S_MT PASS-11 — Montana ordinary unsecured consumer-debt limitation, accrual, choice-of-law, tolling, and revival
Fresh research session: October 26, 2026, Pacific / October 26, 2026, UTC
Actual model/mode: GPT-5.6 Sol Pro, regular Chat
Relationship to prior work: Distinct limitations component. This does not adopt the unreviewed P4, P6–P10 analyses or regenerate provider, licensing, validation, reporting, or remedies work.
Component status: PARTIAL. Montana’s principal ordinary-contract periods, account-stated doctrine, negotiable-note rules, accrual, revival, cross-border limitations framework, core tolling rules, commencement rule, and federal time-barred-debt overlay are established. Several contract-dependent branches and a current service-deadline conflict remain unresolved.
I. Executive conclusions
- Montana’s current limitations period for a claim founded on a written instrument is six years, not eight. Senate Bill 143 reduced the period from eight to six years and expressly applies to actions filed on or after October 1, 2025. Older Montana decisions stating eight years remain useful for accrual principles but not for the current numerical period. Montana Code Annotated+1
- A contract, account, or promise not founded on a written instrument generally carries five years. A noncontractual, unwritten obligation or liability has three years, but that residual three-year branch ordinarily should not displace the more specific contract/account branch. Montana Code Annotated
- “Credit-card debt” is not a standalone Montana limitations category. The period depends on the claim and proof:Six years if the claim is genuinely founded on an operative written instrument containing or incorporating the contractual terms.Five years if it is an unwritten account, promise, or account stated.A billing statement alone does not necessarily establish a written contract.In Colorado National Bank v. Story, the Montana Supreme Court used five years because the signed application contained no contract terms and the statements were merely statements of account. That decision does not hold that all credit-card claims are always five-year claims. Justia Law
- An account stated requires agreement on the items and balance plus an express or implied promise to pay. Silence after receiving statements may create a rebuttable presumption, but whether the period of silence was unreasonable is ordinarily fact-dependent. Montana’s March 2026 Centron decision reversed summary judgment because whether 93 days of silence established assent required a factfinder. Justia Law
- **A qualifying negotiable note uses Montana’s specific UCC periods rather than the general contract period.**Definite-time note: six years from each stated payment date or from the accelerated payment date.Demand note: six years after demand.If no demand is made on a demand note, the action is barred after an uninterrupted ten-year period with no principal or interest payment. Montana Code Annotated
- Accrual ordinarily occurs when the breach is complete and suit can be maintained. Each installment ordinarily accrues separately as it becomes due unless a valid acceleration makes the remaining balance immediately due. Charge-off, assignment, sale, internal collection placement, and a creditor’s later demand do not automatically create or reset accrual when the claim was already complete. Montana Code Annotated+3
- Montana’s revival rule is unusually broad. A qualifying acknowledgment or part payment causes the relevant limitations period to begin anew. An acknowledgment must be in a signed writing; a part payment may be principal or interest. The statute does not say revival is limited to payments made before the original period expires, and Hughes applied it to a note whose ordinary six-year period otherwise would have run. Montana Code Annotated+1
- Payment evidence must identify the particular debt. A creditor-created ledger notation or ambiguous payment is not enough by itself. A payment or acknowledgment generally must come from the debtor or an authorized agent and be tied to the particular obligation. A payment by one co-obligor is not automatically an acknowledgment by another. Justia Law+3
- Cross-border limitations are claim-specific, not residence-specific. If the claim is substantively based on another state’s law, Montana applies that state’s limitation period and its accrual and tolling rules, subject to Montana’s statutory unfairness exception. A choice-of-law clause must first be valid, sufficiently clear, and broad enough to govern the claim. Montana Code Annotated+3
- Filing commences an action for limitations purposes, but service remains independently required. Current Montana law presents a facial conflict:MCA §25-3-107 says service no later than two years after filing.Montana Rule of Civil Procedure 4(t)(1) says three years.The Montana Supreme Court acknowledged that conflict in a 2026 footnote but did not decide which period controls in an ordinary civil case. No definitive ordinary-debt service terminal date should be stated from the present authorities. Montana Code Annotated+3
- For a federally covered debt collector, filing or threatening a lawsuit on a time-barred consumer debt is prohibited. A truthful nonlitigation request for voluntary payment is not inherently prohibited, but it may not falsely imply judicial enforceability. Montana’s revival rule makes any payment or signed acknowledgment especially consequential and fact-sensitive. eCFR+1
II. Claim-by-claim classification matrix
| Claim or obligation |
Current Montana period |
Accrual or measuring event |
Classification conditions and principal limits |
| Ordinary contract founded on an instrument in writing |
6 years |
When breach is complete and the right to sue exists |
Applies to actions filed on or after October 1, 2025. The writing or integrated series of writings must actually contain or incorporate the operative obligation, not merely identify an account. Montana Code Annotated+2 |
| Oral or implied-in-fact contract |
5 years |
Breach or nonpayment when performance is due |
Classification turns on absence of a sufficient written instrument, not merely on whether some writings exist in the file. Montana Code Annotated+1 |
| Unwritten account or promise |
5 years |
When the account claim is complete; may depend on the account theory |
Last payment is not universally the accrual event. Story used the last payment on the particular account-stated record before it. Montana Code Annotated+1 |
| Account stated not founded on a written instrument |
5 years |
Formation of the account stated or the event the controlling record treats as fixing the balance; Story measured from last payment |
Requires agreement on items and balance and an express or implied agreement to pay. Silence is rebuttable evidence, not conclusive assent. Justia Law+1 |
| Mutual, open, current account with reciprocal demands |
Generally 5 years as an unwritten account unless founded on a sufficient writing |
From the last proved item on either side |
MCA §27-2-302 applies only where there are reciprocal demands. An ordinary one-directional credit-card ledger is not automatically a “mutual account.” Montana Code Annotated+1 |
| One-sided open or running account |
Usually 5 years if not founded on a written instrument |
Depends on the underlying obligation, due dates, closure, or account-stated formation |
The reciprocal-demand rule in §27-2-302 cannot simply be imported. Montana Code Annotated+1 |
| Revolving credit-card claim supported by operative written terms |
Potentially 6 years |
Contractual breach, maturity, or valid acceleration under the actual terms |
Requires the relevant cardmember agreement or integrated writings and proof that they governed the account. Story does not foreclose this branch; its evidentiary record lacked those terms. Montana Code Annotated+1 |
| Revolving credit-card claim pleaded as account stated without sufficient written terms |
5 years |
Fact-dependent; Story used last payment |
Account statements do not themselves become a written contract merely by existing. Current account-stated formation remains fact-intensive under Centron. Justia Law+1 |
| Written installment contract that is not a negotiable note |
6 years |
Ordinarily each installment’s due date; remaining balance from valid acceleration if exercised |
Exact result depends on acceleration language, whether acceleration is optional or automatic, required notice, cure rights, and whether acceleration was later waived or rescinded. Montana Code Annotated+1 |
| Qualifying negotiable note payable at definite time |
6 years |
Each stated payment date; if accelerated, the accelerated payment date |
Instrument must satisfy UCC negotiability, including an unconditional fixed-amount promise payable at definite time or on demand. Montana Code Annotated+2 |
| Qualifying negotiable demand note after demand |
6 years |
Date demand is made |
“Payable on demand” means the instrument says demand/sight/will of holder or states no payment time. Montana Code Annotated+1 |
| Qualifying demand note with no demand |
10-year no-payment bar |
Continuous ten-year period with neither principal nor interest payment |
A qualifying payment can implicate Montana’s separate restart rule. Montana Code Annotated+2 |
| Nonnegotiable demand obligation |
General contract period: 6 or 5 years, depending on writing |
From demand when demand is legally necessary to perfect the right to sue |
Do not import the UCC demand-note ten-year branch unless the instrument qualifies under Article 3. Montana Code Annotated+2 |
| Other unwritten obligation not contract, account, or promise |
3 years |
When all elements exist |
Residual branch; not the default merely because a plaintiff chooses an alternative label. Montana Code Annotated+1 |
| Sale-of-goods claim under UCC Article 2 |
Excluded from this pass |
Separate UCC limitation and accrual analysis |
Requires a later sale-of-goods-specific pass. |
| Judgment, lien, mortgage, secured deficiency, support, tax, government, rent, utility, medical-specific, or education claim |
Excluded |
Specialized statute or judgment rules |
No period from this matrix may be transplanted into those sectors. |
Classification rule
The plaintiff’s label is not controlling. The court must identify the actual legal claim and the source of the obligation. A debt purchaser or assignee ordinarily receives no newer limitations period merely because ownership changed; it must prove the same underlying contract, account, or instrument and any legally relevant transfer. Montana’s statutes contain no ordinary-contract reset based solely on sale, assignment, collection placement, or charge-off. That conclusion follows from the governing periods and accrual statutes; exact assignee defenses and proof remain account-specific. Montana Code Annotated+1
III. Accrual and event analysis
1. General accrual
A Montana claim accrues when all elements exist, the right to maintain suit is complete, and a court or agency may accept jurisdiction. Unless another statute controls, the period begins then. Lack of knowledge ordinarily does not postpone accrual. The limited statutory discovery branch applies to injury to person or property when the facts are self-concealing or the defendant acted to prevent discovery; it is not a universal contract-discovery rule. Montana Code Annotated
For breach of contract, the Montana Supreme Court has said accrual begins at breach unless a recognized concealment doctrine applies. The older case used the former eight-year number; only its accrual analysis remains current for this purpose. Justia Law
A later refusal, denial, demand, invoice, charge-off, or collection letter does not postpone accrual when the right to sue was already complete. Montana Petroleum Tank Release Compensation Board distinguished a true installment obligation from a later demand or denial that merely confirmed an already complete claim. Justia Law
2. Installment obligations
Where a debt requires separate periodic installments and no valid acceleration has occurred, each missed installment ordinarily creates a separate accrual. Montana recognized that principle in Fulton in a different sector; its general installment logic is useful, but that domestic-relations judgment context is not imported wholesale into consumer contracts. Justia Law
For a definite-time negotiable note, §30-3-122 directly states that suit must be filed within six years after the stated payment date or dates; if a payment date is accelerated, six years runs from the accelerated payment date. Montana Code Annotated
For an ordinary unsecured installment contract, acceleration depends on:
- Whether the clause is optional or automatic.
- The event of default.
- Required notice and cure.
- Whether the creditor unequivocally exercised the option.
- The date acceleration became effective.
- Whether subsequent conduct waived, rescinded, or deaccelerated it.
No controlling published Montana ordinary-unsecured-debt decision was located that supplies a universal deacceleration rule. Exact acceleration and deacceleration dates therefore remain held without the contract and communications.
3. Demand
When a right exists but demand is legally necessary before suit, Montana measures from demand. That does not mean a creditor may postpone the clock indefinitely by withholding a demand where the claim was already enforceable without one. Montana Code Annotated+1
A qualifying UCC demand note uses the specific §30-3-122 structure. A fixed-date note with an early-demand provision can be payable on demand before the fixed date and then become definite-time if no early demand is made. Montana Code Annotated+2
4. Charge-off, collection placement, assignment, and sale
None of these events automatically supplies ordinary contractual accrual or starts a new Montana period:
| Event |
Limitation consequence |
| Accounting charge-off |
May be evidence that the creditor regarded the account as seriously delinquent; not itself a statutory accrual or restart rule |
| Placement with collection agency |
Does not reset the underlying claim |
| Sale to debt buyer |
Does not reset the underlying claim |
| Assignment to new servicer |
Does not reset the underlying claim |
| New owner’s first statement |
Does not create a new written contract by itself |
| Settlement offer |
Does not restart the period unless the consumer’s conduct independently satisfies §27-2-409 |
| Creditor’s unilateral ledger entry |
Does not prove a consumer payment or acknowledgment |
McCollough illustrates the evidentiary danger. The collector treated a $75 internal entry as a partial payment that would extend the period, but the entry actually represented returned court costs. The Ninth Circuit emphasized the lack of supporting inquiry and the later acknowledgment that no consumer payment had occurred. Ninth Circuit Court of Appeals
5. Account stated
An account stated is not created merely because the creditor mails statements. Montana requires agreement on the items and balance and an express or implied agreement to pay. A course of dealing, antecedent indebtedness, and retention without objection for an unreasonable time may support a rebuttable presumption. Justia Law
In Centron, 93 days elapsed between the first direct statement and receipt of a written dispute. The Montana Supreme Court did not hold that 93 days was sufficient or insufficient; it held that reasonableness and assent presented a factual dispute for trial. Justia Law
Therefore:
- A statement does not automatically convert an oral or disputed transaction into an account stated.
- Silence is evidence, not conclusive assent.
- A timely and specific objection can defeat or rebut implied assent.
- The account-stated balance still must be definite.
- Formation of an account stated does not necessarily prove every original charge lawful.
IV. Acknowledgment, part payment, and revival
1. Statutory rule
Montana provides:
qualifying acknowledgment or part payment⇒relevant limitation period begins anew\text{qualifying acknowledgment or part payment}
\Rightarrow
\text{relevant limitation period begins anew}qualifying acknowledgment or part payment⇒relevant limitation period begins anewAn acknowledgment must be in a signed writing. Part payment means payment of principal or interest. Montana Code Annotated
The restarted period is the period that applies to the underlying claim:
- Six years for a qualifying written-instrument claim.
- Five years for an unwritten contract/account claim.
- Six years for a qualifying note under §30-3-122.
- The applicable foreign period where Montana’s conflicts rules make another state’s limitations law govern.
2. Revival after the ordinary period
Section 27-2-409 contains no “before expiration” condition. In Hughes, the Montana Supreme Court held that the general restart statute applies to promissory notes governed by §30-3-122. The note’s ordinary period would have run in 2005, but payments made and allocated to the note restarted the period. Justia Law
The bounded conclusion is that an ordinary Montana debt may remain capable of revival after the prior period has run if §27-2-409’s actual predicates are proved. That does not apply automatically to a statute that extinguishes the underlying right rather than merely barring the judicial remedy; no such special-sector rule is analyzed here.
3. Written acknowledgment requirements
Older but still materially relevant Montana construction requires the acknowledgment to:
- Be clear and unambiguous.
- Identify the particular debt.
- Recognize the obligation as due and unpaid.
- Be signed by the party to be charged or a duly authorized agent.
- Avoid language inconsistent with an intention to pay. Justia Law+1
An express phrase “I promise to pay” may not always be necessary if the writing otherwise clearly recognizes an existing unpaid debt without contradiction, but an offer to discuss, compromise, investigate, or settle a disputed claim is not automatically an acknowledgment.
Examples of unresolved writings:
- “I dispute this account, but I might pay something to end the matter.”
- “Please send documentation.”
- “I am willing to negotiate.”
- “My records show a different balance.”
- A settlement offer expressly denying liability.
Those communications require their complete text and surrounding context.
4. Electronic acknowledgments
Montana UETA provides that an electronic record or signature cannot be denied effect merely because it is electronic, but only where the parties agreed to transact electronically. Attribution and legal effect depend on proof that the act was the person’s and on the context. Montana Code Annotated+2
Accordingly, an email, portal click, or text message can potentially satisfy §27-2-409’s signed-writing condition if:
- UETA applies.
- The electronic signature or process is attributable to the debtor or authorized agent.
- There was intent to sign.
- The record clearly identifies and acknowledges the particular debt.
- The complete record is preserved.
A creditor-created notation, automated system tag, or unverifiable text is insufficient merely because it is electronic.
5. Payment proof and allocation
A creditor’s endorsement or ledger entry is not enough by itself to prove payment. Nathan described a holder’s unilateral endorsement as potentially self-serving and required evidence tying the payment to the debtor or authorized agent and the particular obligation. Justia Law+1
Where several debts exist, allocation matters. Hughes treated allocation between two notes as a factual question and upheld an implied finding that part of the payments applied to the older note. Justia Law
Necessary proof includes:
- Payer identity.
- Authority if the payer was an agent or third party.
- Date received and cleared.
- Amount.
- Whether applied to principal or interest.
- Account designation on the payment.
- Creditor’s contemporaneous allocation.
- Whether the payment was voluntary.
- Whether it was reversed, refunded, unauthorized, or misposted.
- Whether another obligation better explains it.
A payment by one co-obligor does not automatically revive the claim against another absent authority or an independent acknowledgment by that person. Justia Law
V. Choice of law and cross-border limitations
1. Contract law selection
Montana’s default statutory directive says a contract is interpreted under the law and usage of its place of performance or, if it specifies no performance location, the place where it was made. Montana Code Annotated
A clear contractual choice-of-law provision is generally enforced unless contrary to Montana public policy or good morals. Masters Group applied that rule to a negotiated commercial agreement; its holding does not mean every consumer choice clause is necessarily valid, adequately disclosed, or broad enough to govern limitations. Justia Law
Without an effective clause, Barber confirms that §28-3-102 supplies Montana’s statutory contractual choice directive. Justia Law
2. Limitations law selection
Montana adopted the Uniform Conflict of Laws—Limitations Act:
- If a claim is substantively based on one other state’s law, that state’s limitation applies.
- If based on more than one state, the Act selects one of those states.
- Montana’s period applies to other claims.
- When another state’s period applies, that state’s accrual and tolling rules apply, but not its conflicts rules.
- Montana may substitute its own period if the foreign period is substantially different and did not afford a fair opportunity to sue or imposes an unfair defense burden. Montana Code Annotated+2
This is not a simple “borrow the debtor’s residence period” rule. The claim’s substantive legal basis controls. Oskerson emphasizes that §27-2-503 applies to a claim based on another state’s substantive law, not merely to any matter with an out-of-state origin. Justia Law
3. Practical cross-border sequence
- Identify the claim actually pleaded.
- Determine whether the agreement contains an effective choice clause.
- Determine the clause’s scope.
- If no effective clause, apply Montana’s contractual choice directive and other applicable conflict principles.
- Identify the state whose substantive law governs the claim.
- Apply §27-2-503.
- If foreign limitations law applies, use that state’s accrual and tolling rules under §27-2-504.
- Test §27-2-505’s unfairness exception.
- Separately apply Montana forum commencement and service procedures unless displaced by controlling law.
A creditor cannot select the longest period merely by choosing where to file, and an assignee cannot change the governing state merely through an assignment.
VI. Tolling, suspension, savings, and contractual limits
1. Disability of claimant
If the person entitled to sue was a minor or had been committed under the identified Montana commitment statute when the claim accrued, disability time is excluded. The disability must exist at accrual; later disability does not trigger the provision. Commitment can extend the period no more than five years. This usually has limited application to an institutional creditor but may matter for an individual lender. Montana Code Annotated
2. Defendant outside Montana
Absence tolling applies only when the defendant is outside Montana and cannot be served with process. Remote residence or physical absence alone is not enough when valid service remains available. Montana Code Annotated
3. Arbitration
Montana excludes the specified arbitration interval only under §27-2-405’s conditions, including a written arbitration agreement or submission and the identified revocation or stay circumstances. Merely negotiating or participating in an informal dispute process does not automatically toll the period. Montana Code Annotated
4. Injunction, court order, or statutory prohibition
When commencement is stayed by an injunction, other court order, or statutory prohibition, the duration of that restraint is excluded. Montana Code Annotated
5. Savings after dismissal or reversal
A timely action may be refiled within one year after reversal or qualifying termination, but not where termination was:
- Voluntary discontinuance.
- Dismissal for neglect to prosecute.
- Final judgment on the merits. Montana Code Annotated
This savings provision must be distinguished from ordinary dismissal without prejudice. A dismissal label alone does not guarantee a viable refiling after the underlying period has expired.
6. Bankruptcy
A bankruptcy petition ordinarily stays commencement or continuation of an action to recover a prepetition claim and other collection activity, subject to federal exceptions. GovInfo
11 U.S.C. §108(c) provides the later of:
- The end of the nonbankruptcy period, including any applicable suspension; or
- Thirty days after notice of termination or expiration of the stay. U.S. Code
Section 108(c) should not be described as automatically stopping every clock for the entire bankruptcy. Montana §27-2-406 may supply an applicable suspension where the stay is a statutory prohibition, but exact calculation requires:
- Petition date.
- Whether the period was still open.
- Applicable stay.
- Any relief-from-stay order.
- Termination or expiration date.
- Date and sufficiency of notice.
- Discharge status.
- Any applicable Montana suspension or foreign-law tolling.
Full bankruptcy procedure remains excluded.
7. Contractual shortening
Montana declares void a contractual term that limits the time within which a party may enforce contractual rights through ordinary tribunals, apart from the identified arbitration exception. Montana Code Annotated
The Montana Supreme Court has long treated that rule as strong public policy. A choice-of-law clause therefore cannot be assumed to validate a shortened suit period without a full conflict and public-policy analysis. Justia Law
8. Transition after SB 143
SB 143 says the six-year written-instrument period applies to actions filed on or after October 1, 2025. Montana Legislative Archive
Older Montana authority recognizes that the Legislature may shorten an existing limitation if a reasonable opportunity to sue remains. No controlling published decision located in this pass has yet applied that constitutional transition principle to SB 143. Thus, for a written claim that was still open under the former eight-year period but already more than six years old on October 1, 2025:
- The enacted applicability clause facially directs use of six years.
- Any constitutional “reasonable opportunity” challenge remains unresolved.
- No automatic two-year carryover from the old law may be invented. Justia Law
VII. Commencement, service, defense, and federal time-bar overlay
1. Commencement
For Montana limitations purposes, an action is commenced when the complaint is filed. Montana Code Annotated
That rule does not mean filing alone permanently preserves the action regardless of service.
2. Service conflict
Current published authorities conflict:
| Authority |
Text |
| MCA §25-3-107 |
Service no later than two years after filing; absent appearance, dismissal without prejudice follows. Montana Code Annotated |
| Montana Rule of Civil Procedure 4(t)(1) |
Service within three years after filing; absent appearance, dismissal without prejudice follows. Montana Code Annotated |
In Estate of Athy (2026), the Montana Supreme Court quoted Rule 4’s three-year period and added a footnote: “But see §25-3-107” and its two-year language. The case involved a separate six-month medical-malpractice service statute, so the Court did not resolve the ordinary two-versus-three-year conflict. Justia Law+1
Valid service remains necessary for personal jurisdiction. Failure to serve can cause dismissal even where the complaint was timely filed. A dismissal without prejudice does not revive a limitations period that expired in the interim; Athy explains that the parties may be left as though the dismissed action had not been brought. Justia Law
3. Defense and burden
The statute of limitations is an affirmative defense that must be stated in the responsive pleading. Montana Code Annotated
Montana permits the defense to be pleaded generally by citation to the relied-upon statute. If controverted, the party asserting the defense must prove the facts showing the bar. Montana Code Annotated
No Montana statute located in this pass requires a court to investigate and raise the ordinary contract limitation on behalf of a consumer in every default case. Facial untimeliness can be adjudicated when properly presented, but full default-judgment and court-review procedure remains for a later pass.
4. Limitation ordinarily bars the remedy, not the existence of the debt
The ordinary Montana contract limitation operates as an affirmative defense. Montana’s revival statute and the Ninth Circuit’s description of time-barred debt as potentially continuing as a moral obligation reinforce that expiration does not invariably erase the underlying obligation. Montana Code Annotated+2
That bounded statement does not apply to a sector statute expressly making an illegal or unlicensed obligation void. Those regimes are outside this pass.
5. Federal time-barred collection rule
Regulation F defines “time-barred debt” as a debt for which the applicable limitation period has expired and prohibits a covered debt collector from bringing or threatening legal action on it. Filing a proof of claim in bankruptcy is addressed separately. eCFR
In Kaiser v. Cascade Capital, the Ninth Circuit held that filing or threatening a suit on a time-barred debt violates the FDCPA without requiring the consumer to prove the collector knew or should have known the debt was barred. The bona-fide-error defense remains separately available if its elements are met. Ninth Circuit Court of Appeals
Kaiser also explains that there is nothing inherently unlawful about seeking voluntary payment of a still-existing but judicially unenforceable debt if the communication does not falsely imply enforceability. Ninth Circuit Court of Appeals
Because Montana allows revival by payment or signed acknowledgment, communications concerning a time-barred Montana debt require special precision. A collector may not:
- Sue.
- Threaten suit.
- Imply that suit remains available.
- Misstate the limitation status.
- Falsely claim that a payment already occurred.
- Obscure the legal effect of a requested payment or signed promise where material.
McCollough is the concrete Montana example: the collection firm relied on a nonexistent $75 payment to treat the debt as timely and continued litigation after receiving contrary information. Ninth Circuit Court of Appeals+1
VIII. Process matrix
| Question |
Required analysis |
Legal result if predicate established |
Evidence that remains necessary |
| Is the debt founded on a written instrument? |
Examine the signed agreement and incorporated writings for operative terms |
Six-year current period |
Complete agreement, amendments, terms in force, assent, governing law |
| Is it merely an unwritten account or promise? |
Determine whether writings fail to contain the obligation |
Five-year period |
Application, statements, correspondence, original terms |
| Is there an account stated? |
Agreement on items/balance plus express or implied promise |
Five-year branch if not founded on a written instrument |
Statement dates, objections, course of dealing, balance certainty |
| Is it a mutual open account? |
Reciprocal demands on both sides |
Accrual from last proved item either side |
Full ledger and reciprocal obligations |
| Is the document a negotiable note? |
Apply §§30-3-104, 108, and 109 |
Specific §30-3-122 period |
Original instrument, payment terms, endorsements |
| When did breach occur? |
Identify contractual due date or performance failure |
General accrual date |
Payment schedule, default history, cure rights |
| Are installments separately due? |
Determine whether acceleration occurred |
Each installment accrues separately until acceleration |
Clause, notices, cure, election |
| Was acceleration valid? |
Check contractual trigger and required action |
Remaining balance may accrue on acceleration date |
Notice, delivery, waiver, subsequent statements |
| Was acceleration later waived or rescinded? |
Apply contract and conduct |
Possible change to maturity analysis |
Full post-acceleration record; controlling unsecured-debt authority still missing |
| Did sale or assignment reset the clock? |
No ordinary statutory reset identified |
Existing accrual posture follows claim |
Assignment chain only proves ownership, not restart |
| Did payment restart the period? |
Prove debtor/agent payment of principal or interest tied to debt |
Relevant period begins anew |
Bank record, authorization, account designation, allocation |
| Did a writing restart it? |
Signed, attributable, clear acknowledgment of specific unpaid debt |
Relevant period begins anew |
Complete writing and context |
| Was payment by a third party? |
Prove authority to act for debtor |
Restart only if legally attributable |
Agency evidence |
| Which state’s law governs? |
Validate clause or apply Montana choice rules |
Substantively governing state’s limitation may apply |
Contract formation/performance, clause scope, public policy |
| Does foreign tolling apply? |
Apply §27-2-504 after selecting foreign limitations law |
Foreign accrual/tolling computation |
Other state’s complete current law and facts |
| Is Montana absence tolling available? |
Defendant out of state and not serviceable |
Unserviceable absence excluded |
Address and service availability |
| Is bankruptcy relevant? |
Apply §§362, 108(c), and any state suspension |
Claim-specific extension/suspension |
Petition, stay, notice, termination |
| Was suit timely commenced? |
Compare filing date to computed terminal date |
Filing commences action |
Court-stamped complaint |
| Was service timely? |
Resolve two-year statute/three-year rule issue |
Unresolved ordinary terminal rule |
Service date, appearance, controlling future decision |
| Must defense be raised? |
Rule 8(c) and §25-4-301 |
Affirmative defense; asserting party proves disputed facts |
Pleadings |
| Is collector federally covered? |
FDCPA actor and consumer-debt predicates |
No suit or threat on time-barred debt |
Debt purpose, actor status, communication |
IX. Bounded examples
These examples use hypothetical facts only. They do not establish an actual debt, governing law, valid acceleration, revival, tolling, service compliance, or a safe filing deadline.
Example 1 — Current written-contract period and weekend rule
Assumptions
- Montana law governs.
- Valid written instrument.
- Breach and complete accrual: November 15, 2020.
- No installment issue, tolling, revival, foreign law, bankruptcy, or transition challenge.
- Action would be filed after October 1, 2025.
Six-year arithmetic:
November 15, 2020+6 calendar years=November 15, 2026\text{November 15, 2020}+6\text{ calendar years}
\text{November 15, 2026}November 15, 2020+6 calendar years=November 15, 2026November 15, 2026 is Sunday. Montana excludes the first day, includes the last, and carries an act falling on a Saturday or legal holiday to the next business day. Sunday is a legal holiday. The illustrative terminal filing day becomes:
Monday, November 16, 2026\boxed{\text{Monday, November 16, 2026}}Monday, November 16, 2026This does not determine service. Montana Code Annotated+4
Example 2 — Oral or implied contract
Assumptions
- Oral consumer agreement.
- Entire amount became due April 1, 2020.
- No qualifying writing, payment, acknowledgment, tolling, or foreign law.
April 1, 2020+5 years=April 1, 2025\text{April 1, 2020}+5\text{ years}
\boxed{\text{April 1, 2025}}April 1, 2020+5 years=April 1, 2025April 1, 2025 was Tuesday, so no weekend/holiday extension applies. A later charge-off or sale does not create a new five-year period. Montana Code Annotated+1
Example 3 — Revolving credit account with uncertain classification
Common assumed event: January 10, 2021.
Branch A — Story-like account-stated record
Assume January 10, 2021 was the legally operative last payment/accrual event and no sufficient written instrument exists:
January 10, 2021+5 years=January 10, 2026\text{January 10, 2021}+5\text{ years}
\text{January 10, 2026}January 10, 2021+5 years=January 10, 2026January 10, 2026 was Saturday:
Monday, January 12, 2026\boxed{\text{Monday, January 12, 2026}}Monday, January 12, 2026### Branch B — written-instrument claim
Assume instead that a complete signed or incorporated card agreement governed the account and breach occurred January 10, 2021:
January 10, 2021+6 years=January 10, 2027\text{January 10, 2021}+6\text{ years}
\text{January 10, 2027}January 10, 2021+6 years=January 10, 2027January 10, 2027 will be Sunday:
Monday, January 11, 2027\boxed{\text{Monday, January 11, 2027}}Monday, January 11, 2027The two branches cannot be selected without the operative agreement and accrual evidence. Montana Code Annotated+3
Example 4 — Installments and acceleration
Assumptions
- Written nonnegotiable installment contract.
- Installments due April 1, May 1, and June 1, 2021.
- No acceleration initially.
Separate six-year endpoints:
- April installment: April 1, 2027.
- May installment: May 1, 2027, a Saturday, carried to Monday, May 3, 2027.
- June installment: June 1, 2027.
Conditional acceleration branch
Assume the contract permitted acceleration, all notice and cure conditions were satisfied, and acceleration became effective May 15, 2021.
May 15, 2021+6 years=May 15, 2027\text{May 15, 2021}+6\text{ years}
\text{May 15, 2027}May 15, 2021+6 years=May 15, 2027May 15, 2027 will be Saturday, producing an illustrative next-business-day date of Monday, May 17, 2027.
Without the clause and proof of effective acceleration, that May 17 result is held. Montana Code Annotated+3
Example 5 — Demand note
Assumptions
- Instrument qualifies as a negotiable demand note.
- Demand made June 1, 2020.
- No later payment or acknowledgment.
June 1, 2020+6 years=June 1, 2026\text{June 1, 2020}+6\text{ years}
\boxed{\text{June 1, 2026}}June 1, 2020+6 years=June 1, 2026If no demand was ever made, the different statutory branch bars suit after a continuous ten-year period with no principal or interest payment. A payment can implicate §27-2-409 and restart analysis. Montana Code Annotated+2
Example 6 — Proven part payment after the original period
Assumptions
- Unwritten account due April 1, 2019.
- Original five-year period ended April 1, 2024.
- On October 15, 2024, the debtor voluntarily made and authorized a $100 principal payment specifically on that account.
- No foreign law or special extinguishment statute.
Restart:
October 15, 2024+5 years=October 15, 2029\text{October 15, 2024}+5\text{ years}
\boxed{\text{October 15, 2029}}October 15, 2024+5 years=October 15, 2029October 15, 2029 will be Monday.
The $100 affects timing only because the assumptions establish a genuine, attributable principal payment to that particular debt. It does not prove the remaining balance or every charge. Montana Code Annotated+1
Example 7 — Ambiguous ledger entry
Facts
- Creditor ledger contains “$75 payment.”
- No bank record.
- No receipt.
- No consumer authorization.
- Later internal email says the entry represented unused court costs.
Calculation:
proven consumer principal or interest payment=$0\text{proven consumer principal or interest payment}=$0proven consumer principal or interest payment=$0No restart is established. This is materially similar to the false-payment problem in McCollough and the evidentiary concern in Nathan. Justia Law+1
Example 8 — Electronic acknowledgment
Potentially qualifying
An attributable electronically signed record states:
“I owe $2,000 on account 1234 and will pay it.”
If UETA applies and the signature and intent are established, that can potentially restart the relevant period.
Not established
A message states:
“I dispute this account but may discuss settlement.”
That does not clearly and unambiguously recognize the particular debt as due and unpaid. No restart is assumed. Montana Code Annotated+4
Example 9 — Assignment without restart
Facts
- Claim accrued June 1, 2020.
- Debt sold September 1, 2023.
- Buyer sends first letter October 1, 2023.
- No payment or acknowledgment.
The accrual date remains June 1, 2020. The sale and first letter do not create a new period. The buyer must prove the existing claim and its ownership, but ownership proof and limitations timing are separate. Montana Code Annotated+1
Example 10 — SB 143 transition edge
Assumptions
- Written claim accrued December 1, 2018.
- Former eight-year endpoint would have been December 1, 2026.
- Current six-year endpoint was December 1, 2024.
- Suit filed October 2, 2025.
SB 143’s applicability clause says the six-year law applies because the action was filed after October 1, 2025. On the statute’s face, the action is outside six years.
A possible constitutional reasonable-opportunity argument cannot be resolved from arithmetic. Older Montana cases require a reasonable opportunity when a new law shortens existing periods, but no controlling case located here has applied that doctrine to SB 143. Montana Legislative Archive+1
Example 11 — Cross-border branch
Facts
- Montana consumer.
- Remote creditor.
- Contract contains a purported State X choice clause.
- Claim filed in Montana.
No period can be calculated until determining:
- Whether the clause was valid and covers the claim.
- Whether applying State X law violates Montana policy.
- Whether the claim is substantively based on State X law under §27-2-503.
- State X’s current limitation, accrual, revival, and tolling rules.
- Whether §27-2-505 substitutes Montana’s period.
Residence alone supplies no answer. Montana Code Annotated+4
Example 12 — Bankruptcy sequence
Facts
- Nonbankruptcy period remains open when petition is filed.
- Automatic stay applies.
- Stay later terminates.
- Creditor receives notice of termination.
The federal endpoint is the later of:
original period, including applicable suspension\text{original period, including applicable suspension}original period, including applicable suspensionor
30 days after notice of stay termination\text{30 days after notice of stay termination}30 days after notice of stay terminationNo concrete terminal date is supplied because the exact Montana suspension, petition, stay, termination, and notice dates are missing. U.S. Code+2
Example 13 — Filing and unresolved service window
Assumptions
- Computed filing endpoint: November 16, 2026.
- Complaint filed November 16, 2026.
The action is commenced for limitations purposes on that filing date.
Service still must be validly completed. The current authorities state both two years and three years, and Athy did not resolve the conflict. Accordingly, this example does not generate a definitive service deadline. Montana Code Annotated+3
Example 14 — Time-barred collection communication
Assumptions
- Actor is a federally covered debt collector.
- Ordinary Montana limitation has expired.
- No revival or tolling applies.
The collector may not file or threaten suit. A truthful voluntary-payment request may be permissible, but it may not imply judicial enforceability. If the communication seeks a payment or signature capable of restarting the Montana period, the wording and disclosure consequences require exact review; no collection language is approved here. eCFR+1
X. PASS-11 source register
| Source ID |
Instrument, issuer, full literal URL, and pinpoint |
Version, status, actual access, and limits |
| S_MT-P11-S001 |
Montana general limitation and accrual provisions: §27-2-102 https://mca.legmt.gov/bills/mca/title_0270/chapter_0020/part_0010/section_0020/0270-0020-0010-0020.html; §27-2-202 https://mca.legmt.gov/bills/mca/title_0270/chapter_0020/part_0020/section_0020/0270-0020-0020-0020.html; §27-2-301 https://mca.legmt.gov/bills/mca/title_0270/chapter_0020/part_0030/section_0010/0270-0020-0030-0010.html; §27-2-302 https://mca.legmt.gov/bills/MCA/title_0270/chapter_0020/part_0030/section_0020/0270-0020-0030-0020.html; §27-2-409 https://mca.legmt.gov/bills/mca/title_0270/chapter_0020/part_0040/section_0090/0270-0020-0040-0090.html. |
Fresh direct official HTML read October 26, 2026 Pacific/UTC. Published MCA 2025. Current §202 history includes 2025 Ch. 174. No complete special-session audit. Montana Code Annotated+4 |
| S_MT-P11-S002 |
2025 Senate Bill 143, Chapter 174, Montana Legislature: https://archive.legmt.gov/content/Sessions/69th/Contractor_index/CH0174.pdf. Written-period amendment at printed p.1/PDF index 0; applicability at printed p.2/PDF index 1. |
Fresh complete four-page official enacted PDF parsed and relevant pages visually inspected. Changes eight years to six and applies to written-instrument actions filed on or after October 1, 2025. Montana Legislative Archive |
| S_MT-P11-S003 |
Montana time computation: §1-1-306 https://mca.legmt.gov/bills/mca/title_0010/chapter_0010/part_0030/section_0060/0010-0010-0030-0060.html; §1-1-307 https://mca.legmt.gov/bills/mca/title_0010/chapter_0010/part_0030/section_0070/0010-0010-0030-0070.html; §1-1-216 https://mca.legmt.gov/bills/mca/title_0010/chapter_0010/part_0020/section_0160/0010-0010-0020-0160.html. |
Fresh direct official HTML read October 26, 2026. Used only for the calendar examples. Montana Code Annotated+2 |
| S_MT-P11-S004 |
Montana UCC negotiable instruments: §30-3-104 https://mca.legmt.gov/bills/mca/title_0300/chapter_0030/part_0010/section_0040/0300-0030-0010-0040.html; §30-3-108 https://mca.legmt.gov/bills/mca/title_0300/chapter_0030/part_0010/section_0080/0300-0030-0010-0080.html; §30-3-109 https://mca.legmt.gov/bills/mca/title_0300/chapter_0030/part_0010/section_0090/0300-0030-0010-0090.html; §30-3-122 https://mca.legmt.gov/bills/MCA/title_0300/chapter_0030/part_0010/section_0220/0300-0030-0010-0220.html. |
Fresh direct official HTML read October 26, 2026. Applies only to instruments satisfying Article 3. Montana Code Annotated+3 |
| S_MT-P11-S005 |
Colorado National Bank v. Story, Montana Supreme Court, 1993: https://law.justia.com/cases/montana/supreme-court/1993/44243783-6b74-489b-9d39-e8b28796e7e2.html, especially reproduced opinion lines 49–59. |
Fresh full public opinion reproduction read October 26, 2026. Historical eight-year number superseded; five-year account-stated classification remains material. No paid citator. Justia Law |
| S_MT-P11-S006 |
Centron Services, Inc. v. Hollewijn, 2026 MT 41: https://law.justia.com/cases/montana/supreme-court/2026/da-25-0502.html, ¶¶15–20. |
Fresh full public opinion reproduction read October 26, 2026. Medical factual setting used only for general account-stated doctrine; sector-specific medical law excluded. Reversed summary judgment and remanded. Justia Law |
| S_MT-P11-S007 |
Wolfe v. Flathead Electric Cooperative, 2018 MT 276: https://law.justia.com/cases/montana/supreme-court/2018/da-18-0036.html, ¶¶8–17. |
Fresh full opinion reproduction read. Historical eight-year number not current; used only for breach accrual and concealment boundary. Justia Law |
| S_MT-P11-S008 |
Montana Petroleum Tank Release Compensation Board v. Federated Service Insurance, 2008 MT 208: https://law.justia.com/cases/montana/supreme-court/2008/fecf433d-9d03-4de5-9297-6155e1fc685c.html, relevant accrual discussion. |
Fresh full public opinion reproduction read. Used for complete-claim versus later-demand distinction, not consumer-debt classification. Justia Law |
| S_MT-P11-S009 |
Fulton v. Fulton, 2004 MT 240: https://law.justia.com/cases/montana/supreme-court/2004/cb9d5182-3abb-4083-87e9-f805161bb2a9.html, installment-accrual discussion. |
Fresh full public opinion reproduction read. Domestic-relations judgment context; used only for general separate-installment logic. Justia Law |
| S_MT-P11-S010 |
Hughes v. Hughes, 2013 MT 176: https://law.justia.com/cases/montana/supreme-court/2013/da-12-0464.html, ¶¶21–31. |
Fresh full public opinion reproduction read. Establishes §27-2-409 applies to promissory notes and that payment allocation can be factual. Justia Law |
| S_MT-P11-S011 |
Breese v. O’Brien, 102 Mont. 547 (1936): https://law.justia.com/cases/montana/supreme-court/1936/102-mont-547.html, acknowledgment and agency discussion. |
Fresh full historical opinion reproduction read. No current contrary Montana authority located; used for acknowledgment specificity and authorized-agent principles. Justia Law+2 |
| S_MT-P11-S012 |
Nathan v. Jenkins, 113 Mont. 46 (1942): https://law.justia.com/cases/montana/supreme-court/1942/113-mont-46.html, payment-proof and agency discussion. |
Fresh full historical opinion reproduction read. Used for creditor-ledger, payment attribution, and authorized-agent limits. Justia Law+2 |
| S_MT-P11-S013 |
Montana UETA: §30-18-104 https://mca.legmt.gov/bills/mca/title_0300/chapter_0180/part_0010/section_0040/0300-0180-0010-0040.html; §30-18-106 https://mca.legmt.gov/bills/mca/title_0300/chapter_0180/part_0010/section_0060/0300-0180-0010-0060.html; §30-18-108 https://mca.legmt.gov/bills/mca/title_0300/chapter_0180/part_0010/section_0080/0300-0180-0010-0080.html. |
Fresh direct official HTML read October 26, 2026. Electronic acknowledgment remains fact-dependent. Montana Code Annotated+2 |
| S_MT-P11-S014 |
Contract and limitations choice statutes: §28-3-102 https://mca.legmt.gov/bills/mca/title_0280/chapter_0030/part_0010/section_0020/0280-0030-0010-0020.html; §§27-2-503–506 at https://mca.legmt.gov/bills/mca/title_0270/chapter_0020/part_0050/section_0030/0270-0020-0050-0030.html through section 0060. |
Fresh direct official HTML read October 26, 2026. No foreign state’s substantive law was researched because no actual contract/state was supplied. Montana Code Annotated+4 |
| S_MT-P11-S015 |
Masters Group International v. Comerica Bank, 2015 MT 192: https://law.justia.com/cases/montana/supreme-court/2015/da-14-0113.html, ¶¶55–58. |
Fresh full opinion reproduction read. Negotiated commercial setting; used only for clear-clause/public-policy rule. Justia Law+1 |
| S_MT-P11-S016 |
Barber v. Bradford Aquatic Group, 2023 MT 150: https://law.justia.com/cases/montana/supreme-court/2023/da-23-0218.html, ¶¶11–14. |
Fresh full opinion reproduction read. Used for Montana’s statutory default contractual choice directive. Justia Law+1 |
| S_MT-P11-S017 |
Oskerson v. Boudette, 2019 MT 236: https://law.justia.com/cases/montana/supreme-court/2019/da-19-0196.html, ¶¶15–17. |
Fresh full opinion reproduction read. Used to distinguish a “claim” from enforcement of a foreign judgment. Justia Law+1 |
| S_MT-P11-S018 |
Montana extension/savings statutes: §§27-2-401, 402, 405, 406, and 407, direct URLs ending in part 0040, sections 0010, 0020, 0050, 0060, and 0070; contractual shortening §28-2-708 https://mca.legmt.gov/bills/mca/title_0280/chapter_0020/part_0070/section_0080/0280-0020-0070-0080.html. |
Fresh direct official HTML read October 26, 2026. Only enumerated tolling/savings branches analyzed. Montana Code Annotated+5 |
| S_MT-P11-S019 |
Whitcraft v. Semenza, 399 P.2d 757 (Mont. 1965): https://law.justia.com/cases/montana/supreme-court/1965/10862-0.html, reproduced lines 82–100. |
Fresh full historical opinion reproduction read. Used only for reasonable-opportunity principle when a period is shortened; no SB 143 holding. Justia Law |
| S_MT-P11-S020 |
Bankruptcy stay and extension: 11 U.S.C. §362 https://www.govinfo.gov/content/pkg/USCODE-2024-title11/html/USCODE-2024-title11-chap3-subchapIV-sec362.htm; 11 U.S.C. §108(c) https://uscode.house.gov/us/usc/119-118/t11/s108/. |
Fresh direct official federal text read October 26, 2026. Narrow limitation gateway only; bankruptcy procedure excluded. U.S. Code+1 |
| S_MT-P11-S021 |
Commencement, service, and pleading: §25-3-107 https://mca.legmt.gov/bills/MCA/title_0250/chapter_0030/part_0010/section_0070/0250-0030-0010-0070.html; M. R. Civ. P. 4 https://mca.legmt.gov/bills/mca/title_0250/chapter_0200/part_0020/section_0040/0250-0200-0020-0040.html; Rule 8 https://mca.legmt.gov/bills/mca/title_0250/chapter_0200/part_0030/section_0080/0250-0200-0030-0080.html; §25-4-301 https://mca.legmt.gov/bills/mca/title_0250/chapter_0040/part_0030/section_0010/0250-0040-0030-0010.html. |
Fresh direct official HTML read October 26, 2026. Facial two-year/three-year service conflict preserved. Montana Code Annotated+3 |
| S_MT-P11-S022 |
Estate of Athy v. Edgewood, 2026 MT 3: https://law.justia.com/cases/montana/supreme-court/2026/da-25-0265.html, especially ¶¶21–46 and footnote 11. |
Fresh full public opinion reproduction read October 26, 2026. Medical-malpractice setting; used only for service/jurisdiction/dismissal principles and express notation of the statute/rule conflict. Justia Law+3 |
| S_MT-P11-S023 |
Regulation F time-barred debt, CFPB/eCFR: https://www.ecfr.gov/current/title-12/chapter-X/part-1006/subpart-B/section-1006.26. |
Fresh direct official eCFR read October 26, 2026. Applies only to covered debt collectors and debts. eCFR |
| S_MT-P11-S024 |
Kaiser v. Cascade Capital, LLC, 989 F.3d 1127 (9th Cir. 2021): https://cdn.ca9.uscourts.gov/datastore/opinions/2021/03/09/19-35151.pdf, especially printed pp.8–13/PDF indices 7–12. |
Fresh complete official Ninth Circuit PDF read; relevant pages visually inspected. Time-barred suit/threat and truthful-request boundary. Ninth Circuit Court of Appeals+1 |
| S_MT-P11-S025 |
McCollough v. Johnson, Rodenburg & Lauinger, 637 F.3d 939 (9th Cir. 2011): https://cdn.ca9.uscourts.gov/datastore/opinions/2011/03/04/09-35767.pdf, especially printed pp.4–7 and 23–24/PDF indices 3–6 and 22–23. |
Fresh complete official Ninth Circuit PDF read; relevant pages visually inspected. Montana card-account collection and false-payment evidence; does not replace Montana Supreme Court classification law. Ninth Circuit Court of Appeals+1 |
XI. PASS-11 claim register
| Claim ID |
Precise claim |
Source, conditions, consequence, and confidence |
| S_MT-P11-C001 |
Current period for a claim founded on a written instrument is six years. |
S001 §27-2-202(1). High. Montana Code Annotated |
| S_MT-P11-C002 |
The six-year amendment applies to written-instrument actions filed on or after October 1, 2025. |
S002 §3. High. Montana Legislative Archive |
| S_MT-P11-C003 |
An unwritten contract, account, or promise carries five years. |
S001 §27-2-202(2). High. Montana Code Annotated |
| S_MT-P11-C004 |
Other unwritten, noncontractual obligations carry three years. |
S001 §27-2-202(3). High; residual branch. Montana Code Annotated |
| S_MT-P11-C005 |
General accrual occurs when all elements exist and suit may be maintained. |
S001 §27-2-102. High. Montana Code Annotated |
| S_MT-P11-C006 |
Contract accrual ordinarily begins at breach. |
S007 ¶¶8–9. High for accrual; historical numerical period superseded. Justia Law |
| S_MT-P11-C007 |
A later demand does not postpone accrual if demand was not necessary to complete the claim. |
S001 §27-2-301; S008. High, claim-specific. Montana Code Annotated+1 |
| S_MT-P11-C008 |
A mutual open current account with reciprocal demands accrues from the last proved item on either side. |
S001 §27-2-302. High; reciprocal-demand predicate required. Montana Code Annotated |
| S_MT-P11-C009 |
Credit-card debt has no standalone Montana limitation category. |
S001; S005. High analytical conclusion. Montana Code Annotated+1 |
| S_MT-P11-C010 |
Story used five years where the application and statements did not contain the contract terms. |
S005. High; fact-specific. Justia Law |
| S_MT-P11-C011 |
Account stated requires agreement on items and balance plus express or implied agreement to pay. |
S006 ¶¶15–20. High. Justia Law |
| S_MT-P11-C012 |
Retention of statements without objection creates, at most, a rebuttable and fact-dependent presumption. |
S006. High. Justia Law |
| S_MT-P11-C013 |
Each installment ordinarily accrues separately before valid acceleration. |
S004 §30-3-122; S009. High for notes; qualified generalization for ordinary contracts. Montana Code Annotated+1 |
| S_MT-P11-C014 |
A valid acceleration of a definite-time note starts six years from the accelerated date. |
S004 §30-3-122(1). High. Montana Code Annotated |
| S_MT-P11-C015 |
No universal Montana ordinary-unsecured deacceleration rule was verified. |
Targeted case search and reviewed authorities. Unresolved; contract-specific. |
| S_MT-P11-C016 |
A qualifying demand note carries six years after demand and, absent demand, a ten-year continuous no-payment bar. |
S004 §30-3-122(2). High. Montana Code Annotated |
| S_MT-P11-C017 |
UCC note periods apply only if the instrument meets Article 3 requirements. |
S004 §§30-3-104, 108, 109. High. Montana Code Annotated+2 |
| S_MT-P11-C018 |
Sale, assignment, charge-off, or collection placement does not itself restart an ordinary limitation. |
S001 general accrual/revival framework. High bounded conclusion. Montana Code Annotated+1 |
| S_MT-P11-C019 |
An acknowledgment or part payment restarts the relevant limitation period. |
S001 §27-2-409. High. Montana Code Annotated |
| S_MT-P11-C020 |
A qualifying acknowledgment must be in a writing signed by the party to be charged. |
S001 §27-2-409(2). High. Montana Code Annotated |
| S_MT-P11-C021 |
Part payment means payment of principal or interest. |
S001 §27-2-409(3). High. Montana Code Annotated |
| S_MT-P11-C022 |
Section 27-2-409 applies to UCC promissory notes. |
S010 ¶¶21–31. High. Justia Law |
| S_MT-P11-C023 |
Montana’s restart statute is not textually limited to payments before expiration, and Hughes supports restart after the ordinary period otherwise would have run. |
S001; S010. High-confidence, bounded. Montana Code Annotated+1 |
| S_MT-P11-C024 |
Payment allocation among several debts can be a fact question. |
S010. High. Justia Law |
| S_MT-P11-C025 |
A creditor’s unilateral ledger notation does not by itself prove a payment. |
S012. High historical evidentiary principle. Justia Law |
| S_MT-P11-C026 |
Payment or acknowledgment generally must come from the debtor or authorized agent and identify the particular debt. |
S011–S012. High historical construction; no contrary current case located. Justia Law+2 |
| S_MT-P11-C027 |
Payment by one co-obligor does not automatically revive the claim against another. |
S012. High historical construction. Justia Law |
| S_MT-P11-C028 |
An electronic record can potentially satisfy the signed-writing condition if UETA applies, attribution and intent are proved, and content is sufficient. |
S013. High conditional conclusion. Montana Code Annotated+2 |
| S_MT-P11-C029 |
Settlement discussions do not automatically constitute acknowledgment or revival. |
S001; S011. High bounded conclusion; actual language controls. Montana Code Annotated+1 |
| S_MT-P11-C030 |
Clear contractual choice clauses generally are honored unless contrary to Montana public policy or good morals. |
S015. High but context-dependent. Justia Law |
| S_MT-P11-C031 |
Without an effective choice clause, Montana applies §28-3-102’s place-of-performance/place-made directive for contract interpretation. |
S014; S016. High. Montana Code Annotated+1 |
| S_MT-P11-C032 |
If a claim is substantively based on another state’s law, that state’s limitation applies, subject to §27-2-505. |
S014 §§27-2-503, 505. High. Montana Code Annotated+1 |
| S_MT-P11-C033 |
When foreign limitations law applies, its accrual and tolling rules also apply, but not its conflict rules. |
S014 §27-2-504. High. Montana Code Annotated |
| S_MT-P11-C034 |
Residence or assignment alone does not select the limitations law. |
S014; S017. High. Montana Code Annotated+1 |
| S_MT-P11-C035 |
Defendant absence tolling requires inability to serve, not mere physical absence. |
S018 §27-2-402. High. Montana Code Annotated |
| S_MT-P11-C036 |
Claimant disability tolling must exist at accrual and is statutorily limited. |
S018 §27-2-401. High. Montana Code Annotated |
| S_MT-P11-C037 |
Arbitration tolling applies only under §27-2-405’s particular written-submission and revocation/stay conditions. |
S018. High. Montana Code Annotated |
| S_MT-P11-C038 |
A court order, injunction, or statutory prohibition can suspend the period for its duration. |
S018 §27-2-406. High. Montana Code Annotated |
| S_MT-P11-C039 |
Montana’s savings statute allows one-year refiling after qualifying termination but excludes voluntary discontinuance, neglect to prosecute, and final merits judgments. |
S018 §27-2-407. High. Montana Code Annotated |
| S_MT-P11-C040 |
Section 108(c) provides the later of the nonbankruptcy period including applicable suspension or 30 days after notice of stay termination. |
S020. High; bankruptcy-specific facts required. U.S. Code |
| S_MT-P11-C041 |
A contractual term shortening Montana’s enforcement period is void under §28-2-708, subject to its arbitration exception. |
S018. High. Montana Code Annotated |
| S_MT-P11-C042 |
Montana’s older constitutional cases require a reasonable opportunity when the Legislature shortens a period, but no case located here applies that doctrine to SB 143. |
S019. High historical principle; SB 143 application unresolved. Justia Law |
| S_MT-P11-C043 |
Filing the complaint commences an action for limitations purposes. |
S001 §27-2-102(1)(b). High. Montana Code Annotated |
| S_MT-P11-C044 |
Current MCA says ordinary service within two years; Rule 4(t) says three years. |
S021. High textual conflict. Montana Code Annotated+1 |
| S_MT-P11-C045 |
Athy acknowledged but did not resolve the ordinary service conflict. |
S022. High. Justia Law |
| S_MT-P11-C046 |
Failure of timely service can cause dismissal, and a dismissal without prejudice does not necessarily preserve an expired claim. |
S022. High; medical case supplies general procedural principle. Justia Law |
| S_MT-P11-C047 |
Statute of limitations is an affirmative defense. |
S021 Rule 8(c). High. Montana Code Annotated |
| S_MT-P11-C048 |
If limitations facts are disputed, the party asserting the defense must prove them. |
S021 §25-4-301. High. Montana Code Annotated |
| S_MT-P11-C049 |
Ordinary expiration generally bars judicial enforcement rather than extinguishing the underlying obligation. |
S001, S023–S024. High bounded conclusion; special voidness statutes excluded. Montana Code Annotated+1 |
| S_MT-P11-C050 |
A covered debt collector may not sue or threaten suit on a time-barred debt. |
S023–S024. High, conditional on federal coverage. eCFR+1 |
| S_MT-P11-C051 |
A truthful voluntary-payment request is not inherently prohibited but cannot imply enforceability. |
S024. High, communication-specific. Ninth Circuit Court of Appeals |
| S_MT-P11-C052 |
A false or unsupported claimed partial payment can create serious limitations and FDCPA consequences. |
S025. High, fact-specific. Ninth Circuit Court of Appeals |
| S_MT-P11-C053 |
Credit-reporting obsolescence is separate from suit limitations and debt enforceability. |
Structural conclusion; reporting component excluded from reliance. High general boundary. |
| S_MT-P11-C054 |
No exact terminal date can be established without the claim theory, governing law, operative agreement, accrual, acceleration, payment, acknowledgment, tolling, filing, and service facts. |
All sources. High methodological conclusion. |
XII. Granular coverage and gap table
| Assigned issue |
Status |
Claim IDs |
Exact missing evidence or next action |
| Current written-contract period |
Answered |
C001–C002 |
Apply only after proving a qualifying written instrument. |
| SB 143 applicability date |
Answered |
C002 |
No full constitutional transition adjudication exists in reviewed sources. |
| SB 143 accrued-claim reasonable-time edge |
Unresolved |
C042 |
Controlling post-2025 Montana decision or claim-specific constitutional analysis. |
| Oral contract period |
Answered |
C003 |
Actual formation, terms, breach, and governing law. |
| Implied contract period |
Answered in core |
C003, C005–C006 |
Determine whether claim truly sounds in contract. |
| Unwritten account period |
Answered |
C003 |
Determine accrual theory. |
| One-sided open account |
Partial |
C003, C008 |
Full ledger and claim characterization. |
| Mutual open account |
Answered textually |
C008 |
Prove reciprocal demands; ordinary consumer card likely does not automatically qualify. |
| Account stated elements |
Answered |
C011–C012 |
Statements, assent, objection timing, balance certainty. |
| Account stated period |
Answered if unwritten |
C003, C010 |
Written-instrument alternative remains. |
| Credit-card written branch |
Partial |
C001, C009–C010 |
Complete cardmember agreement, amendments, assent, governing law. |
| Credit-card account-stated branch |
Partial |
C009–C012 |
Last payment, statements, disputes, and formation. |
| Credit-card universal period |
Rejected as overbroad |
C009 |
Must classify actual claim. |
| Written installment debt |
Answered in core |
C001, C013–C014 |
Contract and acceleration evidence. |
| Installment-by-installment accrual |
Answered in principle |
C013 |
Exact due dates and payment application. |
| Automatic acceleration |
Unresolved factually |
C014–C015 |
Contract language and default event. |
| Optional acceleration |
Unresolved factually |
C014–C015 |
Exercise, notice, cure, waiver. |
| Deacceleration/rescission |
Unresolved |
C015 |
No controlling ordinary-unsecured Montana decision located. |
| Cancellation/termination accrual |
Partial |
C005–C007 |
Contract and necessary notice. |
| Charge-off |
Answered as no automatic restart |
C018 |
Could be evidence, not dispositive legal event. |
| Assignment/sale |
Answered as no automatic restart |
C018 |
Ownership proof remains. |
| Collection placement |
Answered as no automatic restart |
C018 |
Collector role and federal law separate. |
| Negotiable-note definition |
Answered |
C017 |
Inspect actual instrument. |
| Definite-time note |
Answered |
C014, C016–C017 |
Payment dates and acceleration. |
| Demand note |
Answered |
C016–C017 |
Demand evidence and payment history. |
| Nonnegotiable demand promise |
Answered in framework |
C005, C007, C017 |
Instrument and demand predicate. |
| Signed acknowledgment |
Answered |
C019–C020, C026 |
Complete writing, attribution, particular debt. |
| Electronic acknowledgment |
Partial |
C028 |
UETA agreement, signature, intent, content. |
| Conditional acknowledgment |
Unresolved factually |
C026, C029 |
Complete communication. |
| Settlement negotiations |
No automatic revival |
C029 |
Actual signed wording and payment. |
| Part payment |
Answered |
C019, C021–C025 |
Proof of principal/interest payment. |
| Payment after original bar |
Answered in bounded form |
C022–C023 |
Special extinguishment statutes excluded. |
| Payment allocation |
Partial |
C024 |
Full ledger and designation. |
| Third-party payment |
Partial |
C026 |
Agency or authorization proof. |
| Joint debtor effect |
Partial |
C027 |
Authority or separate act by each debtor. |
| Creditor ledger entry |
Answered as insufficient alone |
C025, C052 |
Independent payment evidence required. |
| Contract choice clause |
Partial |
C030 |
Validity, scope, assent, public policy. |
| No choice clause |
Answered framework |
C031 |
Place of performance/making facts. |
| Foreign limitation |
Answered framework |
C032–C034 |
Other state’s current complete law. |
| Foreign accrual and tolling |
Answered framework |
C033 |
Other state’s statutes and cases. |
| Montana unfairness exception |
Answered textually |
C032 |
Claim-specific court finding. |
| Nonresident debtor |
Partial |
C034–C035 |
Residence alone does not select law or toll; serviceability facts needed. |
| Absence tolling |
Answered |
C035 |
Actual service availability. |
| Incapacity/disability tolling |
Answered |
C036 |
Disability at accrual. |
| Concealment/discovery |
Partial |
C005–C006 |
Statutory injury-to-person/property predicate or recognized concealment facts. |
| Arbitration suspension |
Answered narrowly |
C037 |
Written submission and statutory event. |
| Court/statutory stay |
Answered |
C038 |
Actual order/prohibition dates. |
| Bankruptcy stay |
Partial |
C040 |
Full bankruptcy timeline and notice. |
| Savings/refiling |
Answered |
C039 |
Nature of prior termination. |
| Contractual shortening |
Answered as void under Montana law |
C041 |
Choice-of-law and FAA questions remain clause-specific. |
| Filing commencement |
Answered |
C043 |
Court-stamped filing. |
| Service deadline |
Unresolved conflict |
C044–C046 |
Controlling Montana resolution of two years versus three years. |
| Appearance exception to service dismissal |
Partial |
C044 |
Actual appearance and procedural history. |
| Affirmative defense |
Answered |
C047–C048 |
Responsive pleading and disputed proof. |
| Sua sponte court duty in consumer defaults |
Unresolved/no special rule verified |
C047–C048 |
Later default-judgment and collection-litigation pass. |
| Time-barred federal suit/threat |
Answered conditionally |
C050 |
Federal actor/debt coverage and correct state period. |
| Voluntary payment request |
Answered only as federal boundary |
C051 |
Exact communication and Montana revival implications. |
| Reporting obsolescence |
Excluded |
C053 |
Separate reporting clock; no import into suit period. |
| Mortgage/foreclosure |
Excluded |
— |
Dedicated sector pass. |
| Vehicle/repo/deficiency |
Excluded |
— |
Dedicated secured-debt pass. |
| Medical-specific debt |
Excluded; Centron used only for account-stated doctrine |
C011–C012 |
Medical billing and assistance law later. |
| Utilities and rent |
Excluded |
— |
Sector passes. |
| Student/education debt |
Excluded |
— |
Sector and federal law pass. |
| Tax, government, fines, support |
Excluded |
— |
Specialized limitations. |
| Probate claims |
Excluded |
— |
Probate nonclaim and presentation rules. |
| Bankruptcy procedure |
Excluded beyond narrow tolling gateway |
C040 |
Full bankruptcy pass. |
| Sale-of-goods limitations |
Excluded |
— |
UCC Article 2 pass. |
| Fraud and tort alternatives |
Excluded |
— |
Separate claim-classification pass. |
| Judgments, liens, renewal, garnishment |
Excluded |
— |
Registry later components. |
| Local and tribal law |
Excluded |
— |
Jurisdiction-specific investigation. |
| Actual account deadline |
Unresolved |
C054 |
Complete instrument and event chronology required. |
XIII. Researcher self-check
Freshly read on October 26, 2026
- Current published Montana general limitation, accrual, demand, mutual-account, revival, tolling, savings, conflict-of-law, time-computation, contractual-shortening, commencement, service, and pleading provisions.
- Complete official enacted 2025 SB 143/Chapter 174, including its applicability clause.
- Current Montana UCC negotiable-instrument definition and limitation provisions.
- Current Montana UETA provisions necessary for electronic acknowledgments.
- Current federal bankruptcy §§362 and 108(c).
- Current Regulation F time-barred-debt rule.
- Full publicly available opinions or complete opinion reproductions for:Colorado National Bank v. Story.Centron v. Hollewijn.Wolfe.Montana Petroleum Tank Release Compensation Board.Fulton.Hughes.Breese.Nathan.Masters Group.Barber.Oskerson.Whitcraft.Estate of Athy.
- Complete official Ninth Circuit PDFs for Kaiser and McCollough.
Numeric and event consistency checks
- Six-year written example: November 15, 2020 → November 15, 2026; Sunday carried to Monday, November 16, 2026.
- Five-year oral example: April 1, 2020 → April 1, 2025.
- Five-year credit-card branch: January 10, 2021 → January 10, 2026; Saturday carried to Monday, January 12, 2026.
- Six-year credit-card branch: January 10, 2021 → January 10, 2027; Sunday carried to Monday, January 11, 2027.
- Restart example: October 15, 2024 → October 15, 2029.
- No interest, balance, fee, or damages arithmetic was inferred from the timing examples.
Bounded negative searches
Targeted public-source searches did not locate:
- A standalone Montana limitation category for credit cards.
- A current Montana appellate decision holding that every card claim is written or unwritten.
- A controlling ordinary-unsecured Montana deacceleration doctrine.
- A post-2025 decision applying SB 143 to a claim that became more than six years old before October 1, 2025 but remained open under the former eight-year period.
- A controlling Montana resolution of §25-3-107’s two-year service period versus Rule 4(t)’s three-year period.
- A general Montana requirement that courts raise ordinary contract limitations sua sponte in every consumer default.
- A rule that charge-off, assignment, placement, or sale resets an ordinary limitation.
- A rule that every partial payment automatically restarts a debt regardless of attribution or allocation.
Those are bounded results, not proof that no unpublished order, trial decision, later opinion, local rule, tribal rule, or account-specific contract principle exists.
Not read or resolved
- Any actual cardmember agreement, promissory note, payment schedule, acceleration notice, account statement, payment record, acknowledgment, settlement communication, assignment, governing-law clause, service return, complaint, or bankruptcy docket.
- Any named borrower, creditor, debt buyer, servicer, law firm, or account.
- A complete paid citator or every Montana district-court docket.
- Every post-2025 special-session enactment or unpublished administrative interpretation.
- Foreign-state law for any particular contract.
- Full litigation, service, default, judgment, garnishment, bankruptcy, probate, secured-debt, medical, utility, rent, education, government-debt, local, or tribal analysis.
- The unreviewed P4 and P6–P10 conclusions as accepted premises.
Exact individual source-fetch timestamps were not exposed and are not invented. No filing, demand, acknowledgment, payment, provider lookup, court search involving private records, contact, records request, purchase, account change, private-data access, browser control, local-file write, deadline opinion for an individual account, suit approval, collection approval, independent review, component acceptance, Montana acceptance, parent-dossier acceptance, A066 acceptance, operational approval, or publication-readiness determination occurred.
REPORT PARTIAL — the focused Montana ordinary unsecured consumer-debt limitation, accrual, choice-of-law, tolling, revival, and narrow commencement component is completed to the stated claim, source, factual, and currentness limits.
END S_MT PASS-11