(4)(a); C053
Q032First paper notice: at least eight business days before disconnection; outside WA/OR/ID mail wording: eleven days beforeMail or primary-door delivery; consented electronic copy contemporaneous. Mailing day excluded under (5). No conversion of eleven days to business days.-128(4)(a)(i), (5); C053
Q033Second notice: electronic copy, if applicable, at least two business days before; door two, mail three, outside-region mail six business daysElectronic copy supplements the chosen authorized branch.-128(4)(a)(ii); C054
Q034Telephone branch: at least two attempts, during regular business hours, at least three business days beforeUnsuccessful conversation requires paper fallback; records retained at least 90 calendar days. No separate unstated retention-clock convention added.-128(4)(a)(ii)(C); C055
Q035Restart if no disconnection within ten business days from stated disconnection dateAgreed payment arrangement exception; inaccurate notice independently requires correction.-128(4)(c)–(d); C057
Q036Service-user/master-meter request: at least five days past original dateSource does not say business days in this clause.-128(4)(i); C058
Q037Listed facility or third-party branch: at least five business days past original dateFacility delay requires specified department request; third-party clause has its own notice predicate.-128(4)(j)–(k); C061–C062
Q038Electric remote nonpayment window 8 a.m.–noon; known low-income assistance lookback prior two yearsSame-day payment/restoration opportunity; required visit branches. Critical-infrastructure clause also refers to limiting remote disconnections within a 24-hour period, without supplying a universal numerical count.S008 -128(6); C063
Q039No-prior-notice explanation/dispute information within five business daysReasonable-effort duty following qualifying action.-128(7)(b); C067
Q040Winter period November 15 through March 15; inability notice should ordinarily be within five business days after receipt of overdue noticeExtenuating circumstances and regained protection preserved; calendar endpoints not converted into a customer deadline.S007 §.010(4); C069
Q041Income history prior twelve months; grantee provides the prescribed 7% household-income dollar figure within thirty days under the WACGrantee determination and incorporated plan required. No automatic annual-to-monthly calculation supplied; precise application of the grantee clock remains contextual.-143(1)(b); S007 §.010(4)(b); C070
Q042Winter required monthly amount P ≤ 0.07 × Iₘ + (1/12) × AₚAₚ is qualifying statutory post-application arrearage, not assumed total debt. Older “billings” wording held.S007 §.010(4)(e); C072
Q043Voluntary higher winter promise: default threshold uses P < statutory 7%-plus-one-twelfth relationNo default merely because P is below a voluntarily higher promise while meeting the statutory threshold.Same; C073
Q044Winter target following October 15; reconnection amount is what would be due under the plan absent default at reconnectionLater assistance requires reformulation; moving does not erase amounts owed.S007 §.010(4)–(5); C074–C077
Q045Heat protection attaches to any day covered by the specified issued/intended NWS alertArea-specific predicate; no temperature number or actual weather supplied.S007 §.010(8)–(9); C078–C079
Q046Heat required monthly payment P ≤ 0.06 × Iₘ; voluntary higher-promise default threshold P < 0.06 × IₘApplies to plan required under heat reconnection subsection, not all utility plans.S007 §.010(10); C080
Q047Heat plan target following May 15, or as soon after as necessary to retain the 6% ceilingAlso designed for continued service; later assistance reformulates plan.Same; C080
Q048Medical grace five business days after verbal/written notification receivedContinued energy must be required by the condition/emergency.-128(8); C082
Q049Medical restoration: electric same day, gas same business day, for timely same-day request; otherwise noon next business dayBefore close of business is the stated timely-contact condition. No upfront reconnect/deposit demand under this branch.-128(8); C083
Q050Certification may be required within five business days; validity no longer than sixty days unless renewedLimited to certified endangerment duration; a universal starting-date convention or automatic renewal is not supplied.-128(8)(a)–(b); C084–C085
Q051Medical payment requirement: stated 10% of delinquent balance, agreement for remainder within 120 days, ongoing bills when dueRequirements within grace period; alternate agreement allowed; no demand beyond prescribed terms. Exact 120-day starting-event construction is not supplied beyond the clause.-128(8)(c); C086
Q052Medical payment-plan confirmation within two business days of agreementFurther default/certificate failure requires prescribed second notice, not automatic cutoff at grace expiration.-128(8)(c)–(d); C087
Q053Historical only: twice within 120 days medical-claim restrictionDeleted in 2020; not a current repetition limit.S011; C088
Q054Ordinary restoration: reasonable efforts within 24 hours; electric remotely disconnected service four hours; or mutually agreed other timeConditional -133(1) triggers; not a guarantee from any partial payment. Gas has no copied four-hour remote branch.C090
Q055UTC-referral utility report two business days; additional information three business days or UTC-specified date; records at least three yearsExtensions may be granted. Initial direct customer complaint uses promptness, not automatically the two-day rule.-173(3)–(4); C093–C094
Q056Rate-schedule reasonableness sponsorship: at least 25 consumers/purchasers or at least 25%, with stated governmental/commission alternativesNot a threshold for every ordinary billing complaint.S002 §.110(1)(b); C097
Q057Reparations/overcharge measure: identified excess or overcharge, plus interest from collectionRequired agency findings differ; no interest rate or award computed.S002 §§.220–.230; C098–C099
Q058Private statutory loss measure: loss/damage/injury caused by prohibited act or required-act omission; discretionary reasonable attorney fee on wilful finding in recoveryNo fixed statutory amount, multiplier, fee percentage or automatic recovery established.S002 §.440; C100
Q059Customer-directed electric dispatched notice at least three days; electric remote-capable notice up to 24 hours; gas at least three daysRule and tariff conditions govern end of usage responsibility; no actual termination date.-128(1); C112
Q060Unquantified relations retained“Promptly,” “reasonable effort,” “satisfactory reason,” “reasonable judgment,” tariff-dependent charges, technical accuracy and undefined rounding remain source-specific.C014, C021, C042, C079, C090, C093
Q061Legislative/rule effective datesExact dates and material conditional application are recorded in S011–S016 and C102–C107. These are legal-version facts, not customer-event calculations.Version register above

Captured table 14

Branch ID · Missing predicate or authority · Supported consequence if the predicate is established · 30 data rows

Branch IDMissing predicate or authoritySupported consequence if the predicate is establishedAdverse inference to avoid; precise next generic inquiry
B001Actual statutory provider/service jurisdictionThe relevant UTC chapter may govern covered service.Do not apply it to all Washington electricity/gas. Separate generic municipal, PUD and cooperative authority must be read for those categories.
B002Master-meter, resale and landlord/service-user classificationUtility-side notice protections may apply independently of customer-of-record identity.Do not decide rent allocation or landlord authority. Later inquiry: applicable housing/rebilling statutes and exact generic resale authorization.
B003Prior obligation versus current account debt, deposits and prior-occupant debtDifferent refusal/restoration rules apply.Do not infer debt succession or mandatory payment of every old balance. Compare -123, -113 and -133 without supplying facts.
B004Operative status/construction of initiative-dependent RCW 80.28.110 gas branchOnly a validated branch can support its particular service-obligation conclusion.Do not declare a gas-service entitlement from codification alone. Later generic status inquiry must establish amendment/validity/application without prohibited party or case investigation.
B005Complete operative fee/deposit suspension text and present endpointCurrent collection treatment could differ from the unrepealed codified formula.Do not infer permission, expiration or universal prohibition. Obtain a readable generic official operative suspension/superseding-rule text and its application/termination clauses.
B006Effective tariff, approved exception/order, charge category and earned basisA charge can be assessed only within applicable authority and conditions.A tariff mention or fee-change notice is not authorization. Actual tariffs/private policies remain excluded; generic tariff-rule/status inquiry remains open.
B007Lawfully held/required deposit, qualifying estimate and annual interest referenceCodified cap, installment, interest and release relations can be analyzed conditionally.Do not substitute an annual estimate, H.15 rate, compounding or rounding. The incorporated annual rate remains unverified by design.
B008Partial-payment allocation and combined-service accounting ruleExpress service-attribution and credit provisions still constrain disconnection.Do not infer customer election, first-in-first-out allocation or allocation to fees before service. Exact generic allocation authority/tariff dependency remains open.
B009Corrected bill versus estimate true-up; discovery/error event; residential versus exceptional classification-178’s correction and collection restrictions apply to their branch.Do not convert six months/six years into universal debt limitations. S015 resolves only the identified meter-test underbilling interaction.
B010Complete technical meter standard and necessary adoption-by-reference textTest-charge and correction consequences can follow a valid technical finding.Do not classify a meter from a headline tolerance. Later inquiry: -338, -999 and the exact incorporated standard/version.
B011Formal correction/construction of stale referencesSubstantive text can be reported, but pointer-dependent exceptions remain bounded.Do not silently change -128(2)(f) to (7)(a)(vi), or -128(9) to (10). Seek generic corrective amendment or formal interpretation.
B012Relationship between mandatory budget-plan offer and WAC refusal wordingOffer duties and stated refusal criteria must be reconciled.Do not use -138(2)(b) as unqualified statutory-denial permission. Exact inquiry: RCW .010(7), -013, adoption explanation or formal generic interpretation.
B013Mailing origin, authorized notice branch, consent, content and applicable computationSource-specific advance periods can be identified.No actual notice effectiveness or calendar result. Holiday and unqualified-day computation beyond read text remain open.
B014Properly established exceptional condition and required earlier notice-128(7) may supply a distinct branch.Delinquency or a dishonored payment alone is not fraud. No operational immediate-disconnection conclusion.
B015Medical energy-dependence, authorized certification category and timely required stepsThe medical grace/restoration framework can apply.No diagnosis, certificate or professional qualifies merely by a label. Medical-licensing and federal/disability-law interfaces remain open.
B016Certified duration, renewal and interaction with safety conditionsCurrent duration and repayment provisions govern their branch.Deleted repeat limits do not apply; absence of that limit is not an indefinite service guarantee. Exact generic renewal/safety construction remains open.
B017Third-party responsibility, listed facility status or incorporated critical-infrastructure categoryAdditional notice/delay/remote safeguards may apply.Do not classify an actual protected customer/facility. Read the exact public infrastructure-plan incorporation only in a later bounded inquiry.
B018Current final Washington LIHEAP state plan and its operative eligibility provisionsStatutory winter income eligibility can be matched to the incorporated plan.A program webpage or draft is insufficient. Retrieve the final approved plan and material 42 U.S.C. 8624 scope/application clauses.
B019Statutory “arrearage” versus older WAC “billings,” income measure and qualifying application eventThe statute supplies a bounded ceiling using its own base.Do not substitute all historical debt or divide annual household income mechanically. Seek a formal generic reconciliation of the differing text.
B020Winter reconnection fee status after 2023 amendment and any current suspensionStatutory counterfactual plan-due amount remains the identified relation.Do not reinsert deleted statutory charge conditions from an older rule. Exact inquiry: operative amendments and generic conforming interpretation/order.
B021Covered electric-service category, qualifying alert and approved request processHeat nontermination/requested-restoration provisions can operate.Do not apply the listed-service statute to gas or invent a weather event. Actual tariff/process and weather facts were not examined.
B022Applicable inclement-weather tariff conditionsBoth chapters require such conditions.No temperature, duration or universal moratorium inferred. Tariff-specific terms remain expressly excluded.
B023Correct restoration branch, lawful charges and completion of specified predicatesThe corresponding reasonable-effort restoration period applies.Do not treat any payment, all-old-debt demand or informal complaint as a completed restoration trigger.
B024Complaint category, formal prerequisites and any commission actionComplaint duties and possible commission relief remain available as public-law categories.Informal submission is not an order or discharge. Special rate-schedule sponsorship is not applied to every complaint.
B025Causation, findings, recovery procedure and interaction of specific remediesRCW .220/.230/.440 provide different bounded powers/claims.No automatic damages, stacking or outcome. Section .240’s exclusive procedure and clocks remain a separate inquiry.
B0262025 funding-condition fulfillment and historical applicationOnly authenticated operative versions can be applied to a historical/legal branch.Failed budget access proves neither funding nor nullity. Thermal expansion remains outside the completed electric/gas conclusions.
B027Federal energy assistance, bankruptcy, collection/reporting, disability and military scopeNo positive federal outcome is stated here.Later generic inquiries: final LIHEAP plan/42 U.S.C. 8624; applicable Bankruptcy Code utility/stay/discharge clauses; actual FDCPA/FCRA scope; applicable disability and military protections, with full exceptions.
B028Public-provider, water/sewer/telecom, thermal, local/tribal/interstate rulesSeparate regimes may supply different protections.Do not infer no protection from exclusion here. Read each applicable generic enabling/protection statute before extending this report.
B029Company contracts/tariffs, physical outage/restoration capability and actual factsNone supplied or investigated.No operational instruction, eligibility, cutoff, reconnection, liability or outcome decision follows.
B030Later amendments, operative general orders and judicial construction outside retrieved bodiesCurrent code text and verified adopted originals remain bounded evidence.No “no later change” conclusion from search silence; no case/opinion/docket investigation was performed.

Captured table 15

Analytical field · Entry · 22 data rows

Analytical fieldEntry
Public-law service category
Governing jurisdiction provision
Applicable statutory definition
Applicable administrative chapter
Material exclusion or alternative regime
Source ID and complete section
Source version and effective/application clause
Charge category
Deposit or security distinction
Disputed/undisputed distinction
Payment-allocation authority
Applicable notice branch
Notice event and source-stated unit
Payment-arrangement category
Seasonal-protection authority
Medical-protection authority
Restoration branch
Symbolic relation reference
Unread incorporation
Currentness or suspension dependency
Construction dependency
Exact next generic authority inquiry

Captured table 16

Scope item · Disposition · Source/claim/branch links · 49 data rows

Scope itemDispositionSource/claim/branch linksExact remaining evidence or retained boundary
1: Commission identity and authorityAnswered—textS001–S002; C001; B001Actual jurisdiction not determined.
1: Electric actor/plant definitions and exclusionsAnswered—textS002; C002, C004No actual operation classified.
1: Natural-gas service/actor definitionsAnswered—textS002, S009; C003Other gas/fuel categories excluded.
1: Customer/applicant/joint responsibilityAnswered—textS008/S009 -023; C009Definition is not proof of liability.
1: Washington territorial/service nexusPartialC001–C003; B001–B002Actual nexus, service territory and tariff excluded.
1: Municipal/PUD/cooperative boundariesAnswered—boundary onlyS002–S006; C005–C007Separate arrears/protection regimes remain open.
1: Master meter/landlord rebillingPartialC013, C058; B002Only covered-utility gateway/notice text; housing allocation excluded.
1: Commercial/water/sewer/telecom/thermalExcluded except boundariesC003, C005, C038, C105; B028No category transfer.
2: Generic bill contents and billing intervalAnswered—text-178; C018–C020Usage and rate correctness not determined.
2: Mailing/payment due datesAnswered—textC021; Q005–Q006No calendar computation.
2: Electronic consent/delivery failureAnswered—text-179; C022–C024No actual consent or delivery.
2: Cash receipts/payment locationsAnswered—textC025, C113No universal card-payment conclusion.
2: Deposit criteria/ceiling/installmentsAnswered—codified baseline; current collection heldC026–C031; B005–B007Operative suspension/status and tariff conditions.
2: Deposit interest/refund/offsetAnswered—relation; numerical rate heldC032–C034H.15 value, rounding/compounding and actual deposit facts absent.
2: Billing correction/credit/refund dutiesAnswered—text and adoption explanationC035–C045; S015Technical classification and exact event application held.
2: Late/returned-payment/collection chargesUnresolved current amount/permissionC017, C048–C049Generic suspension text and effective tariff authority.
2: Partial-payment allocationPartialC048, C052, C060, C113; B008No general allocation priority authenticated.
2: Fee-change noticesAnswered—conditional textC049; -193 through -197Classification overlap, purchased-gas branch and actual tariff excluded.
3: Ordinary nonpayment groundsAnswered—textC050–C052No actual delinquency or charge classification.
3: First/second notice sequence/contentAnswered—textC053–C057No notice preparation or sufficiency determination.
3: Mailing/delivery/telephone/electronic distinctionsAnswered—textC053–C055; Q031–Q035General unqualified-day computation held.
3: Service-user/master-meter noticesAnswered—textC058Tenancy consequences excluded.
3: Days/hours/closures/final contactAnswered—bounded textC059–C064No ordinary universal hourly window inferred.
3: Disputes/protestsAnswered—conditional textC068Undisputed payment and dangerous-condition qualifications retained.
3: Theft/tampering/hazard/no-prior-noticeAnswered—boundary textC065–C067Full theft remedies, technical standards and facts excluded.
4: Delayed-bill arrangementsPartialC046; B011Stale unauthorized-use pointer needs formal correction/construction.
4: Equal-payment/budget optionsPartialC047; B012Statutory offer/WAC refusal interaction held.
4: Winter seasonal scopeAnswered—textC069–C071Current final state-plan threshold unresolved.
4: Winter payment/default/reinstatementPartialC072–C077Statute/WAC base and fee-language differences retained.
4: Heat-alert electric protectionAnswered—statutory textC078–C080Approved process/tariff and actual alert absent.
4: Gas/extreme-weather termsPartialC081; B021–B022No copied heat statute; actual inclement-weather tariff excluded.
4: Temporary/emergency protectionsUnresolved relevant fee overlayC017, C107; F006No universal current emergency moratorium declared.
5: Medical trigger/certificationAnswered—textC082–C085No medical condition, certifier or eligibility evaluation.
5: Medical repayment/restoration/further noticeAnswered—textC083, C086–C087Fee collection and exact application held.
5: Historical repeat-medical limitAnswered—version distinctionC088; S011Deleted restriction not applied.
5: Life-support/facility/third-party safeguardsPartialC061–C064; B016–B017Critical-infrastructure incorporation and licensing classifications open.
5: Confidentiality/disability interfacesPartialC089; B015, B027State incorporated privacy statutes and federal/disability regimes uncompleted.
6: Ordinary restoration timing/conditionsAnswered—conditional textC090–C092Actual completion and tariff/fee predicates absent.
6: Utility and UTC informal disputesAnswered—textC093–C095No complaint or order exists in this inquiry.
6: Formal commission gatewayPartial, intentionally boundedC096–C097Full adjudication, service, evidence and review excluded.
6: Refund/damage/remedy boundariesPartialC098–C101Exclusive court-overcharge procedure, clocks and full remedies remain separate.
6: Assistance information versus approvalAnswered—boundaryC070–C071, C108Guide/draft not current final eligibility or approval evidence.
6: Federal/public/local/tribal/interstate interfacesExcluded with exact dependenciesB001, B027–B030Separate generic investigations required.
7: Current operative RCW/WAC readingAnswered within listed boundsS001–S010Not a complete search of every general order or judicial status.
7: 2016/2020 material rule originalsAnswered within actual read boundsS011, S015; C102–C103Older originals not all retrieved; no wholesale historical assurance.
7: 2023/2025/2026 enactment/applicationPartialS012–S014; C104–C1062025 funding condition and partial-source gap remain.
7: Proposed/agenda versus adopted statusAnswered—distinctionS016; C107No projected milestone treated as actual adoption.
7: Failed routes/currentness limitationsFully disclosed belowF001–F015Failure is not absence of law or protection.
Registry dimension 6 / whole Washington / A066Open; no acceptanceC110; all branchesThis is one sector component only. Earlier passes and holds remain unchanged.

Captured table 17

Log ID · Route actually used · Result and disposition · 14 data rows

Log IDRoute actually usedResult and disposition
R001Direct official RCW 80.01, 80.04 and 80.28 section/chapter readsJurisdiction, definitions, rates, winter/heat, complaint and narrow remedy provisions read as S001/S002/S007.
R002Direct official electric and gas WAC chapter indexes, then individual consumer-rule bodiesSelected sections completed separately for both services; source table records every relied section. Whole chapters not claimed read.
R003Generic primary searches for "20-16-077" "PERMANENT" and 2025/2026 disconnection amendmentsLocated adopted 2020 original and enacted 2023/2025/2026 sources. General guides remained discovery rather than operative substitutes.
R004Generic jurisdiction searches for electric cooperatives, PUDs and UTC rate/service authorityS003–S006 opened and read; no provider, roster or service territory queried.
R005Generic searches for residential late fees, deposits, disconnection protections and 2025/2026 changesLocated the official 2022 fee-suspension announcement lead and 2026 agenda. No current operative suspension conclusion obtained.
R006Exact-title alternate search for the official fee-ban announcement; ordinary official rulemaking-agenda routeNo readable operative suspension text authenticated. The readable agenda resolves only its own planning-status question.
R007Commerce LIHEAP/current-plan searches, official program page and draft announcement, links to 2026 plan/2027 draftGuidance bodies read; linked plan retrievals failed. No final current plan or income ceiling established.
R008Generic searches for 2025 c 263 funding and enacted operating-budget textEnacted budget HTML exceeded access limits. Bill-history page was discovery/status material, not proof of the required appropriation.
R009WAC history index for -023; attempted -113 history index; exact WSR 02-21-066 searchCurrent deposit bodies read. Original deposit-amendment HTML and official issue-PDF routes failed; historical-original gap retained.
R010Exact WSR 16-06-038 search, filing notice, official linked later-issue HTMLPDF timed out; linked adopted HTML succeeded. Material explanation and complete Appendix B billing rules read.
R011Current -183 meter-test clauses compared with -178 and 2016 adoption paragraphsFormal explanation found for six-month underbilling interaction. Stale pointer and other application issues retained.
R012Current -194/-195 notice clauses and their -193/-197 and RCW .060 incorporationsMaterial notice classifications read; no actual tariff or proposed customer rate inspected.
R013Chapter text searches for "partial payment" and "allocation"No partial-payment phrase match; allocation hits concerned other subjects. This does not establish absence of every allocation rule. No regulatory-fee percentage was transferred to customer charges.
R014Completion/verification windows for -128, -113, -143, -153, -179, -123, -173 and current RCW .010Exact triggers, differences, credits and qualifications checked. No actual participant documents, certificates or notices examined.

Captured table 18

Discovery item · Literal URL · Actual status/use · 5 data rows

Discovery itemLiteral URLActual status/use
Current-rule history index for electric definitionshttps://apps.leg.wa.gov/WaC/registerfiling.aspx?cite=480-100-023Filing index read to locate originals; not the operative consumer rule.
Operating-budget bill historyhttps://app.leg.wa.gov/billsummary/?BillNumber=5167&Year=2025Read history/status and attempted ordinary document link. Did not authenticate the funding clause needed by S013.
2002 official Register directoryhttps://lawfilesext.leg.wa.gov/Law/WSR/2002/21/Read only to locate the published issue PDF after the individual original failed. Directory dates are not legal effective dates.
Official 2022 fee-ban announcement search resulthttps://www.utc.wa.gov/news/2022/utc-extends-customer-protections-fee-bans-energy-customersSearch result identified a suspension issue requiring verification. Body inaccessible; not registered as an operative source read.
Other generic guides, historical reproductions and irrelevant search hitsNot used as claim authorityNo secondary wording, named-provider result, party-specific order or actual record supplies a finding.
Source links captured in this table

Captured table 19

Failure ID · Exact attempted ordinary route · Observed result · 15 data rows

Failure IDExact attempted ordinary routeObserved resultMaterially different route and disposition
F001https://app.leg.wa.gov/RCW/default.aspx?cite=80.04.500Internal/inaccessible response.Official full chapter at https://app.leg.wa.gov/RCW/default.aspx?cite=80.04&full=true supplied complete .500. Exact body gap resolved.
F002https://app.leg.wa.gov/WAC/default.aspx?cite=480-90-008Internal/inaccessible response.Official gas chapter supplied complete -008. No broader access conclusion.
F003https://app.leg.wa.gov/WAC/default.aspx?cite=480-90-168Internal/inaccessible response.Official gas chapter supplied complete -168.
F004https://app.leg.wa.gov/WAC/default.aspx?cite=480-07-370Internal/inaccessible response.https://app.leg.wa.gov/WAC/default.aspx?cite=480-07&full=true supplied complete -370.
F005https://app.leg.wa.gov/RCW/default.aspx?cite=80.04.440Internal/inaccessible response.Complete .440 available through the already-read official chapter rendition.
F006https://www.utc.wa.gov/news/2022/utc-extends-customer-protections-fee-bans-energy-customers403.Ordinary alternate official discovery did not supply a readable operative suspension/end-date instrument. Current fee/deposit authority remains held.
F007https://www.utc.wa.gov/sites/default/files/2026-01/Jan-July%202026%20Rule%20Development%20Agenda.pdf403.Official WSR 26-14-084 later-half agenda read. Resolves agenda evidence only, not an operative suspension.
F008https://deptofcommerce.box.com/s/008hcxgv860alo4gx45lxbknnb7lxywgServer/redirect failure to the corresponding deptofcommerce.app.box.com public link.Ordinary Commerce-source searches supplied guidance, not the final operative plan. No authenticated plan threshold.
F009https://deptofcommerce.box.com/s/5jgeglnyyzvqd0iikydlxiswsnf57pzhServer/redirect failure to corresponding public Box rendition.Draft-announcement body read; no final adopted-plan inference.
F010https://apps.leg.wa.gov/WaC/registerfiling.aspx?cite=480-100-113Internal/inaccessible response.Exact WSR search located the original, followed by F012/F013. Current codified -113 itself was readable.
F011https://lawfilesext.leg.wa.gov/biennium/2025-26/Htm/Bills/Session%20Laws/Senate/5167-S.SL.htmContent-too-large error on open/find in the same batch.Official bill-history/document route did not expose the necessary operative appropriation text in the returned rendition. No funding/nullity conclusion.
F012https://lawfilesext.leg.wa.gov/law/wsr/2002/21/02-21-066.htmInternal/inaccessible response.Official directory located the issue-PDF alternative; see F013. Search excerpts were not treated as full original reading.
F013https://lawfilesext.leg.wa.gov/Law/WSR/2002/21/02-21.pdfContent-too-large error.No further retry. Deposit original remains uncompleted; codified text and displayed credits are identified separately.
F014https://lawfilesext.leg.wa.gov/law/wsr/2016/07/16-07PERM.pdfFetch timeout.Filing notice’s ordinary link opened the adopted HTML at S015. Relevant original-body gap resolved without PDF pixels.
F015Additional body-window read of the S013 session-law PDFInaccessible response after earlier successful cover/material-section reads.No identical retry. Earlier read bounds retained; additional tail and funding verification not claimed complete. Current 2026 §8 was separately read, without claiming it resolves every 2025 issue.
Source links captured in this table

Find the assertion and its boundaries

Read the evidence with its boundaries. These are saved research components, including revisions. A scoped coordinator review checks selected evidence; it does not certify every claim, a complete jurisdiction, current law or individual applicability. Dates and access limits remain attached to the records.

How to read the research →

Read the related correction supplements

These components repair their stated scope. They do not replace every other finding in this research series.

SWA correction of the C070 coverage pinpoint →
SWA exact original-row completion →
Two bounded source corrections →
1. Exact two-cell replacements →
S_WA-P14-C001 Saved research record

The UTC has statutory authority over covered public-service utility operations and to adopt implementing rules; the electric/gas consumer chapters expressly require commission jurisdiction.

Recorded check status: whole report read selected current primary aspects only all explicit holds preserved

Authority, conditions and confidence limits
S001 §80.01.040; S002 §80.04.160; S008/S009 -003, -023. Actual provider/service jurisdiction is not established.
S_WA-P14-C002 Saved research record

“Electrical company” and “electric plant” depend on the enacted ownership/operation/for-hire criteria, with railroad and specified cogeneration exceptions.

Recorded check status: whole report read selected current primary aspects only all explicit holds preserved

Authority, conditions and confidence limits
S002 §80.04.010(4), (9), (11)–(12), (19). Cogeneration solely for own/tenant use or specified wholesale recipients is excluded on the stated conditions, unless otherwise an electrical company.
S_WA-P14-C003 Saved research record

The gas chapter’s utility definition requires commission jurisdiction, a Washington gas plant and public compensated gas service. Natural gas is a defined subset of the chapter’s broader “gas” category.

Recorded check status: whole report read selected current primary aspects only all explicit holds preserved

Authority, conditions and confidence limits
S002 §80.04.010(14)–(15); S009 -023, complete gas/natural-gas/utility definitions. Other fuels are not completed here.
S_WA-P14-C004 Saved research record

Ownership or operation of a cogeneration facility alone does not establish public-service-company status.

Recorded check status: whole report read selected current primary aspects only all explicit holds preserved

Authority, conditions and confidence limits
S002 §80.04.010(23). This is not a blanket landlord, master-meter or private-generation exclusion.
S_WA-P14-C005 Saved research record

RCW 80.04.500 restricts UTC orders affecting specified city/town utility rates, charges, contracts and service; it does not declare all Title 80 provisions inapplicable to municipal utilities.

Recorded check status: whole report read selected current primary aspects only all explicit holds preserved

Authority, conditions and confidence limits
S002 §.500, complete paragraph. Its separate safety wording is narrower than its rate/service wording; no complete municipal gas-safety regime is determined.
S_WA-P14-C006 Saved research record

PUD electric rate and service authority has an express statutory independence from UTC jurisdiction.

Recorded check status: whole report read selected current primary aspects only all explicit holds preserved

Authority, conditions and confidence limits
S003 §54.16.040, complete section. The UTC arrears rules therefore are not transferred to PUD service merely because it is residential electricity.
S_WA-P14-C007 Saved research record

The read cooperative statutes preserve locally regulated electric-utility categories and do not confer new UTC rate/service jurisdiction.

Recorded check status: whole report read selected current primary aspects only all explicit holds preserved

Authority, conditions and confidence limits
S004 §54.48.040; S005 §23.86.400(2)–(3); S006 §24.06.600(2)–(3). A cooperative label alone does not finish legal classification.
S_WA-P14-C008 Saved research record

Inconsistent tariff provisions are not automatically validated by filing or acceptance. Rule exemptions require the specified commission process, and statutory duties remain.

Recorded check status: whole report read selected current primary aspects only all explicit holds preserved

Authority, conditions and confidence limits
S008/S009 -003, -008, -013; S010 -110. RCW 80.28.010(12) separately prevents an oral/written agreement from waiving that chapter’s protections.
S_WA-P14-C009 Saved research record

“Applicant” and “customer” include specified jointly responsible applicants; “customer” can include an involuntarily disconnected person seeking reconnection.

Recorded check status: whole report read selected current primary aspects only all explicit holds preserved

Authority, conditions and confidence limits
S008/S009 -023. These definitions do not prove actual acceptance, joint liability or a balance.
S_WA-P14-C010 Saved research record

These chapters define a business day as Monday–Friday, 8 a.m.–5 p.m., excluding official state holidays.

Recorded check status: whole report read selected current primary aspects only all explicit holds preserved

Authority, conditions and confidence limits
S008/S009 -023. This does not convert an unqualified “day” into a business day or supply every computation rule.
S_WA-P14-C011 Saved research record

Covered charges must be just, fair, reasonable and sufficient; covered service and utility rules must meet the statute’s safety, adequacy and reasonableness standards.

Recorded check status: whole report read selected current primary aspects only all explicit holds preserved

Authority, conditions and confidence limits
S007 §80.28.010(1)–(3), (11). No rate reasonableness or service-entitlement determination is made.
S_WA-P14-C012 Saved research record

The filed-and-effective schedule supplies the general rate/charge baseline, subject to the statute’s express exceptions and uniform-treatment provision.

Recorded check status: whole report read selected current primary aspects only all explicit holds preserved

Authority, conditions and confidence limits
S007 §§.050, .080(1)–(2); S008/S009 -028. Listed free/reduced-rate exceptions were read; the utility-theft damages incorporation is not a completed ordinary-arrears fee pathway.
S_WA-P14-C013 Saved research record

The electric application rule permits resale only as authorized by tariff; the gas application rule prohibits customer remetering/submetering for resale.

Recorded check status: whole report read selected current primary aspects only all explicit holds preserved

Authority, conditions and confidence limits
S008/S009 -108. This is a rule for covered utility service, not a completed landlord-rebilling or tenancy analysis.
S_WA-P14-C014 Saved research record

Refusal of new/additional service is governed by enumerated safety, standards, protective-device, rights-of-way and other conditions, with commission approval required for the additional refusal route.

Recorded check status: whole report read selected current primary aspects only all explicit holds preserved

Authority, conditions and confidence limits
S008 -123(1)–(2), (5)–(6); S009 -123(1), (4)–(5); S007 §.110. Technical incorporations and the initiative-dependent gas branch remain held.
S_WA-P14-C015 Saved research record

The residential “prior obligation” rule limits refusal of new/additional service because of billed debt existing at a prior nonpayment disconnection; deposits are excluded from that defined amount.

Recorded check status: whole report read selected current primary aspects only all explicit holds preserved

Authority, conditions and confidence limits
S008 -123(3); S009 -123(2). Winter-plan-default customers are expressly excepted. Fee/deposit conditions remain subject to C017.
S_WA-P14-C016 Saved research record

Prior-occupant debt alone is not a refusal ground; the rule requires objective evidence of the specified cooperative fraud to use that exception.

Recorded check status: whole report read selected current primary aspects only all explicit holds preserved

Authority, conditions and confidence limits
S008 -123(4); S009 -123(3). A deposit criterion involving a prior customer living at the premises is a different provision, not debt succession.
S_WA-P14-C017 Saved research record

Present authority to collect residential deposits and identified late/disconnection/reconnection/site fees is not fully authenticated in this pass.

Recorded check status: whole report read selected current primary aspects only all explicit holds preserved

Authority, conditions and confidence limits
Current S008/S009 text; S016 agenda; failed official suspension-announcement route F006. This is a currentness hold, not a finding that every listed charge is currently allowed or currently forbidden.
S_WA-P14-C018 Saved research record

Bills must meet the prescribed issuance interval and identify the amount due, delinquency date, contact information, usage/read information, applicable charges and required tax/proration/estimate information.

Recorded check status: whole report read selected current primary aspects only all explicit holds preserved

Authority, conditions and confidence limits
S008/S009 -178(1). Electric units and gas units differ. Content does not prove correct usage or a lawful amount.
S_WA-P14-C019 Saved research record

For fractional billing periods, the default proration rules distinguish flat-rate service from metered service and the full basic/minimum charge.

Recorded check status: whole report read selected current primary aspects only all explicit holds preserved

Authority, conditions and confidence limits
S008/S009 -178(1)(h). Express tariff variation remains possible; no amount calculated.
S_WA-P14-C020 Saved research record

Estimated billing must be identified, use a tariff-described method and observe the four-consecutive-month restriction unless a listed exception applies.

Recorded check status: whole report read selected current primary aspects only all explicit holds preserved

Authority, conditions and confidence limits
S008/S009 -178(1)(i): inclement weather, terrain or a previous customer arrangement.
S_WA-P14-C021 Saved research record

The ordinary bill-payment minimum is measured from mailing, with different inside/outside WA–OR–ID periods; a satisfactory reason requires accommodation of a changed due date before the next billing date.

Recorded check status: whole report read selected current primary aspects only all explicit holds preserved

Authority, conditions and confidence limits
S008/S009 -178(2)–(3). Receipt is not substituted for mailing.
S_WA-P14-C022 Saved research record

Electronic billing and related communications require the specified affirmative consent, records and format safeguards; electronic timing is treated as mailing from Washington.

Recorded check status: whole report read selected current primary aspects only all explicit holds preserved

Authority, conditions and confidence limits
S008/S009 -178(4), -179 introduction, (1)–(3). Separate services require separate affirmative consent.
S_WA-P14-C023 Saved research record

Disconnection notices and specified winter-protection information cannot be delivered solely electronically. Ordinary electronic-document paper-request limits do not erase that requirement.

Recorded check status: whole report read selected current primary aspects only all explicit holds preserved

Authority, conditions and confidence limits
S008/S009 -179(4)–(6); -128(4). Specialized-format disputed billing must be understandable to the reviewer.
S_WA-P14-C024 Saved research record

Undeliverable electronic information triggers corrective communication and, if unresolved, paper delivery and return to mail notification under the rule’s alternative time branches.

Recorded check status: whole report read selected current primary aspects only all explicit holds preserved

Authority, conditions and confidence limits
S008/S009 -179(7). A sent electronic message is not assumed received.
S_WA-P14-C025 Saved research record

Cash payments require receipts, and designated payment-agency arrangements must provide the prescribed reasonably accessible, no-charge payment opportunity.

Recorded check status: whole report read selected current primary aspects only all explicit holds preserved

Authority, conditions and confidence limits
S008/S009 -138(3), -188. This does not establish a universal free-credit-card-payment rule.
S_WA-P14-C026 Saved research record

The codified existing-customer deposit grounds are at least three delinquency notices in the prior twelve months, nonpayment disconnection, or the stated indebted prior customer living at the residence.

Recorded check status: whole report read selected current primary aspects only all explicit holds preserved

Authority, conditions and confidence limits
S008/S009 -113(1). Codified criteria only; C017 remains controlling as a hold.
S_WA-P14-C027 Saved research record

Applicant deposit criteria separately include the specified prior history, conjunctive employment/income condition, ownership/purchase condition, resident prior-customer debt and overdue residential utility balance.

Recorded check status: whole report read selected current primary aspects only all explicit holds preserved

Authority, conditions and confidence limits
S008/S009 -113(2). The employment clause is not reduced to unemployment alone. No applicant classified.
S_WA-P14-C028 Saved research record

The codified residential deposit ceiling uses estimated annual billings: two-twelfths for monthly billing or three-twelfths for bimonthly billing.

Recorded check status: whole report read selected current primary aspects only all explicit holds preserved

Authority, conditions and confidence limits
S008/S009 -113(3). Customer/location wording is preserved; no new per-request allowance or actual estimate assumed. C017.
S_WA-P14-C029 Saved research record

The deposit installment option is half before service and the remainder in equal amounts over the next two months on mutually agreed dates; other mutually acceptable arrangements are permitted.

Recorded check status: whole report read selected current primary aspects only all explicit holds preserved

Authority, conditions and confidence limits
S008/S009 -113(4). It is not proof that a deposit may presently be demanded.
S_WA-P14-C030 Saved research record

Inability to pay a deposit invokes the listed alternatives: qualifying prepayment, satisfactory guarantor, winter-program route or the conditioned similar-utility reference opportunity.

Recorded check status: whole report read selected current primary aspects only all explicit holds preserved

Authority, conditions and confidence limits
S008/S009 -113(5). Guarantor exposure is bounded by the notice/deposit terms unless an additional amount is agreed as specified.
S_WA-P14-C031 Saved research record

Additional deposits require written reasons and the existing-customer criteria; deposit-plus-interest transfer/refund is subject to the old-address balance offset stated in the rule.

Recorded check status: whole report read selected current primary aspects only all explicit holds preserved

Authority, conditions and confidence limits
S008/S009 -113(6)–(7). No new numerical cap is created by an additional request. C017.
S_WA-P14-C032 Saved research record

Deposit interest uses the rule’s annual one-year Treasury Constant Maturity reference and runs from deposit to refund/application.

Recorded check status: whole report read selected current primary aspects only all explicit holds preserved

Authority, conditions and confidence limits
S008/S009 -113(9). The referenced annual rate, compounding and rounding are not calculated or supplied.
S_WA-P14-C033 Saved research record

Satisfactory-payment release requires twelve consecutive months, no initiated disconnection process and no more than two delinquency notices; termination release permits the stated amount-due offset.

Recorded check status: whole report read selected current primary aspects only all explicit holds preserved

Authority, conditions and confidence limits
S008/S009 -113(10). Collection suspension does not establish that an existing held deposit has no interest/refund duties.
S_WA-P14-C034 Saved research record

Deposit demand timing after service and satisfactory-payment refund methods have distinct mailing/delivery and billing-month triggers.

Recorded check status: whole report read selected current primary aspects only all explicit holds preserved

Authority, conditions and confidence limits
S008/S009 -113(8), (11). Quantities are registered below; the fifteen-day satisfactory-payment check rule is not declared a universal termination-refund deadline.
S_WA-P14-C035 Saved research record

A qualifying billing correction must use the rates applicable during the affected billing periods and be issued within sixty days of discovery.

Recorded check status: whole report read selected current primary aspects only all explicit holds preserved

Authority, conditions and confidence limits
S008/S009 -178(5)(a). Meter failure, malfunction, unassigned usage and other inaccurate/unbilled usage are covered as defined.
S_WA-P14-C036 Saved research record

The ordinary underbilling collection restriction is six months under the source’s “from the date the error occurred” wording, subject to express exceptions.

Recorded check status: whole report read selected current primary aspects only all explicit holds preserved

Authority, conditions and confidence limits
S008/S009 -178(5)(a), (7); S015 ¶¶28–31. No actual first/last included billing period is selected.
S_WA-P14-C037 Saved research record

Six years is the maximum period for which -178 requires overbilling adjustment.

Recorded check status: whole report read selected current primary aspects only all explicit holds preserved

Authority, conditions and confidence limits
S008/S009 -178(5)(a). This is not presented as a universally applicable suit limitation or a prohibition on every other possible refund remedy.
S_WA-P14-C038 Saved research record

Specified interference/illegal-connection/fraud underbilling is excepted from the six-month restriction; nonresidential good-cause extensions are a separate branch; recovery of underbilling below fifty dollars may be forgone.

Recorded check status: whole report read selected current primary aspects only all explicit holds preserved

Authority, conditions and confidence limits
S008/S009 -178(7). Nonresidential flexibility is not imported into ordinary residential billing. “Below” is strict.
S_WA-P14-C039 Saved research record

Corrected-bill information must explain the reason, monthly breakdown, total correction, covered period and applicable payment-arrangement availability.

Recorded check status: whole report read selected current primary aspects only all explicit holds preserved

Authority, conditions and confidence limits
S008/S009 -178(6), incorporating -138(1). An explanation does not establish that the correction is accurate.
S_WA-P14-C040 Saved research record

A compliant estimated-reading true-up is not treated as a corrected bill under -178(5)(a).

Recorded check status: whole report read selected current primary aspects only all explicit holds preserved

Authority, conditions and confidence limits
S008/S009 -178(8), with (1)(i). The classification predicate must be established before applying this exception.
S_WA-P14-C041 Saved research record

The initial requested meter test has a twenty-business-day test/report duty and one-free-test-in-twelve-months baseline, subject to the stated commission waiver/extension/charge route.

Recorded check status: whole report read selected current primary aspects only all explicit holds preserved

Authority, conditions and confidence limits
S008/S009 -183(1)–(2). Access and witness/sealing provisions were read; no test or access step performed.
S_WA-P14-C042 Saved research record

Additional-test charges depend on tariff authority and a finding within the incorporated accuracy tolerance; an out-of-tolerance additional test cannot be charged under this clause.

Recorded check status: whole report read selected current primary aspects only all explicit holds preserved

Authority, conditions and confidence limits
S008/S009 -183(3), -338. Full technical incorporation and actual accuracy remain held.
S_WA-P14-C043 Saved research record

Commission notification of a meter complaint restricts alteration of the meter without commission authorization; a violation may support the customer’s dispute.

Recorded check status: whole report read selected current primary aspects only all explicit holds preserved

Authority, conditions and confidence limits
S008/S009 -183(4). This is discretionary evidentiary treatment, not an automatic adjudicated billing result.
S_WA-P14-C044 Saved research record

An excessive meter error triggers repair/replacement without customer cost and adjustment using the best available information, subject to the complete adjustment framework.

Recorded check status: whole report read selected current primary aspects only all explicit holds preserved

Authority, conditions and confidence limits
S008/S009 -183(5), -178; S015. The -183 payment-arrangement reference is to -138(2), while -178(6)(e) refers to -138(1).
S_WA-P14-C045 Saved research record

The 2016 adoption order explains that the newer underbilling restriction also limits collection after an older meter-test rule identifies an earlier defective-meter date.

Recorded check status: whole report read selected current primary aspects only all explicit holds preserved

Authority, conditions and confidence limits
S015 ¶¶28–31, Appendix B; current S008/S009 -178(5). Formal agency explanation established; full judicial construction and other adjustment issues remain open.
S_WA-P14-C046 Saved research record

Delayed residential billing requires a payment-arrangement length equal to the delay, subject to the stated unauthorized-use exception.

Recorded check status: whole report read selected current primary aspects only all explicit holds preserved

Authority, conditions and confidence limits
S008/S009 -138(1). Its citation to -128(2)(f) is stale; that subsection now concerns detrimental equipment. Do not silently substitute a new exception pointer.
S_WA-P14-C047 Saved research record

Equal-payment plans use historical or projected usage; the WAC states particular refusal conditions, while RCW 80.28.010(7) contains a residential offer duty and additional low-income availability protections.

Recorded check status: whole report read selected current primary aspects only all explicit holds preserved

Authority, conditions and confidence limits
S008/S009 -138(2); S007 §.010(7). The interaction is not treated as unconditional permission to deny a statutory option.
S_WA-P14-C048 Saved research record

No general numerical residential late-fee, returned-payment or collection-charge amount was established from the selected generic provisions. Payment-allocation priority beyond express clauses also remains unestablished.

Recorded check status: whole report read selected current primary aspects only all explicit holds preserved

Authority, conditions and confidence limits
S007 §§.050/.080; S008/S009 -128, -178, -195; C017. Unknown amounts are not unlimited-charge permission; combined-service attribution is not a complete partial-payment allocation rule.
S_WA-P14-C049 Saved research record

Tariff-change notice depends on classification under -194 versus -195. A -195 notice accompanying the first bill after an effective change does not independently authorize the charge.

Recorded check status: whole report read selected current primary aspects only all explicit holds preserved

Authority, conditions and confidence limits
S008/S009 -193 through -197; S007 §.060. Electric “per-occurrence” wording and gas purchased-gas-adjustment exceptions are not flattened into one rule.
S_WA-P14-C050 Saved research record

Delinquent covered-service charges are a codified notice-based ground, subject to the medical and maintained winter-plan exceptions and other applicable protections.

Recorded check status: whole report read selected current primary aspects only all explicit holds preserved

Authority, conditions and confidence limits
S008/S009 -128(2)(a). Inclusion of “required deposit” does not overcome C017.
S_WA-P14-C051 Saved research record

Other notice-based grounds include unauthorized purpose/property, increased flat-rate use, required-access problems, rule/agreement/tariff violations and detrimental equipment, on the stated conditions.

Recorded check status: whole report read selected current primary aspects only all explicit holds preserved

Authority, conditions and confidence limits
S008/S009 -128(2)(b)–(f); -168. Access is limited to the rule’s authorized-representative, reasonable-hours and necessary-function terms.
S_WA-P14-C052 Saved research record

Nonregulated-service debt is not a disconnection ground under -128(3); combined gas/electric accounts require a reason attributable to the service being disconnected and distinct identification of affected services.

Recorded check status: whole report read selected current primary aspects only all explicit holds preserved

Authority, conditions and confidence limits
S008/S009 -128(3), (4)(e). Neither every fee nor every combined-account balance is classified here.
S_WA-P14-C053 Saved research record

The ordinary process requires at least two notices. The first is paper mail or primary-door delivery, with the source’s minimum timing and additional consented electronic copy.

Recorded check status: whole report read selected current primary aspects only all explicit holds preserved

Authority, conditions and confidence limits
S008/S009 -128(4)(a)(i), (5). Outside WA/OR/ID mailing uses “eleven days,” not “eleven business days.”
S_WA-P14-C054 Saved research record

The second notice combines an electronic copy where contact information/consent exist with one authorized door, mail or telephone branch.

Recorded check status: whole report read selected current primary aspects only all explicit holds preserved

Authority, conditions and confidence limits
S008/S009 -128(4)(a)(ii). Electronic consent does not eliminate the prescribed other branch.
S_WA-P14-C055 Saved research record

Telephone second notice requires at least two attempts during regular business hours, the prescribed lead time and retained call records; unsuccessful actual contact requires paper fallback.

Recorded check status: whole report read selected current primary aspects only all explicit holds preserved

Authority, conditions and confidence limits
S008/S009 -128(4)(a)(ii)(C). An attempted call alone does not complete every branch.
S_WA-P14-C056 Saved research record

Notices must identify cause, regulated-service amount, avoidance/assistance/payment information, relevant charges and utility contact information; winter and electric-remote notices have additional content.

Recorded check status: whole report read selected current primary aspects only all explicit holds preserved

Authority, conditions and confidence limits
S008/S009 -128(4)(b); S007 §.010(5)(a), (9)(a). No notice was prepared or evaluated.
S_WA-P14-C057 Saved research record

Inaccurate/incomplete notices require correction and necessary date recalculation; failure to disconnect within the stated ten-business-day window requires restarting notices unless a payment arrangement was agreed.

Recorded check status: whole report read selected current primary aspects only all explicit holds preserved

Authority, conditions and confidence limits
S008/S009 -128(4)(c)–(d). The gas wording’s cross-reference to required information differs from the electric wording; no factual sufficiency determination follows.
S_WA-P14-C058 Saved research record

Different billing/service users and master-meter occupants have additional notification protections; the specified service-user request triggers at least five extra days.

Recorded check status: whole report read selected current primary aspects only all explicit holds preserved

Authority, conditions and confidence limits
S008/S009 -128(4)(f), (i). This regulates the covered utility’s conduct, not the complete landlord/tenant relationship.
S_WA-P14-C059 Saved research record

Except danger to life or property, disconnection is barred on weekends, legal holidays and days when restoration cannot occur the same or following day.

Recorded check status: whole report read selected current primary aspects only all explicit holds preserved

Authority, conditions and confidence limits
S008/S009 -128(4)(g). No universal ordinary-disconnection hour window beyond the actual text is supplied.
S_WA-P14-C060 Saved research record

A dispatched disconnection representative must accept delinquent-account payment; change need not be supplied, but overpayment must be credited.

Recorded check status: whole report read selected current primary aspects only all explicit holds preserved

Authority, conditions and confidence limits
S008/S009 -128(4)(h). A tariff-mentioned visit fee remains subject to C017 and actual tariff authority.
S_WA-P14-C061 Saved research record

Third-party designation must be offered; specified incapacity concerns require reasonable inquiry, third-party notice and the additional delay.

Recorded check status: whole report read selected current primary aspects only all explicit holds preserved

Authority, conditions and confidence limits
S008/S009 -128(4)(k). No incapacity or responsible agency is presumed.
S_WA-P14-C062 Saved research record

Listed licensed/certified medical-facility categories require notice to the specified state department and customer, with a request-dependent delay; electric remote disconnection is additionally restricted.

Recorded check status: whole report read selected current primary aspects only all explicit holds preserved

Authority, conditions and confidence limits
S008/S009 -128(4)(j). Facility status and full licensing regimes are not verified.
S_WA-P14-C063 Saved research record

Electric remote nonpayment disconnection has a morning-only window, same-day payment/restoration opportunity, particular pre-disconnection visit duties and a no-site/no-fee rule.

Recorded check status: whole report read selected current primary aspects only all explicit holds preserved

Authority, conditions and confidence limits
S008 -128(6). Critical-infrastructure incorporation and actual implementation remain held.
S_WA-P14-C064 Saved research record

Gas remote disconnection and reconnection require commission authorization under the respective rules.

Recorded check status: whole report read selected current primary aspects only all explicit holds preserved

Authority, conditions and confidence limits
S009 -128(6), -133(2). No authorization or actual remote capability was investigated.
S_WA-P14-C065 Saved research record

The without-prior/further-notice branch is confined to enumerated investigation, vacancy, hazard, dishonored-payment, broken-arrangement and unauthorized-use conditions.

Recorded check status: whole report read selected current primary aspects only all explicit holds preserved

Authority, conditions and confidence limits
S008/S009 -128(7)(a). Some branches expressly require prior compliant notice; ordinary delinquency is not transformed into immediate-action authority.
S_WA-P14-C066 Saved research record

Dishonored payment alone is not fraud. The utility bears the stated fraud burden; first and repeated theft/tampering/fraud branches differ.

Recorded check status: whole report read selected current primary aspects only all explicit holds preserved

Authority, conditions and confidence limits
S008/S009 -128(7)(a)(i). Tariff-estimated service, resulting costs and any required deposit are source categories, not verified charges or findings here.
S_WA-P14-C067 Saved research record

After a qualifying no-prior-notice disconnection, reasonable efforts to explain the reason and dispute route are required within five business days.

Recorded check status: whole report read selected current primary aspects only all explicit holds preserved

Authority, conditions and confidence limits
S008/S009 -128(7)(b)–(c). The subsection expressly does not eliminate civil/criminal responsibility.
S_WA-P14-C068 Saved research record

Disconnection is prohibited while the customer pursues a remedy/appeal provided by these rules or qualifying discussions, subject to payment of undisputed amounts and correction of dangerous conditions.

Recorded check status: whole report read selected current primary aspects only all explicit holds preserved

Authority, conditions and confidence limits
S008/S009 -128(10). This is not a conclusion that every communication, lawsuit or unpaid disputed account creates an unconditional stay.
S_WA-P14-C069 Saved research record

Residential space-heating protection operates during the November 15–March 15 period only when the statutory conditions are met. Notice of inability should ordinarily follow within five business days of an overdue notice, but lateness does not permanently foreclose regaining protection.

Recorded check status: whole report read selected current primary aspects only all explicit holds preserved

Authority, conditions and confidence limits
S007 §.010(4)(a); S008/S009 -143(1). Extenuating circumstances and statutory reconnection language preserved.
S_WA-P14-C070 Saved research record

The winter income predicate uses prior-twelve-month household self-certification to the designated Commerce grantee and the maximum under the incorporated state energy-assistance plan.

Recorded check status: whole report read selected current primary aspects only all explicit holds preserved

Authority, conditions and confidence limits
S007 §.010(4)(b); S008/S009 -143(1)(b). Grantee verification is permitted; current final-plan threshold remains held.
S_WA-P14-C071 Saved research record

The winter route also requires applications for applicable heating assistance, commitment of assistance to current/future utility bills, and weatherization application if available for the dwelling.

Recorded check status: whole report read selected current primary aspects only all explicit holds preserved

Authority, conditions and confidence limits
S007 §.010(4)(c)–(d); S008/S009 -143(1)(c)–(d). Availability, application and benefit approval are different predicates.
S_WA-P14-C072 Saved research record

The statutory winter required-payment ceiling combines seven percent of monthly income with one-twelfth of qualifying post-application arrearage.

Recorded check status: whole report read selected current primary aspects only all explicit holds preserved

Authority, conditions and confidence limits
S007 §.010(4)(e). Older -143 wording uses “billings” in one sentence and “past-due amounts” in another; exact reconciliation is held rather than silently broadening the statutory base.
S_WA-P14-C073 Saved research record

Agreement to pay a higher winter percentage does not make a payment below that voluntary promise a default unless it falls below the statutory threshold.

Recorded check status: whole report read selected current primary aspects only all explicit holds preserved

Authority, conditions and confidence limits
S007 §.010(4)(e); S008/S009 -143(1)(e). No payment amount or income supplied.
S_WA-P14-C074 Saved research record

The winter plan must address continued service and payment of the past-due bill by the following October 15; nonpayment by that target affects future protection, and moving does not erase the obligation.

Recorded check status: whole report read selected current primary aspects only all explicit holds preserved

Authority, conditions and confidence limits
S007 §.010(4)(e)–(f); S008/S009 -143(1)(e), (g). No actual future eligibility determined.
S_WA-P14-C075 Saved research record

Utilities must assist with winter requirements and provide the required information/plan; the WAC requires same-service-area plan transfer and recalculation when qualifying assistance is received.

Recorded check status: whole report read selected current primary aspects only all explicit holds preserved

Authority, conditions and confidence limits
S007 §.010(5); S008/S009 -143(1)(f), (2). The statute’s transfer authorization and rule’s duty are identified separately.
S_WA-P14-C076 Saved research record

A qualifying winter-plan defaulter can regain protection through the statute’s amount that would have been due under the plan, absent default, at reconnection.

Recorded check status: whole report read selected current primary aspects only all explicit holds preserved

Authority, conditions and confidence limits
S007 §.010(5)(d)–(e). This is not automatically the entire historical account balance. Other lawful nonpayment-independent grounds remain separate.
S_WA-P14-C077 Saved research record

The 2023 original removed winter deposit/reconnection-charge wording that remains in the older WAC text.

Recorded check status: whole report read selected current primary aspects only all explicit holds preserved

Authority, conditions and confidence limits
S014 §6; S007 §.010(4)(a), (5)(d); S008/S009 -143(1)(a), (2)(e). Current charge collection is held; the older text is not used to restore deleted statutory conditions.
S_WA-P14-C078 Saved research record

RCW 80.28.010(8) requires an approved tariff prohibiting nonpayment termination of covered residential electric service on the specified NWS heat-alert day; natural-gas service is not listed in that subsection.

Recorded check status: whole report read selected current primary aspects only all explicit holds preserved

Authority, conditions and confidence limits
S007 §.010(8), complete; S014 §6; S012 §8. Includes issued or announced-intended alerts for the relevant area. No actual alert checked.
S_WA-P14-C079 Saved research record

The statutory heat route permits a nonpayment-disconnected residential user to request reconnection; the utility must promptly make a reasonable attempt and may require a compliant payment plan.

Recorded check status: whole report read selected current primary aspects only all explicit holds preserved

Authority, conditions and confidence limits
S007 §.010(9). The approved notice/request process and actual request are unestablished; no guaranteed physical restoration time is invented.
S_WA-P14-C080 Saved research record

A payment plan required under the heat-reconnection branch cannot require monthly payments exceeding six percent of monthly income; its May 15 target can extend as specified to preserve that ceiling.

Recorded check status: whole report read selected current primary aspects only all explicit holds preserved

Authority, conditions and confidence limits
S007 §.010(10). Voluntary higher payments, the lower default threshold and later-assistance reformulation are expressly preserved.
S_WA-P14-C081 Saved research record

Both electric and gas rules require tariff conditions under which nonvoluntary disconnections cease during inclement weather.

Recorded check status: whole report read selected current primary aspects only all explicit holds preserved

Authority, conditions and confidence limits
S008/S009 -128(11). No actual tariff was read; no temperature threshold, statewide gas heat moratorium or universal winter shutdown is inferred.
S_WA-P14-C082 Saved research record

A qualifying verbal or written medical notification triggers a five-business-day postponement/reinstatement grace period when residential service is subject to disconnection or has been disconnected.

Recorded check status: whole report read selected current primary aspects only all explicit holds preserved

Authority, conditions and confidence limits
S008/S009 -128(8), opening paragraph. The condition must require continued electricity/gas; no condition label is treated as sufficient.
S_WA-P14-C083 Saved research record

The medical restoration clause uses same-day/same-business-day language for a timely request and otherwise noon the next business day; upfront reconnection/deposit payment is not a prerequisite under that clause.

Recorded check status: whole report read selected current primary aspects only all explicit holds preserved

Authority, conditions and confidence limits
S008/S009 -128(8), second paragraph. Later billing language does not establish that a fee is presently lawful; C017 remains.
S_WA-P14-C084 Saved research record

Certification may be required within five business days from the source-defined medical professional, with only the listed residence, aggravation explanation, expected duration and certifier information.

Recorded check status: whole report read selected current primary aspects only all explicit holds preserved

Authority, conditions and confidence limits
S008/S009 -128(8)(a). The codified professional definition is preserved; no medical-license or certification determination is made.
S_WA-P14-C085 Saved research record

Certification lasts only for the certified health-endangerment period, at most sixty days unless renewed.

Recorded check status: whole report read selected current primary aspects only all explicit holds preserved

Authority, conditions and confidence limits
S008/S009 -128(8)(b). Renewal is not inferred to be automatic or indefinite.
S_WA-P14-C086 Saved research record

Medical protection does not excuse delinquent or ongoing charges; the rule permits the specified ten-percent payment, remaining-balance arrangement within 120 days and ongoing-bill promise, while forbidding demands exceeding the prescribed requirements.

Recorded check status: whole report read selected current primary aspects only all explicit holds preserved

Authority, conditions and confidence limits
S008/S009 -128(8)(c). Alternate plans may be agreed. “Minimum” wording is read together with the no-more-than-prescribed sentence.
S_WA-P14-C087 Saved research record

The medical plan must be confirmed within two business days; specified certification/payment/plan failures require the prescribed second-notice process, including an additional second notice if one was previously given.

Recorded check status: whole report read selected current primary aspects only all explicit holds preserved

Authority, conditions and confidence limits
S008/S009 -128(8)(c)–(d). Failure does not itself establish an immediate lawful cutoff.
S_WA-P14-C088 Saved research record

The older twice-in-120-days restriction was deleted in the 2020 amendment and is absent from the current medical subsection.

Recorded check status: whole report read selected current primary aspects only all explicit holds preserved

Authority, conditions and confidence limits
S011 adopted -128 replacement; current S008/S009 -128(8). This removes that historical restriction as a current premise; it does not establish unlimited protection regardless of other conditions.
S_WA-P14-C089 Saved research record

Medical/low-income status falls within account-and-usage information; utility safeguards, limited collection/use/disclosure and consent requirements apply, with express lawful-demand and other exceptions.

Recorded check status: whole report read selected current primary aspects only all explicit holds preserved

Authority, conditions and confidence limits
S008/S009 -023 and -153(1)–(8). RCW 19.29A/19.255, special-contract and federal medical/disability interfaces are not fully completed. No absolute-confidentiality claim.
S_WA-P14-C090 Saved research record

Ordinary restoration requires every reasonable effort within the source-stated time after the applicable charge is paid or agreed to be billed and one of the specified cause-removal/payment/arrangement branches is satisfied.

Recorded check status: whole report read selected current primary aspects only all explicit holds preserved

Authority, conditions and confidence limits
S008/S009 -133(1)(a)–(c). Electric remote restoration has a separate four-hour relation. Fee/deposit currentness and “prior obligation” distinctions remain.
S_WA-P14-C091 Saved research record

Electric disconnection/reconnection fees are prohibited by the specified clauses when no site visit is required.

Recorded check status: whole report read selected current primary aspects only all explicit holds preserved

Authority, conditions and confidence limits
S008 -128(6)(e), -133(2). This is an express codified no-fee rule, not permission to charge whenever a visit occurs.
S_WA-P14-C092 Saved research record

The commission may require reconnection pending a dispute over the propriety of disconnection.

Recorded check status: whole report read selected current primary aspects only all explicit holds preserved

Authority, conditions and confidence limits
S008/S009 -133(3). A request or informal complaint is not itself such an order.
S_WA-P14-C093 Saved research record

Utilities must acknowledge, investigate, report on and appropriately correct complaints, with supervisor and commission-escalation information under the stated sequence.

Recorded check status: whole report read selected current primary aspects only all explicit holds preserved

Authority, conditions and confidence limits
S008/S009 -173(1)–(2). “Promptly” is not replaced with an invented fixed deadline.
S_WA-P14-C094 Saved research record

Commission-referred informal complaints have separate two-/three-business-day reporting branches and a minimum three-year utility complaint-record retention duty.

Recorded check status: whole report read selected current primary aspects only all explicit holds preserved

Authority, conditions and confidence limits
S008/S009 -173(3)–(4). Commission extensions/specified dates are preserved.
S_WA-P14-C095 Saved research record

The informal commission process investigates and seeks compliance but does not result in a hearing or order; a formal proceeding ends informal processing of that subject.

Recorded check status: whole report read selected current primary aspects only all explicit holds preserved

Authority, conditions and confidence limits
S010 -910(3)–(5). No actual complaint or debt determination.
S_WA-P14-C096 Saved research record

Formal complaints require the statutory/rule jurisdictional and pleading predicates; the commission’s commencement decision and final merits are separate from submission.

Recorded check status: whole report read selected current primary aspects only all explicit holds preserved

Authority, conditions and confidence limits
S002 §.110; S010 -305, -370. Only the indispensable generic interface was read, not full litigation/adjudication.
S_WA-P14-C097 Saved research record

A complaint attacking the reasonableness of a rate schedule has the special statutory sponsorship threshold, distinct from an ordinary service/billing complaint.

Recorded check status: whole report read selected current primary aspects only all explicit holds preserved

Authority, conditions and confidence limits
S002 §.110(1)(b): commission’s own motion, specified municipal sponsorship, at least twenty-five consumers/purchasers, or at least twenty-five percent.
S_WA-P14-C098 Saved research record

The reparations statute requires investigation and specified findings of an excessive/exorbitant charge and entitlement before the commission orders the excess with interest from collection.

Recorded check status: whole report read selected current primary aspects only all explicit holds preserved

Authority, conditions and confidence limits
S002 §.220. Interest rate and completed recovery procedure are not established here.
S_WA-P14-C099 Saved research record

The unlawful-overcharge statute permits a refund order after investigation and a finding that collection exceeded the lawful rate, with interest from collection.

Recorded check status: whole report read selected current primary aspects only all explicit holds preserved

Authority, conditions and confidence limits
S002 §.230. “May” is preserved; no automatic refund from an allegation.
S_WA-P14-C100 Saved research record

RCW 80.04.440 provides liability for loss caused by the stated unlawful act or required-act omission; a wilful finding permits a discretionary reasonable attorney fee in a recovery.

Recorded check status: whole report read selected current primary aspects only all explicit holds preserved

Authority, conditions and confidence limits
S002 §.440, complete. Causation, recovery, wilfulness and court jurisdiction are unestablished.
S_WA-P14-C101 Saved research record

A complete court-overcharge recovery pathway is not established: RCW 80.04.240 contains a special exclusive procedure and deadline provisions that remain outside this pass’s limitation/court scope.

Recorded check status: whole report read selected current primary aspects only all explicit holds preserved

Authority, conditions and confidence limits
S002 §.240, read to preserve this boundary. No deadline, election or cumulative-recovery conclusion.
S_WA-P14-C112 Saved research record

Customer-directed termination has separate notice and usage-liability conditions, including a different electric remote-capability branch. Moving without a qualifying request does not automatically end responsibility under the rule.

Recorded check status: whole report read selected current primary aspects only all explicit holds preserved

Authority, conditions and confidence limits
S008/S009 -128(1). No move, termination request or final bill is supplied.
S_WA-P14-C113 Saved research record

Payment at a designated agency counts under the disconnection rule when the customer informs the utility and the utility verifies it; verification must be prompt.

Recorded check status: whole report read selected current primary aspects only all explicit holds preserved

Authority, conditions and confidence limits
S008/S009 -128(9). Dispatch, deposit of funds and verified payment are not treated as identical events.
S_WA-P14-C114 Saved research record

Generic consumer-information and tariff-access duties exist, including descriptions of credit, deposits, billing, disconnection and disputes.

Recorded check status: whole report read selected current primary aspects only all explicit holds preserved

Authority, conditions and confidence limits
S008/S009 -103, -193. No actual brochure, tariff, private policy or provider compliance was inspected.
S_WA-P14-C102 Saved research record

WSR 20-16-077 expressly adopted the identified amendments with an August 29, 2020 effective date.

Recorded check status: whole report read selected current primary aspects only all explicit holds preserved

Authority and limit
S011 filing notice, ¶¶25–28 and selected adopted clauses. Publication in a later Register issue is not a different effective date.
S_WA-P14-C103 Saved research record

WSR 16-06-038 expressly adopted the billing-correction amendments effective March 25, 2016.

Recorded check status: whole report read selected current primary aspects only all explicit holds preserved

Authority and limit
S015 header, adoption/effect provisions and Appendix B. Current -178 was also separately read.
S_WA-P14-C104 Saved research record

The 2023 heat/winter changes are enacted text with the session law’s stated July 23, 2023 effective date.

Recorded check status: whole report read selected current primary aspects only all explicit holds preserved

Authority and limit
S014 cover and §6; current S007. No application to an invented historical event.
S_WA-P14-C105 Saved research record

The 2025 original contains a specific funding condition; fulfillment was not authenticated through an enacted budget body.

Recorded check status: whole report read selected current primary aspects only all explicit holds preserved

Authority and limit
S013 §26; F011/F015. No inference of either failure or fulfillment from the failed route.
S_WA-P14-C106 Saved research record

The 2026 original reenacts the operative winter/heat provisions and substitutes encouragement concerning savings from reporting removal.

Recorded check status: whole report read selected current primary aspects only all explicit holds preserved

Authority and limit
S012 §8 and cover; S007 §.010(14). Effective June 11, 2026 as stated; encouragement is not an approved assistance award.
S_WA-P14-C107 Saved research record

The 2026 fee/customer-notice agenda is planning material and does not prove adoption, suspension expiration or present fee authority.

Recorded check status: whole report read selected current primary aspects only all explicit holds preserved

Authority and limit
S016 relevant agenda row. Projected dates are not accomplished legal events.
S_WA-P14-C108 Saved research record

The current operative LIHEAP-plan threshold incorporated by the winter statute was not authenticated.

Recorded check status: whole report read selected current primary aspects only all explicit holds preserved

Authority and limit
S017 guide; S018 draft announcement; failed linked plan routes F008/F009. No guide figure substituted.
S_WA-P14-C109 Saved research record

Stale rule references remain visible in the current text and must not be silently repaired.

Recorded check status: whole report read selected current primary aspects only all explicit holds preserved

Authority and limit
S008/S009 -123’s -128(2) reference; -138(1)’s -128(2)(f); -183(3)’s -128(9); -183(5)’s -138(2) compared with -178(6)(e)’s -138(1).
S_WA-P14-C110 Saved research record

No complete federal, local, tribal, public-provider, tariff, disability or judicial-construction conclusion is supplied.

Recorded check status: whole report read selected current primary aspects only all explicit holds preserved

Authority and limit
Deliberate scope boundary and B001–B030. Only the state text’s express incorporations are identified.
S_WA-P14-C111 Saved research record

The read protections regulate continuation/restoration and payment conditions; they do not themselves establish cancellation of an actual service debt.

Recorded check status: whole report read selected current primary aspects only all explicit holds preserved

Authority and limit
Especially S007 §.010(4)(f); S008/S009 -128(8)(c), -133, -143. No debt validity or discharge determination.

Sources, pinpoints and access limits

Keep the source version, actual read extent and jurisdiction with the proposition. A link or researcher access claim is not a substitute for an operative primary passage.

S_WA-P14-S001 Saved research record

Washington Legislature, RCW 80.01.040, Commission powers and duties. https://app.leg.wa.gov/RCW/default.aspx?cite=80.01.040

Recorded check status: whole report source record read underlying group not freshly reopened

Actual read bounds and use
Complete (1)–(4), credits. Used for commission authority and rulemaking jurisdiction.
Displayed credits, status and limits
Current codification; latest displayed credit 2007 c 234 §1, with earlier 1985/1961 credits. Historical originals not independently completed.
Direct source URLs
https://app.leg.wa.gov/RCW/default.aspx?cite=80.01.040
https://app.leg.wa.gov/RCW/default.aspx?cite=80.01.040&utm_source=chatgpt.com
S_WA-P14-S002 Saved research record

Washington Legislature, selected chapter 80.04 RCW provisions. https://app.leg.wa.gov/RCW/default.aspx?cite=80.04.010; https://app.leg.wa.gov/RCW/default.aspx?cite=80.04.110; https://app.leg.wa.gov/RCW/default.aspx?cite=80.04.160; https://app.leg.wa.gov/RCW/default.aspx?cite=80.04&full=true

Recorded check status: whole report source record read underlying group not freshly reopened

Actual read bounds and use
Complete §.010 definitions and displayed notes; complete §.110(1)–(5), §.160, §.220, §.230, §.440 and §.500. Section .240 was read to identify the special exclusive recovery-procedure boundary; its limitation analysis is excluded. The whole chapter was not read.
Displayed credits, status and limits
§.010 latest credit 2025 c 263 §1, preceded by 2024 c 348 §1 and 2021 c 65 §93; §.110 latest 2021 c 65 §94; §§.160/.500 latest 2011 c 214 §§8/10; §§.220/.230/.240/.440 carry 1961 codification and earlier enactment credits. The 2025 funding-condition issue is retained in S013/B026.
Direct source URLs
https://app.leg.wa.gov/RCW/default.aspx?cite=80.04.010
https://app.leg.wa.gov/RCW/default.aspx?cite=80.04.110
https://app.leg.wa.gov/RCW/default.aspx?cite=80.04.160
https://app.leg.wa.gov/RCW/default.aspx?cite=80.04&full=true
https://app.leg.wa.gov/RCW/default.aspx?cite=80.04.010&utm_source=chatgpt.com
https://app.leg.wa.gov/RCW/default.aspx?cite=80.04.110&utm_source=chatgpt.com
https://app.leg.wa.gov/RCW/default.aspx?cite=80.04.160&utm_source=chatgpt.com
https://app.leg.wa.gov/RCW/default.aspx?cite=80.04&full=true&utm_source=chatgpt.com
S_WA-P14-S003 Saved research record

Washington Legislature, RCW 54.16.040, PUD electric powers. https://app.leg.wa.gov/RCW/default.aspx?cite=54.16.040

Recorded check status: whole report source record read underlying group not freshly reopened

Actual read bounds and use
Complete section, including provisos and credits. Used only for the electric rate/service jurisdiction boundary.
Displayed credits, status and limits
Current codification; latest displayed credit 1955 c 390 §5. No PUD-specific customer policy or tariff read.
Direct source URLs
https://app.leg.wa.gov/RCW/default.aspx?cite=54.16.040
https://app.leg.wa.gov/RCW/default.aspx?cite=54.16.040&utm_source=chatgpt.com
S_WA-P14-S004 Saved research record

Washington Legislature, RCW 54.48.040. https://app.leg.wa.gov/RCW/default.aspx?cite=54.48.040

Recorded check status: whole report source record read underlying group not freshly reopened

Actual read bounds and use
Complete section and credit; cooperative/public-utility jurisdiction-preservation clause.
Displayed credits, status and limits
Current codification; 1969 c 102 §4. Does not itself complete every cooperative classification.
Direct source URLs
https://app.leg.wa.gov/RCW/default.aspx?cite=54.48.040
https://app.leg.wa.gov/RCW/default.aspx?cite=54.48.040&utm_source=chatgpt.com
S_WA-P14-S005 Saved research record

Washington Legislature, RCW 23.86.400. https://app.leg.wa.gov/RCW/default.aspx?cite=23.86.400

Recorded check status: whole report source record read underlying group not freshly reopened

Actual read bounds and use
Complete (1)–(3), including the locally regulated utility definition and no-new-jurisdiction clause.
Displayed credits, status and limits
Current; 1996 c 32 §1. Pole-attachment subject matter was not converted into retail arrears rules.
Direct source URLs
https://app.leg.wa.gov/RCW/default.aspx?cite=23.86.400
https://app.leg.wa.gov/RCW/default.aspx?cite=23.86.400&utm_source=chatgpt.com
S_WA-P14-S006 Saved research record

Washington Legislature, RCW 24.06.600. https://app.leg.wa.gov/RCW/default.aspx?cite=24.06.600

Recorded check status: whole report source record read underlying group not freshly reopened

Actual read bounds and use
Complete (1)–(3), including locally regulated cooperative/mutual scope.
Displayed credits, status and limits
Current; 1996 c 32 §2. Same bounded use as S005.
Direct source URLs
https://app.leg.wa.gov/RCW/default.aspx?cite=24.06.600
https://app.leg.wa.gov/RCW/default.aspx?cite=24.06.600&utm_source=chatgpt.com
S_WA-P14-S007 Saved research record

Washington Legislature, selected chapter 80.28 RCW provisions. https://app.leg.wa.gov/RCW/default.aspx?cite=80.28.010

Recorded check status: fresh current primary selected complete 80 28 010 only

Actual read bounds and use
Complete §.010(1)–(14), credits and displayed notes. Core winter, heat-alert, budget-plan and nonwaiver source.
Displayed credits, status and limits
Current page credits 2026 c 137 §8; 2025 c 263 §4; 2023 c 105 §6, followed by earlier enactments. Material originals are separately registered below.
Direct source URLs
https://app.leg.wa.gov/RCW/default.aspx?cite=80.28.010
https://app.leg.wa.gov/RCW/default.aspx?cite=80.28.010&utm_source=chatgpt.com
S_WA-P14-S007 Saved research record

https://app.leg.wa.gov/RCW/default.aspx?cite=80.28.050; https://app.leg.wa.gov/RCW/default.aspx?cite=80.28.060; https://app.leg.wa.gov/RCW/default.aspx?cite=80.28.080; https://app.leg.wa.gov/RCW/default.aspx?cite=80.28.110

Recorded check status: whole report additional usage read not freshly reopened

Actual read bounds and use
Complete §.050; §.060(1)–(2); §.080(1)–(2), including exceptions and definitions; §.110(1)–(2), credits and notes.
Displayed credits, status and limits
§§.050/.060/.080 latest credits 2025 c 263 §§8/9/14. Section .110 displays 2025 c 1 §2, Initiative 2066, and 2024 c 348 §6. Its initiative-dependent service branch is not given an unqualified validity/status conclusion. Emergency-power and utility-theft incorporations were not completed.
Direct source URLs
https://app.leg.wa.gov/RCW/default.aspx?cite=80.28.050
https://app.leg.wa.gov/RCW/default.aspx?cite=80.28.060
https://app.leg.wa.gov/RCW/default.aspx?cite=80.28.080
https://app.leg.wa.gov/RCW/default.aspx?cite=80.28.110
https://app.leg.wa.gov/RCW/default.aspx?cite=80.28.050&utm_source=chatgpt.com
https://app.leg.wa.gov/RCW/default.aspx?cite=80.28.060&utm_source=chatgpt.com
https://app.leg.wa.gov/RCW/default.aspx?cite=80.28.080&utm_source=chatgpt.com
https://app.leg.wa.gov/RCW/default.aspx?cite=80.28.110&utm_source=chatgpt.com
S_WA-P14-S008 Saved research record

Washington Utilities and Transportation Commission; Washington Code Reviser, chapter 480-100 WAC. https://app.leg.wa.gov/WAC/default.aspx?cite=480-100&full=true

Recorded check status: fresh current primary seven selected complete consumer rule bodies

Actual extent and status
Selected complete sections listed below, read through section renditions and chapter windows. The whole chapter was not read. Current codified text; individual section credits control, not the chapter’s latest-update marker.
Direct source URLs
https://app.leg.wa.gov/WAC/default.aspx?cite=480-100&full=true
https://app.leg.wa.gov/WAC/default.aspx?cite=480-100&full=true&utm_source=chatgpt.com
S_WA-P14-S009 Saved research record

Washington Utilities and Transportation Commission; Washington Code Reviser, chapter 480-90 WAC. https://app.leg.wa.gov/WAC/default.aspx?cite=480-90&full=true

Recorded check status: fresh current primary seven selected complete consumer rule bodies

Actual extent and status
Same bounded approach, independently reading the gas provisions. Gas -008 and -168 were completed through this chapter rendition after individual-route failures.
Direct source URLs
https://app.leg.wa.gov/WAC/default.aspx?cite=480-90&full=true
https://app.leg.wa.gov/WAC/default.aspx?cite=480-90&full=true&utm_source=chatgpt.com
S_WA-P14-S010 Saved research record

Washington UTC; Code Reviser, selected chapter 480-07 WAC provisions. https://app.leg.wa.gov/WAC/default.aspx?cite=480-07-110; https://app.leg.wa.gov/WAC/default.aspx?cite=480-07-305; https://app.leg.wa.gov/WAC/default.aspx?cite=480-07-910; https://app.leg.wa.gov/WAC/default.aspx?cite=480-07&full=true

Recorded check status: whole report source record read underlying group not freshly reopened

Actual extent and status
Complete -110(1)–(4), -305(1)–(5), -910(1)–(5), and -370(1)–(8) through the chapter rendition. Used only for exemption and complaint-process boundaries. Latest relevant credits: WSR 17-06-051, effective March 31, 2017, and WSR 18-18-041, effective September 29, 2018, for -910. Full adjudicative practice is excluded.
Direct source URLs
https://app.leg.wa.gov/WAC/default.aspx?cite=480-07-110
https://app.leg.wa.gov/WAC/default.aspx?cite=480-07-305
https://app.leg.wa.gov/WAC/default.aspx?cite=480-07-910
https://app.leg.wa.gov/WAC/default.aspx?cite=480-07&full=true
https://app.leg.wa.gov/WAC/default.aspx?cite=480-07-110&utm_source=chatgpt.com
https://app.leg.wa.gov/WAC/default.aspx?cite=480-07-305&utm_source=chatgpt.com
https://app.leg.wa.gov/WAC/default.aspx?cite=480-07-910&utm_source=chatgpt.com
https://app.leg.wa.gov/WAC/default.aspx?cite=480-07&full=true&utm_source=chatgpt.com
S_WA-P14-S011 Saved research record

Washington UTC, WSR 20-16-077, permanent rules. Filing notice: https://lawfilesext.leg.wa.gov/law/wsr/2020/16/20-16-077.htm. Adopted text: https://lawfilesext.leg.wa.gov/law/wsr/2020/17/20-16-077.htm. Issue PDF: https://app.leg.wa.gov/documents/laws/wsr/2020/17/20-17PERM.pdf

Recorded check status: whole report source record read underlying group not freshly reopened

Actual read bounds
Filing notice; adoption/status discussion, especially ¶¶24–28; selected adopted -023, -128 and -133 clauses, including new notices, remote provisions, medical provisions and deletion of the former repeat-medical restriction. PDF printed p.1/index 0 header material only. Current complete operative sections independently read as S008/S009.
Version, effectiveness and limitation
Filed July 29, 2020; stated effective August 29, 2020. Full comment matrix and all appendices were not a substantive foundation. HTML/PDF are one instrument, not independent corroboration.
Direct source URLs
https://lawfilesext.leg.wa.gov/law/wsr/2020/16/20-16-077.htm
https://lawfilesext.leg.wa.gov/law/wsr/2020/17/20-16-077.htm
https://app.leg.wa.gov/documents/laws/wsr/2020/17/20-17PERM.pdf
https://lawfilesext.leg.wa.gov/law/wsr/2020/16/20-16-077.htm?utm_source=chatgpt.com
https://lawfilesext.leg.wa.gov/law/wsr/2020/17/20-16-077.htm?utm_source=chatgpt.com
https://app.leg.wa.gov/documents/laws/wsr/2020/17/20-17PERM.pdf?utm_source=chatgpt.com
S_WA-P14-S012 Saved research record

Washington Legislature, 2026 c 137, EHB 2575, session law. https://lawfilesext.leg.wa.gov/biennium/2025-26/Pdf/Bills/Session%20Laws/House/2575.SL.pdf?cite=2026+c+137+s+8

Recorded check status: whole report source record read underlying group not freshly reopened

Actual read bounds
Cover/index 0; complete §8, printed pp.16–20/PDF indices 16–20; final §10, printed p.25/index 25, and enactment tail.
Version, effectiveness and limitation
Stated effective June 11, 2026. Section 8 reenacts RCW 80.28.010 and changes the reporting/savings provision; it does not replace the winter/heat conditions with an unconditional assistance entitlement. Parsed text, not page-pixel review.
Direct source URLs
https://lawfilesext.leg.wa.gov/biennium/2025-26/Pdf/Bills/Session%20Laws/House/2575.SL.pdf?cite=2026+c+137+s+8
https://lawfilesext.leg.wa.gov/biennium/2025-26/Pdf/Bills/Session%20Laws/House/2575.SL.pdf?cite=2026+c+137+s+8&utm_source=chatgpt.com
S_WA-P14-S013 Saved research record

Washington Legislature, 2025 c 263, 2SHB 1514. https://lawfilesext.leg.wa.gov/biennium/2025-26/Pdf/Bills/Session%20Laws/House/1514-S2.SL.pdf?cite=2025+c+263+s+4

Recorded check status: whole report source record read underlying group not freshly reopened

Actual read bounds
Cover/index 0; material §4 winter/heat amendments within printed pp.10–14/indices 10–14; complete §26, printed p.28/index 28. A later attempt to complete an additional §4 tail window failed; that failure does not undo the earlier reads.
Version, effectiveness and limitation
Cover states July 27, 2025. Section 26 contains a funding-specific null-and-void condition tied to June 30, 2025. Enacted-budget fulfillment was not authenticated. Thermal-energy expansion is not treated as completed in this electricity/natural-gas pass.
Direct source URLs
https://lawfilesext.leg.wa.gov/biennium/2025-26/Pdf/Bills/Session%20Laws/House/1514-S2.SL.pdf?cite=2025+c+263+s+4
https://lawfilesext.leg.wa.gov/biennium/2025-26/Pdf/Bills/Session%20Laws/House/1514-S2.SL.pdf?cite=2025+c+263+s+4&utm_source=chatgpt.com
S_WA-P14-S014 Saved research record

Washington Legislature, 2023 c 105, ESHB 1329. https://lawfilesext.leg.wa.gov/biennium/2023-24/Pdf/Bills/Session%20Laws/House/1329-S.SL.pdf?cite=2023+c+105+s+6

Recorded check status: whole report source record read underlying group not freshly reopened

Actual read bounds
Cover/index 0; complete §6, printed pp.12–16/indices 12–16. Read additions/deletions in the winter and heat provisions.
Version, effectiveness and limitation
Stated effective July 23, 2023. Material deletion of winter deposit/reconnect-charge language and addition of heat protections authenticated. Other provider regimes in the act not completed.
Direct source URLs
https://lawfilesext.leg.wa.gov/biennium/2023-24/Pdf/Bills/Session%20Laws/House/1329-S.SL.pdf?cite=2023+c+105+s+6
https://lawfilesext.leg.wa.gov/biennium/2023-24/Pdf/Bills/Session%20Laws/House/1329-S.SL.pdf?cite=2023+c+105+s+6&utm_source=chatgpt.com
S_WA-P14-S015 Saved research record

Washington UTC, WSR 16-06-038, billing corrections. Filing notice: https://lawfilesext.leg.wa.gov/law/wsr/2016/06/16-06-038.htm. Adopted original: https://lawfilesext.leg.wa.gov/law/wsr/2016/07/16-06-038.htm

Recorded check status: fresh selected formal adoption explanation paragraphs28 31

Actual read bounds
Header; material explanatory paragraphs, especially ¶¶15–22, 28–31, 34–39, adoption/effect paragraphs and ¶¶43–44; complete Appendix B adopted -178(1)–(8) for both services.
Version, effectiveness and limitation
Filed February 23, 2016; stated effective March 25, 2016. Formal agency adoption explanation, not a judicial decision. Proposed alternatives and commenter examples are not current rules or examples in this report.
Direct source URLs
https://lawfilesext.leg.wa.gov/law/wsr/2016/06/16-06-038.htm
https://lawfilesext.leg.wa.gov/law/wsr/2016/07/16-06-038.htm
https://lawfilesext.leg.wa.gov/law/wsr/2016/06/16-06-038.htm?utm_source=chatgpt.com
https://lawfilesext.leg.wa.gov/law/wsr/2016/07/16-06-038.htm?utm_source=chatgpt.com
S_WA-P14-S016 Saved research record

Washington UTC, WSR 26-14-084, semiannual rule-development agenda. https://lawfilesext.leg.wa.gov/law/wsr/2026/14/26-14-084.htm

Recorded check status: whole report source record read underlying group not freshly reopened

Actual read bounds
Header and complete relevant “customer notice and fees” agenda entry; surrounding agenda read for status.
Version, effectiveness and limitation
Filed June 29, 2026, agenda for July–December 2026. It identifies contemplated permanent fee/deposit changes and projected rulemaking milestones. Not an adoption, operative suspension, or proof of completion.
Direct source URLs
https://lawfilesext.leg.wa.gov/law/wsr/2026/14/26-14-084.htm
https://lawfilesext.leg.wa.gov/law/wsr/2026/14/26-14-084.htm?utm_source=chatgpt.com
S_WA-P14-S017 Saved research record

Washington Department of Commerce, Low-Income Home Energy Assistance Program. https://www.commerce.wa.gov/community-opportunities/liheap/

Recorded check status: whole report source record read underlying group not freshly reopened

Actual read bounds
Generic program services, eligibility-guide qualification, FAQs and links to plan material; no provider map or participant information investigated.
Version, effectiveness and limitation
Official program guidance, not the adopted state-plan body. Numerical guide information is not substituted for the statute’s incorporated current plan.
Direct source URLs
https://www.commerce.wa.gov/community-opportunities/liheap/
https://www.commerce.wa.gov/community-opportunities/liheap/?utm_source=chatgpt.com
S_WA-P14-S018 Saved research record

Washington Department of Commerce, Help shape the future of energy assistance in Washington. https://www.commerce.wa.gov/help-shape-the-future-of-energy-assistance-in-washington/

Recorded check status: whole report source record read underlying group not freshly reopened

Actual read bounds
Complete substantive announcement and draft-plan status language.
Version, effectiveness and limitation
Announces a 2027 draft model plan published June 29, 2026. It does not establish final adoption/approval or current operative eligibility. Linked draft retrieval failed.
Direct source URLs
https://www.commerce.wa.gov/help-shape-the-future-of-energy-assistance-in-washington/
https://www.commerce.wa.gov/help-shape-the-future-of-energy-assistance-in-washington/?utm_source=chatgpt.com

What was examined—and what is still missing

The saved component-level coverage record keeps answered, partial, blank and unresolved branches distinct. A coverage label is not acceptance of a whole subject or jurisdiction.

coverage-1 Saved research record

1: Commission identity and authority

Recorded check status: recorded; no individual primary acceptance inferred

Disposition
Answered—text
Source/claim/branch links
S001–S002; C001; B001
Exact remaining evidence or retained boundary
Actual jurisdiction not determined.

Recorded coordinator check boundaries

coordinator acceptance
whole_report_scoped_review_selected_primary_only_source_status_incorporation_construction_application_holds
coverage-2 Saved research record

1: Electric actor/plant definitions and exclusions

Recorded check status: recorded; no individual primary acceptance inferred

Disposition
Answered—text
Source/claim/branch links
S002; C002, C004
Exact remaining evidence or retained boundary
No actual operation classified.

Recorded coordinator check boundaries

coordinator acceptance
whole_report_scoped_review_selected_primary_only_source_status_incorporation_construction_application_holds
coverage-3 Saved research record

1: Natural-gas service/actor definitions

Recorded check status: recorded; no individual primary acceptance inferred

Disposition
Answered—text
Source/claim/branch links
S002, S009; C003
Exact remaining evidence or retained boundary
Other gas/fuel categories excluded.

Recorded coordinator check boundaries

coordinator acceptance
whole_report_scoped_review_selected_primary_only_source_status_incorporation_construction_application_holds
coverage-4 Saved research record

1: Customer/applicant/joint responsibility

Recorded check status: recorded; no individual primary acceptance inferred

Disposition
Answered—text
Source/claim/branch links
S008/S009 -023; C009
Exact remaining evidence or retained boundary
Definition is not proof of liability.

Recorded coordinator check boundaries

coordinator acceptance
whole_report_scoped_review_selected_primary_only_source_status_incorporation_construction_application_holds
coverage-5 Saved research record

1: Washington territorial/service nexus

Recorded check status: recorded; no individual primary acceptance inferred

Disposition
Partial
Source/claim/branch links
C001–C003; B001–B002
Exact remaining evidence or retained boundary
Actual nexus, service territory and tariff excluded.

Recorded coordinator check boundaries

coordinator acceptance
whole_report_scoped_review_selected_primary_only_source_status_incorporation_construction_application_holds
coverage-6 Saved research record

1: Municipal/PUD/cooperative boundaries

Recorded check status: recorded; no individual primary acceptance inferred

Disposition
Answered—boundary only
Source/claim/branch links
S002–S006; C005–C007
Exact remaining evidence or retained boundary
Separate arrears/protection regimes remain open.

Recorded coordinator check boundaries

coordinator acceptance
whole_report_scoped_review_selected_primary_only_source_status_incorporation_construction_application_holds
coverage-7 Saved research record

1: Master meter/landlord rebilling

Recorded check status: recorded; no individual primary acceptance inferred

Disposition
Partial
Source/claim/branch links
C013, C058; B002
Exact remaining evidence or retained boundary
Only covered-utility gateway/notice text; housing allocation excluded.

Recorded coordinator check boundaries

coordinator acceptance
whole_report_scoped_review_selected_primary_only_source_status_incorporation_construction_application_holds
coverage-8 Saved research record

1: Commercial/water/sewer/telecom/thermal

Recorded check status: recorded; no individual primary acceptance inferred

Disposition
Excluded except boundaries
Source/claim/branch links
C003, C005, C038, C105; B028
Exact remaining evidence or retained boundary
No category transfer.

Recorded coordinator check boundaries

coordinator acceptance
whole_report_scoped_review_selected_primary_only_source_status_incorporation_construction_application_holds
coverage-9 Saved research record

2: Generic bill contents and billing interval

Recorded check status: recorded; no individual primary acceptance inferred

Disposition
Answered—text
Source/claim/branch links
-178; C018–C020
Exact remaining evidence or retained boundary
Usage and rate correctness not determined.

Recorded coordinator check boundaries

coordinator acceptance
whole_report_scoped_review_selected_primary_only_source_status_incorporation_construction_application_holds
coverage-10 Saved research record

2: Mailing/payment due dates

Recorded check status: recorded; no individual primary acceptance inferred

Disposition
Answered—text
Source/claim/branch links
C021; Q005–Q006
Exact remaining evidence or retained boundary
No calendar computation.

Recorded coordinator check boundaries

coordinator acceptance
whole_report_scoped_review_selected_primary_only_source_status_incorporation_construction_application_holds
coverage-11 Saved research record

2: Electronic consent/delivery failure

Recorded check status: recorded; no individual primary acceptance inferred

Disposition
Answered—text
Source/claim/branch links
-179; C022–C024
Exact remaining evidence or retained boundary
No actual consent or delivery.

Recorded coordinator check boundaries

coordinator acceptance
whole_report_scoped_review_selected_primary_only_source_status_incorporation_construction_application_holds
coverage-12 Saved research record

2: Cash receipts/payment locations

Recorded check status: recorded; no individual primary acceptance inferred

Disposition
Answered—text
Source/claim/branch links
C025, C113
Exact remaining evidence or retained boundary
No universal card-payment conclusion.

Recorded coordinator check boundaries

coordinator acceptance
whole_report_scoped_review_selected_primary_only_source_status_incorporation_construction_application_holds
coverage-13 Saved research record

2: Deposit criteria/ceiling/installments

Recorded check status: recorded; no individual primary acceptance inferred

Disposition
Answered—codified baseline; current collection held
Source/claim/branch links
C026–C031; B005–B007
Exact remaining evidence or retained boundary
Operative suspension/status and tariff conditions.

Recorded coordinator check boundaries

coordinator acceptance
whole_report_scoped_review_selected_primary_only_source_status_incorporation_construction_application_holds
coverage-14 Saved research record

2: Deposit interest/refund/offset

Recorded check status: recorded; no individual primary acceptance inferred

Disposition
Answered—relation; numerical rate held
Source/claim/branch links
C032–C034
Exact remaining evidence or retained boundary
H.15 value, rounding/compounding and actual deposit facts absent.

Recorded coordinator check boundaries

coordinator acceptance
whole_report_scoped_review_selected_primary_only_source_status_incorporation_construction_application_holds
coverage-15 Saved research record

2: Billing correction/credit/refund duties

Recorded check status: recorded; no individual primary acceptance inferred

Disposition
Answered—text and adoption explanation
Source/claim/branch links
C035–C045; S015
Exact remaining evidence or retained boundary
Technical classification and exact event application held.

Recorded coordinator check boundaries

coordinator acceptance
whole_report_scoped_review_selected_primary_only_source_status_incorporation_construction_application_holds
coverage-16 Saved research record

2: Late/returned-payment/collection charges

Recorded check status: recorded; no individual primary acceptance inferred

Disposition
Unresolved current amount/permission
Source/claim/branch links
C017, C048–C049
Exact remaining evidence or retained boundary
Generic suspension text and effective tariff authority.

Recorded coordinator check boundaries

coordinator acceptance
whole_report_scoped_review_selected_primary_only_source_status_incorporation_construction_application_holds
coverage-17 Saved research record

2: Partial-payment allocation

Recorded check status: recorded; no individual primary acceptance inferred

Disposition
Partial
Source/claim/branch links
C048, C052, C060, C113; B008
Exact remaining evidence or retained boundary
No general allocation priority authenticated.

Recorded coordinator check boundaries

coordinator acceptance
whole_report_scoped_review_selected_primary_only_source_status_incorporation_construction_application_holds
coverage-18 Saved research record

2: Fee-change notices

Recorded check status: recorded; no individual primary acceptance inferred

Disposition
Answered—conditional text
Source/claim/branch links
C049; -193 through -197
Exact remaining evidence or retained boundary
Classification overlap, purchased-gas branch and actual tariff excluded.

Recorded coordinator check boundaries

coordinator acceptance
whole_report_scoped_review_selected_primary_only_source_status_incorporation_construction_application_holds
coverage-19 Saved research record

3: Ordinary nonpayment grounds

Recorded check status: recorded; no individual primary acceptance inferred

Disposition
Answered—text
Source/claim/branch links
C050–C052
Exact remaining evidence or retained boundary
No actual delinquency or charge classification.

Recorded coordinator check boundaries

coordinator acceptance
whole_report_scoped_review_selected_primary_only_source_status_incorporation_construction_application_holds
coverage-20 Saved research record

3: First/second notice sequence/content

Recorded check status: recorded; no individual primary acceptance inferred

Disposition
Answered—text
Source/claim/branch links
C053–C057
Exact remaining evidence or retained boundary
No notice preparation or sufficiency determination.

Recorded coordinator check boundaries

coordinator acceptance
whole_report_scoped_review_selected_primary_only_source_status_incorporation_construction_application_holds
coverage-21 Saved research record

3: Mailing/delivery/telephone/electronic distinctions

Recorded check status: recorded; no individual primary acceptance inferred

Disposition
Answered—text
Source/claim/branch links
C053–C055; Q031–Q035
Exact remaining evidence or retained boundary
General unqualified-day computation held.

Recorded coordinator check boundaries

coordinator acceptance
whole_report_scoped_review_selected_primary_only_source_status_incorporation_construction_application_holds
coverage-22 Saved research record

3: Service-user/master-meter notices

Recorded check status: recorded; no individual primary acceptance inferred

Disposition
Answered—text
Source/claim/branch links
C058
Exact remaining evidence or retained boundary
Tenancy consequences excluded.

Recorded coordinator check boundaries

coordinator acceptance
whole_report_scoped_review_selected_primary_only_source_status_incorporation_construction_application_holds
coverage-23 Saved research record

3: Days/hours/closures/final contact

Recorded check status: recorded; no individual primary acceptance inferred

Disposition
Answered—bounded text
Source/claim/branch links
C059–C064
Exact remaining evidence or retained boundary
No ordinary universal hourly window inferred.

Recorded coordinator check boundaries

coordinator acceptance
whole_report_scoped_review_selected_primary_only_source_status_incorporation_construction_application_holds
coverage-24 Saved research record

3: Disputes/protests

Recorded check status: recorded; no individual primary acceptance inferred

Disposition
Answered—conditional text
Source/claim/branch links
C068
Exact remaining evidence or retained boundary
Undisputed payment and dangerous-condition qualifications retained.

Recorded coordinator check boundaries

coordinator acceptance
whole_report_scoped_review_selected_primary_only_source_status_incorporation_construction_application_holds
coverage-25 Saved research record

3: Theft/tampering/hazard/no-prior-notice

Recorded check status: recorded; no individual primary acceptance inferred

Disposition
Answered—boundary text
Source/claim/branch links
C065–C067
Exact remaining evidence or retained boundary
Full theft remedies, technical standards and facts excluded.

Recorded coordinator check boundaries

coordinator acceptance
whole_report_scoped_review_selected_primary_only_source_status_incorporation_construction_application_holds
coverage-26 Saved research record

4: Delayed-bill arrangements

Recorded check status: recorded; no individual primary acceptance inferred

Disposition
Partial
Source/claim/branch links
C046; B011
Exact remaining evidence or retained boundary
Stale unauthorized-use pointer needs formal correction/construction.

Recorded coordinator check boundaries

coordinator acceptance
whole_report_scoped_review_selected_primary_only_source_status_incorporation_construction_application_holds
coverage-27 Saved research record

4: Equal-payment/budget options

Recorded check status: recorded; no individual primary acceptance inferred

Disposition
Partial
Source/claim/branch links
C047; B012
Exact remaining evidence or retained boundary
Statutory offer/WAC refusal interaction held.

Recorded coordinator check boundaries

coordinator acceptance
whole_report_scoped_review_selected_primary_only_source_status_incorporation_construction_application_holds
coverage-28 Saved research record

4: Winter seasonal scope

Recorded check status: recorded; no individual primary acceptance inferred

Disposition
Answered—text
Source/claim/branch links
C069–C071
Exact remaining evidence or retained boundary
Current final state-plan threshold unresolved.

Recorded coordinator check boundaries

coordinator acceptance
whole_report_scoped_review_selected_primary_only_source_status_incorporation_construction_application_holds
coverage-29 Saved research record

4: Winter payment/default/reinstatement

Recorded check status: recorded; no individual primary acceptance inferred

Disposition
Partial
Source/claim/branch links
C072–C077
Exact remaining evidence or retained boundary
Statute/WAC base and fee-language differences retained.

Recorded coordinator check boundaries

coordinator acceptance
whole_report_scoped_review_selected_primary_only_source_status_incorporation_construction_application_holds
coverage-30 Saved research record

4: Heat-alert electric protection

Recorded check status: recorded; no individual primary acceptance inferred

Disposition
Answered—statutory text
Source/claim/branch links
C078–C080
Exact remaining evidence or retained boundary
Approved process/tariff and actual alert absent.

Recorded coordinator check boundaries

coordinator acceptance
whole_report_scoped_review_selected_primary_only_source_status_incorporation_construction_application_holds
coverage-31 Saved research record

4: Gas/extreme-weather terms

Recorded check status: recorded; no individual primary acceptance inferred

Disposition
Partial
Source/claim/branch links
C081; B021–B022
Exact remaining evidence or retained boundary
No copied heat statute; actual inclement-weather tariff excluded.

Recorded coordinator check boundaries

coordinator acceptance
whole_report_scoped_review_selected_primary_only_source_status_incorporation_construction_application_holds
coverage-32 Saved research record

4: Temporary/emergency protections

Recorded check status: recorded; no individual primary acceptance inferred

Disposition
Unresolved relevant fee overlay
Source/claim/branch links
C017, C107; F006
Exact remaining evidence or retained boundary
No universal current emergency moratorium declared.

Recorded coordinator check boundaries

coordinator acceptance
whole_report_scoped_review_selected_primary_only_source_status_incorporation_construction_application_holds
coverage-33 Saved research record

5: Medical trigger/certification

Recorded check status: recorded; no individual primary acceptance inferred

Disposition
Answered—text
Source/claim/branch links
C082–C085
Exact remaining evidence or retained boundary
No medical condition, certifier or eligibility evaluation.

Recorded coordinator check boundaries

coordinator acceptance
whole_report_scoped_review_selected_primary_only_source_status_incorporation_construction_application_holds
coverage-34 Saved research record

5: Medical repayment/restoration/further notice

Recorded check status: recorded; no individual primary acceptance inferred

Disposition
Answered—text
Source/claim/branch links
C083, C086–C087
Exact remaining evidence or retained boundary
Fee collection and exact application held.

Recorded coordinator check boundaries

coordinator acceptance
whole_report_scoped_review_selected_primary_only_source_status_incorporation_construction_application_holds
coverage-35 Saved research record

5: Historical repeat-medical limit

Recorded check status: recorded; no individual primary acceptance inferred

Disposition
Answered—version distinction
Source/claim/branch links
C088; S011
Exact remaining evidence or retained boundary
Deleted restriction not applied.

Recorded coordinator check boundaries

coordinator acceptance
whole_report_scoped_review_selected_primary_only_source_status_incorporation_construction_application_holds
coverage-36 Saved research record

5: Life-support/facility/third-party safeguards

Recorded check status: recorded; no individual primary acceptance inferred

Disposition
Partial
Source/claim/branch links
C061–C064; B016–B017
Exact remaining evidence or retained boundary
Critical-infrastructure incorporation and licensing classifications open.

Recorded coordinator check boundaries

coordinator acceptance
whole_report_scoped_review_selected_primary_only_source_status_incorporation_construction_application_holds
coverage-37 Saved research record

5: Confidentiality/disability interfaces

Recorded check status: recorded; no individual primary acceptance inferred

Disposition
Partial
Source/claim/branch links
C089; B015, B027
Exact remaining evidence or retained boundary
State incorporated privacy statutes and federal/disability regimes uncompleted.

Recorded coordinator check boundaries

coordinator acceptance
whole_report_scoped_review_selected_primary_only_source_status_incorporation_construction_application_holds
coverage-38 Saved research record

6: Ordinary restoration timing/conditions

Recorded check status: recorded; no individual primary acceptance inferred

Disposition
Answered—conditional text
Source/claim/branch links
C090–C092
Exact remaining evidence or retained boundary
Actual completion and tariff/fee predicates absent.

Recorded coordinator check boundaries

coordinator acceptance
whole_report_scoped_review_selected_primary_only_source_status_incorporation_construction_application_holds
coverage-39 Saved research record

6: Utility and UTC informal disputes

Recorded check status: recorded; no individual primary acceptance inferred

Disposition
Answered—text
Source/claim/branch links
C093–C095
Exact remaining evidence or retained boundary
No complaint or order exists in this inquiry.

Recorded coordinator check boundaries

coordinator acceptance
whole_report_scoped_review_selected_primary_only_source_status_incorporation_construction_application_holds
coverage-40 Saved research record

6: Formal commission gateway

Recorded check status: recorded; no individual primary acceptance inferred

Disposition
Partial, intentionally bounded
Source/claim/branch links
C096–C097
Exact remaining evidence or retained boundary
Full adjudication, service, evidence and review excluded.

Recorded coordinator check boundaries

coordinator acceptance
whole_report_scoped_review_selected_primary_only_source_status_incorporation_construction_application_holds
coverage-41 Saved research record

6: Refund/damage/remedy boundaries

Recorded check status: recorded; no individual primary acceptance inferred

Disposition
Partial
Source/claim/branch links
C098–C101
Exact remaining evidence or retained boundary
Exclusive court-overcharge procedure, clocks and full remedies remain separate.

Recorded coordinator check boundaries

coordinator acceptance
whole_report_scoped_review_selected_primary_only_source_status_incorporation_construction_application_holds
coverage-42 Saved research record

6: Assistance information versus approval

Recorded check status: recorded; no individual primary acceptance inferred

Disposition
Answered—boundary
Source/claim/branch links
C070–C071, C108
Exact remaining evidence or retained boundary
Guide/draft not current final eligibility or approval evidence.

Recorded coordinator check boundaries

coordinator acceptance
whole_report_scoped_review_selected_primary_only_source_status_incorporation_construction_application_holds
coverage-43 Saved research record

6: Federal/public/local/tribal/interstate interfaces

Recorded check status: recorded; no individual primary acceptance inferred

Disposition
Excluded with exact dependencies
Source/claim/branch links
B001, B027–B030
Exact remaining evidence or retained boundary
Separate generic investigations required.

Recorded coordinator check boundaries

coordinator acceptance
whole_report_scoped_review_selected_primary_only_source_status_incorporation_construction_application_holds
coverage-44 Saved research record

7: Current operative RCW/WAC reading

Recorded check status: recorded; no individual primary acceptance inferred

Disposition
Answered within listed bounds
Source/claim/branch links
S001–S010
Exact remaining evidence or retained boundary
Not a complete search of every general order or judicial status.

Recorded coordinator check boundaries

coordinator acceptance
whole_report_scoped_review_selected_primary_only_source_status_incorporation_construction_application_holds
coverage-45 Saved research record

7: 2016/2020 material rule originals

Recorded check status: recorded; no individual primary acceptance inferred

Disposition
Answered within actual read bounds
Source/claim/branch links
S011, S015; C102–C103
Exact remaining evidence or retained boundary
Older originals not all retrieved; no wholesale historical assurance.

Recorded coordinator check boundaries

coordinator acceptance
whole_report_scoped_review_selected_primary_only_source_status_incorporation_construction_application_holds
coverage-46 Saved research record

7: 2023/2025/2026 enactment/application

Recorded check status: recorded; no individual primary acceptance inferred

Disposition
Partial
Source/claim/branch links
S012–S014; C104–C106
Exact remaining evidence or retained boundary
2025 funding condition and partial-source gap remain.

Recorded coordinator check boundaries

coordinator acceptance
whole_report_scoped_review_selected_primary_only_source_status_incorporation_construction_application_holds
coverage-47 Saved research record

7: Proposed/agenda versus adopted status

Recorded check status: recorded; no individual primary acceptance inferred

Disposition
Answered—distinction
Source/claim/branch links
S016; C107
Exact remaining evidence or retained boundary
No projected milestone treated as actual adoption.

Recorded coordinator check boundaries

coordinator acceptance
whole_report_scoped_review_selected_primary_only_source_status_incorporation_construction_application_holds
coverage-48 Saved research record

7: Failed routes/currentness limitations

Recorded check status: recorded; no individual primary acceptance inferred

Disposition
Fully disclosed below
Source/claim/branch links
F001–F015
Exact remaining evidence or retained boundary
Failure is not absence of law or protection.

Recorded coordinator check boundaries

coordinator acceptance
whole_report_scoped_review_selected_primary_only_source_status_incorporation_construction_application_holds
coverage-49 Saved research record

Registry dimension 6 / whole Washington / A066

Recorded check status: recorded; no individual primary acceptance inferred

Disposition
Open; no acceptance
Source/claim/branch links
C110; all branches
Exact remaining evidence or retained boundary
This is one sector component only. Earlier passes and holds remain unchanged.

Recorded coordinator check boundaries

coordinator acceptance
whole_report_scoped_review_selected_primary_only_source_status_incorporation_construction_application_holds

Corrections, review and scope

Read the evidence with its boundaries. These are saved research components, including revisions. A scoped coordinator review checks selected evidence; it does not certify every claim, a complete jurisdiction, current law or individual applicability. Dates and access limits remain attached to the records.

How to read the research →

No currently queued material correction is mapped to this component. This does not remove its currentness, access, jurisdiction or application limits.

Recorded review disposition

scoped review complete with source status incorporation construction application holds

Other components in this research series

S_WApass-03-citation-01

SWA correction of the C070 coverage pinpoint

Inside: 1. Source and usage register · 3. Old-versus-new patch table · 5. Source-version and quantity-or-unchanged table

6 tables6 claim records3 source recordsScoped review · limits applyCaptured 2026-10-28
S_WApass-03-citation-02

SWA exact original-row completion

Inside: 1. Source and usage register · 2. Corrected claim table · 3. Complete old/new patch table

7 tables3 claim records4 source recordsScoped review · limits applyCaptured 2026-10-28
S_WApass-18-limited-01

Two bounded source corrections

Inside: Two bounded source corrections · 1. Exact replacement claim table · 2. Necessary cross-reference patch table

7 tables2 claim records4 source recordsScoped review · limits applyCaptured 2026-10-29
S_WApass-19-limited-01

1. Exact two-cell replacements

Inside: 1. Exact two-cell replacements · 2. Minimal source and claim traceability · 4. Actual read/failure log and version limits

4 tables2 claim records1 source recordsScoped review · limits applyCaptured 2026-10-29
S_WApass-01

Washington provider market access and consumer fees

Inside: Washington provider market access and consumer fees · 1. What Washington classifies as debt adjustment · Conduct controls the classification

9 tables40 claim records30 source recordsScoped review · limits applyCaptured 2026-10-23
S_WApass-02

Remaining fee interactions and patches to

Inside: Remaining fee interactions and patches to PASS-01 · A. Substantive findings · 1. Initial $25, the payment cap, cumulative retention, and a small first payment

8 tables19 claim records13 source recordsScoped review · limits applyCaptured 2026-10-23
S_WApass-03

Generic limitation periods, accrual, acknowledgment, payment and revival

Inside: Generic limitation periods, accrual, acknowledgment, payment and revival · How to read the registers · 1.1 Ordinary contracts, accounts, sales and leases

18 tables98 claim records45 source recordsScoped review · limits applyCaptured 2026-10-28
S_WApass-04

SWA Washington generic civil debt-action framework

Inside: 1. Reading conventions and authority boundaries · Authority and procedural-category comparison · 2.1 Courts, jurisdiction, venue, and procedural tracks

17 tables103 claim records112 source recordsScoped review · limits applyCaptured 2026-10-28
S_WApass-05

SWA Washington ordinary civil earnings garnishment

Inside: Reading conventions · A1. Legal categories, jurisdictional predicates, and authority levels · A2. Symbolic wage relations and adopted rate references

23 tables84 claim records39 source recordsScoped review · limits applyCaptured 2026-10-28
S_WApass-06

Washington non-earnings bank/deposit garnishment, account protections, and exemption process

Inside: Washington non-earnings bank/deposit garnishment, account protections, and exemption process · Reading and citation conventions · 1.1 What each authority governs

26 tables91 claim records31 source recordsScoped review · limits applyCaptured 2026-10-28
S_WApass-07

Washington homestead and ordinary nonwage, nondeposit property exemptions from execution

Inside: Washington homestead and ordinary nonwage, nondeposit property exemptions from execution · Reading conventions · 1.1 The principal distinctions

16 tables120 claim records29 source recordsScoped review · limits applyCaptured 2026-10-28
S_WApass-08

Washington nonjudicial deed-of-trust foreclosure, residential presale protections, cure, sale, postponement, and deficiency boundaries

Inside: Washington nonjudicial deed-of-trust foreclosure, residential presale protections, cure, sale, postponement, and deficiency boundaries · 1. Reading conventions and authority boundaries · Authority and category comparison

21 tables94 claim records27 source recordsScoped review · limits applyCaptured 2026-10-28
S_WApass-09

Judicial mortgage foreclosure, judicial sale, redemption, deficiency, and debt/security boundaries

Inside: Judicial mortgage foreclosure, judicial sale, redemption, deficiency, and debt/security boundaries · Reading conventions · A. Judicial-route gateway, instruments, actors, parties, and proof — Questions 1–2

18 tables106 claim records54 source recordsCorrections to readCaptured 2026-10-28
S_WApass-10

Washington Article 9A: default, possession, disposition, redemption, surplus, deficiency, and bounded remedies

Inside: Washington Article 9A: default, possession, disposition, redemption, surplus, deficiency, and bounded remedies · Reading conventions · 1. Material category, actor, authority, and event comparisons

20 tables111 claim records72 source recordsScoped review · limits applyCaptured 2026-10-28
S_WApass-11

SWA Washington consumer credit sales and retail installment obligations

Inside: 1. Principal findings · Identifier convention · 2. Material legal-category and authority comparisons

18 tables81 claim records45 source recordsScoped review · limits applyCaptured 2026-10-28
S_WApass-12

SWA Consumer personal-property leases and rental-purchase agreements

Inside: 1. Substantive findings by requested question · Question 1 — Governing regimes and classification · Question 2 — Agreement, disclosure, writing, and prohibited terms

15 tables112 claim records31 source recordsScoped review · limits applyCaptured 2026-10-28
S_WApass-13

SWA Residential rent arrears, nonpayment termination, deposits, and the summary-possession interface

Inside: Reading conventions · 1. Material category and authority comparisons · B. Rent increases, nonwaiver, and dishonored-payment boundaries

17 tables118 claim records99 source recordsScoped review · limits applyCaptured 2026-10-28
S_WApass-15

SWA Hospital charity care, medical billing, and medical-debt collection

Inside: 1. Material legal-category and actor comparisons · 2A. Current codified operative sources · 2B. Adopted originals, federal poverty publication, interpretation, and status sources

19 tables112 claim records41 source recordsScoped review · limits applyCaptured 2026-10-28
S_WApass-16

Washington student-loan servicing and borrower protection

Inside: Washington student-loan servicing and borrower protection · 1. Material category and authority comparisons · Reading and identification conventions

18 tables120 claim records22 source recordsCorrections to readCaptured 2026-10-28
S_WApass-17

SWA Washington small-loan / payday / deferred-deposit component

Inside: 1. Reading conventions and evidentiary status · A. Category, actor, exemption, and territorial boundaries · B. License, endorsement, limited-agent, and financial-security structure

29 tables141 claim records134 source recordsScoped review · limits applyCaptured 2026-10-28
S_WApass-18

Ordinary nonmortgage Consumer Loan Act origination, pricing, agreement, payment, prepayment, refinancing and refund

Inside: Ordinary nonmortgage Consumer Loan Act origination, pricing, agreement, payment, prepayment, refinancing and refund · Reading conventions · 2. Atomic consequential claim ledger

23 tables122 claim records78 source recordsScoped review · limits applyCaptured 2026-10-29
S_WApass-19

Washington residential real-property tax arrears, relief, deferral, exemption and tax-foreclosure boundaries

Inside: Washington residential real-property tax arrears, relief, deferral, exemption and tax-foreclosure boundaries · 2. Source and usage ledger · Reading conventions

24 tables120 claim records82 source recordsCorrections to readCaptured 2026-10-29
S_WApass-20

Ordinary contested civil debt proof in Washington

Inside: Ordinary contested civil debt proof in Washington · 1.2 Assertions, admissions, affidavits, and declarations · 1.3 Documentary and electronic proof

21 tables165 claim records123 source recordsScoped review · limits applyCaptured 2026-10-29
Record integrity

Original saved Markdown SHA-256: a7852848940dc6c4ec5aaf378c7e6ee10b8f72a1591ec5b410ddd3522d48aea2. Public formatting, private-reference removal and correction annotations are separate from that immutable original.

Get debt settlement help