SettleADebt.

FIND THE EXPLANATION

Find a debt-help route outside the United States

Start with the country and, where necessary, the province or legal system. Familiar debt words can describe different procedures.

Explore Brazil information →

This address preserves a dated source document behind the guide. The complete explanation covers the questions, comparisons and next steps for this subject.

If you came here to check a specific citation, open the original archive below. It includes its source dates and recorded qualifications.

Original source archive (optional)Original working documents, complete tables and revision history
About this archive

The explanation above is written for readers. These original working documents preserve the evidence trail, including technical language, dated passages and known corrections. They have not all received independent professional review. Use the marked limits before relying on a particular rule or figure.

DETAILED RESEARCH · EVIDENCE & LIMITS INCLUDED

Brazil: positive credit history and Cadastro Positivo

C_BR · pass-07Captured 2026-10-2712 tables · 72 claim records · 11 source recordsScoped coordinator review completed

Read the evidence with its boundaries. These are saved research components, including revisions. A scoped coordinator review checks selected evidence; it does not certify every claim, a complete jurisdiction, current law or individual applicability. Dates and access limits remain attached to the records.

How to read the research →

Read the related correction supplements

These components repair their stated scope. They do not replace every other finding in this research series.

One bounded provenance-only repair to →
Bounded P13 payment-recipient qualification and source/claim/count traceability repair →
Bounded P14 atomic-predicate, commencement-traceability and count-unit repair →

SettleADebt C_BR PASS-07 — Brazil

Distinct narrow component: Cadastro Positivo / positive payment-history databases only.

Baseline: October 22, 2026, America/Los_Angeles. Fresh source-access dates: October 26, 2026 PDT / October 27, 2026 UTC. Individual source-search and opening clock times were not logged and remain unknown. No inferred session window is used. Status: Narrow federal research report and publication hold. It is not an actual credit-file review, score explanation, database-manager authorization, consumer complaint, provider clearance, or country acceptance.

PASS-04, PASS-05 and PASS-06 remain saved but unreviewed. None of their consumer-contract, prescription or negative-register conclusions is adopted as an accepted premise. This pass independently reads the positive-history regime.

Executive determination

Brazil’s present Cadastro Positivo regime is an opt-out positive-payment-history system, not the original 2011 opt-in system.

  1. Opening no longer requires prior consent. Lei Complementar 166/2019 replaced the original consent-first model. A qualifying database manager may open a positive record for a natural or legal person under Lei 12.414/2011, subject to later notice, cancellation rights and the other statutory safeguards. The substantive opt-out amendments took effect 91 days after the April 9, 2019 official publication—July 9, 2019. Planalto+1
  2. **Opening, consultation and full-history disclosure are three different events.**Opening may occur without prior opt-in.No information may be furnished to a consulente during the first 60 days after opening.A score may be furnished after the applicable waiting period and for a permitted credit-risk purpose.Disclosure of the full credit history requires the registered person’s prior, specific authorization. Planalto+1
  3. Post-opening notice is mandatory but has a statutory exception. Notice must occur without cost within 30 days after opening, directly by the manager or through a source, and must clearly identify available cancellation channels. The notice may be dispensed with if that person already has a positive record open at another database. Planalto
  4. The data are defined and bounded. The regime concerns financial and payment information for paid or current credit operations and payment obligations. The implementing decree identifies fields such as origination date, obligation value, due dates, amounts due, and full or partial payments. Unrelated or excessive information and specified sensitive information may not be recorded or used for scoring. Planalto+1
  5. **Cancellation and score suspension are separate rights.**A person may request free cancellation or reopening through any manager by telephone, physical channel or electronic channel.The receiving manager has up to two business days to act and forward the request; the other managers receive their own two-business-day period after receipt.A person may instead suspend third-party access to the score while retaining access to their own score.Cancellation prevents statutory use of the credit history, but does not necessarily erase legally retained audit records, delete negative entries, cancel the underlying debt or erase unrelated datasets. Planalto+2
  6. **Access and correction have multiple clocks.**The registered person has free access to their data, history and score without needing to justify the request.Specific source, sharing and consultant-access information is subject to a 10-day statutory response period.Erroneous information must be corrected or cancelled across the databases that shared it within 10 days.A source asked to verify challenged information has a separate two-business-day duty, and must update or correct information previously supplied within 10 days. Planalto+1
  7. Score transparency is meaningful but not unlimited. A person may learn the principal elements and criteria used in risk analysis and request review of a decision made exclusively through automated means. Trade secrets remain protected. The decree gives the consulente seven business days to provide the result of an automated-decision review. No law examined guarantees a higher score, credit approval or a particular interest rate. Planalto+1
  8. Positive-history information has a different duration structure from an ordinary negative entry. Lei 12.414 art. 14 sets a maximum of 15 years for positive payment information. Separately, Decreto 9.936 requires retention of certain authorization, cancellation, reopening and correction records for audit purposes for at least 15 years from cancellation. Those are not the same clock and do not establish public availability for the whole audit period. Planalto+1
  9. Financial-origin data are subject to a special manager-registration branch. Institutions authorized by Banco Central may provide covered credit-operation information only to database managers registered with Banco Central, and financial-origin sharing is limited to registered managers. That registration does not make the manager a financial institution and does not constitute a general licence for SettleADebt or another debt adviser. Planalto+3

G1. Current primary law, actors and data

G1.1 Operative law and amendment timeline

Stage Rule and legal effect Current disposition
Original 2011 law Lei 12.414 originally required informed prior authorization before opening a positive record. Historical only for this point; that wording was replaced.
Original 2012 regulation Decreto 7.829 implemented the consent-based model. Expressly revoked by Decreto 9.936/2019. Planalto+1
LC 166/2019 Rewrote the definitions, opening, notice, cancellation, sharing, scoring and financial-data provisions. Most amendments became effective 91 days after publication. Current opt-out foundation; substantive date July 9, 2019. Planalto+1
Decreto 9.936/2019 Regulates manager requirements, permissible fields, authorization, access, cancellation, score suspension, correction and source duties. Operative regulation; effective on publication July 25, 2019. The August 1 rectification is not a second commencement date. Planalto
Resolução CMN 4.737/2019 Regulates financial-institution reporting and Banco Central registration/cancellation of managers receiving financial-origin data. Current consolidated official PDF read, including amendments effective April 1, 2022. Banco Central do Brasil Normativos+3
Resolução CMN 4.990/2022 Amended registration, control and governance provisions in Resolução 4.737. Amendment effects visible in the official consolidated 4.737 PDF. The standalone dynamic body was not substantively readable.
Resolução BCB 14/2020 Identified by official BCB material as the procedural rule for manager registration. Full current enacted procedure was not substantively readable through the public dynamic page; detailed forms and filing mechanics remain held. Banco Central do Brasil+1

The current compiled Lei 12.414 and Decreto 9.936 were read through the actual operative bodies. No later amendment was inferred merely from a search absence.

G1.2 Actor matrix

Actor Exact statutory role What that status does not establish
Banco de dados Structured data concerning natural or legal persons used to support credit, deferred sales or other transactions involving financial risk. It is not automatically an ordinary negative register, public court database or SCR.
Gestor Legal person meeting statutory and regulatory operating requirements and administering collection, storage, analysis and third-party access. “Gestor” status is not an adviser, lender, lawyer or payment licence.
Cadastrado Natural or legal person whose information has been included. It does not necessarily mean “consumer” under every CDC rule.
Fonte Person or entity granting credit, conducting deferred sales, self-financing or another transaction producing financial risk; expressly includes BCB-authorized institutions and continuous-service providers. Source status does not grant unrestricted data-sharing rights.
Consulente Natural or legal person accessing data for a purpose allowed by Lei 12.414. It is not unrestricted public access; the user must maintain or intend a commercial or credit relationship.
Consumer CDC classification may apply where the final-recipient predicates are satisfied. Lei 12.414 separately covers legal persons even where CDC consumer status remains unresolved.
Representative May exercise rights where legally authorized. Lei 12.414 does not prescribe one universal mandate or authentication format.
Banco Central Registers managers eligible to receive covered financial-institution data and supervises that registration branch. It does not approve every score, every source datum, every consultant access or a debt-adviser business model.
SNDC / consumer bodies May apply consumer sanctions and specified corrective measures where the registered person is a consumer. Federal statutory authority does not verify each state, DF or municipal implementation.

These distinctions come from Lei 12.414 arts. 1–2, 12 and 17 and the current regulation. Planalto+2

G1.3 Natural persons, legal persons and territorial limits

Lei 12.414 expressly covers both natural and legal persons. Its rights to access, cancellation, reopening, correction and automated-decision review are therefore not limited to natural persons merely because the LGPD defines a data titular as a natural person. The LGPD overlay directly concerns personal data connected to natural persons; company-level rights in this regime arise primarily from Lei 12.414. Planalto+2

For a natural person, the LGPD can add purpose, necessity, transparency, quality, access, correction and automated-review requirements. Its art. 7(X) permits processing for credit protection, “including” under the specific credit-protection legislation. That basis does not nullify the specific Lei 12.414 requirement for authorization before disclosing full credit history to a consultant. Planalto+1

For a legal person:

  • Lei 12.414 applies directly;
  • the full-history authorization may last up to 12 months rather than the three-month natural-person limit;
  • CDC remedies depend on separate consumer classification;
  • LGPD natural-person rights do not automatically attach to company data merely because the data concern a company; and
  • personal data about directors, owners, guarantors or employees may still engage LGPD separately.

For remote or foreign actors, LGPD art. 3 can create a Brazilian nexus for natural-person data processing, but the complete cross-border, jurisdiction, recognition and international-transfer analysis is deferred. Planalto

G1.4 What constitutes positive payment history?

Lei 12.414 defines histórico de crédito as financial and payment information concerning paid or current credit operations and payment obligations. Decreto 9.936 specifies:

  • date credit was granted or the obligation assumed;
  • original credit or obligation amount;
  • amounts due and their maturity and payment dates;
  • amounts paid, including partial payments;
  • the nature of the relationship—credit, commercial, continuous service or another defined category; and
  • identifying and contact data necessary to operate the system. Planalto+2

For financial institutions, Resolução CMN 4.737 covers credit, leasing, consortium self-financing and other credit-like operations and requires reporting fields including origination date, original amount, instalment due dates and full or partial amounts paid. Banco Central do Brasil Normativos+1

Continuous-service providers—including water, sewer, electricity, gas and telecommunications—are expressly included as possible sources under the amended statutory definition. The former separate opt-in utility provision was repealed, so a utility source is now analyzed under the general current framework, not the old art. 11 consent model. Planalto+1

G1.5 Prohibited and out-of-scope data

The positive register may retain only objective, clear, true, understandable data necessary to assess economic status and credit risk. It may not record excessive information unrelated to credit-risk analysis or specified sensitive data concerning social or ethnic origin, health, genetic information, sexual orientation or political, religious and philosophical convictions. Score criteria are subject to overlapping prohibitions, including sex and information about unrelated third parties. Planalto+1

The reviewed provisions do not authorize indiscriminate disclosure of:

  • deposit-account balances;
  • itemized purchases;
  • income and assets generally;
  • transaction narratives unrelated to payment performance;
  • medical or genetic information;
  • political, religious or philosophical views;
  • a family member’s information merely because they share an address; or
  • public tax, court or governmental-debt records outside the specific positive-history system.

LC 105 art. 1 §3(VII) supplies a bank-secrecy exception for the defined financial and payment information sent to managers under the specific positive-history law. It is not a general exception for unrelated banking information. Planalto

Public-law databases maintained by domestic public-law entities are expressly governed by specific legislation rather than automatically by Lei 12.414’s ordinary private positive-register model. Planalto

G1.6 Manager requirements versus a general provider licence

Decreto 9.936 sets manager-level economic, technical, governance, security, consumer-service and audit requirements. It includes a R$100 million minimum net-worth requirement for the manager, subject to the regulation’s detailed composition rules; through December 31, 2026, the permitted controller/associate contribution percentage described by §6 is 10%. Those figures concern the database manager’s regulatory structure—not a consumer charge, adviser bond, SettleADebt authorization or required capital for an ordinary non-database consultancy. Planalto+1

A Banco Central registration under Lei 12.414 art. 12 and Resolução 4.737 is required for a manager to receive covered information from BCB-authorized institutions. Lei 12.414 expressly states that such managers are not thereby subjected to the legal regime governing financial institutions. Planalto+1

G2. Opening, notice, consultation, consent and cancellation

G2.1 Opt-in to opt-out transition

The original 2011 rule required prior informed authorization to open the record. LC 166 replaced it with express authority for the manager to:

  • open a positive record;
  • make positive-payment annotations;
  • share registered and payment information with other managers;
  • provide a score; and
  • provide full credit history only after prior specific authorization. Planalto+1

LC 166 was officially published April 9, 2019. Its art. 7 made most of the opt-out changes effective after 91 days:

April 9, 2019 + 91 calendar days = July 9, 2019.

That is the operative transition date expressly used by Decreto 9.936. Planalto+1

G2.2 Opening notice

After opening, the communication must:

  1. occur within 30 days;
  2. be free;
  3. be made by the manager directly or through a source; and
  4. clearly explain the available cancellation channels. Planalto

The communication uses personal data supplied by the person to a source, including residential, commercial or electronic addresses. The read provisions do not prescribe one exclusive communication technology or a universal proof package. Actual delivery, content, address provenance and operator procedure remain factual. Planalto

Notice exception

Notice is dispensed with where the person already has a positive record open at another database. That exception does not erase cancellation rights or authorize consultation before the 60-day period; it only concerns the statutory opening communication. Planalto

Previously expressed opt-out

A manager must automatically cancel a record for a natural or legal person who had previously expressed—by telephone, physical or electronic means—the wish not to have a record opened. Planalto

G2.3 Sixty-day consultation barrier

Information about the registered person may be furnished to consultants only 60 days after opening, subject to the relevant purpose and authorization conditions. The barrier applies before consultant access; it does not prevent the registered person from exercising their own access or cancellation rights. Planalto

The statute does not create a second consent requirement for a score merely because the 60 days elapse. It instead distinguishes score access from full-history access:

  • score: may be furnished under art. 4(IV)(a), the 60-day rule, permitted-purpose rule and any score-access suspension;
  • full history: requires all those conditions plus prior specific authorization under art. 4(IV)(b). Planalto+1

G2.4 Full-history authorization

The authorization may be physical or electronic, may be delivered directly or through the prospective consultant and extends to all managers. It may authorize:

  • one access;
  • fixed access for up to three months when granted by a natural person;
  • fixed access for up to 12 months when granted by a legal person; or
  • indefinite access by a BCB-authorized institution, but only while its contractual relationship with the registered person continues. Planalto+1

It may be revoked unilaterally at any time. The manager must maintain adequate procedures proving the authorization’s authenticity and validity. A generic privacy clause, broad marketing consent or mere credit inquiry request is not automatically equivalent to the specific full-history authorization. Planalto+1

G2.5 Permitted consultation purpose

A consultant may access information only where it maintains or intends to maintain a commercial or credit relationship with the registered person. Permitted uses are limited to credit-risk analysis or supporting credit, deferred sale or another transaction presenting financial risk to that consultant. Planalto+1

The regime does not establish:

  • general public access;
  • access for curiosity, employment screening or unrelated marketing;
  • authority for a debt adviser to pull another person’s history merely because the person contacted the adviser;
  • automatic entitlement to full-history data from a signed general service agreement; or
  • authority to disclose individual source identities to the consultant.

G2.6 Sharing among managers

The 2019 amendments permit sharing of registration and positive-payment information among managers. A receiving manager assumes statutory duties concerning challenges, cancellations and correction, while the originating manager must keep shared information updated without charge. Planalto+1

For information originating with BCB-authorized institutions, sharing is allowed only among BCB-registered managers. Planalto

Manager-to-manager sharing does not eliminate the specific authorization required before a consultant receives the full history.

G2.7 Cancellation and reopening

Cancellation and reopening:

  • are free;
  • may be requested from any manager;
  • may be requested by telephone, physical channel or electronic channel;
  • require the receiving manager to close or reopen within two business days;
  • require that manager to relay the request to the others within the same period; and
  • require the other managers to comply within their own two-business-day period after receipt. Planalto

Decreto 9.936 requires an express request and permits electronic requests. It also requires telephone and electronic tracking systems. Planalto

Effects of cancellation

Cancellation prevents managers from using the person’s history for the purposes of Lei 12.414, including use in composing third-party scores. New positive annotations may not be added after two business days from the request. Partial deletion is not available merely because the person wants some accurate items omitted; partial deletion remains possible where information was improperly recorded. Planalto+1

Cancellation does not, by itself:

  • cancel the underlying obligation;
  • amend a contract;
  • delete an ordinary negative-register entry;
  • delete a protest;
  • remove a judgment;
  • require destruction of audit records;
  • eliminate all data kept for another lawful regime; or
  • guarantee an improved score.

The regulation expressly requires certain audit records to remain for at least 15 years from cancellation. Planalto

Reopening

Reopening follows the same free request and two-business-day manager workflow. The read law and decree do not expressly state whether every reopening must produce a new 30-day opening notice. That precise re-notice question remains unresolved rather than being inferred.

G2.8 Score-access suspension

Instead of cancelling the whole positive record, a person may request indefinite suspension of consultant access to their score. The receiving manager has two business days to suspend access and forward the request; other managers must act within two business days after receiving it. The person retains access to their own score. Planalto

Score suspension is therefore not equivalent to:

  • cancellation of the positive register;
  • revocation of one consultant’s full-history authorization;
  • correction of inaccurate information; or
  • a score recalculation.

G3. Access, correction, transparency, scoring and use

G3.1 Free access

A registered person may access, free of charge and without giving a reason:

  • all information about them in the database;
  • their credit history;
  • their score;
  • the sources of the information, with contact details;
  • the managers with which data were shared;
  • all consultants that accessed their information during the preceding six months;
  • a summary of their rights and available government bodies; and
  • confirmation of cancellation. Planalto+1

Decreto 9.936 requires secure, free website access and telephone access. Each consultant response must show the last update date. The manager may disclose source identities to the registered person but may not reveal individual sources to consultants. Planalto+1

G3.2 Access clocks

The law contains several different response concepts:

  • Lei 12.414 art. 6(I) defines the requested dataset as the information present at the moment of the request.
  • Art. 5 §3 gives up to 10 days for the information in art. 5(II) and (IV)—the person’s information/history/score and the principal risk-analysis elements and criteria.
  • Art. 6 §2 gives 10 days for the source, shared-manager, six-month consultant-access and rights-summary items.
  • Decreto 9.936 requires free website and telephone systems but does not convert every statutory 10-day item into an instantaneous duty. Planalto+2

The data snapshot should correspond to the request date even where the response is furnished within an applicable later period.

G3.3 Correction and refusal

A person who challenges erroneous information has the right to correction or cancellation in all databases that shared it within 10 days. A receiving manager must accept and process the challenge; sharing does not force the person to locate every downstream manager individually. Planalto+1

The source has distinct duties:

  • verify and confirm or correct challenged information within two business days when asked by a manager or directly by the person;
  • update or correct previously supplied information within 10 days;
  • maintain records supporting what it supplied; and
  • supply information to managers on nondiscriminatory terms. Planalto

These clocks operate together rather than replacing one another. For example, a manager’s 10-day correction result cannot be extended automatically merely because the source also has its own two-business-day verification task.

Potentially correctable fields include:

  • identity or CPF/CNPJ;
  • source;
  • nature of the commercial or credit relationship;
  • origination date;
  • original obligation amount;
  • instalment amount;
  • due date;
  • payment date;
  • full versus partial payment;
  • amount paid;
  • status of an obligation as current or paid; and
  • whether a consultant accessed a history or score.

An accurate but unfavorable datum is not an “error” merely because it contributed to a lower score or adverse decision.

G3.4 Score criteria and transparency

The person may learn the principal elements and criteria used in risk analysis, subject to commercial secrecy. The manager must publish a clear and accessible policy describing collection and use of personal data for credit-risk analysis. Planalto+1

The score may not use:

  • information unrelated to credit risk;
  • specified sensitive categories;
  • information about people without a first-degree family or economic-dependency relationship;
  • information penalizing the person for exercising their own access right; or
  • discriminatory or abusive processing prohibited by the LGPD. Planalto+1

These transparency rights do not necessarily require disclosure of:

  • source code;
  • model weights;
  • proprietary formulae;
  • trade-secret thresholds;
  • another person’s data; or
  • a guaranteed method to increase the score.

G3.5 Automated decisions

Lei 12.414 allows the registered person to ask the consulente to review a decision made exclusively by automated means. Decreto 9.936 requires the consultant to provide the review result within seven business days from the request. Planalto+1

For natural-person data, LGPD art. 20 supplies a related automated-decision review and criteria-explanation right, also subject to commercial and industrial secrecy. Lei 12.414 remains important because it also expressly covers legal persons. Planalto

Neither statute guarantees:

  • human approval;
  • reversal of the adverse decision;
  • credit approval;
  • a specific interest rate;
  • a score increase;
  • disclosure of every proprietary model detail; or
  • damages merely because the result was adverse.

G3.6 Duration and retention

Two 15-year periods must be kept distinct:

Clock Trigger and function Limit
Positive-information duration Lei 12.414 art. 14 prohibits positive payment information remaining in databases for more than 15 years. Exact record-level start and historical treatment need the particular datum and manager record.
Audit retention Decreto 9.936 arts. 10(VIII) and 12 require records concerning authorizations, cancellations, reopenings, exclusions, revocations and corrections for at least 15 years, with art. 12 counting from cancellation. Audit retention is not continued consultant access or continued scoring use after cancellation.

G3.7 Limited LGPD crossover

For natural-person data only, this pass confirms the following limited overlaps:

  • national-territorial nexus under LGPD art. 3;
  • purpose, necessity, free access, data quality, transparency, security and non-discrimination;
  • credit protection as a legal basis under art. 7(X);
  • access and correction rights;
  • a legally constituted representative’s ability to submit a request;
  • simplified immediate access or a complete declaration within 15 days under art. 19, subject to sector-specific regulation; and
  • review of solely automated decisions under art. 20. Planalto+3

This is not a complete LGPD module. Controller/operator allocation, international transfers, retention outside the positive-register law, biometrics, children’s data, security incidents, sanctions, civil actions and damages are separately deferred.

G3.8 Generic registration and regulatory verification

A generic verification would ask:

  1. Is the entity actually a gestor or merely a source, consultant or service provider?
  2. Does it receive data originating with BCB-authorized institutions?
  3. If so, does it claim the Banco Central manager-registration category required by Lei 12.414 art. 12 and Resolução 4.737?
  4. Which exact activities does the registration cover?
  5. What is the effective date and status?
  6. Which manager, source and consultant act in the specific data flow?
  7. What authorization exists for full-history consultation?
  8. What proof exists for notice, cancellation, access and correction?

No actual manager, source, consultant, institution, record or registration was searched. The publicly indexed Resolução BCB 14 procedure could not be substantively read, so detailed filing requirements and current forms remain unresolved.

G4. Ten fictional workflows

All persons, companies, data, dates and outcomes below are invented. They demonstrate conditional classification and clocks only.

H01 — Automatic opening without prior opt-in

Facts: A manager opens a positive record for a natural person on Monday, October 5, 2026. The person never signed a prior opt-in.

Actors/data: Manager, natural-person cadastrado, positive payment information.

Primary claims: C_BR-P07-C019–C026.

Conditional result: Lack of prior opt-in does not alone invalidate opening under the post-July 9, 2019 regime. The manager must satisfy the post-opening notice rule and may not furnish information to consultants during the first 60 days.

Notice calculation:

  • Opening day: October 5, 2026.
  • Exclude the opening day under the ordinary Civil Code art. 132 convention.
  • Day 1: October 6.
  • Day 30: Wednesday, November 4, 2026.
  • Formula: October 5, 2026 + 30 calendar days = November 4, 2026.

The calculation assumes no different specific convention and no factual dispute over when opening occurred. Civil Code art. 132 moves a holiday endpoint to the next business day; no local holiday is assumed here. Planalto

Sixty-day branch:

  • The 60th calendar day after October 5 is Friday, December 4, 2026.
  • The statute permits furnishing information only after 60 days.
  • If the precise opening timestamp is unknown, the first unambiguously complete calendar day is December 5.

Adverse branch: Notice is excused if the person already had a record open at another manager, but the 60-day consultation condition and cancellation rights remain.

Missing facts: Exact opening timestamp, prior record status, notice content, channel and proof.

Exact next question: Was this the person’s first open positive record, and on what exact date and time did the manager open it?

H02 — Missing or delayed opening notice

Facts: A legal person’s record is opened, but no notice is sent within 30 days. The manager says notice was unnecessary because the company “probably already had another record.”

Primary claims: C022–C025.

Conditional result: The statutory exception depends on an existing open record at another database, not speculation. If that predicate is absent, delayed or missing notice is a compliance defect.

Required act: Identify the existing other record or establish timely free notice with clear cancellation channels.

Clock: Thirty calendar days after opening; no separate grace period was identified.

Adverse branch: The legal person may already have another open record, making the statutory communication dispensable.

Missing facts: Other-manager status, opening date, notice record, address/contact source.

Exact next question: What contemporaneous evidence showed that another positive record was already open when the new manager relied on the exception?

H03 — Consumer requests cancellation

Facts: A natural person submits an express electronic cancellation request to one manager on Monday, October 19, 2026. Assume no holidays.

Primary claims: C037–C045.

Conditional calculation for the receiving manager:

  • Request date: Monday, October 19.
  • Tuesday, October 20 = business day 1.
  • Wednesday, October 21 = business day 2.

The receiving manager must close the record and transmit the request by Wednesday, October 21, under the stipulated no-holiday assumption.

Each other manager receives a separate two-business-day period beginning from its receipt of the transmitted request.

Consequences: No new positive annotations may be made after two business days from the request. Statutory use of the history must stop, while audit records may remain.

Adverse branch: If Monday or a subsequent day is a relevant holiday, the endpoint changes. A request sent after an operator cutoff may create a factual receipt-date issue not resolved here.

Missing facts: Receipt timestamp, tracking number, holiday calendar, transmission and downstream acknowledgments.

Exact next question: When did each manager actually receive the express request?

H04 — Later reopening after cancellation

Facts: Six months after cancellation, the same person requests reopening through another manager.

Primary claims: C037–C046.

Conditional result: Reopening is free, may be requested through any manager and follows the two-business-day workflow.

Adverse branch: The read bodies do not expressly resolve whether reopening triggers a new 30-day opening notice. That point remains held.

Missing facts: Prior cancellation status, reopening request authentication, receipt date and shared-manager list.

Exact next question: Does the operative manager procedure treat reopening as requiring a new art. 4 §4 communication, and what current official instrument supplies that rule?

H05 — Score-only consultation versus full-history access

Facts: A retailer plans an instalment sale and asks for a consumer’s score. It then asks for the complete payment-by-payment history but has no specific authorization.

Primary claims: C026–C035.

Conditional result:

  • Score-only access may be possible after the 60-day period, for the permitted commercial/credit purpose and absent score-access suspension.
  • Full-history access requires prior specific authorization.
  • A general retail privacy clause is not automatically the required authorization.

Adverse branch: Even score access is improper if the retailer has no actual or contemplated commercial/credit relationship.

Missing facts: Opening date, purpose, consultant identity, score-suspension status and authorization record.

Exact next question: Is the request limited to a score, or will it disclose the underlying payment history?

H06 — Inaccurate partial-payment datum

Facts: A source reports that no payment was made on an instalment. The registered person produces proof of a partial payment and challenges the field on Friday, October 16, 2026.

Primary claims: C052–C055.

Conditional source-verification calculation, assuming no holidays:

  • Monday, October 19 = business day 1.
  • Tuesday, October 20 = business day 2.

The source must verify and confirm or correct the challenged information within two business days. The broader result across shared databases remains subject to the 10-day correction rule.

Required act: Verify the payment, correct amount/date/status where appropriate and propagate the correction.

Adverse branch: The payment may have been allocated to another obligation or reversed; a receipt alone may not resolve allocation.

Missing facts: Source request timestamp, payment clearing, allocation and shared-manager list.

Exact next question: Which obligation and instalment did the partial payment legally satisfy?

H07 — Accurate datum but adverse credit decision

Facts: Payment history is accurate, but a lender rejects an application through an automated process. The applicant believes the score should be higher.

Primary claims: C056–C061.

Conditional result: Accuracy correction is not available merely because the outcome was adverse. The person may request the principal elements and criteria and request review of an exclusively automated decision. The consultant has seven business days to provide the review result.

Adverse branch: A mixed human-and-automated decision may require different analysis. Trade-secret limits remain.

Missing facts: Whether the decision was exclusively automated, review request date, criteria supplied and decision purpose.

Exact next question: Was any human decision-maker substantively involved before the rejection?

H08 — Legal-person business record

Facts: A corporation’s commercial payment obligations are included. It asks for its history and authorizes a prospective supplier to access it for nine months.

Primary claims: C002, C030–C035, C049–C051.

Conditional result: Lei 12.414 covers legal persons. A fixed nine-month full-history authorization is within the decree’s 12-month legal-person maximum, assuming the authorization is specific and valid.

Adverse branch: LGPD personal-data rights do not automatically attach to purely corporate information, although personal data about directors or guarantors require separate analysis.

Missing facts: Authorization wording, consultant relationship, corporate authority and personal-data fields.

Exact next question: Who had authority to grant the company’s full-history authorization, and did it identify the consultant and purpose specifically?

H09 — Representative requests access

Facts: An adult child asks a manager for a parent’s full positive history and score but supplies no authorization.

Primary claims: C049–C051 and C062–C065.

Conditional result: The parent has free access rights, and a legally constituted representative can exercise natural-person LGPD rights. The requester must establish valid authority and identity; family relationship alone does not establish access.

Adverse branch: An unreasonable verification process may obstruct statutory rights, but that requires the actual procedure.

Missing facts: Mandate, identity, capacity and requested dataset.

Exact next question: What legally valid authority allows the representative to receive the parent’s history and score?

H10 — Utility and financial-source edge

Facts: An electricity provider reports partial monthly payments; a bank reports a loan history. Both send data to the same manager.

Primary claims: C007, C014–C018 and C066–C070.

Conditional result:

  • The utility is an expressly recognized source under the general law.
  • The bank’s covered credit-operation data may go only to a BCB-registered manager.
  • The data should be limited to the regulated payment-history fields.
  • The bank-secrecy exception does not authorize disclosure of unrelated account balances or transaction details.

Adverse branch: The manager may satisfy the general Decreto 9.936 operating regime yet lack the BCB registration needed for financial-origin data.

Missing facts: Manager category, registration status, reporting fields, source contracts and data layout.

Exact next question: Does the manager receive financial-institution-origin information, and what current registration category authorizes that receipt?

G5. P01 old-to-new disposition

Literal reviewed P01 row preserved

Original field Literal saved content
# D05
Named deferred family Credit reporting and correction
Gateway reference/status C003, C035; Deferred
Exact next research action Research CDC records, LGPD, cadastro-positive and bureau-specific current primary rules.

Original coordinator acceptance: explicit_deferred_hold_preserved.

PASS-07 narrow addition

P01 D05 branch PASS-07 result Remaining gate
Positive-history primary law Lei 12.414, LC 166 and Decreto 9.936 operative framework read. Later amendments/current consolidation must be rechecked at publication.
Original opt-in versus current opening Opt-out opening effective July 9, 2019 established. Actual opening, manager and notice facts absent.
Data and actors Gestor, fonte, consulente, cadastrado and permitted payment-history fields identified. Actual data flow absent.
Notice Thirty-day post-opening communication and existing-record exception identified. Actual channel, proof and record status absent.
Consultation Sixty-day barrier, permitted purpose and relationship identified. Actual consultant and purpose absent.
Score/full history Score and full-history authorization separated. Actual authorization and access logs absent.
Cancellation/reopening Free channels and two-business-day manager workflow identified. Actual request/receipt/propagation absent; reopening re-notice unresolved.
Access/correction Free access, 10-day correction, two-business-day source verification and 10-day source update identified. Actual record/error/source absent.
Scoring/automated decisions Criteria rights and seven-business-day automated review result identified. Proprietary model, actual decision and full remedy unexamined.
BCB manager registration Financial-origin manager registration gateway identified. Full current Resolução BCB 14 procedure not read; no registrant queried.
LGPD Limited natural-person crossover identified. Full LGPD module deferred.
P06 negative-register work Not adopted or rerun. Entire P06 remains awaiting review.

PASS-07 source register

Access date for every row: October 26, 2026 PDT / October 27, 2026 UTC. Source-specific clock times are unknown.

FRESH-READ—OPERATIVE means the actual current enacted/compiled body was read. FRESH-READ—AMENDMENT means an enacted amendment body was read. FRESH-READ—LIMITED means only the stated crossover provisions were read. HISTORICAL—REVOKED means nonoperative history. INDEX/FAILED BODY means the official title or index was identified, but the full dynamic body was not substantively readable.

Source ID Issuer, title and complete literal URL Pinpoints, publication/commencement, pages and limits
C_BR-P07-S001 Presidência da República, Lei nº 12.414, de 9 de junho de 2011, compiled. https://www.planalto.gov.br/ccivil_03/_ato2011-2014/2011/lei/l12414.htm FRESH-READ—OPERATIVE. Arts. 1–9, 12–18; especially arts. 2–8, 12, 14–17. Original law effective on publication under art. 18; current text contains LC 166 amendments and shows historical struck text. HTML; printed page and PDF index N/A. Full remedies/case citator not completed. Planalto+3
S002 Presidência da República, Lei Complementar nº 166, de 8 de abril de 2019. https://www.planalto.gov.br/ccivil_03/leis/lcp/lcp166.htm FRESH-READ—AMENDMENT. Arts. 1–7, especially art. 2 amendments and art. 7 commencement. DOU April 9, 2019. Selected provisions effective on publication; other substantive amendments after 91 days, July 9, 2019. HTML; printed page/PDF index N/A. Planalto+2
S003 Presidência da República, Decreto nº 9.936, de 24 de julho de 2019. https://www.planalto.gov.br/ccivil_03/_ato2019-2022/2019/decreto/d9936.htm FRESH-READ—OPERATIVE. Arts. 1–23 and annex; materially arts. 2–17, 19, 22–23. Published DOU July 25, 2019; art. 23 effective on publication; rectified August 1, 2019. HTML; printed page/PDF index N/A. Security-incident branch not substantively completed. Planalto+5
S004 Conselho Monetário Nacional / Banco Central do Brasil, Resolução nº 4.737, de 29 de julho de 2019, current consolidated PDF. https://normativos.bcb.gov.br/Lists/Normativos/Attachments/50808/Res_4737_v2_P.pdf FRESH-READ—OPERATIVE PDF. Arts. 1–3: printed p.1, zero-based index 0; arts. 3–6: printed p.2, index 1; arts. 12–14: printed p.7, index 6; arts. 14–19: printed p.8, index 7. Original DOU July 31, 2019, Section 1, p.58; art. 19 effective on publication. Consolidation shows Resolução CMN 4.990 changes effective April 1, 2022. Banco Central do Brasil Normativos+3
S005 Banco Central do Brasil, Resolução CMN nº 4.990, de 24 de março de 2022, dynamic normative page. https://www.bcb.gov.br/estabilidadefinanceira/exibenormativo?numero=4990&tipo=Resolu%C3%A7%C3%A3o+CMN INDEX/FAILED BODY. Public dynamic page returned no substantive text. The actual amendment wording/effective date is visible in S004’s official consolidated 4.737 PDF; an official preparatory vote was discovery only and is not treated as the enacted rule. HTML dynamic page; printed page/PDF index N/A. Banco Central do Brasil+1
S006 Banco Central do Brasil, Resolução BCB nº 14, de 9 de setembro de 2020, dynamic normative page. https://www.bcb.gov.br/estabilidadefinanceira/exibenormativo?numero=14&tipo=Resolu%C3%A7%C3%A3o+BCB INDEX/FAILED BODY. Official dynamic page did not return substantive provisions. Official BCB material identifies it as the procedural rule for manager registration. No detailed current form, filing or procedural claim is adopted. HTML; printed page/PDF index N/A. Banco Central do Brasil+1
S007 Presidência da República, Lei Complementar nº 105, de 10 de janeiro de 2001, compiled. https://www.planalto.gov.br/ccivil_03/leis/lcp/lcp105.htm FRESH-READ—LIMITED. Art. 1 §3(VII) and related bank-secrecy context. The positive-history exception was added by LC 166/2019. HTML; printed page/PDF index N/A. No general bank-secrecy module completed. Planalto
S008 Presidência da República, Lei nº 13.709/2018 — LGPD, compiled. https://www.planalto.gov.br/ccivil_03/_ato2015-2018/2018/lei/l13709compilado.htm FRESH-READ—LIMITED CROSSOVER. Arts. 1, 3, 5–9 and 17–20. Current compiled text read only for natural-person scope, territorial nexus, principles, credit-protection basis, access/correction and automated decisions. HTML; printed page/PDF index N/A. Full LGPD module deferred. Planalto+4
S009 Presidência da República, Lei nº 8.078/1990 — Código de Defesa do Consumidor, compiled. https://www.planalto.gov.br/ccivil_03/leis/l8078compilado.htm FRESH-READ—LIMITED. Arts. 2–3 only, for consumer/supplier definitions and the credit-service overlay. HTML; printed page/PDF index N/A. Negative-register art. 43 doctrine was not rerun. Planalto
S010 Presidência da República, Lei nº 10.406/2002 — Código Civil, compiled. https://www.planalto.gov.br/ccivil_03/leis/2002/l10406compilada.htm FRESH-READ—TIMING ONLY. Art. 132 caput and §§1–4. Used only for fictional deadline arithmetic. HTML; printed page/PDF index N/A. No PASS-05 prescription conclusions adopted. Planalto
S011 Presidência da República, Decreto nº 7.829, de 17 de outubro de 2012. https://www.planalto.gov.br/ccivil_03/_ato2011-2014/2012/decreto/d7829.htm HISTORICAL—REVOKED. Official page identifies revocation by Decreto 9.936/2019. Read only to preserve the original opt-in regulatory history. HTML; printed page/PDF index N/A. Planalto

Source count: 11 displayed rows: seven freshly read operative/amending bodies, two limited crossovers, one historical revoked body, and two dynamic/index failures contained within the 11-row register.

Atomic claim/evidence register

Claim ID Area; atomic proposition, predicate, act/effect and retained limit Primary source and pinpoint
C_BR-P07-C001 A098. PASS-07 concerns positive payment history, not ordinary negative entries, scores as an independent commercial product, SCR, protest, Cadin or court data. S001 arts. 1–2; scope hold.
C_BR-P07-C002 A098. Lei 12.414 covers positive history for natural and legal persons. S001 arts. 1–2. Planalto
C_BR-P07-C003 A098. Public-law databases maintained by domestic public-law entities are governed by specific legislation. S001 art. 1 sole paragraph. Planalto
C_BR-P07-C004 A097. A banco de dados is a dataset used to support credit, deferred sales or other financial-risk transactions. S001 art. 2(I). Planalto
C_BR-P07-C005 A097. A gestor is a qualifying legal person administering collection, storage, analysis and third-party access. S001 art. 2(II). Planalto
C_BR-P07-C006 A098. A cadastrado is a natural or legal person whose information has been included. S001 art. 2(III). Planalto
C_BR-P07-C007 A097. A fonte includes credit/deferred-sale actors, BCB-authorized institutions and listed continuous-service providers. S001 art. 2(IV). Planalto
C_BR-P07-C008 A097. A consulente is a natural or legal person accessing data for a legally permitted purpose. S001 art. 2(V). Planalto
C_BR-P07-C009 A098. Histórico de crédito comprises financial/payment data for paid or current credit operations and obligations. S001 art. 2(VII). Planalto
C_BR-P07-C010 A098. A score is a derived output and is distinct from disclosure of the complete history. S001 art. 4(IV)(a)–(b). Planalto
C_BR-P07-C011 A098. Stored data must be objective, clear, true, understandable and necessary. S001 art. 3 §§1–2. Planalto
C_BR-P07-C012 A098. Excessive information unrelated to credit-risk analysis is prohibited. S001 art. 3 §3(I). Planalto
C_BR-P07-C013 A098. Specified sensitive information is prohibited. S001 art. 3 §3(II). Planalto
C_BR-P07-C014 A097. Water, sewer, electricity, gas, telecommunications and analogous continuous-service providers may be sources. S001 art. 2(IV). Planalto
C_BR-P07-C015 A098. Regulated positive-history fields include origination, value, due dates and full or partial payments. S003 arts. 3–4; S004 arts. 2–3. Planalto+2
C_BR-P07-C016 A098. The operating layout may include source and registered-person identification/contact fields. S003 art. 17. Planalto
C_BR-P07-C017 A098. The reviewed regime does not authorize unrelated bank balances, itemized purchases or general asset data. S001 arts. 2–3; S007 art. 1 §3(VII); bounded textual conclusion.
C_BR-P07-C018 A097. Manager-level capital, security and governance requirements are not a SettleADebt adviser licence. S003 art. 2; S001 art. 12 §7. Planalto+1
C_BR-P07-C019 A098. The original 2011 opening model required prior informed consent. Historical S001 art. 4 text; S011. Planalto+1
C_BR-P07-C020 A098. LC 166 replaced the opening model, with most substantive changes effective July 9, 2019. S002 arts. 2, 7. Planalto+1
C_BR-P07-C021 A097. Current law permits a manager to open a positive record without prior opt-in. S001 art. 4(I). Planalto
C_BR-P07-C022 A098. Opening communication must occur without cost within 30 days. S001 art. 4 §4(I). Planalto
C_BR-P07-C023 A097. Notice is made by the manager directly or through a source and must identify cancellation channels. S001 art. 4 §4(II)–(III). Planalto
C_BR-P07-C024 A098. Notice is excused if the person already has a positive record open at another database. S001 art. 4 §5. Planalto
C_BR-P07-C025 A098. Notice uses personal contact data supplied by the person to a source. S001 art. 4 §6. Planalto
C_BR-P07-C026 A098. Data may be furnished to consultants only 60 days after opening. S001 art. 4 §7. Planalto
C_BR-P07-C027 A098. Score availability and full-history disclosure are legally distinct. S001 art. 4(IV)(a)–(b). Planalto
C_BR-P07-C028 A098. Full-history disclosure requires prior specific authorization. S001 art. 4(IV)(b); S003 art. 7. Planalto+1
C_BR-P07-C029 A097. The manager must be able to prove authorization authenticity and validity. S001 art. 4 §8. Planalto
C_BR-P07-C030 A098. Authorization may cover one access or a fixed permitted period. S003 art. 8 §1. Planalto
C_BR-P07-C031 A098. Natural-person fixed authorization may last no more than three months. S003 art. 8 §1(II)(a). Planalto
C_BR-P07-C032 A098. Legal-person fixed authorization may last no more than 12 months. S003 art. 8 §1(II)(b). Planalto
C_BR-P07-C033 A098. A BCB-authorized institution may receive indefinite authorization only while its contractual relationship continues. S003 art. 8 §2. Planalto
C_BR-P07-C034 A098. Fixed or indefinite full-history authorization may be revoked at any time. S003 art. 8 §3. Planalto
C_BR-P07-C035 A097. A consultant must maintain or intend a commercial or credit relationship and use data for a permitted financial-risk purpose. S001 arts. 7, 15; S003 art. 9. Planalto+1
C_BR-P07-C036 A097. Manager-to-manager sharing is permitted, with receiving and originating managers retaining update/correction duties. S001 arts. 4(III), 9. Planalto
C_BR-P07-C037 A098. Cancellation and reopening are free rights available on request. S001 art. 5(I), §§4–5. Planalto
C_BR-P07-C038 A098. A request may be made to any manager by telephone, physical or electronic means. S001 art. 5 §5. Planalto
C_BR-P07-C039 A097. The receiving manager and downstream managers each have a two-business-day statutory workflow. S001 art. 5 §6. Planalto
C_BR-P07-C040 A098. A prior expressed wish not to open a record requires automatic cancellation. S001 art. 5 §7. Planalto
C_BR-P07-C041 A098. Cancellation prevents use of history for statutory purposes, including use in third-party scores. S001 art. 5 §8. Planalto
C_BR-P07-C042 A098. Partial deletion is unavailable except for improperly recorded information. S003 art. 14 §1. Planalto
C_BR-P07-C043 A097. No new positive annotations may be made after two business days from cancellation request. S003 art. 14 §2. Planalto
C_BR-P07-C044 A098. Score-access suspension is distinct from full cancellation. S003 art. 13. Planalto
C_BR-P07-C045 A098. The person retains access to their own score during third-party score suspension. S003 art. 13 §2. Planalto
C_BR-P07-C046 A098. The read provisions do not expressly settle whether reopening requires a new 30-day notice. Bounded source gap; no affirmative rule inferred.
C_BR-P07-C047 A098. Positive payment information may not remain for more than 15 years. S001 art. 14. Planalto
C_BR-P07-C048 A097. Authorization/cancellation/correction audit records may be kept at least 15 years from cancellation. S003 arts. 10(VIII), 12. Planalto
C_BR-P07-C049 A098. The person has free, justification-free access to their information, history and score. S001 art. 5(II). Planalto
C_BR-P07-C050 A098. Access includes sources, shared managers and consultants that accessed information during the preceding six months. S001 art. 6; S003 art. 10(V). Planalto+1
C_BR-P07-C051 A098. Several access and criteria disclosures have a 10-day statutory period. S001 art. 5 §3 and art. 6 §2. Planalto+1
C_BR-P07-C052 A098. Erroneous information must be corrected or cancelled in all shared databases within 10 days. S001 art. 5(III). Planalto
C_BR-P07-C053 A097. The source must verify and confirm or correct challenged information within two business days. S001 art. 8(III). Planalto
C_BR-P07-C054 A097. A source must update or correct information sent to managers within 10 days. S001 art. 8(IV). Planalto
C_BR-P07-C055 A097. A receiving manager assumes challenge/correction duties, and the originating manager must keep shared information updated. S001 art. 9 §§1–2. Planalto
C_BR-P07-C056 A098. The person may know principal score elements and criteria, subject to trade secrecy. S001 art. 5(IV). Planalto
C_BR-P07-C057 A098. Score criteria may not use unrelated, specified sensitive or prohibited third-party/right-exercise data. S001 art. 7-A. Planalto
C_BR-P07-C058 A097. A manager must publish a clear and accessible data-collection/use policy for credit-risk analysis. S001 art. 7-A §1. Planalto
C_BR-P07-C059 A098. Each response must show last update; the person may see sources, but consultants may not receive individual-source identities. S003 arts. 10(I),(V), 11. Planalto
C_BR-P07-C060 A098. A consultant must return an automated-decision review result within seven business days. S001 art. 5(VI); S003 art. 19. Planalto
C_BR-P07-C061 A098. Access, correction and review rights do not guarantee score increase, credit approval or a rate. Negative consequence bounded by S001 arts. 5, 7, 7-A.
C_BR-P07-C062 A098. LGPD personal-data rights attach to natural persons; Lei 12.414 separately protects legal persons. S008 arts. 1, 5, 17; S001 art. 1. Planalto+2
C_BR-P07-C063 A098. LGPD territorial applicability depends on art. 3’s processing and offering/data-collection nexus. S008 art. 3. Planalto
C_BR-P07-C064 A097. Credit protection is an LGPD legal basis, but it does not displace specific full-history authorization rules. S008 art. 7(X), §6; S001 art. 4(IV)(b). Planalto+1
C_BR-P07-C065 A098. Natural persons have LGPD access, correction and automated-review rights in addition to sector-specific rights. S008 arts. 18–20; complete LGPD module held. Planalto+1
C_BR-P07-C066 A097. Covered financial-institution information may go only to BCB-registered managers. S001 art. 12; S004 arts. 1–5. Planalto+2
C_BR-P07-C067 A097. Resolução 4.737 specifies covered operations and reporting fields, including partial payments. S004 arts. 2–3, printed pp.1–2, indices 0–1. Banco Central do Brasil Normativos+1
C_BR-P07-C068 A097. Banco Central manager registration does not make the manager a financial institution or grant an adviser licence. S001 art. 12 §7; S004 scope. Planalto+1
C_BR-P07-C069 A097. LC 105 permits the defined positive-history transfer without creating a general bank-data exception. S007 art. 1 §3(VII). Planalto
C_BR-P07-C070 A098. Detailed current Resolução BCB 14 registration procedure remains unread because the official dynamic body returned no substantive text. S006; explicit source-access limit.
C_BR-P07-C071 A098. Currentness includes LC 166, Decreto 9.936 and Resolução 4.737 as amended effective April 1, 2022; later exhaustive citator remains held. S001–S005.
C_BR-P07-C072 A098. No actual person, company, score, history, source, consultant, manager or registration record was searched. Research boundary.

Claim count: 72 displayed atomic and qualified claims, C_BR-P07-C001–C072.

Complete granular core coverage

# Required subquestion Finding / claims Status and exact next action
P07-G01 Positive-history scope C001, C009 Answered narrowly. Verify actual dataset before applying.
G02 Natural person C002, C062 Answered gateway. Obtain actual data and actor roles.
G03 Legal person C002, C032, C062 Answered gateway. Separate corporate and personal data.
G04 Consumer status C002; CDC overlay held Conditional. Apply CDC only after final-recipient classification.
G05 Public-law database C003 Excluded. Identify specific public register law.
G06 Foreign/remote nexus C063 Held. Determine processing, offering and collection locations.
G07 Database definition C004 Answered. Confirm financial-risk purpose.
G08 Manager C005, C018 Answered category. Verify actual operating role.
G09 Registered person C006 Answered. Establish identity and record.
G10 Source C007, C014 Answered. Identify exact source and transaction.
G11 Consultant C008, C035 Answered. Verify relationship and purpose.
G12 Representative C065, C072 Conditional. Obtain mandate and authentication.
G13 Credit history C009 Answered definition. Map actual fields.
G14 Score distinction C010, C027 Answered. Do not treat score as full history.
G15 Negative entry C001 Deferred. P06 remains unreviewed and unadopted.
G16 SCR C001 Deferred. Read BCB/SCR rules separately.
G17 Protest/Cadin/court data C001, C003 Deferred. Apply specific regimes separately.
G18 Objective/clear/true data C011 Answered standard. Audit actual fields.
G19 Excessive data C012 Prohibited. Test necessity to credit risk.
G20 Sensitive data C013, C057 Prohibited categories identified. Full LGPD sensitivity held.
G21 Utility source C014 Answered gateway. Identify service and payment fields.
G22 Financial source C066–C069 Conditional. Verify BCB registration and operation type.
G23 Partial-payment data C015, C067 Permitted field. Verify amount/date accuracy.
G24 Identity/contact fields C016 Permitted operational layout. Check necessity and accuracy.
G25 Account balances/itemized purchases C017 No general authority established. Identify separate legal basis if claimed.
G26 Manager capital/governance C018 Manager-only. Do not turn into adviser licence or consumer fee.
G27 Original opt-in rule C019 Historical. Do not publish as current.
G28 Current opt-out rule C020–C021 Answered. Effective July 9, 2019.
G29 Opening without consent C021 Permitted conditionally. Other safeguards still apply.
G30 Opening notice period C022 Thirty days. Obtain exact opening date.
G31 Notice cost C022 No cost.
G32 Notice actor C023 Manager directly or through source.
G33 Notice content C023 Cancellation channels required. Inspect actual communication.
G34 Notice medium C025 No exclusive method established. Verify contact-data origin and proof.
G35 Existing-record exception C024 Conditional exception. Prove another record was open.
G36 Prior opt-out C040 Automatic cancellation required. Prove earlier expression.
G37 Sixty-day consultation delay C026 Answered. Obtain exact opening timestamp.
G38 Score consultation C027, C035 Conditional. Apply purpose, relationship, 60 days and suspension.
G39 Full-history consultation C028–C035 Specific authorization required.
G40 Authorization authenticity C029 Manager proof required. Obtain authorization record.
G41 One-time authorization C030 Permitted. Identify consultant and access.
G42 Natural-person duration C031 Maximum three months.
G43 Legal-person duration C032 Maximum 12 months.
G44 BCB institution indefinite duration C033 Only during contractual relationship.
G45 Authorization revocation C034 Available anytime. Verify manager receipt.
G46 Consultant relationship C035 Actual/intended commercial or credit relationship required.
G47 Permitted purpose C035 Credit-risk or financial-risk transaction only.
G48 Manager-to-manager sharing C036 Permitted with retained duties.
G49 Financial-origin sharing C066 Registered managers only.
G50 Cancellation free C037 Answered.
G51 Reopening free C037 Answered.
G52 Request to any manager C038 Answered.
G53 Telephone/physical/electronic channel C038 Answered.
G54 Receiving-manager deadline C039 Two business days. Verify holidays/receipt.
G55 Downstream-manager deadline C039 Two business days from downstream receipt.
G56 Cancellation effect C041 Statutory use stops. Other regimes unaffected.
G57 Partial deletion C042 Only for improperly recorded data.
G58 New annotations after cancellation C043 Stop after two business days.
G59 Audit retention after cancellation C048 At least 15 years. No continued consultant use implied.
G60 Reopening re-notice C046 Unresolved. Locate current authoritative rule before publication.
G61 Score-access suspension C044 Distinct right.
G62 Own score during suspension C045 Access retained.
G63 Positive-data maximum C047 Fifteen years. Establish datum-level start.
G64 Free access C049 Answered.
G65 No justification required C049 Answered.
G66 Information/history/score access C049 Answered.
G67 Sources and contact details C050 Accessible to registered person.
G68 Shared managers C050 Accessible.
G69 Prior six-month consultants C050 Accessible.
G70 Access response periods C051 Multiple 10-day categories. Do not promise universal instant delivery.
G71 Correction across all databases C052, C055 Within 10 days. Identify shared chain.
G72 Source verification C053 Two business days.
G73 Source update C054 Within 10 days.
G74 Score criteria C056 Principal elements available; trade secrets preserved.
G75 Prohibited score inputs C057 Answered categories. Audit actual model separately.
G76 Published data-use policy C058 Required. No actual manager policy reviewed.
G77 Last-update timestamp C059 Required in consultation response.
G78 Source identity asymmetry C059 Person sees sources; consultant does not.
G79 Automated review C060 Seven-business-day result. Verify exclusively automated predicate.
G80 Score or approval guarantee C061 None established.
G81 LGPD natural-person scope C062 Limited crossover only.
G82 LGPD territorial nexus C063 Conditional.
G83 Credit-protection legal basis C064 Does not override specific authorization.
G84 LGPD access/correction/review C065 Limited confirmation. Full module deferred.
G85 Financial manager registration C066–C068 Gateway identified. No registrant lookup.
G86 Bank-secrecy exception C069 Narrow data category only.
G87 Detailed BCB registration procedure C070 Unresolved body. Obtain readable current Resolução BCB 14.
G88 Currentness, P01 disposition and real-record acceptance C071–C072 HOLD. Recheck law and obtain actual data only under future authority.

Core-coverage count: 88 displayed rows, P07-G01 through G88.

Separately named deferred families

# Deferred family Exact remaining action
P07-D01 Ordinary negative credit-register entries Preserve P06 as unreviewed; conduct separate accepted review before use.
D02 Full LGPD legal bases and controller/operator allocation Read complete current statute, regulations and actual data flow.
D03 LGPD international transfer and foreign controller Determine location, transfer mechanism and current ANPD rules.
D04 LGPD retention and deletion outside Lei 12.414 Classify each purpose and statutory retention duty.
D05 Biometrics, children’s data and sensitive-data processing Read specific LGPD rules and actual dataset.
D06 Security incidents and breach notification Decreto 9.936 art. 18 noted but full current LGPD/ANPD regime deferred.
D07 LGPD sanctions, private actions and damages Full remedial and current case-law review required.
D08 Actual proprietary score model Obtain actual criteria, edition, inputs and model governance under authority.
D09 Commercial scoring products outside Cadastro Positivo Classify separately from the statutory positive register.
D10 Cadastro Positivo remedies and complete judicial citator Research current precedent, proof, causation and remedies separately.
D11 SCR / Banco Central credit reporting Read current BCB instruments; do not equate with Cadastro Positivo.
D12 Protest and notarial records Apply Lei 9.492 and local notarial law separately.
D13 Cadin and governmental debt registers Apply specific public-law regime.
D14 Court judgments and public judicial records Apply procedural and public-record rules separately.
D15 Detailed Resolução BCB 14 registration procedure Obtain readable current enacted body and current filing instructions.
D16 Actual manager registration or named registrant No lookup authorized; perform only under separate instruction.
D17 Provider professional permission Preserve OAB/CRA/CORECON and other P01 holds.
D18 Adviser fees and consumer contracts PASS-04 remains unreviewed and unadopted.
D19 Client money, payment services and safeguarding Preserve BCB 494/payment and funds-flow holds.
D20 Current CMN 4.935 / Joint Resolution 17 correspondent regime Preserve P02 partial current-source hold.
D21 Underlying debt and settlement validity Obtain actual contract, authority and settlement documents separately.
D22 Prescription and interruption PASS-05 remains unreviewed and unadopted.
D23 General collection communications and conduct Research separately from positive payment history.
D24 Secured credit, collateral and guaranties Apply product and security-specific law.
D25 Tax, government, student and support claims Apply specific public/program law.
D26 Insolvency, recuperação and falência Analyze effect of the actual proceeding and plan.
D27 Sector-specific utility, telecom, insurance and lending rules Identify source sector and read its current regulations.
D28 Tax treatment of data, settlement or write-offs No tax conclusion from positive-history law.
D29 Complaints, Procon procedure and administrative sanctions Read actual federal/state/local procedure; no complaint filed.
D30 Civil damages, causation and limitation Full remedy and current precedent review required.
D31 Representative authority and authentication standards Obtain actual mandate and manager procedure.
D32 Reopening notice requirement Locate express current authority; do not infer.
D33 State/DF/municipal implementation All 27 branches remain individually deferred below.
D34 Foreign law, recognition and overseas data access No foreign-law premise adopted.
D35 Actual records, reports, scores and consultant decisions None obtained or searched.
D36 Full Brazil, A097/A098, parent-program and publication acceptance HOLD pending same-coordinator review and every outstanding branch.

Deferred-family count: 36 displayed rows.

All 27 inherited state and Distrito Federal branches

These names are inherited from the saved P01 territorial inventory. No geography API, IBGE endpoint or fresh territorial certification was used. No state, DF or municipality is cleared by the federal analysis.

State / DF PASS-07 status Exact remaining local issue
Acre (AC) No local body read AC consumer authority, Procon, court procedure, accessibility and municipal implementation.
Alagoas (AL) No local body read AL consumer enforcement, court remedies, municipal channels and local procedure.
Amapá (AP) No local body read AP Procon, courts, accessibility and local positive-history enforcement.
Amazonas (AM) No local body read AM consumer agencies, remote-access issues, courts and municipalities.
Bahia (BA) No local body read BA Procon, court and municipal implementation.
Ceará (CE) No local body read CE consumer enforcement, administrative procedure and courts.
Distrito Federal (DF) No local body read DF consumer authority, TJDFT, local remedies and accessibility.
Espírito Santo (ES) No local body read ES Procon, courts, municipalities and local evidence rules.
Goiás (GO) No local body read GO consumer authorities, court procedure and municipal routes.
Maranhão (MA) No local body read MA Procon, courts, accessibility and local complaint procedure.
Mato Grosso (MT) No local body read MT administrative and court implementation.
Mato Grosso do Sul (MS) No local body read MS Procon, courts, border/remote issues and local procedures.
Minas Gerais (MG) No local body read MG consumer enforcement, courts and municipal implementation.
Pará (PA) No local body read PA Procon, courts, language/accessibility and municipalities.
Paraíba (PB) No local body read PB consumer authority, court remedies and local channels.
Paraná (PR) No local body read PR Procon, courts and local implementation.
Pernambuco (PE) No local body read PE consumer enforcement, courts and municipalities.
Piauí (PI) No local body read PI Procon, judicial procedure and local accessibility.
Rio de Janeiro (RJ) No local body read RJ consumer authority, courts and municipal procedures.
Rio Grande do Norte (RN) No local body read RN Procon, courts and local remedies.
Rio Grande do Sul (RS) No local body read RS consumer agencies, courts and current local interpretation.
Rondônia (RO) No local body read RO Procon, courts, remote access and municipalities.
Roraima (RR) No local body read RR consumer routes, multilingual/accessibility issues and courts.
Santa Catarina (SC) No local body read SC Procon, courts and municipal implementation.
São Paulo (SP) No local PASS-07 body read SP Procon, TJSP, municipalities and local administrative procedure.
Sergipe (SE) No local body read SE consumer authority, courts and municipal routes.
Tocantins (TO) No local body read TO Procon, courts, accessibility and local implementation.

Territorial count: 27 displayed rows; zero state/DF branches cleared.

Evidence-backed article, checklist and conditional-tool opportunities

Opportunity Supported function Mandatory guardrail
“Brazil’s Cadastro Positivo is opt-out—but not open access” Explain opening, 30-day notice, 60-day delay and specific full-history authorization. Do not describe it as unrestricted sharing or prior consent for opening.
Score versus full-history explainer Show the different consent, purpose and suspension branches. No promise that score-only access is proper without relationship and purpose.
Opening timeline worksheet Input opening date; display 30-day notice and 60-day consultant barrier. Require exact timestamp and distinguish “60th day” from “after 60 days.”
Cancellation/reopening tracker Show receiving-manager and downstream-manager two-business-day clocks. Require receipt dates and local holiday inputs.
Positive-history authorization checker One-time, natural-person three-month, legal-person 12-month and regulated-institution relationship options. Never convert a general privacy clause automatically into specific authorization.
Payment-history field audit Compare source, date, amount due, amount paid, partial payment and status. Do not infer debt validity or negative-register consequences.
Correction workflow Track source’s two-business-day verification and 10-day cross-database correction/update duties. Clarify which actor received each request and when.
Automated-decision review tracker Record request date and seven-business-day result period. No automatic credit approval, score increase or model disclosure promise.
System classifier Separate Cadastro Positivo, negative register, SCR, score, protest, Cadin and court data. Each excluded system needs its own source-backed module.
Manager-versus-adviser checklist Explain that manager regulation and BCB registration concern database operations/financial-origin data. Do not market manager rules as a debt-adviser licence.

A safe positive-history tool should display:

“This result classifies the statutory workflow only. It does not verify an actual database, score, source, authorization, credit decision, underlying debt or legal remedy.”

It should never produce “Your score will rise,” “You will be approved,” or “Cancellation deletes all credit information.”

Researcher self-check

Reconciliation item Actual result
Assigned component P01 D05 remaining Cadastro Positivo / positive-history branch only.
P04/P05/P06 reliance None. All remain unreviewed and were not adopted.
Sources 11 displayed: operative laws/regulations, limited crossovers, one revoked historical body and two dynamic/index failures.
Claims 72 displayed, C_BR-P07-C001–C072.
Core coverage 88 displayed, P07-G01–G88.
Deferred families 36 displayed, P07-D01–D36.
Territorial rows 27 displayed, none cleared.
Fictional workflows 10 displayed, H01–H10.
Timing calculations H01 30-day and 60-day opening intervals; H03 two-business-day cancellation; H06 two-business-day source verification.
Actual report, score or history None obtained or searched.
Named manager, source, consultant or institution None searched or classified.
Actual authorization or cancellation request None obtained.
Original opt-in/current opt-out Independently traced through Lei 12.414, LC 166 and Decreto 9.936.
Current regulation Decreto 9.936 operative body read; Resolução 4.737 current consolidated PDF read.
Detailed BCB registration procedure Not completed because Resolução BCB 14’s public dynamic body did not return substantive text.
Full LGPD Deferred. Only necessary natural-person crossover read.
Negative-register doctrine Not rerun or adopted.
Prescription Not rerun or adopted.
Source-specific clock times Unknown and not invented.
APIs, Deep Research, Work/Codex, subagents or new chats None used.
Named private case or record lookup None.
Contacts, complaints or filings None.
Coordinator files No write performed or claimed.
Model/power No self-certified model tier, Pro status, quota, recovery or measured ranking.
Review status This is not independent review or all-source certification. Same-coordinator review remains separate.
Country/publication status HOLD. No provider, contract, locality, A097/A098, parent or Brazil-wide acceptance.

Exact evidence still required for a real positive-history assessment

  1. Identity of the actual manager, source and consultant.
  2. Exact record-opening date and timestamp.
  3. Whether another positive record was already open.
  4. Post-opening notice, content, channel and proof.
  5. Consultant-access dates and purpose.
  6. Whether the request was score-only or full-history.
  7. Full-history authorization and its duration.
  8. Cancellation, reopening, score-suspension or authorization-revocation records.
  9. Exact source fields and payment-history data.
  10. Correction requests, source verification and downstream propagation.
  11. Six-month consultant-access log.
  12. Automated-decision details and review request.
  13. Manager category and, if financial-origin data are involved, relevant BCB registration.
  14. Applicable state/DF/municipal procedures.
  15. Current versions of every consequential federal instrument at the actual use date.

Final disposition: PASS-07 establishes the narrow current federal framework for Cadastro Positivo opening, notice, consultation, authorization, cancellation, access, correction, scoring and financial-origin manager registration. It does not establish that any actual record, score, data use, authorization, cancellation, credit decision, provider or database is lawful, unlawful, accurate, removable, compensable or approved.

END C_BR PASS-07

Every captured table

Captured cells with original header handling and explicitly labeled bounded correction overlays. Downloaded JSON retains original cells. Tables may contain source limitations, historical examples and identified corrections; the complete reading supplies context.

Read the evidence with its boundaries. These are saved research components, including revisions. A scoped coordinator review checks selected evidence; it does not certify every claim, a complete jurisdiction, current law or individual applicability. Dates and access limits remain attached to the records.

How to read the research →

Read the related correction supplements

These components repair their stated scope. They do not replace every other finding in this research series.

One bounded provenance-only repair to →
Bounded P13 payment-recipient qualification and source/claim/count traceability repair →
Bounded P14 atomic-predicate, commencement-traceability and count-unit repair →

Captured table 01

Stage · Rule and legal effect · Current disposition · 7 data rows

StageRule and legal effectCurrent disposition
Original 2011 lawLei 12.414 originally required informed prior authorization before opening a positive record.Historical only for this point; that wording was replaced.
Original 2012 regulationDecreto 7.829 implemented the consent-based model.Expressly revoked by Decreto 9.936/2019. Planalto +1
LC 166/2019Rewrote the definitions, opening, notice, cancellation, sharing, scoring and financial-data provisions. Most amendments became effective 91 days after publication.Current opt-out foundation; substantive date July 9, 2019. Planalto +1
Decreto 9.936/2019Regulates manager requirements, permissible fields, authorization, access, cancellation, score suspension, correction and source duties.Operative regulation; effective on publication July 25, 2019. The August 1 rectification is not a second commencement date. Planalto
Resolução CMN 4.737/2019Regulates financial-institution reporting and Banco Central registration/cancellation of managers receiving financial-origin data.Current consolidated official PDF read, including amendments effective April 1, 2022. Banco Central do Brasil Normativos +3
Resolução CMN 4.990/2022Amended registration, control and governance provisions in Resolução 4.737.Amendment effects visible in the official consolidated 4.737 PDF. The standalone dynamic body was not substantively readable.
Resolução BCB 14/2020Identified by official BCB material as the procedural rule for manager registration.Full current enacted procedure was not substantively readable through the public dynamic page; detailed forms and filing mechanics remain held. Banco Central do Brasil +1
Source links captured in this table

Captured table 02

Actor · Exact statutory role · What that status does not establish · 9 data rows

ActorExact statutory roleWhat that status does not establish
Banco de dadosStructured data concerning natural or legal persons used to support credit, deferred sales or other transactions involving financial risk.It is not automatically an ordinary negative register, public court database or SCR.
GestorLegal person meeting statutory and regulatory operating requirements and administering collection, storage, analysis and third-party access.“Gestor” status is not an adviser, lender, lawyer or payment licence.
CadastradoNatural or legal person whose information has been included.It does not necessarily mean “consumer” under every CDC rule.
FontePerson or entity granting credit, conducting deferred sales, self-financing or another transaction producing financial risk; expressly includes BCB-authorized institutions and continuous-service providers.Source status does not grant unrestricted data-sharing rights.
ConsulenteNatural or legal person accessing data for a purpose allowed by Lei 12.414.It is not unrestricted public access; the user must maintain or intend a commercial or credit relationship.
ConsumerCDC classification may apply where the final-recipient predicates are satisfied.Lei 12.414 separately covers legal persons even where CDC consumer status remains unresolved.
RepresentativeMay exercise rights where legally authorized.Lei 12.414 does not prescribe one universal mandate or authentication format.
Banco CentralRegisters managers eligible to receive covered financial-institution data and supervises that registration branch.It does not approve every score, every source datum, every consultant access or a debt-adviser business model.
SNDC / consumer bodiesMay apply consumer sanctions and specified corrective measures where the registered person is a consumer.Federal statutory authority does not verify each state, DF or municipal implementation.

Captured table 03

Clock · Trigger and function · Limit · 2 data rows

ClockTrigger and functionLimit
Positive-information durationLei 12.414 art. 14 prohibits positive payment information remaining in databases for more than 15 years.Exact record-level start and historical treatment need the particular datum and manager record.
Audit retentionDecreto 9.936 arts. 10(VIII) and 12 require records concerning authorizations, cancellations, reopenings, exclusions, revocations and corrections for at least 15 years, with art. 12 counting from cancellation.Audit retention is not continued consultant access or continued scoring use after cancellation.

Captured table 04

Original field · Literal saved content · 4 data rows

Original fieldLiteral saved content
#D05
Named deferred familyCredit reporting and correction
Gateway reference/statusC003, C035; Deferred
Exact next research actionResearch CDC records, LGPD, cadastro-positive and bureau-specific current primary rules.

Captured table 05

P01 D05 branch · PASS-07 result · Remaining gate · 12 data rows

P01 D05 branchPASS-07 resultRemaining gate
Positive-history primary lawLei 12.414, LC 166 and Decreto 9.936 operative framework read.Later amendments/current consolidation must be rechecked at publication.
Original opt-in versus current openingOpt-out opening effective July 9, 2019 established.Actual opening, manager and notice facts absent.
Data and actorsGestor, fonte, consulente, cadastrado and permitted payment-history fields identified.Actual data flow absent.
NoticeThirty-day post-opening communication and existing-record exception identified.Actual channel, proof and record status absent.
ConsultationSixty-day barrier, permitted purpose and relationship identified.Actual consultant and purpose absent.
Score/full historyScore and full-history authorization separated.Actual authorization and access logs absent.
Cancellation/reopeningFree channels and two-business-day manager workflow identified.Actual request/receipt/propagation absent; reopening re-notice unresolved.
Access/correctionFree access, 10-day correction, two-business-day source verification and 10-day source update identified.Actual record/error/source absent.
Scoring/automated decisionsCriteria rights and seven-business-day automated review result identified.Proprietary model, actual decision and full remedy unexamined.
BCB manager registrationFinancial-origin manager registration gateway identified.Full current Resolução BCB 14 procedure not read; no registrant queried.
LGPDLimited natural-person crossover identified.Full LGPD module deferred.
P06 negative-register workNot adopted or rerun.Entire P06 remains awaiting review.

Captured table 06

Source ID · Issuer, title and complete literal URL · Pinpoints, publication/commencement, pages and limits · 11 data rows

Source IDIssuer, title and complete literal URLPinpoints, publication/commencement, pages and limits
C_BR-P07-S001Presidência da República, Lei nº 12.414, de 9 de junho de 2011, compiled. https://www.planalto.gov.br/ccivil_03/_ato2011-2014/2011/lei/l12414.htmFRESH-READ—OPERATIVE. Arts. 1–9, 12–18; especially arts. 2–8, 12, 14–17. Original law effective on publication under art. 18; current text contains LC 166 amendments and shows historical struck text. HTML; printed page and PDF index N/A. Full remedies/case citator not completed. Planalto +3
S002Presidência da República, Lei Complementar nº 166, de 8 de abril de 2019. https://www.planalto.gov.br/ccivil_03/leis/lcp/lcp166.htmFRESH-READ—AMENDMENT. Arts. 1–7, especially art. 2 amendments and art. 7 commencement. DOU April 9, 2019. Selected provisions effective on publication; other substantive amendments after 91 days, July 9, 2019. HTML; printed page/PDF index N/A. Planalto +2
S003Presidência da República, Decreto nº 9.936, de 24 de julho de 2019. https://www.planalto.gov.br/ccivil_03/_ato2019-2022/2019/decreto/d9936.htmFRESH-READ—OPERATIVE. Arts. 1–23 and annex; materially arts. 2–17, 19, 22–23. Published DOU July 25, 2019; art. 23 effective on publication; rectified August 1, 2019. HTML; printed page/PDF index N/A. Security-incident branch not substantively completed. Planalto +5
S004Conselho Monetário Nacional / Banco Central do Brasil, Resolução nº 4.737, de 29 de julho de 2019, current consolidated PDF. https://normativos.bcb.gov.br/Lists/Normativos/Attachments/50808/Res_4737_v2_P.pdfFRESH-READ—OPERATIVE PDF. Arts. 1–3: printed p.1, zero-based index 0; arts. 3–6: printed p.2, index 1; arts. 12–14: printed p.7, index 6; arts. 14–19: printed p.8, index 7. Original DOU July 31, 2019, Section 1, p.58; art. 19 effective on publication. Consolidation shows Resolução CMN 4.990 changes effective April 1, 2022. Banco Central do Brasil Normativos +3
S005Banco Central do Brasil, Resolução CMN nº 4.990, de 24 de março de 2022, dynamic normative page. https://www.bcb.gov.br/estabilidadefinanceira/exibenormativo?numero=4990&tipo=Resolu%C3%A7%C3%A3o+CMNINDEX/FAILED BODY. Public dynamic page returned no substantive text. The actual amendment wording/effective date is visible in S004’s official consolidated 4.737 PDF; an official preparatory vote was discovery only and is not treated as the enacted rule. HTML dynamic page; printed page/PDF index N/A. Banco Central do Brasil +1
S006Banco Central do Brasil, Resolução BCB nº 14, de 9 de setembro de 2020, dynamic normative page. https://www.bcb.gov.br/estabilidadefinanceira/exibenormativo?numero=14&tipo=Resolu%C3%A7%C3%A3o+BCBINDEX/FAILED BODY. Official dynamic page did not return substantive provisions. Official BCB material identifies it as the procedural rule for manager registration. No detailed current form, filing or procedural claim is adopted. HTML; printed page/PDF index N/A. Banco Central do Brasil +1
S007Presidência da República, Lei Complementar nº 105, de 10 de janeiro de 2001, compiled. https://www.planalto.gov.br/ccivil_03/leis/lcp/lcp105.htmFRESH-READ—LIMITED. Art. 1 §3(VII) and related bank-secrecy context. The positive-history exception was added by LC 166/2019. HTML; printed page/PDF index N/A. No general bank-secrecy module completed. Planalto
S008Presidência da República, Lei nº 13.709/2018 — LGPD, compiled. https://www.planalto.gov.br/ccivil_03/_ato2015-2018/2018/lei/l13709compilado.htmFRESH-READ—LIMITED CROSSOVER. Arts. 1, 3, 5–9 and 17–20. Current compiled text read only for natural-person scope, territorial nexus, principles, credit-protection basis, access/correction and automated decisions. HTML; printed page/PDF index N/A. Full LGPD module deferred. Planalto +4
S009Presidência da República, Lei nº 8.078/1990 — Código de Defesa do Consumidor, compiled. https://www.planalto.gov.br/ccivil_03/leis/l8078compilado.htmFRESH-READ—LIMITED. Arts. 2–3 only, for consumer/supplier definitions and the credit-service overlay. HTML; printed page/PDF index N/A. Negative-register art. 43 doctrine was not rerun. Planalto
S010Presidência da República, Lei nº 10.406/2002 — Código Civil, compiled. https://www.planalto.gov.br/ccivil_03/leis/2002/l10406compilada.htmFRESH-READ—TIMING ONLY. Art. 132 caput and §§1–4. Used only for fictional deadline arithmetic. HTML; printed page/PDF index N/A. No PASS-05 prescription conclusions adopted. Planalto
S011Presidência da República, Decreto nº 7.829, de 17 de outubro de 2012. https://www.planalto.gov.br/ccivil_03/_ato2011-2014/2012/decreto/d7829.htmHISTORICAL—REVOKED. Official page identifies revocation by Decreto 9.936/2019. Read only to preserve the original opt-in regulatory history. HTML; printed page/PDF index N/A. Planalto
Source links captured in this table

Captured table 07

Claim ID · Area; atomic proposition, predicate, act/effect and retained limit · Primary source and pinpoint · 72 data rows

Claim IDArea; atomic proposition, predicate, act/effect and retained limitPrimary source and pinpoint
C_BR-P07-C001A098. PASS-07 concerns positive payment history, not ordinary negative entries, scores as an independent commercial product, SCR, protest, Cadin or court data.S001 arts. 1–2; scope hold.
C_BR-P07-C002A098. Lei 12.414 covers positive history for natural and legal persons.S001 arts. 1–2. Planalto
C_BR-P07-C003A098. Public-law databases maintained by domestic public-law entities are governed by specific legislation.S001 art. 1 sole paragraph. Planalto
C_BR-P07-C004A097. A banco de dados is a dataset used to support credit, deferred sales or other financial-risk transactions.S001 art. 2(I). Planalto
C_BR-P07-C005A097. A gestor is a qualifying legal person administering collection, storage, analysis and third-party access.S001 art. 2(II). Planalto
C_BR-P07-C006A098. A cadastrado is a natural or legal person whose information has been included.S001 art. 2(III). Planalto
C_BR-P07-C007A097. A fonte includes credit/deferred-sale actors, BCB-authorized institutions and listed continuous-service providers.S001 art. 2(IV). Planalto
C_BR-P07-C008A097. A consulente is a natural or legal person accessing data for a legally permitted purpose.S001 art. 2(V). Planalto
C_BR-P07-C009A098. Histórico de crédito comprises financial/payment data for paid or current credit operations and obligations.S001 art. 2(VII). Planalto
C_BR-P07-C010A098. A score is a derived output and is distinct from disclosure of the complete history.S001 art. 4(IV)(a)–(b). Planalto
C_BR-P07-C011A098. Stored data must be objective, clear, true, understandable and necessary.S001 art. 3 §§1–2. Planalto
C_BR-P07-C012A098. Excessive information unrelated to credit-risk analysis is prohibited.S001 art. 3 §3(I). Planalto
C_BR-P07-C013A098. Specified sensitive information is prohibited.S001 art. 3 §3(II). Planalto
C_BR-P07-C014A097. Water, sewer, electricity, gas, telecommunications and analogous continuous-service providers may be sources.S001 art. 2(IV). Planalto
C_BR-P07-C015A098. Regulated positive-history fields include origination, value, due dates and full or partial payments.S003 arts. 3–4; S004 arts. 2–3. Planalto +2
C_BR-P07-C016A098. The operating layout may include source and registered-person identification/contact fields.S003 art. 17. Planalto
C_BR-P07-C017A098. The reviewed regime does not authorize unrelated bank balances, itemized purchases or general asset data.S001 arts. 2–3; S007 art. 1 §3(VII); bounded textual conclusion.
C_BR-P07-C018A097. Manager-level capital, security and governance requirements are not a SettleADebt adviser licence.S003 art. 2; S001 art. 12 §7. Planalto +1
C_BR-P07-C019A098. The original 2011 opening model required prior informed consent.Historical S001 art. 4 text; S011. Planalto +1
C_BR-P07-C020A098. LC 166 replaced the opening model, with most substantive changes effective July 9, 2019.S002 arts. 2, 7. Planalto +1
C_BR-P07-C021A097. Current law permits a manager to open a positive record without prior opt-in.S001 art. 4(I). Planalto
C_BR-P07-C022A098. Opening communication must occur without cost within 30 days.S001 art. 4 §4(I). Planalto
C_BR-P07-C023A097. Notice is made by the manager directly or through a source and must identify cancellation channels.S001 art. 4 §4(II)–(III). Planalto
C_BR-P07-C024A098. Notice is excused if the person already has a positive record open at another database.S001 art. 4 §5. Planalto
C_BR-P07-C025A098. Notice uses personal contact data supplied by the person to a source.S001 art. 4 §6. Planalto
C_BR-P07-C026A098. Data may be furnished to consultants only 60 days after opening.S001 art. 4 §7. Planalto
C_BR-P07-C027A098. Score availability and full-history disclosure are legally distinct.S001 art. 4(IV)(a)–(b). Planalto
C_BR-P07-C028A098. Full-history disclosure requires prior specific authorization.S001 art. 4(IV)(b); S003 art. 7. Planalto +1
C_BR-P07-C029A097. The manager must be able to prove authorization authenticity and validity.S001 art. 4 §8. Planalto
C_BR-P07-C030A098. Authorization may cover one access or a fixed permitted period.S003 art. 8 §1. Planalto
C_BR-P07-C031A098. Natural-person fixed authorization may last no more than three months.S003 art. 8 §1(II)(a). Planalto
C_BR-P07-C032A098. Legal-person fixed authorization may last no more than 12 months.S003 art. 8 §1(II)(b). Planalto
C_BR-P07-C033A098. A BCB-authorized institution may receive indefinite authorization only while its contractual relationship continues.S003 art. 8 §2. Planalto
C_BR-P07-C034A098. Fixed or indefinite full-history authorization may be revoked at any time.S003 art. 8 §3. Planalto
C_BR-P07-C035A097. A consultant must maintain or intend a commercial or credit relationship and use data for a permitted financial-risk purpose.S001 arts. 7, 15; S003 art. 9. Planalto +1
C_BR-P07-C036A097. Manager-to-manager sharing is permitted, with receiving and originating managers retaining update/correction duties.S001 arts. 4(III), 9. Planalto
C_BR-P07-C037A098. Cancellation and reopening are free rights available on request.S001 art. 5(I), §§4–5. Planalto
C_BR-P07-C038A098. A request may be made to any manager by telephone, physical or electronic means.S001 art. 5 §5. Planalto
C_BR-P07-C039A097. The receiving manager and downstream managers each have a two-business-day statutory workflow.S001 art. 5 §6. Planalto
C_BR-P07-C040A098. A prior expressed wish not to open a record requires automatic cancellation.S001 art. 5 §7. Planalto
C_BR-P07-C041A098. Cancellation prevents use of history for statutory purposes, including use in third-party scores.S001 art. 5 §8. Planalto
C_BR-P07-C042A098. Partial deletion is unavailable except for improperly recorded information.S003 art. 14 §1. Planalto
C_BR-P07-C043A097. No new positive annotations may be made after two business days from cancellation request.S003 art. 14 §2. Planalto
C_BR-P07-C044A098. Score-access suspension is distinct from full cancellation.S003 art. 13. Planalto
C_BR-P07-C045A098. The person retains access to their own score during third-party score suspension.S003 art. 13 §2. Planalto
C_BR-P07-C046A098. The read provisions do not expressly settle whether reopening requires a new 30-day notice.Bounded source gap; no affirmative rule inferred.
C_BR-P07-C047A098. Positive payment information may not remain for more than 15 years.S001 art. 14. Planalto
C_BR-P07-C048A097. Authorization/cancellation/correction audit records may be kept at least 15 years from cancellation.S003 arts. 10(VIII), 12. Planalto
C_BR-P07-C049A098. The person has free, justification-free access to their information, history and score.S001 art. 5(II). Planalto
C_BR-P07-C050A098. Access includes sources, shared managers and consultants that accessed information during the preceding six months.S001 art. 6; S003 art. 10(V). Planalto +1
C_BR-P07-C051A098. Several access and criteria disclosures have a 10-day statutory period.S001 art. 5 §3 and art. 6 §2. Planalto +1
C_BR-P07-C052A098. Erroneous information must be corrected or cancelled in all shared databases within 10 days.S001 art. 5(III). Planalto
C_BR-P07-C053A097. The source must verify and confirm or correct challenged information within two business days.S001 art. 8(III). Planalto
C_BR-P07-C054A097. A source must update or correct information sent to managers within 10 days.S001 art. 8(IV). Planalto
C_BR-P07-C055A097. A receiving manager assumes challenge/correction duties, and the originating manager must keep shared information updated.S001 art. 9 §§1–2. Planalto
C_BR-P07-C056A098. The person may know principal score elements and criteria, subject to trade secrecy.S001 art. 5(IV). Planalto
C_BR-P07-C057A098. Score criteria may not use unrelated, specified sensitive or prohibited third-party/right-exercise data.S001 art. 7-A. Planalto
C_BR-P07-C058A097. A manager must publish a clear and accessible data-collection/use policy for credit-risk analysis.S001 art. 7-A §1. Planalto
C_BR-P07-C059A098. Each response must show last update; the person may see sources, but consultants may not receive individual-source identities.S003 arts. 10(I),(V), 11. Planalto
C_BR-P07-C060A098. A consultant must return an automated-decision review result within seven business days.S001 art. 5(VI); S003 art. 19. Planalto
C_BR-P07-C061A098. Access, correction and review rights do not guarantee score increase, credit approval or a rate.Negative consequence bounded by S001 arts. 5, 7, 7-A.
C_BR-P07-C062A098. LGPD personal-data rights attach to natural persons; Lei 12.414 separately protects legal persons.S008 arts. 1, 5, 17; S001 art. 1. Planalto +2
C_BR-P07-C063A098. LGPD territorial applicability depends on art. 3’s processing and offering/data-collection nexus.S008 art. 3. Planalto
C_BR-P07-C064A097. Credit protection is an LGPD legal basis, but it does not displace specific full-history authorization rules.S008 art. 7(X), §6; S001 art. 4(IV)(b). Planalto +1
C_BR-P07-C065A098. Natural persons have LGPD access, correction and automated-review rights in addition to sector-specific rights.S008 arts. 18–20; complete LGPD module held. Planalto +1
C_BR-P07-C066A097. Covered financial-institution information may go only to BCB-registered managers.S001 art. 12; S004 arts. 1–5. Planalto +2
C_BR-P07-C067A097. Resolução 4.737 specifies covered operations and reporting fields, including partial payments.S004 arts. 2–3, printed pp.1–2, indices 0–1. Banco Central do Brasil Normativos +1
C_BR-P07-C068A097. Banco Central manager registration does not make the manager a financial institution or grant an adviser licence.S001 art. 12 §7; S004 scope. Planalto +1
C_BR-P07-C069A097. LC 105 permits the defined positive-history transfer without creating a general bank-data exception.S007 art. 1 §3(VII). Planalto
C_BR-P07-C070A098. Detailed current Resolução BCB 14 registration procedure remains unread because the official dynamic body returned no substantive text.S006; explicit source-access limit.
C_BR-P07-C071A098. Currentness includes LC 166, Decreto 9.936 and Resolução 4.737 as amended effective April 1, 2022; later exhaustive citator remains held.S001–S005.
C_BR-P07-C072A098. No actual person, company, score, history, source, consultant, manager or registration record was searched.Research boundary.
Source links captured in this table

Captured table 08

# · Required subquestion · Finding / claims · 88 data rows

#Required subquestionFinding / claimsStatus and exact next action
P07-G01Positive-history scopeC001, C009Answered narrowly. Verify actual dataset before applying.
G02Natural personC002, C062Answered gateway. Obtain actual data and actor roles.
G03Legal personC002, C032, C062Answered gateway. Separate corporate and personal data.
G04Consumer statusC002; CDC overlay heldConditional. Apply CDC only after final-recipient classification.
G05Public-law databaseC003Excluded. Identify specific public register law.
G06Foreign/remote nexusC063Held. Determine processing, offering and collection locations.
G07Database definitionC004Answered. Confirm financial-risk purpose.
G08ManagerC005, C018Answered category. Verify actual operating role.
G09Registered personC006Answered. Establish identity and record.
G10SourceC007, C014Answered. Identify exact source and transaction.
G11ConsultantC008, C035Answered. Verify relationship and purpose.
G12RepresentativeC065, C072Conditional. Obtain mandate and authentication.
G13Credit historyC009Answered definition. Map actual fields.
G14Score distinctionC010, C027Answered. Do not treat score as full history.
G15Negative entryC001Deferred. P06 remains unreviewed and unadopted.
G16SCRC001Deferred. Read BCB/SCR rules separately.
G17Protest/Cadin/court dataC001, C003Deferred. Apply specific regimes separately.
G18Objective/clear/true dataC011Answered standard. Audit actual fields.
G19Excessive dataC012Prohibited. Test necessity to credit risk.
G20Sensitive dataC013, C057Prohibited categories identified. Full LGPD sensitivity held.
G21Utility sourceC014Answered gateway. Identify service and payment fields.
G22Financial sourceC066–C069Conditional. Verify BCB registration and operation type.
G23Partial-payment dataC015, C067Permitted field. Verify amount/date accuracy.
G24Identity/contact fieldsC016Permitted operational layout. Check necessity and accuracy.
G25Account balances/itemized purchasesC017No general authority established. Identify separate legal basis if claimed.
G26Manager capital/governanceC018Manager-only. Do not turn into adviser licence or consumer fee.
G27Original opt-in ruleC019Historical. Do not publish as current.
G28Current opt-out ruleC020–C021Answered. Effective July 9, 2019.
G29Opening without consentC021Permitted conditionally. Other safeguards still apply.
G30Opening notice periodC022Thirty days. Obtain exact opening date.
G31Notice costC022No cost.
G32Notice actorC023Manager directly or through source.
G33Notice contentC023Cancellation channels required. Inspect actual communication.
G34Notice mediumC025No exclusive method established. Verify contact-data origin and proof.
G35Existing-record exceptionC024Conditional exception. Prove another record was open.
G36Prior opt-outC040Automatic cancellation required. Prove earlier expression.
G37Sixty-day consultation delayC026Answered. Obtain exact opening timestamp.
G38Score consultationC027, C035Conditional. Apply purpose, relationship, 60 days and suspension.
G39Full-history consultationC028–C035Specific authorization required.
G40Authorization authenticityC029Manager proof required. Obtain authorization record.
G41One-time authorizationC030Permitted. Identify consultant and access.
G42Natural-person durationC031Maximum three months.
G43Legal-person durationC032Maximum 12 months.
G44BCB institution indefinite durationC033Only during contractual relationship.
G45Authorization revocationC034Available anytime. Verify manager receipt.
G46Consultant relationshipC035Actual/intended commercial or credit relationship required.
G47Permitted purposeC035Credit-risk or financial-risk transaction only.
G48Manager-to-manager sharingC036Permitted with retained duties.
G49Financial-origin sharingC066Registered managers only.
G50Cancellation freeC037Answered.
G51Reopening freeC037Answered.
G52Request to any managerC038Answered.
G53Telephone/physical/electronic channelC038Answered.
G54Receiving-manager deadlineC039Two business days. Verify holidays/receipt.
G55Downstream-manager deadlineC039Two business days from downstream receipt.
G56Cancellation effectC041Statutory use stops. Other regimes unaffected.
G57Partial deletionC042Only for improperly recorded data.
G58New annotations after cancellationC043Stop after two business days.
G59Audit retention after cancellationC048At least 15 years. No continued consultant use implied.
G60Reopening re-noticeC046Unresolved. Locate current authoritative rule before publication.
G61Score-access suspensionC044Distinct right.
G62Own score during suspensionC045Access retained.
G63Positive-data maximumC047Fifteen years. Establish datum-level start.
G64Free accessC049Answered.
G65No justification requiredC049Answered.
G66Information/history/score accessC049Answered.
G67Sources and contact detailsC050Accessible to registered person.
G68Shared managersC050Accessible.
G69Prior six-month consultantsC050Accessible.
G70Access response periodsC051Multiple 10-day categories. Do not promise universal instant delivery.
G71Correction across all databasesC052, C055Within 10 days. Identify shared chain.
G72Source verificationC053Two business days.
G73Source updateC054Within 10 days.
G74Score criteriaC056Principal elements available; trade secrets preserved.
G75Prohibited score inputsC057Answered categories. Audit actual model separately.
G76Published data-use policyC058Required. No actual manager policy reviewed.
G77Last-update timestampC059Required in consultation response.
G78Source identity asymmetryC059Person sees sources; consultant does not.
G79Automated reviewC060Seven-business-day result. Verify exclusively automated predicate.
G80Score or approval guaranteeC061None established.
G81LGPD natural-person scopeC062Limited crossover only.
G82LGPD territorial nexusC063Conditional.
G83Credit-protection legal basisC064Does not override specific authorization.
G84LGPD access/correction/reviewC065Limited confirmation. Full module deferred.
G85Financial manager registrationC066–C068Gateway identified. No registrant lookup.
G86Bank-secrecy exceptionC069Narrow data category only.
G87Detailed BCB registration procedureC070Unresolved body. Obtain readable current Resolução BCB 14.
G88Currentness, P01 disposition and real-record acceptanceC071–C072HOLD. Recheck law and obtain actual data only under future authority.

Captured table 09

# · Deferred family · Exact remaining action · 36 data rows

#Deferred familyExact remaining action
P07-D01Ordinary negative credit-register entriesPreserve P06 as unreviewed; conduct separate accepted review before use.
D02Full LGPD legal bases and controller/operator allocationRead complete current statute, regulations and actual data flow.
D03LGPD international transfer and foreign controllerDetermine location, transfer mechanism and current ANPD rules.
D04LGPD retention and deletion outside Lei 12.414Classify each purpose and statutory retention duty.
D05Biometrics, children’s data and sensitive-data processingRead specific LGPD rules and actual dataset.
D06Security incidents and breach notificationDecreto 9.936 art. 18 noted but full current LGPD/ANPD regime deferred.
D07LGPD sanctions, private actions and damagesFull remedial and current case-law review required.
D08Actual proprietary score modelObtain actual criteria, edition, inputs and model governance under authority.
D09Commercial scoring products outside Cadastro PositivoClassify separately from the statutory positive register.
D10Cadastro Positivo remedies and complete judicial citatorResearch current precedent, proof, causation and remedies separately.
D11SCR / Banco Central credit reportingRead current BCB instruments; do not equate with Cadastro Positivo.
D12Protest and notarial recordsApply Lei 9.492 and local notarial law separately.
D13Cadin and governmental debt registersApply specific public-law regime.
D14Court judgments and public judicial recordsApply procedural and public-record rules separately.
D15Detailed Resolução BCB 14 registration procedureObtain readable current enacted body and current filing instructions.
D16Actual manager registration or named registrantNo lookup authorized; perform only under separate instruction.
D17Provider professional permissionPreserve OAB/CRA/CORECON and other P01 holds.
D18Adviser fees and consumer contractsPASS-04 remains unreviewed and unadopted.
D19Client money, payment services and safeguardingPreserve BCB 494/payment and funds-flow holds.
D20Current CMN 4.935 / Joint Resolution 17 correspondent regimePreserve P02 partial current-source hold.
D21Underlying debt and settlement validityObtain actual contract, authority and settlement documents separately.
D22Prescription and interruptionPASS-05 remains unreviewed and unadopted.
D23General collection communications and conductResearch separately from positive payment history.
D24Secured credit, collateral and guarantiesApply product and security-specific law.
D25Tax, government, student and support claimsApply specific public/program law.
D26Insolvency, recuperação and falênciaAnalyze effect of the actual proceeding and plan.
D27Sector-specific utility, telecom, insurance and lending rulesIdentify source sector and read its current regulations.
D28Tax treatment of data, settlement or write-offsNo tax conclusion from positive-history law.
D29Complaints, Procon procedure and administrative sanctionsRead actual federal/state/local procedure; no complaint filed.
D30Civil damages, causation and limitationFull remedy and current precedent review required.
D31Representative authority and authentication standardsObtain actual mandate and manager procedure.
D32Reopening notice requirementLocate express current authority; do not infer.
D33State/DF/municipal implementationAll 27 branches remain individually deferred below.
D34Foreign law, recognition and overseas data accessNo foreign-law premise adopted.
D35Actual records, reports, scores and consultant decisionsNone obtained or searched.
D36Full Brazil, A097/A098, parent-program and publication acceptanceHOLD pending same-coordinator review and every outstanding branch.

Captured table 10

State / DF · PASS-07 status · Exact remaining local issue · 27 data rows

State / DFPASS-07 statusExact remaining local issue
Acre (AC)No local body readAC consumer authority, Procon, court procedure, accessibility and municipal implementation.
Alagoas (AL)No local body readAL consumer enforcement, court remedies, municipal channels and local procedure.
Amapá (AP)No local body readAP Procon, courts, accessibility and local positive-history enforcement.
Amazonas (AM)No local body readAM consumer agencies, remote-access issues, courts and municipalities.
Bahia (BA)No local body readBA Procon, court and municipal implementation.
Ceará (CE)No local body readCE consumer enforcement, administrative procedure and courts.
Distrito Federal (DF)No local body readDF consumer authority, TJDFT, local remedies and accessibility.
Espírito Santo (ES)No local body readES Procon, courts, municipalities and local evidence rules.
Goiás (GO)No local body readGO consumer authorities, court procedure and municipal routes.
Maranhão (MA)No local body readMA Procon, courts, accessibility and local complaint procedure.
Mato Grosso (MT)No local body readMT administrative and court implementation.
Mato Grosso do Sul (MS)No local body readMS Procon, courts, border/remote issues and local procedures.
Minas Gerais (MG)No local body readMG consumer enforcement, courts and municipal implementation.
Pará (PA)No local body readPA Procon, courts, language/accessibility and municipalities.
Paraíba (PB)No local body readPB consumer authority, court remedies and local channels.
Paraná (PR)No local body readPR Procon, courts and local implementation.
Pernambuco (PE)No local body readPE consumer enforcement, courts and municipalities.
Piauí (PI)No local body readPI Procon, judicial procedure and local accessibility.
Rio de Janeiro (RJ)No local body readRJ consumer authority, courts and municipal procedures.
Rio Grande do Norte (RN)No local body readRN Procon, courts and local remedies.
Rio Grande do Sul (RS)No local body readRS consumer agencies, courts and current local interpretation.
Rondônia (RO)No local body readRO Procon, courts, remote access and municipalities.
Roraima (RR)No local body readRR consumer routes, multilingual/accessibility issues and courts.
Santa Catarina (SC)No local body readSC Procon, courts and municipal implementation.
São Paulo (SP)No local PASS-07 body readSP Procon, TJSP, municipalities and local administrative procedure.
Sergipe (SE)No local body readSE consumer authority, courts and municipal routes.
Tocantins (TO)No local body readTO Procon, courts, accessibility and local implementation.

Captured table 11

Opportunity · Supported function · Mandatory guardrail · 10 data rows

OpportunitySupported functionMandatory guardrail
“Brazil’s Cadastro Positivo is opt-out—but not open access”Explain opening, 30-day notice, 60-day delay and specific full-history authorization.Do not describe it as unrestricted sharing or prior consent for opening.
Score versus full-history explainerShow the different consent, purpose and suspension branches.No promise that score-only access is proper without relationship and purpose.
Opening timeline worksheetInput opening date; display 30-day notice and 60-day consultant barrier.Require exact timestamp and distinguish “60th day” from “after 60 days.”
Cancellation/reopening trackerShow receiving-manager and downstream-manager two-business-day clocks.Require receipt dates and local holiday inputs.
Positive-history authorization checkerOne-time, natural-person three-month, legal-person 12-month and regulated-institution relationship options.Never convert a general privacy clause automatically into specific authorization.
Payment-history field auditCompare source, date, amount due, amount paid, partial payment and status.Do not infer debt validity or negative-register consequences.
Correction workflowTrack source’s two-business-day verification and 10-day cross-database correction/update duties.Clarify which actor received each request and when.
Automated-decision review trackerRecord request date and seven-business-day result period.No automatic credit approval, score increase or model disclosure promise.
System classifierSeparate Cadastro Positivo, negative register, SCR, score, protest, Cadin and court data.Each excluded system needs its own source-backed module.
Manager-versus-adviser checklistExplain that manager regulation and BCB registration concern database operations/financial-origin data.Do not market manager rules as a debt-adviser licence.

Captured table 12

Reconciliation item · Actual result · 26 data rows

Reconciliation itemActual result
Assigned componentP01 D05 remaining Cadastro Positivo / positive-history branch only.
P04/P05/P06 relianceNone. All remain unreviewed and were not adopted.
Sources11 displayed: operative laws/regulations, limited crossovers, one revoked historical body and two dynamic/index failures.
Claims72 displayed, C_BR-P07-C001–C072.
Core coverage88 displayed, P07-G01–G88.
Deferred families36 displayed, P07-D01–D36.
Territorial rows27 displayed, none cleared.
Fictional workflows10 displayed, H01–H10.
Timing calculationsH01 30-day and 60-day opening intervals; H03 two-business-day cancellation; H06 two-business-day source verification.
Actual report, score or historyNone obtained or searched.
Named manager, source, consultant or institutionNone searched or classified.
Actual authorization or cancellation requestNone obtained.
Original opt-in/current opt-outIndependently traced through Lei 12.414, LC 166 and Decreto 9.936.
Current regulationDecreto 9.936 operative body read; Resolução 4.737 current consolidated PDF read.
Detailed BCB registration procedureNot completed because Resolução BCB 14’s public dynamic body did not return substantive text.
Full LGPDDeferred. Only necessary natural-person crossover read.
Negative-register doctrineNot rerun or adopted.
PrescriptionNot rerun or adopted.
Source-specific clock timesUnknown and not invented.
APIs, Deep Research, Work/Codex, subagents or new chatsNone used.
Named private case or record lookupNone.
Contacts, complaints or filingsNone.
Coordinator filesNo write performed or claimed.
Model/powerNo self-certified model tier, Pro status, quota, recovery or measured ranking.
Review statusThis is not independent review or all-source certification. Same-coordinator review remains separate.
Country/publication statusHOLD. No provider, contract, locality, A097/A098, parent or Brazil-wide acceptance.

Find the assertion and its boundaries

Read the evidence with its boundaries. These are saved research components, including revisions. A scoped coordinator review checks selected evidence; it does not certify every claim, a complete jurisdiction, current law or individual applicability. Dates and access limits remain attached to the records.

How to read the research →

Read the related correction supplements

These components repair their stated scope. They do not replace every other finding in this research series.

One bounded provenance-only repair to →
Bounded P13 payment-recipient qualification and source/claim/count traceability repair →
Bounded P14 atomic-predicate, commencement-traceability and count-unit repair →
C_BR-P07-C001 Saved research record

A098. PASS-07 concerns positive payment history, not ordinary negative entries, scores as an independent commercial product, SCR, protest, Cadin or court data.

Recorded check status: not yet checked

Primary source and pinpoint
S001 arts. 1–2; scope hold.

Recorded coordinator check boundaries

coordinator review status
scoped_two_bounded_repairs_pending
coordinator review scope
Wholeanswer/all12tables;6freshselectedprimaryfamilies+2datedreuse/math;notindependent/allsource/currentconsolidationcertification.
C_BR-P07-C002 Saved research record

A098. Lei 12.414 covers positive history for natural and legal persons.

Recorded check status: not yet checked

Primary source and pinpoint
S001 arts. 1–2. Planalto

Recorded coordinator check boundaries

coordinator review status
scoped_two_bounded_repairs_pending
coordinator review scope
Wholeanswer/all12tables;6freshselectedprimaryfamilies+2datedreuse/math;notindependent/allsource/currentconsolidationcertification.
C_BR-P07-C003 Saved research record

A098. Public-law databases maintained by domestic public-law entities are governed by specific legislation.

Recorded check status: not yet checked

Primary source and pinpoint
S001 art. 1 sole paragraph. Planalto

Recorded coordinator check boundaries

coordinator review status
scoped_two_bounded_repairs_pending
coordinator review scope
Wholeanswer/all12tables;6freshselectedprimaryfamilies+2datedreuse/math;notindependent/allsource/currentconsolidationcertification.
C_BR-P07-C004 Saved research record

A097. A banco de dados is a dataset used to support credit, deferred sales or other financial-risk transactions.

Recorded check status: not yet checked

Primary source and pinpoint
S001 art. 2(I). Planalto

Recorded coordinator check boundaries

coordinator review status
scoped_two_bounded_repairs_pending
coordinator review scope
Wholeanswer/all12tables;6freshselectedprimaryfamilies+2datedreuse/math;notindependent/allsource/currentconsolidationcertification.
C_BR-P07-C005 Saved research record

A097. A gestor is a qualifying legal person administering collection, storage, analysis and third-party access.

Recorded check status: not yet checked

Primary source and pinpoint
S001 art. 2(II). Planalto

Recorded coordinator check boundaries

coordinator review status
scoped_two_bounded_repairs_pending
coordinator review scope
Wholeanswer/all12tables;6freshselectedprimaryfamilies+2datedreuse/math;notindependent/allsource/currentconsolidationcertification.
C_BR-P07-C006 Saved research record

A098. A cadastrado is a natural or legal person whose information has been included.

Recorded check status: not yet checked

Primary source and pinpoint
S001 art. 2(III). Planalto

Recorded coordinator check boundaries

coordinator review status
scoped_two_bounded_repairs_pending
coordinator review scope
Wholeanswer/all12tables;6freshselectedprimaryfamilies+2datedreuse/math;notindependent/allsource/currentconsolidationcertification.
C_BR-P07-C007 Saved research record

A097. A fonte includes credit/deferred-sale actors, BCB-authorized institutions and listed continuous-service providers.

Recorded check status: not yet checked

Primary source and pinpoint
S001 art. 2(IV). Planalto

Recorded coordinator check boundaries

coordinator review status
scoped_two_bounded_repairs_pending
coordinator review scope
Wholeanswer/all12tables;6freshselectedprimaryfamilies+2datedreuse/math;notindependent/allsource/currentconsolidationcertification.
C_BR-P07-C008 Saved research record

A097. A consulente is a natural or legal person accessing data for a legally permitted purpose.

Recorded check status: not yet checked

Primary source and pinpoint
S001 art. 2(V). Planalto

Recorded coordinator check boundaries

coordinator review status
scoped_two_bounded_repairs_pending
coordinator review scope
Wholeanswer/all12tables;6freshselectedprimaryfamilies+2datedreuse/math;notindependent/allsource/currentconsolidationcertification.
C_BR-P07-C009 Saved research record

A098. Histórico de crédito comprises financial/payment data for paid or current credit operations and obligations.

Recorded check status: not yet checked

Primary source and pinpoint
S001 art. 2(VII). Planalto

Recorded coordinator check boundaries

coordinator review status
scoped_two_bounded_repairs_pending
coordinator review scope
Wholeanswer/all12tables;6freshselectedprimaryfamilies+2datedreuse/math;notindependent/allsource/currentconsolidationcertification.
C_BR-P07-C010 Saved research record

A098. A score is a derived output and is distinct from disclosure of the complete history.

Recorded check status: not yet checked

Primary source and pinpoint
S001 art. 4(IV)(a)–(b). Planalto

Recorded coordinator check boundaries

coordinator review status
scoped_two_bounded_repairs_pending
coordinator review scope
Wholeanswer/all12tables;6freshselectedprimaryfamilies+2datedreuse/math;notindependent/allsource/currentconsolidationcertification.
C_BR-P07-C011 Saved research record

A098. Stored data must be objective, clear, true, understandable and necessary.

Recorded check status: not yet checked

Primary source and pinpoint
S001 art. 3 §§1–2. Planalto

Recorded coordinator check boundaries

coordinator review status
scoped_two_bounded_repairs_pending
coordinator review scope
Wholeanswer/all12tables;6freshselectedprimaryfamilies+2datedreuse/math;notindependent/allsource/currentconsolidationcertification.
C_BR-P07-C012 Saved research record

A098. Excessive information unrelated to credit-risk analysis is prohibited.

Recorded check status: not yet checked

Primary source and pinpoint
S001 art. 3 §3(I). Planalto

Recorded coordinator check boundaries

coordinator review status
scoped_two_bounded_repairs_pending
coordinator review scope
Wholeanswer/all12tables;6freshselectedprimaryfamilies+2datedreuse/math;notindependent/allsource/currentconsolidationcertification.
C_BR-P07-C013 Saved research record

A098. Specified sensitive information is prohibited.

Recorded check status: not yet checked

Primary source and pinpoint
S001 art. 3 §3(II). Planalto

Recorded coordinator check boundaries

coordinator review status
scoped_two_bounded_repairs_pending
coordinator review scope
Wholeanswer/all12tables;6freshselectedprimaryfamilies+2datedreuse/math;notindependent/allsource/currentconsolidationcertification.
C_BR-P07-C014 Saved research record

A097. Water, sewer, electricity, gas, telecommunications and analogous continuous-service providers may be sources.

Recorded check status: not yet checked

Primary source and pinpoint
S001 art. 2(IV). Planalto

Recorded coordinator check boundaries

coordinator review status
scoped_two_bounded_repairs_pending
coordinator review scope
Wholeanswer/all12tables;6freshselectedprimaryfamilies+2datedreuse/math;notindependent/allsource/currentconsolidationcertification.
C_BR-P07-C015 Saved research record

A098. Regulated positive-history fields include origination, value, due dates and full or partial payments.

Recorded check status: not yet checked

Primary source and pinpoint
S003 arts. 3–4; S004 arts. 2–3. Planalto +2

Recorded coordinator check boundaries

coordinator review status
scoped_two_bounded_repairs_pending
coordinator review scope
Wholeanswer/all12tables;6freshselectedprimaryfamilies+2datedreuse/math;notindependent/allsource/currentconsolidationcertification.
C_BR-P07-C016 Saved research record

A098. The operating layout may include source and registered-person identification/contact fields.

Recorded check status: not yet checked

Primary source and pinpoint
S003 art. 17. Planalto

Recorded coordinator check boundaries

coordinator review status
scoped_two_bounded_repairs_pending
coordinator review scope
Wholeanswer/all12tables;6freshselectedprimaryfamilies+2datedreuse/math;notindependent/allsource/currentconsolidationcertification.
C_BR-P07-C017 Saved research record

A098. The reviewed regime does not authorize unrelated bank balances, itemized purchases or general asset data.

Recorded check status: not yet checked

Primary source and pinpoint
S001 arts. 2–3; S007 art. 1 §3(VII); bounded textual conclusion.

Recorded coordinator check boundaries

coordinator review status
scoped_two_bounded_repairs_pending
coordinator review scope
Wholeanswer/all12tables;6freshselectedprimaryfamilies+2datedreuse/math;notindependent/allsource/currentconsolidationcertification.
C_BR-P07-C018 Saved research record

A097. Manager-level capital, security and governance requirements are not a SettleADebt adviser licence.

Recorded check status: not yet checked

Primary source and pinpoint
S003 art. 2; S001 art. 12 §7. Planalto +1

Recorded coordinator check boundaries

coordinator review status
scoped_two_bounded_repairs_pending
coordinator review scope
Wholeanswer/all12tables;6freshselectedprimaryfamilies+2datedreuse/math;notindependent/allsource/currentconsolidationcertification.
C_BR-P07-C019 Saved research record

A098. The original 2011 opening model required prior informed consent.

Recorded check status: not yet checked

Primary source and pinpoint
Historical S001 art. 4 text; S011. Planalto +1

Recorded coordinator check boundaries

coordinator review status
scoped_two_bounded_repairs_pending
coordinator review scope
Wholeanswer/all12tables;6freshselectedprimaryfamilies+2datedreuse/math;notindependent/allsource/currentconsolidationcertification.
C_BR-P07-C020 Saved research record

A098. LC 166 replaced the opening model, with most substantive changes effective July 9, 2019.

Recorded check status: not yet checked

Primary source and pinpoint
S002 arts. 2, 7. Planalto +1

Recorded coordinator check boundaries

coordinator review status
scoped_two_bounded_repairs_pending
coordinator review scope
Wholeanswer/all12tables;6freshselectedprimaryfamilies+2datedreuse/math;notindependent/allsource/currentconsolidationcertification.
C_BR-P07-C021 Saved research record

A097. Current law permits a manager to open a positive record without prior opt-in.

Recorded check status: not yet checked

Primary source and pinpoint
S001 art. 4(I). Planalto

Recorded coordinator check boundaries

coordinator review status
scoped_two_bounded_repairs_pending
coordinator review scope
Wholeanswer/all12tables;6freshselectedprimaryfamilies+2datedreuse/math;notindependent/allsource/currentconsolidationcertification.
C_BR-P07-C022 Saved research record

A098. Opening communication must occur without cost within 30 days.

Recorded check status: not yet checked

Primary source and pinpoint
S001 art. 4 §4(I). Planalto

Recorded coordinator check boundaries

coordinator review status
scoped_two_bounded_repairs_pending
coordinator review scope
Wholeanswer/all12tables;6freshselectedprimaryfamilies+2datedreuse/math;notindependent/allsource/currentconsolidationcertification.
C_BR-P07-C023 Saved research record

A097. Notice is made by the manager directly or through a source and must identify cancellation channels.

Recorded check status: not yet checked

Primary source and pinpoint
S001 art. 4 §4(II)–(III). Planalto

Recorded coordinator check boundaries

coordinator review status
scoped_two_bounded_repairs_pending
coordinator review scope
Wholeanswer/all12tables;6freshselectedprimaryfamilies+2datedreuse/math;notindependent/allsource/currentconsolidationcertification.
C_BR-P07-C024 Saved research record

A098. Notice is excused if the person already has a positive record open at another database.

Recorded check status: not yet checked

Primary source and pinpoint
S001 art. 4 §5. Planalto

Recorded coordinator check boundaries

coordinator review status
scoped_two_bounded_repairs_pending
coordinator review scope
Wholeanswer/all12tables;6freshselectedprimaryfamilies+2datedreuse/math;notindependent/allsource/currentconsolidationcertification.
C_BR-P07-C025 Saved research record

A098. Notice uses personal contact data supplied by the person to a source.

Recorded check status: not yet checked

Primary source and pinpoint
S001 art. 4 §6. Planalto

Recorded coordinator check boundaries

coordinator review status
scoped_two_bounded_repairs_pending
coordinator review scope
Wholeanswer/all12tables;6freshselectedprimaryfamilies+2datedreuse/math;notindependent/allsource/currentconsolidationcertification.
C_BR-P07-C026 Saved research record

A098. Data may be furnished to consultants only 60 days after opening.

Recorded check status: not yet checked

Primary source and pinpoint
S001 art. 4 §7. Planalto

Recorded coordinator check boundaries

coordinator review status
scoped_two_bounded_repairs_pending
coordinator review scope
Wholeanswer/all12tables;6freshselectedprimaryfamilies+2datedreuse/math;notindependent/allsource/currentconsolidationcertification.
C_BR-P07-C027 Saved research record

A098. Score availability and full-history disclosure are legally distinct.

Recorded check status: not yet checked

Primary source and pinpoint
S001 art. 4(IV)(a)–(b). Planalto

Recorded coordinator check boundaries

coordinator review status
scoped_two_bounded_repairs_pending
coordinator review scope
Wholeanswer/all12tables;6freshselectedprimaryfamilies+2datedreuse/math;notindependent/allsource/currentconsolidationcertification.
C_BR-P07-C028 Saved research record

A098. Full-history disclosure requires prior specific authorization.

Recorded check status: not yet checked

Primary source and pinpoint
S001 art. 4(IV)(b); S003 art. 7. Planalto +1

Recorded coordinator check boundaries

coordinator review status
scoped_two_bounded_repairs_pending
coordinator review scope
Wholeanswer/all12tables;6freshselectedprimaryfamilies+2datedreuse/math;notindependent/allsource/currentconsolidationcertification.
C_BR-P07-C029 Saved research record

A097. The manager must be able to prove authorization authenticity and validity.

Recorded check status: not yet checked

Primary source and pinpoint
S001 art. 4 §8. Planalto

Recorded coordinator check boundaries

coordinator review status
scoped_two_bounded_repairs_pending
coordinator review scope
Wholeanswer/all12tables;6freshselectedprimaryfamilies+2datedreuse/math;notindependent/allsource/currentconsolidationcertification.
C_BR-P07-C030 Saved research record

A098. Authorization may cover one access or a fixed permitted period.

Recorded check status: not yet checked

Primary source and pinpoint
S003 art. 8 §1. Planalto

Recorded coordinator check boundaries

coordinator review status
scoped_two_bounded_repairs_pending
coordinator review scope
Wholeanswer/all12tables;6freshselectedprimaryfamilies+2datedreuse/math;notindependent/allsource/currentconsolidationcertification.
C_BR-P07-C031 Saved research record

A098. Natural-person fixed authorization may last no more than three months.

Recorded check status: not yet checked

Primary source and pinpoint
S003 art. 8 §1(II)(a). Planalto

Recorded coordinator check boundaries

coordinator review status
scoped_two_bounded_repairs_pending
coordinator review scope
Wholeanswer/all12tables;6freshselectedprimaryfamilies+2datedreuse/math;notindependent/allsource/currentconsolidationcertification.
C_BR-P07-C032 Saved research record

A098. Legal-person fixed authorization may last no more than 12 months.

Recorded check status: not yet checked

Primary source and pinpoint
S003 art. 8 §1(II)(b). Planalto

Recorded coordinator check boundaries

coordinator review status
scoped_two_bounded_repairs_pending
coordinator review scope
Wholeanswer/all12tables;6freshselectedprimaryfamilies+2datedreuse/math;notindependent/allsource/currentconsolidationcertification.
C_BR-P07-C033 Saved research record

A098. A BCB-authorized institution may receive indefinite authorization only while its contractual relationship continues.

Recorded check status: not yet checked

Primary source and pinpoint
S003 art. 8 §2. Planalto

Recorded coordinator check boundaries

coordinator review status
scoped_two_bounded_repairs_pending
coordinator review scope
Wholeanswer/all12tables;6freshselectedprimaryfamilies+2datedreuse/math;notindependent/allsource/currentconsolidationcertification.
C_BR-P07-C034 Saved research record

A098. Fixed or indefinite full-history authorization may be revoked at any time.

Recorded check status: not yet checked

Primary source and pinpoint
S003 art. 8 §3. Planalto

Recorded coordinator check boundaries

coordinator review status
scoped_two_bounded_repairs_pending
coordinator review scope
Wholeanswer/all12tables;6freshselectedprimaryfamilies+2datedreuse/math;notindependent/allsource/currentconsolidationcertification.
C_BR-P07-C035 Saved research record

A097. A consultant must maintain or intend a commercial or credit relationship and use data for a permitted financial-risk purpose.

Recorded check status: not yet checked

Primary source and pinpoint
S001 arts. 7, 15; S003 art. 9. Planalto +1

Recorded coordinator check boundaries

coordinator review status
scoped_two_bounded_repairs_pending
coordinator review scope
Wholeanswer/all12tables;6freshselectedprimaryfamilies+2datedreuse/math;notindependent/allsource/currentconsolidationcertification.
C_BR-P07-C036 Saved research record

A097. Manager-to-manager sharing is permitted, with receiving and originating managers retaining update/correction duties.

Recorded check status: not yet checked

Primary source and pinpoint
S001 arts. 4(III), 9. Planalto

Recorded coordinator check boundaries

coordinator review status
scoped_two_bounded_repairs_pending
coordinator review scope
Wholeanswer/all12tables;6freshselectedprimaryfamilies+2datedreuse/math;notindependent/allsource/currentconsolidationcertification.
C_BR-P07-C037 Saved research record

A098. Cancellation and reopening are free rights available on request.

Recorded check status: not yet checked

Primary source and pinpoint
S001 art. 5(I), §§4–5. Planalto

Recorded coordinator check boundaries

coordinator review status
scoped_two_bounded_repairs_pending
coordinator review scope
Wholeanswer/all12tables;6freshselectedprimaryfamilies+2datedreuse/math;notindependent/allsource/currentconsolidationcertification.
C_BR-P07-C038 Saved research record

A098. A request may be made to any manager by telephone, physical or electronic means.

Recorded check status: not yet checked

Primary source and pinpoint
S001 art. 5 §5. Planalto

Recorded coordinator check boundaries

coordinator review status
scoped_two_bounded_repairs_pending
coordinator review scope
Wholeanswer/all12tables;6freshselectedprimaryfamilies+2datedreuse/math;notindependent/allsource/currentconsolidationcertification.
C_BR-P07-C039 Saved research record

A097. The receiving manager and downstream managers each have a two-business-day statutory workflow.

Recorded check status: not yet checked

Primary source and pinpoint
S001 art. 5 §6. Planalto

Recorded coordinator check boundaries

coordinator review status
scoped_two_bounded_repairs_pending
coordinator review scope
Wholeanswer/all12tables;6freshselectedprimaryfamilies+2datedreuse/math;notindependent/allsource/currentconsolidationcertification.
C_BR-P07-C040 Saved research record

A098. A prior expressed wish not to open a record requires automatic cancellation.

Recorded check status: not yet checked

Primary source and pinpoint
S001 art. 5 §7. Planalto

Recorded coordinator check boundaries

coordinator review status
scoped_two_bounded_repairs_pending
coordinator review scope
Wholeanswer/all12tables;6freshselectedprimaryfamilies+2datedreuse/math;notindependent/allsource/currentconsolidationcertification.
C_BR-P07-C041 Saved research record

A098. Cancellation prevents use of history for statutory purposes, including use in third-party scores.

Recorded check status: not yet checked

Primary source and pinpoint
S001 art. 5 §8. Planalto

Recorded coordinator check boundaries

coordinator review status
scoped_two_bounded_repairs_pending
coordinator review scope
Wholeanswer/all12tables;6freshselectedprimaryfamilies+2datedreuse/math;notindependent/allsource/currentconsolidationcertification.
C_BR-P07-C042 Saved research record

A098. Partial deletion is unavailable except for improperly recorded information.

Recorded check status: not yet checked

Primary source and pinpoint
S003 art. 14 §1. Planalto

Recorded coordinator check boundaries

coordinator review status
scoped_two_bounded_repairs_pending
coordinator review scope
Wholeanswer/all12tables;6freshselectedprimaryfamilies+2datedreuse/math;notindependent/allsource/currentconsolidationcertification.
C_BR-P07-C043 Saved research record

A097. No new positive annotations may be made after two business days from cancellation request.

Recorded check status: not yet checked

Primary source and pinpoint
S003 art. 14 §2. Planalto

Recorded coordinator check boundaries

coordinator review status
scoped_two_bounded_repairs_pending
coordinator review scope
Wholeanswer/all12tables;6freshselectedprimaryfamilies+2datedreuse/math;notindependent/allsource/currentconsolidationcertification.
C_BR-P07-C044 Saved research record

A098. Score-access suspension is distinct from full cancellation.

Recorded check status: not yet checked

Primary source and pinpoint
S003 art. 13. Planalto

Recorded coordinator check boundaries

coordinator review status
scoped_two_bounded_repairs_pending
coordinator review scope
Wholeanswer/all12tables;6freshselectedprimaryfamilies+2datedreuse/math;notindependent/allsource/currentconsolidationcertification.
C_BR-P07-C045 Saved research record

A098. The person retains access to their own score during third-party score suspension.

Recorded check status: not yet checked

Primary source and pinpoint
S003 art. 13 §2. Planalto

Recorded coordinator check boundaries

coordinator review status
scoped_two_bounded_repairs_pending
coordinator review scope
Wholeanswer/all12tables;6freshselectedprimaryfamilies+2datedreuse/math;notindependent/allsource/currentconsolidationcertification.
C_BR-P07-C046 Saved research record

A098. The read provisions do not expressly settle whether reopening requires a new 30-day notice.

Recorded check status: not yet checked

Primary source and pinpoint
Bounded source gap; no affirmative rule inferred.

Recorded coordinator check boundaries

coordinator review status
scoped_two_bounded_repairs_pending
coordinator review scope
Wholeanswer/all12tables;6freshselectedprimaryfamilies+2datedreuse/math;notindependent/allsource/currentconsolidationcertification.
C_BR-P07-C047 Saved research record

A098. Positive payment information may not remain for more than 15 years.

Recorded check status: not yet checked

Primary source and pinpoint
S001 art. 14. Planalto

Recorded coordinator check boundaries

coordinator review status
scoped_two_bounded_repairs_pending
coordinator review scope
Wholeanswer/all12tables;6freshselectedprimaryfamilies+2datedreuse/math;notindependent/allsource/currentconsolidationcertification.
C_BR-P07-C048 Saved research record

A097. Authorization/cancellation/correction audit records may be kept at least 15 years from cancellation.

Recorded check status: not yet checked

Primary source and pinpoint
S003 arts. 10(VIII), 12. Planalto

Recorded coordinator check boundaries

coordinator review status
scoped_two_bounded_repairs_pending
coordinator review scope
Wholeanswer/all12tables;6freshselectedprimaryfamilies+2datedreuse/math;notindependent/allsource/currentconsolidationcertification.
C_BR-P07-C049 Saved research record

A098. The person has free, justification-free access to their information, history and score.

Recorded check status: not yet checked

Primary source and pinpoint
S001 art. 5(II). Planalto

Recorded coordinator check boundaries

coordinator review status
scoped_two_bounded_repairs_pending
coordinator review scope
Wholeanswer/all12tables;6freshselectedprimaryfamilies+2datedreuse/math;notindependent/allsource/currentconsolidationcertification.
C_BR-P07-C050 Saved research record

A098. Access includes sources, shared managers and consultants that accessed information during the preceding six months.

Recorded check status: not yet checked

Primary source and pinpoint
S001 art. 6; S003 art. 10(V). Planalto +1

Recorded coordinator check boundaries

coordinator review status
scoped_two_bounded_repairs_pending
coordinator review scope
Wholeanswer/all12tables;6freshselectedprimaryfamilies+2datedreuse/math;notindependent/allsource/currentconsolidationcertification.
C_BR-P07-C051 Saved research record

A098. Several access and criteria disclosures have a 10-day statutory period.

Recorded check status: not yet checked

Primary source and pinpoint
S001 art. 5 §3 and art. 6 §2. Planalto +1

Recorded coordinator check boundaries

coordinator review status
scoped_two_bounded_repairs_pending
coordinator review scope
Wholeanswer/all12tables;6freshselectedprimaryfamilies+2datedreuse/math;notindependent/allsource/currentconsolidationcertification.
C_BR-P07-C052 Saved research record

A098. Erroneous information must be corrected or cancelled in all shared databases within 10 days.

Recorded check status: not yet checked

Primary source and pinpoint
S001 art. 5(III). Planalto

Recorded coordinator check boundaries

coordinator review status
scoped_two_bounded_repairs_pending
coordinator review scope
Wholeanswer/all12tables;6freshselectedprimaryfamilies+2datedreuse/math;notindependent/allsource/currentconsolidationcertification.
C_BR-P07-C053 Saved research record

A097. The source must verify and confirm or correct challenged information within two business days.

Recorded check status: not yet checked

Primary source and pinpoint
S001 art. 8(III). Planalto

Recorded coordinator check boundaries

coordinator review status
scoped_two_bounded_repairs_pending
coordinator review scope
Wholeanswer/all12tables;6freshselectedprimaryfamilies+2datedreuse/math;notindependent/allsource/currentconsolidationcertification.
C_BR-P07-C054 Saved research record

A097. A source must update or correct information sent to managers within 10 days.

Recorded check status: not yet checked

Primary source and pinpoint
S001 art. 8(IV). Planalto

Recorded coordinator check boundaries

coordinator review status
scoped_two_bounded_repairs_pending
coordinator review scope
Wholeanswer/all12tables;6freshselectedprimaryfamilies+2datedreuse/math;notindependent/allsource/currentconsolidationcertification.
C_BR-P07-C055 Saved research record

A097. A receiving manager assumes challenge/correction duties, and the originating manager must keep shared information updated.

Recorded check status: not yet checked

Primary source and pinpoint
S001 art. 9 §§1–2. Planalto

Recorded coordinator check boundaries

coordinator review status
scoped_two_bounded_repairs_pending
coordinator review scope
Wholeanswer/all12tables;6freshselectedprimaryfamilies+2datedreuse/math;notindependent/allsource/currentconsolidationcertification.
C_BR-P07-C056 Saved research record

A098. The person may know principal score elements and criteria, subject to trade secrecy.

Recorded check status: not yet checked

Primary source and pinpoint
S001 art. 5(IV). Planalto

Recorded coordinator check boundaries

coordinator review status
scoped_two_bounded_repairs_pending
coordinator review scope
Wholeanswer/all12tables;6freshselectedprimaryfamilies+2datedreuse/math;notindependent/allsource/currentconsolidationcertification.
C_BR-P07-C057 Saved research record

A098. Score criteria may not use unrelated, specified sensitive or prohibited third-party/right-exercise data.

Recorded check status: not yet checked

Primary source and pinpoint
S001 art. 7-A. Planalto

Recorded coordinator check boundaries

coordinator review status
scoped_two_bounded_repairs_pending
coordinator review scope
Wholeanswer/all12tables;6freshselectedprimaryfamilies+2datedreuse/math;notindependent/allsource/currentconsolidationcertification.
C_BR-P07-C058 Saved research record

A097. A manager must publish a clear and accessible data-collection/use policy for credit-risk analysis.

Recorded check status: not yet checked

Primary source and pinpoint
S001 art. 7-A §1. Planalto

Recorded coordinator check boundaries

coordinator review status
scoped_two_bounded_repairs_pending
coordinator review scope
Wholeanswer/all12tables;6freshselectedprimaryfamilies+2datedreuse/math;notindependent/allsource/currentconsolidationcertification.
C_BR-P07-C059 Saved research record

A098. Each response must show last update; the person may see sources, but consultants may not receive individual-source identities.

Recorded check status: not yet checked

Primary source and pinpoint
S003 arts. 10(I),(V), 11. Planalto

Recorded coordinator check boundaries

coordinator review status
scoped_two_bounded_repairs_pending
coordinator review scope
Wholeanswer/all12tables;6freshselectedprimaryfamilies+2datedreuse/math;notindependent/allsource/currentconsolidationcertification.
C_BR-P07-C060 Saved research record

A098. A consultant must return an automated-decision review result within seven business days.

Recorded check status: not yet checked

Primary source and pinpoint
S001 art. 5(VI); S003 art. 19. Planalto

Recorded coordinator check boundaries

coordinator review status
scoped_two_bounded_repairs_pending
coordinator review scope
Wholeanswer/all12tables;6freshselectedprimaryfamilies+2datedreuse/math;notindependent/allsource/currentconsolidationcertification.
C_BR-P07-C061 Saved research record

A098. Access, correction and review rights do not guarantee score increase, credit approval or a rate.

Recorded check status: not yet checked

Primary source and pinpoint
Negative consequence bounded by S001 arts. 5, 7, 7-A.

Recorded coordinator check boundaries

coordinator review status
scoped_two_bounded_repairs_pending
coordinator review scope
Wholeanswer/all12tables;6freshselectedprimaryfamilies+2datedreuse/math;notindependent/allsource/currentconsolidationcertification.
C_BR-P07-C062 Saved research record

A098. LGPD personal-data rights attach to natural persons; Lei 12.414 separately protects legal persons.

Recorded check status: not yet checked

Primary source and pinpoint
S008 arts. 1, 5, 17; S001 art. 1. Planalto +2

Recorded coordinator check boundaries

coordinator review status
scoped_two_bounded_repairs_pending
coordinator review scope
Wholeanswer/all12tables;6freshselectedprimaryfamilies+2datedreuse/math;notindependent/allsource/currentconsolidationcertification.
C_BR-P07-C063 Saved research record

A098. LGPD territorial applicability depends on art. 3’s processing and offering/data-collection nexus.

Recorded check status: not yet checked

Primary source and pinpoint
S008 art. 3. Planalto

Recorded coordinator check boundaries

coordinator review status
scoped_two_bounded_repairs_pending
coordinator review scope
Wholeanswer/all12tables;6freshselectedprimaryfamilies+2datedreuse/math;notindependent/allsource/currentconsolidationcertification.
C_BR-P07-C064 Saved research record

A097. Credit protection is an LGPD legal basis, but it does not displace specific full-history authorization rules.

Recorded check status: not yet checked

Primary source and pinpoint
S008 art. 7(X), §6; S001 art. 4(IV)(b). Planalto +1

Recorded coordinator check boundaries

coordinator review status
scoped_two_bounded_repairs_pending
coordinator review scope
Wholeanswer/all12tables;6freshselectedprimaryfamilies+2datedreuse/math;notindependent/allsource/currentconsolidationcertification.
C_BR-P07-C065 Saved research record

A098. Natural persons have LGPD access, correction and automated-review rights in addition to sector-specific rights.

Recorded check status: not yet checked

Primary source and pinpoint
S008 arts. 18–20; complete LGPD module held. Planalto +1

Recorded coordinator check boundaries

coordinator review status
scoped_two_bounded_repairs_pending
coordinator review scope
Wholeanswer/all12tables;6freshselectedprimaryfamilies+2datedreuse/math;notindependent/allsource/currentconsolidationcertification.
C_BR-P07-C066 Saved research record

A097. Covered financial-institution information may go only to BCB-registered managers.

Recorded check status: not yet checked

Primary source and pinpoint
S001 art. 12; S004 arts. 1–5. Planalto +2

Recorded coordinator check boundaries

coordinator review status
scoped_two_bounded_repairs_pending
coordinator review scope
Wholeanswer/all12tables;6freshselectedprimaryfamilies+2datedreuse/math;notindependent/allsource/currentconsolidationcertification.
C_BR-P07-C067 Saved research record

A097. Resolução 4.737 specifies covered operations and reporting fields, including partial payments.

Recorded check status: not yet checked

Primary source and pinpoint
S004 arts. 2–3, printed pp.1–2, indices 0–1. Banco Central do Brasil Normativos +1

Recorded coordinator check boundaries

coordinator review status
scoped_two_bounded_repairs_pending
coordinator review scope
Wholeanswer/all12tables;6freshselectedprimaryfamilies+2datedreuse/math;notindependent/allsource/currentconsolidationcertification.
C_BR-P07-C068 Saved research record

A097. Banco Central manager registration does not make the manager a financial institution or grant an adviser licence.

Recorded check status: not yet checked

Primary source and pinpoint
S001 art. 12 §7; S004 scope. Planalto +1

Recorded coordinator check boundaries

coordinator review status
scoped_two_bounded_repairs_pending
coordinator review scope
Wholeanswer/all12tables;6freshselectedprimaryfamilies+2datedreuse/math;notindependent/allsource/currentconsolidationcertification.
C_BR-P07-C069 Saved research record

A097. LC 105 permits the defined positive-history transfer without creating a general bank-data exception.

Recorded check status: not yet checked

Primary source and pinpoint
S007 art. 1 §3(VII). Planalto

Recorded coordinator check boundaries

coordinator review status
scoped_two_bounded_repairs_pending
coordinator review scope
Wholeanswer/all12tables;6freshselectedprimaryfamilies+2datedreuse/math;notindependent/allsource/currentconsolidationcertification.
C_BR-P07-C070 Saved research record

A098. Detailed current Resolução BCB 14 registration procedure remains unread because the official dynamic body returned no substantive text.

Recorded check status: not yet checked

Primary source and pinpoint
S006; explicit source-access limit.

Recorded coordinator check boundaries

coordinator review status
scoped_two_bounded_repairs_pending
coordinator review scope
Wholeanswer/all12tables;6freshselectedprimaryfamilies+2datedreuse/math;notindependent/allsource/currentconsolidationcertification.
C_BR-P07-C071 Saved research record

A098. Currentness includes LC 166, Decreto 9.936 and Resolução 4.737 as amended effective April 1, 2022; later exhaustive citator remains held.

Recorded check status: not yet checked

Primary source and pinpoint
S001–S005.

Recorded coordinator check boundaries

coordinator review status
scoped_two_bounded_repairs_pending
coordinator review scope
Wholeanswer/all12tables;6freshselectedprimaryfamilies+2datedreuse/math;notindependent/allsource/currentconsolidationcertification.
C_BR-P07-C072 Saved research record

A098. No actual person, company, score, history, source, consultant, manager or registration record was searched.

Recorded check status: not yet checked

Primary source and pinpoint
Research boundary.

Recorded coordinator check boundaries

coordinator review status
scoped_two_bounded_repairs_pending
coordinator review scope
Wholeanswer/all12tables;6freshselectedprimaryfamilies+2datedreuse/math;notindependent/allsource/currentconsolidationcertification.

Sources, pinpoints and access limits

Keep the source version, actual read extent and jurisdiction with the proposition. A link or researcher access claim is not a substitute for an operative primary passage.

C_BR-P07-S001 Saved research record

Presidência da República, Lei nº 12.414, de 9 de junho de 2011, compiled. https://www.planalto.gov.br/ccivil_03/_ato2011-2014/2011/lei/l12414.htm

Recorded check status: not yet checked

Pinpoints, publication/commencement, pages and limits
FRESH-READ—OPERATIVE. Arts. 1–9, 12–18; especially arts. 2–8, 12, 14–17. Original law effective on publication under art. 18; current text contains LC 166 amendments and shows historical struck text. HTML; printed page and PDF index N/A. Full remedies/case citator not completed. Planalto +3
Direct source URLs
https://www.planalto.gov.br/ccivil_03/_ato2011-2014/2011/lei/l12414.htm

Recorded coordinator check boundaries

coordinator review status
scoped_two_bounded_repairs_pending
coordinator review scope
Wholeanswer/all12tables;6freshselectedprimaryfamilies+2datedreuse/math;notindependent/allsource/currentconsolidationcertification.
C_BR-S002 Saved research record

Presidência da República, Lei Complementar nº 166, de 8 de abril de 2019. https://www.planalto.gov.br/ccivil_03/leis/lcp/lcp166.htm

Recorded check status: not yet checked

Pinpoints, publication/commencement, pages and limits
FRESH-READ—AMENDMENT. Arts. 1–7, especially art. 2 amendments and art. 7 commencement. DOU April 9, 2019. Selected provisions effective on publication; other substantive amendments after 91 days, July 9, 2019. HTML; printed page/PDF index N/A. Planalto +2
Direct source URLs
https://www.planalto.gov.br/ccivil_03/leis/lcp/lcp166.htm

Recorded coordinator check boundaries

coordinator review status
scoped_two_bounded_repairs_pending
coordinator review scope
Wholeanswer/all12tables;6freshselectedprimaryfamilies+2datedreuse/math;notindependent/allsource/currentconsolidationcertification.
C_BR-S003 Saved research record

Presidência da República, Decreto nº 9.936, de 24 de julho de 2019. https://www.planalto.gov.br/ccivil_03/_ato2019-2022/2019/decreto/d9936.htm

Recorded check status: not yet checked

Pinpoints, publication/commencement, pages and limits
FRESH-READ—OPERATIVE. Arts. 1–23 and annex; materially arts. 2–17, 19, 22–23. Published DOU July 25, 2019; art. 23 effective on publication; rectified August 1, 2019. HTML; printed page/PDF index N/A. Security-incident branch not substantively completed. Planalto +5
Direct source URLs
https://www.planalto.gov.br/ccivil_03/_ato2019-2022/2019/decreto/d9936.htm

Recorded coordinator check boundaries

coordinator review status
scoped_two_bounded_repairs_pending
coordinator review scope
Wholeanswer/all12tables;6freshselectedprimaryfamilies+2datedreuse/math;notindependent/allsource/currentconsolidationcertification.
C_BR-S004 Saved research record

Conselho Monetário Nacional / Banco Central do Brasil, Resolução nº 4.737, de 29 de julho de 2019, current consolidated PDF. https://normativos.bcb.gov.br/Lists/Normativos/Attachments/50808/Res_4737_v2_P.pdf

Recorded check status: not yet checked

Pinpoints, publication/commencement, pages and limits
FRESH-READ—OPERATIVE PDF. Arts. 1–3: printed p.1, zero-based index 0; arts. 3–6: printed p.2, index 1; arts. 12–14: printed p.7, index 6; arts. 14–19: printed p.8, index 7. Original DOU July 31, 2019, Section 1, p.58; art. 19 effective on publication. Consolidation shows Resolução CMN 4.990 changes effective April 1, 2022. Banco Central do Brasil Normativos +3
Direct source URLs
https://normativos.bcb.gov.br/Lists/Normativos/Attachments/50808/Res_4737_v2_P.pdf

Recorded coordinator check boundaries

coordinator review status
scoped_two_bounded_repairs_pending
coordinator review scope
Wholeanswer/all12tables;6freshselectedprimaryfamilies+2datedreuse/math;notindependent/allsource/currentconsolidationcertification.
C_BR-S005 Saved research record

Banco Central do Brasil, Resolução CMN nº 4.990, de 24 de março de 2022, dynamic normative page. https://www.bcb.gov.br/estabilidadefinanceira/exibenormativo?numero=4990&tipo=Resolu%C3%A7%C3%A3o+CMN

Recorded check status: not yet checked

Pinpoints, publication/commencement, pages and limits
INDEX/FAILED BODY. Public dynamic page returned no substantive text. The actual amendment wording/effective date is visible in S004’s official consolidated 4.737 PDF; an official preparatory vote was discovery only and is not treated as the enacted rule. HTML dynamic page; printed page/PDF index N/A. Banco Central do Brasil +1
Direct source URLs
https://www.bcb.gov.br/estabilidadefinanceira/exibenormativo?numero=4990&tipo=Resolu%C3%A7%C3%A3o+CMN

Recorded coordinator check boundaries

coordinator review status
scoped_two_bounded_repairs_pending
coordinator review scope
Wholeanswer/all12tables;6freshselectedprimaryfamilies+2datedreuse/math;notindependent/allsource/currentconsolidationcertification.
C_BR-S006 Saved research record

Banco Central do Brasil, Resolução BCB nº 14, de 9 de setembro de 2020, dynamic normative page. https://www.bcb.gov.br/estabilidadefinanceira/exibenormativo?numero=14&tipo=Resolu%C3%A7%C3%A3o+BCB

Recorded check status: not yet checked

Pinpoints, publication/commencement, pages and limits
INDEX/FAILED BODY. Official dynamic page did not return substantive provisions. Official BCB material identifies it as the procedural rule for manager registration. No detailed current form, filing or procedural claim is adopted. HTML; printed page/PDF index N/A. Banco Central do Brasil +1
Direct source URLs
https://www.bcb.gov.br/estabilidadefinanceira/exibenormativo?numero=14&tipo=Resolu%C3%A7%C3%A3o+BCB

Recorded coordinator check boundaries

coordinator review status
scoped_two_bounded_repairs_pending
coordinator review scope
Wholeanswer/all12tables;6freshselectedprimaryfamilies+2datedreuse/math;notindependent/allsource/currentconsolidationcertification.
C_BR-S007 Saved research record

Presidência da República, Lei Complementar nº 105, de 10 de janeiro de 2001, compiled. https://www.planalto.gov.br/ccivil_03/leis/lcp/lcp105.htm

Recorded check status: not yet checked

Pinpoints, publication/commencement, pages and limits
FRESH-READ—LIMITED. Art. 1 §3(VII) and related bank-secrecy context. The positive-history exception was added by LC 166/2019. HTML; printed page/PDF index N/A. No general bank-secrecy module completed. Planalto
Direct source URLs
https://www.planalto.gov.br/ccivil_03/leis/lcp/lcp105.htm

Recorded coordinator check boundaries

coordinator review status
scoped_two_bounded_repairs_pending
coordinator review scope
Wholeanswer/all12tables;6freshselectedprimaryfamilies+2datedreuse/math;notindependent/allsource/currentconsolidationcertification.
C_BR-S008 Saved research record

Presidência da República, Lei nº 13.709/2018 — LGPD, compiled. https://www.planalto.gov.br/ccivil_03/_ato2015-2018/2018/lei/l13709compilado.htm

Recorded check status: not yet checked

Pinpoints, publication/commencement, pages and limits
FRESH-READ—LIMITED CROSSOVER. Arts. 1, 3, 5–9 and 17–20. Current compiled text read only for natural-person scope, territorial nexus, principles, credit-protection basis, access/correction and automated decisions. HTML; printed page/PDF index N/A. Full LGPD module deferred. Planalto +4
Direct source URLs
https://www.planalto.gov.br/ccivil_03/_ato2015-2018/2018/lei/l13709compilado.htm

Recorded coordinator check boundaries

coordinator review status
scoped_two_bounded_repairs_pending
coordinator review scope
Wholeanswer/all12tables;6freshselectedprimaryfamilies+2datedreuse/math;notindependent/allsource/currentconsolidationcertification.
C_BR-S009 Saved research record

Presidência da República, Lei nº 8.078/1990 — Código de Defesa do Consumidor, compiled. https://www.planalto.gov.br/ccivil_03/leis/l8078compilado.htm

Recorded check status: not yet checked

Pinpoints, publication/commencement, pages and limits
FRESH-READ—LIMITED. Arts. 2–3 only, for consumer/supplier definitions and the credit-service overlay. HTML; printed page/PDF index N/A. Negative-register art. 43 doctrine was not rerun. Planalto
Direct source URLs
https://www.planalto.gov.br/ccivil_03/leis/l8078compilado.htm
https://www.planalto.gov.br/ccivil_03/leis/l8078compilado.htm?utm_source=chatgpt.com

Recorded coordinator check boundaries

coordinator review status
scoped_two_bounded_repairs_pending
coordinator review scope
Wholeanswer/all12tables;6freshselectedprimaryfamilies+2datedreuse/math;notindependent/allsource/currentconsolidationcertification.
C_BR-S010 Saved research record

Presidência da República, Lei nº 10.406/2002 — Código Civil, compiled. https://www.planalto.gov.br/ccivil_03/leis/2002/l10406compilada.htm

Recorded check status: not yet checked

Pinpoints, publication/commencement, pages and limits
FRESH-READ—TIMING ONLY. Art. 132 caput and §§1–4. Used only for fictional deadline arithmetic. HTML; printed page/PDF index N/A. No PASS-05 prescription conclusions adopted. Planalto
Direct source URLs
https://www.planalto.gov.br/ccivil_03/leis/2002/l10406compilada.htm

Recorded coordinator check boundaries

coordinator review status
scoped_two_bounded_repairs_pending
coordinator review scope
Wholeanswer/all12tables;6freshselectedprimaryfamilies+2datedreuse/math;notindependent/allsource/currentconsolidationcertification.
C_BR-S011 Saved research record

Presidência da República, Decreto nº 7.829, de 17 de outubro de 2012. https://www.planalto.gov.br/ccivil_03/_ato2011-2014/2012/decreto/d7829.htm

Recorded check status: not yet checked

Pinpoints, publication/commencement, pages and limits
HISTORICAL—REVOKED. Official page identifies revocation by Decreto 9.936/2019. Read only to preserve the original opt-in regulatory history. HTML; printed page/PDF index N/A. Planalto
Direct source URLs
https://www.planalto.gov.br/ccivil_03/_ato2011-2014/2012/decreto/d7829.htm

Recorded coordinator check boundaries

coordinator review status
scoped_two_bounded_repairs_pending
coordinator review scope
Wholeanswer/all12tables;6freshselectedprimaryfamilies+2datedreuse/math;notindependent/allsource/currentconsolidationcertification.

What was examined—and what is still missing

The saved component-level coverage record keeps answered, partial, blank and unresolved branches distinct. A coverage label is not acceptance of a whole subject or jurisdiction.

coverage-1 Saved research record

P07-G01 Positive-history scope

Recorded check status: recorded; no individual primary acceptance inferred

#
P07-G01
Required subquestion
Positive-history scope
Finding / claims
C001, C009
Status and exact next action
Answered narrowly. Verify actual dataset before applying.

Recorded coordinator check boundaries

coordinator acceptance
scoped_supported_or_hold_with_prior_information_audit_clock_repairs_pending
coordinator review status
scoped_two_bounded_repairs_pending
coordinator review scope
Wholeanswer/all12tables;6freshselectedprimaryfamilies+2datedreuse/math;notindependent/allsource/currentconsolidationcertification.
coverage-2 Saved research record

G02 Natural person

Recorded check status: recorded; no individual primary acceptance inferred

#
G02
Required subquestion
Natural person
Finding / claims
C002, C062
Status and exact next action
Answered gateway. Obtain actual data and actor roles.

Recorded coordinator check boundaries

coordinator acceptance
scoped_supported_or_hold_with_prior_information_audit_clock_repairs_pending
coordinator review status
scoped_two_bounded_repairs_pending
coordinator review scope
Wholeanswer/all12tables;6freshselectedprimaryfamilies+2datedreuse/math;notindependent/allsource/currentconsolidationcertification.
coverage-3 Saved research record

G03 Legal person

Recorded check status: recorded; no individual primary acceptance inferred

#
G03
Required subquestion
Legal person
Finding / claims
C002, C032, C062
Status and exact next action
Answered gateway. Separate corporate and personal data.

Recorded coordinator check boundaries

coordinator acceptance
scoped_supported_or_hold_with_prior_information_audit_clock_repairs_pending
coordinator review status
scoped_two_bounded_repairs_pending
coordinator review scope
Wholeanswer/all12tables;6freshselectedprimaryfamilies+2datedreuse/math;notindependent/allsource/currentconsolidationcertification.
coverage-4 Saved research record

G04 Consumer status

Recorded check status: recorded; no individual primary acceptance inferred

#
G04
Required subquestion
Consumer status
Finding / claims
C002; CDC overlay held
Status and exact next action
Conditional. Apply CDC only after final-recipient classification.

Recorded coordinator check boundaries

coordinator acceptance
scoped_supported_or_hold_with_prior_information_audit_clock_repairs_pending
coordinator review status
scoped_two_bounded_repairs_pending
coordinator review scope
Wholeanswer/all12tables;6freshselectedprimaryfamilies+2datedreuse/math;notindependent/allsource/currentconsolidationcertification.
coverage-5 Saved research record

G05 Public-law database

Recorded check status: recorded; no individual primary acceptance inferred

#
G05
Required subquestion
Public-law database
Finding / claims
C003
Status and exact next action
Excluded. Identify specific public register law.

Recorded coordinator check boundaries

coordinator acceptance
scoped_supported_or_hold_with_prior_information_audit_clock_repairs_pending
coordinator review status
scoped_two_bounded_repairs_pending
coordinator review scope
Wholeanswer/all12tables;6freshselectedprimaryfamilies+2datedreuse/math;notindependent/allsource/currentconsolidationcertification.
coverage-6 Saved research record

G06 Foreign/remote nexus

Recorded check status: recorded; no individual primary acceptance inferred

#
G06
Required subquestion
Foreign/remote nexus
Finding / claims
C063
Status and exact next action
Held. Determine processing, offering and collection locations.

Recorded coordinator check boundaries

coordinator acceptance
scoped_supported_or_hold_with_prior_information_audit_clock_repairs_pending
coordinator review status
scoped_two_bounded_repairs_pending
coordinator review scope
Wholeanswer/all12tables;6freshselectedprimaryfamilies+2datedreuse/math;notindependent/allsource/currentconsolidationcertification.
coverage-7 Saved research record

G07 Database definition

Recorded check status: recorded; no individual primary acceptance inferred

#
G07
Required subquestion
Database definition
Finding / claims
C004
Status and exact next action
Answered. Confirm financial-risk purpose.

Recorded coordinator check boundaries

coordinator acceptance
scoped_supported_or_hold_with_prior_information_audit_clock_repairs_pending
coordinator review status
scoped_two_bounded_repairs_pending
coordinator review scope
Wholeanswer/all12tables;6freshselectedprimaryfamilies+2datedreuse/math;notindependent/allsource/currentconsolidationcertification.
coverage-8 Saved research record

G08 Manager

Recorded check status: recorded; no individual primary acceptance inferred

#
G08
Required subquestion
Manager
Finding / claims
C005, C018
Status and exact next action
Answered category. Verify actual operating role.

Recorded coordinator check boundaries

coordinator acceptance
scoped_supported_or_hold_with_prior_information_audit_clock_repairs_pending
coordinator review status
scoped_two_bounded_repairs_pending
coordinator review scope
Wholeanswer/all12tables;6freshselectedprimaryfamilies+2datedreuse/math;notindependent/allsource/currentconsolidationcertification.
coverage-9 Saved research record

G09 Registered person

Recorded check status: recorded; no individual primary acceptance inferred

#
G09
Required subquestion
Registered person
Finding / claims
C006
Status and exact next action
Answered. Establish identity and record.

Recorded coordinator check boundaries

coordinator acceptance
scoped_supported_or_hold_with_prior_information_audit_clock_repairs_pending
coordinator review status
scoped_two_bounded_repairs_pending
coordinator review scope
Wholeanswer/all12tables;6freshselectedprimaryfamilies+2datedreuse/math;notindependent/allsource/currentconsolidationcertification.
coverage-10 Saved research record

G10 Source

Recorded check status: recorded; no individual primary acceptance inferred

#
G10
Required subquestion
Source
Finding / claims
C007, C014
Status and exact next action
Answered. Identify exact source and transaction.

Recorded coordinator check boundaries

coordinator acceptance
scoped_supported_or_hold_with_prior_information_audit_clock_repairs_pending
coordinator review status
scoped_two_bounded_repairs_pending
coordinator review scope
Wholeanswer/all12tables;6freshselectedprimaryfamilies+2datedreuse/math;notindependent/allsource/currentconsolidationcertification.
coverage-11 Saved research record

G11 Consultant

Recorded check status: recorded; no individual primary acceptance inferred

#
G11
Required subquestion
Consultant
Finding / claims
C008, C035
Status and exact next action
Answered. Verify relationship and purpose.

Recorded coordinator check boundaries

coordinator acceptance
scoped_supported_or_hold_with_prior_information_audit_clock_repairs_pending
coordinator review status
scoped_two_bounded_repairs_pending
coordinator review scope
Wholeanswer/all12tables;6freshselectedprimaryfamilies+2datedreuse/math;notindependent/allsource/currentconsolidationcertification.
coverage-12 Saved research record

G12 Representative

Recorded check status: recorded; no individual primary acceptance inferred

#
G12
Required subquestion
Representative
Finding / claims
C065, C072
Status and exact next action
Conditional. Obtain mandate and authentication.

Recorded coordinator check boundaries

coordinator acceptance
scoped_supported_or_hold_with_prior_information_audit_clock_repairs_pending
coordinator review status
scoped_two_bounded_repairs_pending
coordinator review scope
Wholeanswer/all12tables;6freshselectedprimaryfamilies+2datedreuse/math;notindependent/allsource/currentconsolidationcertification.
coverage-13 Saved research record

G13 Credit history

Recorded check status: recorded; no individual primary acceptance inferred

#
G13
Required subquestion
Credit history
Finding / claims
C009
Status and exact next action
Answered definition. Map actual fields.

Recorded coordinator check boundaries

coordinator acceptance
scoped_supported_or_hold_with_prior_information_audit_clock_repairs_pending
coordinator review status
scoped_two_bounded_repairs_pending
coordinator review scope
Wholeanswer/all12tables;6freshselectedprimaryfamilies+2datedreuse/math;notindependent/allsource/currentconsolidationcertification.
coverage-14 Saved research record

G14 Score distinction

Recorded check status: recorded; no individual primary acceptance inferred

#
G14
Required subquestion
Score distinction
Finding / claims
C010, C027
Status and exact next action
Answered. Do not treat score as full history.

Recorded coordinator check boundaries

coordinator acceptance
scoped_supported_or_hold_with_prior_information_audit_clock_repairs_pending
coordinator review status
scoped_two_bounded_repairs_pending
coordinator review scope
Wholeanswer/all12tables;6freshselectedprimaryfamilies+2datedreuse/math;notindependent/allsource/currentconsolidationcertification.
coverage-15 Saved research record

G15 Negative entry

Recorded check status: recorded; no individual primary acceptance inferred

#
G15
Required subquestion
Negative entry
Finding / claims
C001
Status and exact next action
Deferred. P06 remains unreviewed and unadopted.

Recorded coordinator check boundaries

coordinator acceptance
scoped_supported_or_hold_with_prior_information_audit_clock_repairs_pending
coordinator review status
scoped_two_bounded_repairs_pending
coordinator review scope
Wholeanswer/all12tables;6freshselectedprimaryfamilies+2datedreuse/math;notindependent/allsource/currentconsolidationcertification.
coverage-16 Saved research record

G16 SCR

Recorded check status: recorded; no individual primary acceptance inferred

#
G16
Required subquestion
SCR
Finding / claims
C001
Status and exact next action
Deferred. Read BCB/SCR rules separately.

Recorded coordinator check boundaries

coordinator acceptance
scoped_supported_or_hold_with_prior_information_audit_clock_repairs_pending
coordinator review status
scoped_two_bounded_repairs_pending
coordinator review scope
Wholeanswer/all12tables;6freshselectedprimaryfamilies+2datedreuse/math;notindependent/allsource/currentconsolidationcertification.
coverage-17 Saved research record

G17 Protest/Cadin/court data

Recorded check status: recorded; no individual primary acceptance inferred

#
G17
Required subquestion
Protest/Cadin/court data
Finding / claims
C001, C003
Status and exact next action
Deferred. Apply specific regimes separately.

Recorded coordinator check boundaries

coordinator acceptance
scoped_supported_or_hold_with_prior_information_audit_clock_repairs_pending
coordinator review status
scoped_two_bounded_repairs_pending
coordinator review scope
Wholeanswer/all12tables;6freshselectedprimaryfamilies+2datedreuse/math;notindependent/allsource/currentconsolidationcertification.
coverage-18 Saved research record

G18 Objective/clear/true data

Recorded check status: recorded; no individual primary acceptance inferred

#
G18
Required subquestion
Objective/clear/true data
Finding / claims
C011
Status and exact next action
Answered standard. Audit actual fields.

Recorded coordinator check boundaries

coordinator acceptance
scoped_supported_or_hold_with_prior_information_audit_clock_repairs_pending
coordinator review status
scoped_two_bounded_repairs_pending
coordinator review scope
Wholeanswer/all12tables;6freshselectedprimaryfamilies+2datedreuse/math;notindependent/allsource/currentconsolidationcertification.
coverage-19 Saved research record

G19 Excessive data

Recorded check status: recorded; no individual primary acceptance inferred

#
G19
Required subquestion
Excessive data
Finding / claims
C012
Status and exact next action
Prohibited. Test necessity to credit risk.

Recorded coordinator check boundaries

coordinator acceptance
scoped_supported_or_hold_with_prior_information_audit_clock_repairs_pending
coordinator review status
scoped_two_bounded_repairs_pending
coordinator review scope
Wholeanswer/all12tables;6freshselectedprimaryfamilies+2datedreuse/math;notindependent/allsource/currentconsolidationcertification.
coverage-20 Saved research record

G20 Sensitive data

Recorded check status: recorded; no individual primary acceptance inferred

#
G20
Required subquestion
Sensitive data
Finding / claims
C013, C057
Status and exact next action
Prohibited categories identified. Full LGPD sensitivity held.

Recorded coordinator check boundaries

coordinator acceptance
scoped_supported_or_hold_with_prior_information_audit_clock_repairs_pending
coordinator review status
scoped_two_bounded_repairs_pending
coordinator review scope
Wholeanswer/all12tables;6freshselectedprimaryfamilies+2datedreuse/math;notindependent/allsource/currentconsolidationcertification.
coverage-21 Saved research record

G21 Utility source

Recorded check status: recorded; no individual primary acceptance inferred

#
G21
Required subquestion
Utility source
Finding / claims
C014
Status and exact next action
Answered gateway. Identify service and payment fields.

Recorded coordinator check boundaries

coordinator acceptance
scoped_supported_or_hold_with_prior_information_audit_clock_repairs_pending
coordinator review status
scoped_two_bounded_repairs_pending
coordinator review scope
Wholeanswer/all12tables;6freshselectedprimaryfamilies+2datedreuse/math;notindependent/allsource/currentconsolidationcertification.
coverage-22 Saved research record

G22 Financial source

Recorded check status: recorded; no individual primary acceptance inferred

#
G22
Required subquestion
Financial source
Finding / claims
C066–C069
Status and exact next action
Conditional. Verify BCB registration and operation type.

Recorded coordinator check boundaries

coordinator acceptance
scoped_supported_or_hold_with_prior_information_audit_clock_repairs_pending
coordinator review status
scoped_two_bounded_repairs_pending
coordinator review scope
Wholeanswer/all12tables;6freshselectedprimaryfamilies+2datedreuse/math;notindependent/allsource/currentconsolidationcertification.
coverage-23 Saved research record

G23 Partial-payment data

Recorded check status: recorded; no individual primary acceptance inferred

#
G23
Required subquestion
Partial-payment data
Finding / claims
C015, C067
Status and exact next action
Permitted field. Verify amount/date accuracy.

Recorded coordinator check boundaries

coordinator acceptance
scoped_supported_or_hold_with_prior_information_audit_clock_repairs_pending
coordinator review status
scoped_two_bounded_repairs_pending
coordinator review scope
Wholeanswer/all12tables;6freshselectedprimaryfamilies+2datedreuse/math;notindependent/allsource/currentconsolidationcertification.
coverage-24 Saved research record

G24 Identity/contact fields

Recorded check status: recorded; no individual primary acceptance inferred

#
G24
Required subquestion
Identity/contact fields
Finding / claims
C016
Status and exact next action
Permitted operational layout. Check necessity and accuracy.

Recorded coordinator check boundaries

coordinator acceptance
scoped_supported_or_hold_with_prior_information_audit_clock_repairs_pending
coordinator review status
scoped_two_bounded_repairs_pending
coordinator review scope
Wholeanswer/all12tables;6freshselectedprimaryfamilies+2datedreuse/math;notindependent/allsource/currentconsolidationcertification.
coverage-25 Saved research record

G25 Account balances/itemized purchases

Recorded check status: recorded; no individual primary acceptance inferred

#
G25
Required subquestion
Account balances/itemized purchases
Finding / claims
C017
Status and exact next action
No general authority established. Identify separate legal basis if claimed.

Recorded coordinator check boundaries

coordinator acceptance
scoped_supported_or_hold_with_prior_information_audit_clock_repairs_pending
coordinator review status
scoped_two_bounded_repairs_pending
coordinator review scope
Wholeanswer/all12tables;6freshselectedprimaryfamilies+2datedreuse/math;notindependent/allsource/currentconsolidationcertification.
coverage-26 Saved research record

G26 Manager capital/governance

Recorded check status: recorded; no individual primary acceptance inferred

#
G26
Required subquestion
Manager capital/governance
Finding / claims
C018
Status and exact next action
Manager-only. Do not turn into adviser licence or consumer fee.

Recorded coordinator check boundaries

coordinator acceptance
scoped_supported_or_hold_with_prior_information_audit_clock_repairs_pending
coordinator review status
scoped_two_bounded_repairs_pending
coordinator review scope
Wholeanswer/all12tables;6freshselectedprimaryfamilies+2datedreuse/math;notindependent/allsource/currentconsolidationcertification.
coverage-27 Saved research record

G27 Original opt-in rule

Recorded check status: recorded; no individual primary acceptance inferred

#
G27
Required subquestion
Original opt-in rule
Finding / claims
C019
Status and exact next action
Historical. Do not publish as current.

Recorded coordinator check boundaries

coordinator acceptance
scoped_supported_or_hold_with_prior_information_audit_clock_repairs_pending
coordinator review status
scoped_two_bounded_repairs_pending
coordinator review scope
Wholeanswer/all12tables;6freshselectedprimaryfamilies+2datedreuse/math;notindependent/allsource/currentconsolidationcertification.
coverage-28 Saved research record

G28 Current opt-out rule

Recorded check status: recorded; no individual primary acceptance inferred

#
G28
Required subquestion
Current opt-out rule
Finding / claims
C020–C021
Status and exact next action
Answered. Effective July 9, 2019.

Recorded coordinator check boundaries

coordinator acceptance
scoped_supported_or_hold_with_prior_information_audit_clock_repairs_pending
coordinator review status
scoped_two_bounded_repairs_pending
coordinator review scope
Wholeanswer/all12tables;6freshselectedprimaryfamilies+2datedreuse/math;notindependent/allsource/currentconsolidationcertification.
coverage-29 Saved research record

G29 Opening without consent

Recorded check status: recorded; no individual primary acceptance inferred

#
G29
Required subquestion
Opening without consent
Finding / claims
C021
Status and exact next action
Permitted conditionally. Other safeguards still apply.

Recorded coordinator check boundaries

coordinator acceptance
scoped_supported_or_hold_with_prior_information_audit_clock_repairs_pending
coordinator review status
scoped_two_bounded_repairs_pending
coordinator review scope
Wholeanswer/all12tables;6freshselectedprimaryfamilies+2datedreuse/math;notindependent/allsource/currentconsolidationcertification.
coverage-30 Saved research record

G30 Opening notice period

Recorded check status: recorded; no individual primary acceptance inferred

#
G30
Required subquestion
Opening notice period
Finding / claims
C022
Status and exact next action
Thirty days. Obtain exact opening date.

Recorded coordinator check boundaries

coordinator acceptance
scoped_supported_or_hold_with_prior_information_audit_clock_repairs_pending
coordinator review status
scoped_two_bounded_repairs_pending
coordinator review scope
Wholeanswer/all12tables;6freshselectedprimaryfamilies+2datedreuse/math;notindependent/allsource/currentconsolidationcertification.
coverage-31 Saved research record

G31 Notice cost

Recorded check status: recorded; no individual primary acceptance inferred

#
G31
Required subquestion
Notice cost
Finding / claims
C022
Status and exact next action
No cost.

Recorded coordinator check boundaries

coordinator acceptance
scoped_supported_or_hold_with_prior_information_audit_clock_repairs_pending
coordinator review status
scoped_two_bounded_repairs_pending
coordinator review scope
Wholeanswer/all12tables;6freshselectedprimaryfamilies+2datedreuse/math;notindependent/allsource/currentconsolidationcertification.
coverage-32 Saved research record

G32 Notice actor

Recorded check status: recorded; no individual primary acceptance inferred

#
G32
Required subquestion
Notice actor
Finding / claims
C023
Status and exact next action
Manager directly or through source.

Recorded coordinator check boundaries

coordinator acceptance
scoped_supported_or_hold_with_prior_information_audit_clock_repairs_pending
coordinator review status
scoped_two_bounded_repairs_pending
coordinator review scope
Wholeanswer/all12tables;6freshselectedprimaryfamilies+2datedreuse/math;notindependent/allsource/currentconsolidationcertification.
coverage-33 Saved research record

G33 Notice content

Recorded check status: recorded; no individual primary acceptance inferred

#
G33
Required subquestion
Notice content
Finding / claims
C023
Status and exact next action
Cancellation channels required. Inspect actual communication.

Recorded coordinator check boundaries

coordinator acceptance
scoped_supported_or_hold_with_prior_information_audit_clock_repairs_pending
coordinator review status
scoped_two_bounded_repairs_pending
coordinator review scope
Wholeanswer/all12tables;6freshselectedprimaryfamilies+2datedreuse/math;notindependent/allsource/currentconsolidationcertification.
coverage-34 Saved research record

G34 Notice medium

Recorded check status: recorded; no individual primary acceptance inferred

#
G34
Required subquestion
Notice medium
Finding / claims
C025
Status and exact next action
No exclusive method established. Verify contact-data origin and proof.

Recorded coordinator check boundaries

coordinator acceptance
scoped_supported_or_hold_with_prior_information_audit_clock_repairs_pending
coordinator review status
scoped_two_bounded_repairs_pending
coordinator review scope
Wholeanswer/all12tables;6freshselectedprimaryfamilies+2datedreuse/math;notindependent/allsource/currentconsolidationcertification.
coverage-35 Saved research record

G35 Existing-record exception

Recorded check status: recorded; no individual primary acceptance inferred

#
G35
Required subquestion
Existing-record exception
Finding / claims
C024
Status and exact next action
Conditional exception. Prove another record was open.

Recorded coordinator check boundaries

coordinator acceptance
scoped_supported_or_hold_with_prior_information_audit_clock_repairs_pending
coordinator review status
scoped_two_bounded_repairs_pending
coordinator review scope
Wholeanswer/all12tables;6freshselectedprimaryfamilies+2datedreuse/math;notindependent/allsource/currentconsolidationcertification.
coverage-36 Saved research record

G36 Prior opt-out

Recorded check status: recorded; no individual primary acceptance inferred

#
G36
Required subquestion
Prior opt-out
Finding / claims
C040
Status and exact next action
Automatic cancellation required. Prove earlier expression.

Recorded coordinator check boundaries

coordinator acceptance
scoped_supported_or_hold_with_prior_information_audit_clock_repairs_pending
coordinator review status
scoped_two_bounded_repairs_pending
coordinator review scope
Wholeanswer/all12tables;6freshselectedprimaryfamilies+2datedreuse/math;notindependent/allsource/currentconsolidationcertification.
coverage-37 Saved research record

G37 Sixty-day consultation delay

Recorded check status: recorded; no individual primary acceptance inferred

#
G37
Required subquestion
Sixty-day consultation delay
Finding / claims
C026
Status and exact next action
Answered. Obtain exact opening timestamp.

Recorded coordinator check boundaries

coordinator acceptance
scoped_supported_or_hold_with_prior_information_audit_clock_repairs_pending
coordinator review status
scoped_two_bounded_repairs_pending
coordinator review scope
Wholeanswer/all12tables;6freshselectedprimaryfamilies+2datedreuse/math;notindependent/allsource/currentconsolidationcertification.
coverage-38 Saved research record

G38 Score consultation

Recorded check status: recorded; no individual primary acceptance inferred

#
G38
Required subquestion
Score consultation
Finding / claims
C027, C035
Status and exact next action
Conditional. Apply purpose, relationship, 60 days and suspension.

Recorded coordinator check boundaries

coordinator acceptance
scoped_supported_or_hold_with_prior_information_audit_clock_repairs_pending
coordinator review status
scoped_two_bounded_repairs_pending
coordinator review scope
Wholeanswer/all12tables;6freshselectedprimaryfamilies+2datedreuse/math;notindependent/allsource/currentconsolidationcertification.
coverage-39 Saved research record

G39 Full-history consultation

Recorded check status: recorded; no individual primary acceptance inferred

#
G39
Required subquestion
Full-history consultation
Finding / claims
C028–C035
Status and exact next action
Specific authorization required.

Recorded coordinator check boundaries

coordinator acceptance
scoped_supported_or_hold_with_prior_information_audit_clock_repairs_pending
coordinator review status
scoped_two_bounded_repairs_pending
coordinator review scope
Wholeanswer/all12tables;6freshselectedprimaryfamilies+2datedreuse/math;notindependent/allsource/currentconsolidationcertification.
coverage-40 Saved research record

G40 Authorization authenticity

Recorded check status: recorded; no individual primary acceptance inferred

#
G40
Required subquestion
Authorization authenticity
Finding / claims
C029
Status and exact next action
Manager proof required. Obtain authorization record.

Recorded coordinator check boundaries

coordinator acceptance
scoped_supported_or_hold_with_prior_information_audit_clock_repairs_pending
coordinator review status
scoped_two_bounded_repairs_pending
coordinator review scope
Wholeanswer/all12tables;6freshselectedprimaryfamilies+2datedreuse/math;notindependent/allsource/currentconsolidationcertification.
coverage-41 Saved research record

G41 One-time authorization

Recorded check status: recorded; no individual primary acceptance inferred

#
G41
Required subquestion
One-time authorization
Finding / claims
C030
Status and exact next action
Permitted. Identify consultant and access.

Recorded coordinator check boundaries

coordinator acceptance
scoped_supported_or_hold_with_prior_information_audit_clock_repairs_pending
coordinator review status
scoped_two_bounded_repairs_pending
coordinator review scope
Wholeanswer/all12tables;6freshselectedprimaryfamilies+2datedreuse/math;notindependent/allsource/currentconsolidationcertification.
coverage-42 Saved research record

G42 Natural-person duration

Recorded check status: recorded; no individual primary acceptance inferred

#
G42
Required subquestion
Natural-person duration
Finding / claims
C031
Status and exact next action
Maximum three months.

Recorded coordinator check boundaries

coordinator acceptance
scoped_supported_or_hold_with_prior_information_audit_clock_repairs_pending
coordinator review status
scoped_two_bounded_repairs_pending
coordinator review scope
Wholeanswer/all12tables;6freshselectedprimaryfamilies+2datedreuse/math;notindependent/allsource/currentconsolidationcertification.
coverage-43 Saved research record

G43 Legal-person duration

Recorded check status: recorded; no individual primary acceptance inferred

#
G43
Required subquestion
Legal-person duration
Finding / claims
C032
Status and exact next action
Maximum 12 months.

Recorded coordinator check boundaries

coordinator acceptance
scoped_supported_or_hold_with_prior_information_audit_clock_repairs_pending
coordinator review status
scoped_two_bounded_repairs_pending
coordinator review scope
Wholeanswer/all12tables;6freshselectedprimaryfamilies+2datedreuse/math;notindependent/allsource/currentconsolidationcertification.
coverage-44 Saved research record

G44 BCB institution indefinite duration

Recorded check status: recorded; no individual primary acceptance inferred

#
G44
Required subquestion
BCB institution indefinite duration
Finding / claims
C033
Status and exact next action
Only during contractual relationship.

Recorded coordinator check boundaries

coordinator acceptance
scoped_supported_or_hold_with_prior_information_audit_clock_repairs_pending
coordinator review status
scoped_two_bounded_repairs_pending
coordinator review scope
Wholeanswer/all12tables;6freshselectedprimaryfamilies+2datedreuse/math;notindependent/allsource/currentconsolidationcertification.
coverage-45 Saved research record

G45 Authorization revocation

Recorded check status: recorded; no individual primary acceptance inferred

#
G45
Required subquestion
Authorization revocation
Finding / claims
C034
Status and exact next action
Available anytime. Verify manager receipt.

Recorded coordinator check boundaries

coordinator acceptance
scoped_supported_or_hold_with_prior_information_audit_clock_repairs_pending
coordinator review status
scoped_two_bounded_repairs_pending
coordinator review scope
Wholeanswer/all12tables;6freshselectedprimaryfamilies+2datedreuse/math;notindependent/allsource/currentconsolidationcertification.
coverage-46 Saved research record

G46 Consultant relationship

Recorded check status: recorded; no individual primary acceptance inferred

#
G46
Required subquestion
Consultant relationship
Finding / claims
C035
Status and exact next action
Actual/intended commercial or credit relationship required.

Recorded coordinator check boundaries

coordinator acceptance
scoped_supported_or_hold_with_prior_information_audit_clock_repairs_pending
coordinator review status
scoped_two_bounded_repairs_pending
coordinator review scope
Wholeanswer/all12tables;6freshselectedprimaryfamilies+2datedreuse/math;notindependent/allsource/currentconsolidationcertification.
coverage-47 Saved research record

G47 Permitted purpose

Recorded check status: recorded; no individual primary acceptance inferred

#
G47
Required subquestion
Permitted purpose
Finding / claims
C035
Status and exact next action
Credit-risk or financial-risk transaction only.

Recorded coordinator check boundaries

coordinator acceptance
scoped_supported_or_hold_with_prior_information_audit_clock_repairs_pending
coordinator review status
scoped_two_bounded_repairs_pending
coordinator review scope
Wholeanswer/all12tables;6freshselectedprimaryfamilies+2datedreuse/math;notindependent/allsource/currentconsolidationcertification.
coverage-48 Saved research record

G48 Manager-to-manager sharing

Recorded check status: recorded; no individual primary acceptance inferred

#
G48
Required subquestion
Manager-to-manager sharing
Finding / claims
C036
Status and exact next action
Permitted with retained duties.

Recorded coordinator check boundaries

coordinator acceptance
scoped_supported_or_hold_with_prior_information_audit_clock_repairs_pending
coordinator review status
scoped_two_bounded_repairs_pending
coordinator review scope
Wholeanswer/all12tables;6freshselectedprimaryfamilies+2datedreuse/math;notindependent/allsource/currentconsolidationcertification.
coverage-49 Saved research record

G49 Financial-origin sharing

Recorded check status: recorded; no individual primary acceptance inferred

#
G49
Required subquestion
Financial-origin sharing
Finding / claims
C066
Status and exact next action
Registered managers only.

Recorded coordinator check boundaries

coordinator acceptance
scoped_supported_or_hold_with_prior_information_audit_clock_repairs_pending
coordinator review status
scoped_two_bounded_repairs_pending
coordinator review scope
Wholeanswer/all12tables;6freshselectedprimaryfamilies+2datedreuse/math;notindependent/allsource/currentconsolidationcertification.
coverage-50 Saved research record

G50 Cancellation free

Recorded check status: recorded; no individual primary acceptance inferred

#
G50
Required subquestion
Cancellation free
Finding / claims
C037
Status and exact next action
Answered.

Recorded coordinator check boundaries

coordinator acceptance
scoped_supported_or_hold_with_prior_information_audit_clock_repairs_pending
coordinator review status
scoped_two_bounded_repairs_pending
coordinator review scope
Wholeanswer/all12tables;6freshselectedprimaryfamilies+2datedreuse/math;notindependent/allsource/currentconsolidationcertification.
coverage-51 Saved research record

G51 Reopening free

Recorded check status: recorded; no individual primary acceptance inferred

#
G51
Required subquestion
Reopening free
Finding / claims
C037
Status and exact next action
Answered.

Recorded coordinator check boundaries

coordinator acceptance
scoped_supported_or_hold_with_prior_information_audit_clock_repairs_pending
coordinator review status
scoped_two_bounded_repairs_pending
coordinator review scope
Wholeanswer/all12tables;6freshselectedprimaryfamilies+2datedreuse/math;notindependent/allsource/currentconsolidationcertification.
coverage-52 Saved research record

G52 Request to any manager

Recorded check status: recorded; no individual primary acceptance inferred

#
G52
Required subquestion
Request to any manager
Finding / claims
C038
Status and exact next action
Answered.

Recorded coordinator check boundaries

coordinator acceptance
scoped_supported_or_hold_with_prior_information_audit_clock_repairs_pending
coordinator review status
scoped_two_bounded_repairs_pending
coordinator review scope
Wholeanswer/all12tables;6freshselectedprimaryfamilies+2datedreuse/math;notindependent/allsource/currentconsolidationcertification.
coverage-53 Saved research record

G53 Telephone/physical/electronic channel

Recorded check status: recorded; no individual primary acceptance inferred

#
G53
Required subquestion
Telephone/physical/electronic channel
Finding / claims
C038
Status and exact next action
Answered.

Recorded coordinator check boundaries

coordinator acceptance
scoped_supported_or_hold_with_prior_information_audit_clock_repairs_pending
coordinator review status
scoped_two_bounded_repairs_pending
coordinator review scope
Wholeanswer/all12tables;6freshselectedprimaryfamilies+2datedreuse/math;notindependent/allsource/currentconsolidationcertification.
coverage-54 Saved research record

G54 Receiving-manager deadline

Recorded check status: recorded; no individual primary acceptance inferred

#
G54
Required subquestion
Receiving-manager deadline
Finding / claims
C039
Status and exact next action
Two business days. Verify holidays/receipt.

Recorded coordinator check boundaries

coordinator acceptance
scoped_supported_or_hold_with_prior_information_audit_clock_repairs_pending
coordinator review status
scoped_two_bounded_repairs_pending
coordinator review scope
Wholeanswer/all12tables;6freshselectedprimaryfamilies+2datedreuse/math;notindependent/allsource/currentconsolidationcertification.
coverage-55 Saved research record

G55 Downstream-manager deadline

Recorded check status: recorded; no individual primary acceptance inferred

#
G55
Required subquestion
Downstream-manager deadline
Finding / claims
C039
Status and exact next action
Two business days from downstream receipt.

Recorded coordinator check boundaries

coordinator acceptance
scoped_supported_or_hold_with_prior_information_audit_clock_repairs_pending
coordinator review status
scoped_two_bounded_repairs_pending
coordinator review scope
Wholeanswer/all12tables;6freshselectedprimaryfamilies+2datedreuse/math;notindependent/allsource/currentconsolidationcertification.
coverage-56 Saved research record

G56 Cancellation effect

Recorded check status: recorded; no individual primary acceptance inferred

#
G56
Required subquestion
Cancellation effect
Finding / claims
C041
Status and exact next action
Statutory use stops. Other regimes unaffected.

Recorded coordinator check boundaries

coordinator acceptance
scoped_supported_or_hold_with_prior_information_audit_clock_repairs_pending
coordinator review status
scoped_two_bounded_repairs_pending
coordinator review scope
Wholeanswer/all12tables;6freshselectedprimaryfamilies+2datedreuse/math;notindependent/allsource/currentconsolidationcertification.
coverage-57 Saved research record

G57 Partial deletion

Recorded check status: recorded; no individual primary acceptance inferred

#
G57
Required subquestion
Partial deletion
Finding / claims
C042
Status and exact next action
Only for improperly recorded data.

Recorded coordinator check boundaries

coordinator acceptance
scoped_supported_or_hold_with_prior_information_audit_clock_repairs_pending
coordinator review status
scoped_two_bounded_repairs_pending
coordinator review scope
Wholeanswer/all12tables;6freshselectedprimaryfamilies+2datedreuse/math;notindependent/allsource/currentconsolidationcertification.
coverage-58 Saved research record

G58 New annotations after cancellation

Recorded check status: recorded; no individual primary acceptance inferred

#
G58
Required subquestion
New annotations after cancellation
Finding / claims
C043
Status and exact next action
Stop after two business days.

Recorded coordinator check boundaries

coordinator acceptance
scoped_supported_or_hold_with_prior_information_audit_clock_repairs_pending
coordinator review status
scoped_two_bounded_repairs_pending
coordinator review scope
Wholeanswer/all12tables;6freshselectedprimaryfamilies+2datedreuse/math;notindependent/allsource/currentconsolidationcertification.
coverage-59 Saved research record

G59 Audit retention after cancellation

Recorded check status: recorded; no individual primary acceptance inferred

#
G59
Required subquestion
Audit retention after cancellation
Finding / claims
C048
Status and exact next action
At least 15 years. No continued consultant use implied.

Recorded coordinator check boundaries

coordinator acceptance
scoped_supported_or_hold_with_prior_information_audit_clock_repairs_pending
coordinator review status
scoped_two_bounded_repairs_pending
coordinator review scope
Wholeanswer/all12tables;6freshselectedprimaryfamilies+2datedreuse/math;notindependent/allsource/currentconsolidationcertification.
coverage-60 Saved research record

G60 Reopening re-notice

Recorded check status: recorded; no individual primary acceptance inferred

#
G60
Required subquestion
Reopening re-notice
Finding / claims
C046
Status and exact next action
Unresolved. Locate current authoritative rule before publication.

Recorded coordinator check boundaries

coordinator acceptance
scoped_supported_or_hold_with_prior_information_audit_clock_repairs_pending
coordinator review status
scoped_two_bounded_repairs_pending
coordinator review scope
Wholeanswer/all12tables;6freshselectedprimaryfamilies+2datedreuse/math;notindependent/allsource/currentconsolidationcertification.
coverage-61 Saved research record

G61 Score-access suspension

Recorded check status: recorded; no individual primary acceptance inferred

#
G61
Required subquestion
Score-access suspension
Finding / claims
C044
Status and exact next action
Distinct right.

Recorded coordinator check boundaries

coordinator acceptance
scoped_supported_or_hold_with_prior_information_audit_clock_repairs_pending
coordinator review status
scoped_two_bounded_repairs_pending
coordinator review scope
Wholeanswer/all12tables;6freshselectedprimaryfamilies+2datedreuse/math;notindependent/allsource/currentconsolidationcertification.
coverage-62 Saved research record

G62 Own score during suspension

Recorded check status: recorded; no individual primary acceptance inferred

#
G62
Required subquestion
Own score during suspension
Finding / claims
C045
Status and exact next action
Access retained.

Recorded coordinator check boundaries

coordinator acceptance
scoped_supported_or_hold_with_prior_information_audit_clock_repairs_pending
coordinator review status
scoped_two_bounded_repairs_pending
coordinator review scope
Wholeanswer/all12tables;6freshselectedprimaryfamilies+2datedreuse/math;notindependent/allsource/currentconsolidationcertification.
coverage-63 Saved research record

G63 Positive-data maximum

Recorded check status: recorded; no individual primary acceptance inferred

#
G63
Required subquestion
Positive-data maximum
Finding / claims
C047
Status and exact next action
Fifteen years. Establish datum-level start.

Recorded coordinator check boundaries

coordinator acceptance
scoped_supported_or_hold_with_prior_information_audit_clock_repairs_pending
coordinator review status
scoped_two_bounded_repairs_pending
coordinator review scope
Wholeanswer/all12tables;6freshselectedprimaryfamilies+2datedreuse/math;notindependent/allsource/currentconsolidationcertification.
coverage-64 Saved research record

G64 Free access

Recorded check status: recorded; no individual primary acceptance inferred

#
G64
Required subquestion
Free access
Finding / claims
C049
Status and exact next action
Answered.

Recorded coordinator check boundaries

coordinator acceptance
scoped_supported_or_hold_with_prior_information_audit_clock_repairs_pending
coordinator review status
scoped_two_bounded_repairs_pending
coordinator review scope
Wholeanswer/all12tables;6freshselectedprimaryfamilies+2datedreuse/math;notindependent/allsource/currentconsolidationcertification.
coverage-65 Saved research record

G65 No justification required

Recorded check status: recorded; no individual primary acceptance inferred

#
G65
Required subquestion
No justification required
Finding / claims
C049
Status and exact next action
Answered.

Recorded coordinator check boundaries

coordinator acceptance
scoped_supported_or_hold_with_prior_information_audit_clock_repairs_pending
coordinator review status
scoped_two_bounded_repairs_pending
coordinator review scope
Wholeanswer/all12tables;6freshselectedprimaryfamilies+2datedreuse/math;notindependent/allsource/currentconsolidationcertification.
coverage-66 Saved research record

G66 Information/history/score access

Recorded check status: recorded; no individual primary acceptance inferred

#
G66
Required subquestion
Information/history/score access
Finding / claims
C049
Status and exact next action
Answered.

Recorded coordinator check boundaries

coordinator acceptance
scoped_supported_or_hold_with_prior_information_audit_clock_repairs_pending
coordinator review status
scoped_two_bounded_repairs_pending
coordinator review scope
Wholeanswer/all12tables;6freshselectedprimaryfamilies+2datedreuse/math;notindependent/allsource/currentconsolidationcertification.
coverage-67 Saved research record

G67 Sources and contact details

Recorded check status: recorded; no individual primary acceptance inferred

#
G67
Required subquestion
Sources and contact details
Finding / claims
C050
Status and exact next action
Accessible to registered person.

Recorded coordinator check boundaries

coordinator acceptance
scoped_supported_or_hold_with_prior_information_audit_clock_repairs_pending
coordinator review status
scoped_two_bounded_repairs_pending
coordinator review scope
Wholeanswer/all12tables;6freshselectedprimaryfamilies+2datedreuse/math;notindependent/allsource/currentconsolidationcertification.
coverage-68 Saved research record

G68 Shared managers

Recorded check status: recorded; no individual primary acceptance inferred

#
G68
Required subquestion
Shared managers
Finding / claims
C050
Status and exact next action
Accessible.

Recorded coordinator check boundaries

coordinator acceptance
scoped_supported_or_hold_with_prior_information_audit_clock_repairs_pending
coordinator review status
scoped_two_bounded_repairs_pending
coordinator review scope
Wholeanswer/all12tables;6freshselectedprimaryfamilies+2datedreuse/math;notindependent/allsource/currentconsolidationcertification.
coverage-69 Saved research record

G69 Prior six-month consultants

Recorded check status: recorded; no individual primary acceptance inferred

#
G69
Required subquestion
Prior six-month consultants
Finding / claims
C050
Status and exact next action
Accessible.

Recorded coordinator check boundaries

coordinator acceptance
scoped_supported_or_hold_with_prior_information_audit_clock_repairs_pending
coordinator review status
scoped_two_bounded_repairs_pending
coordinator review scope
Wholeanswer/all12tables;6freshselectedprimaryfamilies+2datedreuse/math;notindependent/allsource/currentconsolidationcertification.
coverage-70 Saved research record

G70 Access response periods

Recorded check status: recorded; no individual primary acceptance inferred

#
G70
Required subquestion
Access response periods
Finding / claims
C051
Status and exact next action
Multiple 10-day categories. Do not promise universal instant delivery.

Recorded coordinator check boundaries

coordinator acceptance
scoped_supported_or_hold_with_prior_information_audit_clock_repairs_pending
coordinator review status
scoped_two_bounded_repairs_pending
coordinator review scope
Wholeanswer/all12tables;6freshselectedprimaryfamilies+2datedreuse/math;notindependent/allsource/currentconsolidationcertification.
coverage-71 Saved research record

G71 Correction across all databases

Recorded check status: recorded; no individual primary acceptance inferred

#
G71
Required subquestion
Correction across all databases
Finding / claims
C052, C055
Status and exact next action
Within 10 days. Identify shared chain.

Recorded coordinator check boundaries

coordinator acceptance
scoped_supported_or_hold_with_prior_information_audit_clock_repairs_pending
coordinator review status
scoped_two_bounded_repairs_pending
coordinator review scope
Wholeanswer/all12tables;6freshselectedprimaryfamilies+2datedreuse/math;notindependent/allsource/currentconsolidationcertification.
coverage-72 Saved research record

G72 Source verification

Recorded check status: recorded; no individual primary acceptance inferred

#
G72
Required subquestion
Source verification
Finding / claims
C053
Status and exact next action
Two business days.

Recorded coordinator check boundaries

coordinator acceptance
scoped_supported_or_hold_with_prior_information_audit_clock_repairs_pending
coordinator review status
scoped_two_bounded_repairs_pending
coordinator review scope
Wholeanswer/all12tables;6freshselectedprimaryfamilies+2datedreuse/math;notindependent/allsource/currentconsolidationcertification.
coverage-73 Saved research record

G73 Source update

Recorded check status: recorded; no individual primary acceptance inferred

#
G73
Required subquestion
Source update
Finding / claims
C054
Status and exact next action
Within 10 days.

Recorded coordinator check boundaries

coordinator acceptance
scoped_supported_or_hold_with_prior_information_audit_clock_repairs_pending
coordinator review status
scoped_two_bounded_repairs_pending
coordinator review scope
Wholeanswer/all12tables;6freshselectedprimaryfamilies+2datedreuse/math;notindependent/allsource/currentconsolidationcertification.
coverage-74 Saved research record

G74 Score criteria

Recorded check status: recorded; no individual primary acceptance inferred

#
G74
Required subquestion
Score criteria
Finding / claims
C056
Status and exact next action
Principal elements available; trade secrets preserved.

Recorded coordinator check boundaries

coordinator acceptance
scoped_supported_or_hold_with_prior_information_audit_clock_repairs_pending
coordinator review status
scoped_two_bounded_repairs_pending
coordinator review scope
Wholeanswer/all12tables;6freshselectedprimaryfamilies+2datedreuse/math;notindependent/allsource/currentconsolidationcertification.
coverage-75 Saved research record

G75 Prohibited score inputs

Recorded check status: recorded; no individual primary acceptance inferred

#
G75
Required subquestion
Prohibited score inputs
Finding / claims
C057
Status and exact next action
Answered categories. Audit actual model separately.

Recorded coordinator check boundaries

coordinator acceptance
scoped_supported_or_hold_with_prior_information_audit_clock_repairs_pending
coordinator review status
scoped_two_bounded_repairs_pending
coordinator review scope
Wholeanswer/all12tables;6freshselectedprimaryfamilies+2datedreuse/math;notindependent/allsource/currentconsolidationcertification.
coverage-76 Saved research record

G76 Published data-use policy

Recorded check status: recorded; no individual primary acceptance inferred

#
G76
Required subquestion
Published data-use policy
Finding / claims
C058
Status and exact next action
Required. No actual manager policy reviewed.

Recorded coordinator check boundaries

coordinator acceptance
scoped_supported_or_hold_with_prior_information_audit_clock_repairs_pending
coordinator review status
scoped_two_bounded_repairs_pending
coordinator review scope
Wholeanswer/all12tables;6freshselectedprimaryfamilies+2datedreuse/math;notindependent/allsource/currentconsolidationcertification.
coverage-77 Saved research record

G77 Last-update timestamp

Recorded check status: recorded; no individual primary acceptance inferred

#
G77
Required subquestion
Last-update timestamp
Finding / claims
C059
Status and exact next action
Required in consultation response.

Recorded coordinator check boundaries

coordinator acceptance
scoped_supported_or_hold_with_prior_information_audit_clock_repairs_pending
coordinator review status
scoped_two_bounded_repairs_pending
coordinator review scope
Wholeanswer/all12tables;6freshselectedprimaryfamilies+2datedreuse/math;notindependent/allsource/currentconsolidationcertification.
coverage-78 Saved research record

G78 Source identity asymmetry

Recorded check status: recorded; no individual primary acceptance inferred

#
G78
Required subquestion
Source identity asymmetry
Finding / claims
C059
Status and exact next action
Person sees sources; consultant does not.

Recorded coordinator check boundaries

coordinator acceptance
scoped_supported_or_hold_with_prior_information_audit_clock_repairs_pending
coordinator review status
scoped_two_bounded_repairs_pending
coordinator review scope
Wholeanswer/all12tables;6freshselectedprimaryfamilies+2datedreuse/math;notindependent/allsource/currentconsolidationcertification.
coverage-79 Saved research record

G79 Automated review

Recorded check status: recorded; no individual primary acceptance inferred

#
G79
Required subquestion
Automated review
Finding / claims
C060
Status and exact next action
Seven-business-day result. Verify exclusively automated predicate.

Recorded coordinator check boundaries

coordinator acceptance
scoped_supported_or_hold_with_prior_information_audit_clock_repairs_pending
coordinator review status
scoped_two_bounded_repairs_pending
coordinator review scope
Wholeanswer/all12tables;6freshselectedprimaryfamilies+2datedreuse/math;notindependent/allsource/currentconsolidationcertification.
coverage-80 Saved research record

G80 Score or approval guarantee

Recorded check status: recorded; no individual primary acceptance inferred

#
G80
Required subquestion
Score or approval guarantee
Finding / claims
C061
Status and exact next action
None established.

Recorded coordinator check boundaries

coordinator acceptance
scoped_supported_or_hold_with_prior_information_audit_clock_repairs_pending
coordinator review status
scoped_two_bounded_repairs_pending
coordinator review scope
Wholeanswer/all12tables;6freshselectedprimaryfamilies+2datedreuse/math;notindependent/allsource/currentconsolidationcertification.
coverage-81 Saved research record

G81 LGPD natural-person scope

Recorded check status: recorded; no individual primary acceptance inferred

#
G81
Required subquestion
LGPD natural-person scope
Finding / claims
C062
Status and exact next action
Limited crossover only.

Recorded coordinator check boundaries

coordinator acceptance
scoped_supported_or_hold_with_prior_information_audit_clock_repairs_pending
coordinator review status
scoped_two_bounded_repairs_pending
coordinator review scope
Wholeanswer/all12tables;6freshselectedprimaryfamilies+2datedreuse/math;notindependent/allsource/currentconsolidationcertification.
coverage-82 Saved research record

G82 LGPD territorial nexus

Recorded check status: recorded; no individual primary acceptance inferred

#
G82
Required subquestion
LGPD territorial nexus
Finding / claims
C063
Status and exact next action
Conditional.

Recorded coordinator check boundaries

coordinator acceptance
scoped_supported_or_hold_with_prior_information_audit_clock_repairs_pending
coordinator review status
scoped_two_bounded_repairs_pending
coordinator review scope
Wholeanswer/all12tables;6freshselectedprimaryfamilies+2datedreuse/math;notindependent/allsource/currentconsolidationcertification.
coverage-83 Saved research record

G83 Credit-protection legal basis

Recorded check status: recorded; no individual primary acceptance inferred

#
G83
Required subquestion
Credit-protection legal basis
Finding / claims
C064
Status and exact next action
Does not override specific authorization.

Recorded coordinator check boundaries

coordinator acceptance
scoped_supported_or_hold_with_prior_information_audit_clock_repairs_pending
coordinator review status
scoped_two_bounded_repairs_pending
coordinator review scope
Wholeanswer/all12tables;6freshselectedprimaryfamilies+2datedreuse/math;notindependent/allsource/currentconsolidationcertification.
coverage-84 Saved research record

G84 LGPD access/correction/review

Recorded check status: recorded; no individual primary acceptance inferred

#
G84
Required subquestion
LGPD access/correction/review
Finding / claims
C065
Status and exact next action
Limited confirmation. Full module deferred.

Recorded coordinator check boundaries

coordinator acceptance
scoped_supported_or_hold_with_prior_information_audit_clock_repairs_pending
coordinator review status
scoped_two_bounded_repairs_pending
coordinator review scope
Wholeanswer/all12tables;6freshselectedprimaryfamilies+2datedreuse/math;notindependent/allsource/currentconsolidationcertification.
coverage-85 Saved research record

G85 Financial manager registration

Recorded check status: recorded; no individual primary acceptance inferred

#
G85
Required subquestion
Financial manager registration
Finding / claims
C066–C068
Status and exact next action
Gateway identified. No registrant lookup.

Recorded coordinator check boundaries

coordinator acceptance
scoped_supported_or_hold_with_prior_information_audit_clock_repairs_pending
coordinator review status
scoped_two_bounded_repairs_pending
coordinator review scope
Wholeanswer/all12tables;6freshselectedprimaryfamilies+2datedreuse/math;notindependent/allsource/currentconsolidationcertification.
coverage-86 Saved research record

G86 Bank-secrecy exception

Recorded check status: recorded; no individual primary acceptance inferred

#
G86
Required subquestion
Bank-secrecy exception
Finding / claims
C069
Status and exact next action
Narrow data category only.

Recorded coordinator check boundaries

coordinator acceptance
scoped_supported_or_hold_with_prior_information_audit_clock_repairs_pending
coordinator review status
scoped_two_bounded_repairs_pending
coordinator review scope
Wholeanswer/all12tables;6freshselectedprimaryfamilies+2datedreuse/math;notindependent/allsource/currentconsolidationcertification.
coverage-87 Saved research record

G87 Detailed BCB registration procedure

Recorded check status: recorded; no individual primary acceptance inferred

#
G87
Required subquestion
Detailed BCB registration procedure
Finding / claims
C070
Status and exact next action
Unresolved body. Obtain readable current Resolução BCB 14.

Recorded coordinator check boundaries

coordinator acceptance
scoped_supported_or_hold_with_prior_information_audit_clock_repairs_pending
coordinator review status
scoped_two_bounded_repairs_pending
coordinator review scope
Wholeanswer/all12tables;6freshselectedprimaryfamilies+2datedreuse/math;notindependent/allsource/currentconsolidationcertification.
coverage-88 Saved research record

G88 Currentness, P01 disposition and real-record acceptance

Recorded check status: recorded; no individual primary acceptance inferred

#
G88
Required subquestion
Currentness, P01 disposition and real-record acceptance
Finding / claims
C071–C072
Status and exact next action
HOLD. Recheck law and obtain actual data only under future authority.

Recorded coordinator check boundaries

coordinator acceptance
scoped_supported_or_hold_with_prior_information_audit_clock_repairs_pending
coordinator review status
scoped_two_bounded_repairs_pending
coordinator review scope
Wholeanswer/all12tables;6freshselectedprimaryfamilies+2datedreuse/math;notindependent/allsource/currentconsolidationcertification.
coverage-89 Saved research record

P07-D01 Ordinary negative credit-register entries

Recorded check status: recorded; no individual primary acceptance inferred

#
P07-D01
Deferred family
Ordinary negative credit-register entries
Exact remaining action
Preserve P06 as unreviewed; conduct separate accepted review before use.

Recorded coordinator check boundaries

coordinator acceptance
scoped_supported_or_hold_with_prior_information_audit_clock_repairs_pending
coordinator review status
scoped_two_bounded_repairs_pending
coordinator review scope
Wholeanswer/all12tables;6freshselectedprimaryfamilies+2datedreuse/math;notindependent/allsource/currentconsolidationcertification.
coverage-90 Saved research record

D02 Full LGPD legal bases and controller/operator allocation

Recorded check status: recorded; no individual primary acceptance inferred

#
D02
Deferred family
Full LGPD legal bases and controller/operator allocation
Exact remaining action
Read complete current statute, regulations and actual data flow.

Recorded coordinator check boundaries

coordinator acceptance
scoped_supported_or_hold_with_prior_information_audit_clock_repairs_pending
coordinator review status
scoped_two_bounded_repairs_pending
coordinator review scope
Wholeanswer/all12tables;6freshselectedprimaryfamilies+2datedreuse/math;notindependent/allsource/currentconsolidationcertification.
coverage-91 Saved research record

D03 LGPD international transfer and foreign controller

Recorded check status: recorded; no individual primary acceptance inferred

#
D03
Deferred family
LGPD international transfer and foreign controller
Exact remaining action
Determine location, transfer mechanism and current ANPD rules.

Recorded coordinator check boundaries

coordinator acceptance
scoped_supported_or_hold_with_prior_information_audit_clock_repairs_pending
coordinator review status
scoped_two_bounded_repairs_pending
coordinator review scope
Wholeanswer/all12tables;6freshselectedprimaryfamilies+2datedreuse/math;notindependent/allsource/currentconsolidationcertification.
coverage-92 Saved research record

D04 LGPD retention and deletion outside Lei 12.414

Recorded check status: recorded; no individual primary acceptance inferred

#
D04
Deferred family
LGPD retention and deletion outside Lei 12.414
Exact remaining action
Classify each purpose and statutory retention duty.

Recorded coordinator check boundaries

coordinator acceptance
scoped_supported_or_hold_with_prior_information_audit_clock_repairs_pending
coordinator review status
scoped_two_bounded_repairs_pending
coordinator review scope
Wholeanswer/all12tables;6freshselectedprimaryfamilies+2datedreuse/math;notindependent/allsource/currentconsolidationcertification.
coverage-93 Saved research record

D05 Biometrics, children’s data and sensitive-data processing

Recorded check status: recorded; no individual primary acceptance inferred

#
D05
Deferred family
Biometrics, children’s data and sensitive-data processing
Exact remaining action
Read specific LGPD rules and actual dataset.

Recorded coordinator check boundaries

coordinator acceptance
scoped_supported_or_hold_with_prior_information_audit_clock_repairs_pending
coordinator review status
scoped_two_bounded_repairs_pending
coordinator review scope
Wholeanswer/all12tables;6freshselectedprimaryfamilies+2datedreuse/math;notindependent/allsource/currentconsolidationcertification.
coverage-94 Saved research record

D06 Security incidents and breach notification

Recorded check status: recorded; no individual primary acceptance inferred

#
D06
Deferred family
Security incidents and breach notification
Exact remaining action
Decreto 9.936 art. 18 noted but full current LGPD/ANPD regime deferred.

Recorded coordinator check boundaries

coordinator acceptance
scoped_supported_or_hold_with_prior_information_audit_clock_repairs_pending
coordinator review status
scoped_two_bounded_repairs_pending
coordinator review scope
Wholeanswer/all12tables;6freshselectedprimaryfamilies+2datedreuse/math;notindependent/allsource/currentconsolidationcertification.
coverage-95 Saved research record

D07 LGPD sanctions, private actions and damages

Recorded check status: recorded; no individual primary acceptance inferred

#
D07
Deferred family
LGPD sanctions, private actions and damages
Exact remaining action
Full remedial and current case-law review required.

Recorded coordinator check boundaries

coordinator acceptance
scoped_supported_or_hold_with_prior_information_audit_clock_repairs_pending
coordinator review status
scoped_two_bounded_repairs_pending
coordinator review scope
Wholeanswer/all12tables;6freshselectedprimaryfamilies+2datedreuse/math;notindependent/allsource/currentconsolidationcertification.
coverage-96 Saved research record

D08 Actual proprietary score model

Recorded check status: recorded; no individual primary acceptance inferred

#
D08
Deferred family
Actual proprietary score model
Exact remaining action
Obtain actual criteria, edition, inputs and model governance under authority.

Recorded coordinator check boundaries

coordinator acceptance
scoped_supported_or_hold_with_prior_information_audit_clock_repairs_pending
coordinator review status
scoped_two_bounded_repairs_pending
coordinator review scope
Wholeanswer/all12tables;6freshselectedprimaryfamilies+2datedreuse/math;notindependent/allsource/currentconsolidationcertification.
coverage-97 Saved research record

D09 Commercial scoring products outside Cadastro Positivo

Recorded check status: recorded; no individual primary acceptance inferred

#
D09
Deferred family
Commercial scoring products outside Cadastro Positivo
Exact remaining action
Classify separately from the statutory positive register.

Recorded coordinator check boundaries

coordinator acceptance
scoped_supported_or_hold_with_prior_information_audit_clock_repairs_pending
coordinator review status
scoped_two_bounded_repairs_pending
coordinator review scope
Wholeanswer/all12tables;6freshselectedprimaryfamilies+2datedreuse/math;notindependent/allsource/currentconsolidationcertification.
coverage-98 Saved research record

D10 Cadastro Positivo remedies and complete judicial citator

Recorded check status: recorded; no individual primary acceptance inferred

#
D10
Deferred family
Cadastro Positivo remedies and complete judicial citator
Exact remaining action
Research current precedent, proof, causation and remedies separately.

Recorded coordinator check boundaries

coordinator acceptance
scoped_supported_or_hold_with_prior_information_audit_clock_repairs_pending
coordinator review status
scoped_two_bounded_repairs_pending
coordinator review scope
Wholeanswer/all12tables;6freshselectedprimaryfamilies+2datedreuse/math;notindependent/allsource/currentconsolidationcertification.
coverage-99 Saved research record

D11 SCR / Banco Central credit reporting

Recorded check status: recorded; no individual primary acceptance inferred

#
D11
Deferred family
SCR / Banco Central credit reporting
Exact remaining action
Read current BCB instruments; do not equate with Cadastro Positivo.

Recorded coordinator check boundaries

coordinator acceptance
scoped_supported_or_hold_with_prior_information_audit_clock_repairs_pending
coordinator review status
scoped_two_bounded_repairs_pending
coordinator review scope
Wholeanswer/all12tables;6freshselectedprimaryfamilies+2datedreuse/math;notindependent/allsource/currentconsolidationcertification.
coverage-100 Saved research record

D12 Protest and notarial records

Recorded check status: recorded; no individual primary acceptance inferred

#
D12
Deferred family
Protest and notarial records
Exact remaining action
Apply Lei 9.492 and local notarial law separately.

Recorded coordinator check boundaries

coordinator acceptance
scoped_supported_or_hold_with_prior_information_audit_clock_repairs_pending
coordinator review status
scoped_two_bounded_repairs_pending
coordinator review scope
Wholeanswer/all12tables;6freshselectedprimaryfamilies+2datedreuse/math;notindependent/allsource/currentconsolidationcertification.
coverage-101 Saved research record

D13 Cadin and governmental debt registers

Recorded check status: recorded; no individual primary acceptance inferred

#
D13
Deferred family
Cadin and governmental debt registers
Exact remaining action
Apply specific public-law regime.

Recorded coordinator check boundaries

coordinator acceptance
scoped_supported_or_hold_with_prior_information_audit_clock_repairs_pending
coordinator review status
scoped_two_bounded_repairs_pending
coordinator review scope
Wholeanswer/all12tables;6freshselectedprimaryfamilies+2datedreuse/math;notindependent/allsource/currentconsolidationcertification.
coverage-102 Saved research record

D14 Court judgments and public judicial records

Recorded check status: recorded; no individual primary acceptance inferred

#
D14
Deferred family
Court judgments and public judicial records
Exact remaining action
Apply procedural and public-record rules separately.

Recorded coordinator check boundaries

coordinator acceptance
scoped_supported_or_hold_with_prior_information_audit_clock_repairs_pending
coordinator review status
scoped_two_bounded_repairs_pending
coordinator review scope
Wholeanswer/all12tables;6freshselectedprimaryfamilies+2datedreuse/math;notindependent/allsource/currentconsolidationcertification.
coverage-103 Saved research record

D15 Detailed Resolução BCB 14 registration procedure

Recorded check status: recorded; no individual primary acceptance inferred

#
D15
Deferred family
Detailed Resolução BCB 14 registration procedure
Exact remaining action
Obtain readable current enacted body and current filing instructions.

Recorded coordinator check boundaries

coordinator acceptance
scoped_supported_or_hold_with_prior_information_audit_clock_repairs_pending
coordinator review status
scoped_two_bounded_repairs_pending
coordinator review scope
Wholeanswer/all12tables;6freshselectedprimaryfamilies+2datedreuse/math;notindependent/allsource/currentconsolidationcertification.
coverage-104 Saved research record

D16 Actual manager registration or named registrant

Recorded check status: recorded; no individual primary acceptance inferred

#
D16
Deferred family
Actual manager registration or named registrant
Exact remaining action
No lookup authorized; perform only under separate instruction.

Recorded coordinator check boundaries

coordinator acceptance
scoped_supported_or_hold_with_prior_information_audit_clock_repairs_pending
coordinator review status
scoped_two_bounded_repairs_pending
coordinator review scope
Wholeanswer/all12tables;6freshselectedprimaryfamilies+2datedreuse/math;notindependent/allsource/currentconsolidationcertification.
coverage-105 Saved research record

D17 Provider professional permission

Recorded check status: recorded; no individual primary acceptance inferred

#
D17
Deferred family
Provider professional permission
Exact remaining action
Preserve OAB/CRA/CORECON and other P01 holds.

Recorded coordinator check boundaries

coordinator acceptance
scoped_supported_or_hold_with_prior_information_audit_clock_repairs_pending
coordinator review status
scoped_two_bounded_repairs_pending
coordinator review scope
Wholeanswer/all12tables;6freshselectedprimaryfamilies+2datedreuse/math;notindependent/allsource/currentconsolidationcertification.
coverage-106 Saved research record

D18 Adviser fees and consumer contracts

Recorded check status: recorded; no individual primary acceptance inferred

#
D18
Deferred family
Adviser fees and consumer contracts
Exact remaining action
PASS-04 remains unreviewed and unadopted.

Recorded coordinator check boundaries

coordinator acceptance
scoped_supported_or_hold_with_prior_information_audit_clock_repairs_pending
coordinator review status
scoped_two_bounded_repairs_pending
coordinator review scope
Wholeanswer/all12tables;6freshselectedprimaryfamilies+2datedreuse/math;notindependent/allsource/currentconsolidationcertification.
coverage-107 Saved research record

D19 Client money, payment services and safeguarding

Recorded check status: recorded; no individual primary acceptance inferred

#
D19
Deferred family
Client money, payment services and safeguarding
Exact remaining action
Preserve BCB 494/payment and funds-flow holds.

Recorded coordinator check boundaries

coordinator acceptance
scoped_supported_or_hold_with_prior_information_audit_clock_repairs_pending
coordinator review status
scoped_two_bounded_repairs_pending
coordinator review scope
Wholeanswer/all12tables;6freshselectedprimaryfamilies+2datedreuse/math;notindependent/allsource/currentconsolidationcertification.
coverage-108 Saved research record

D20 Current CMN 4.935 / Joint Resolution 17 correspondent regime

Recorded check status: recorded; no individual primary acceptance inferred

#
D20
Deferred family
Current CMN 4.935 / Joint Resolution 17 correspondent regime
Exact remaining action
Preserve P02 partial current-source hold.

Recorded coordinator check boundaries

coordinator acceptance
scoped_supported_or_hold_with_prior_information_audit_clock_repairs_pending
coordinator review status
scoped_two_bounded_repairs_pending
coordinator review scope
Wholeanswer/all12tables;6freshselectedprimaryfamilies+2datedreuse/math;notindependent/allsource/currentconsolidationcertification.
coverage-109 Saved research record

D21 Underlying debt and settlement validity

Recorded check status: recorded; no individual primary acceptance inferred

#
D21
Deferred family
Underlying debt and settlement validity
Exact remaining action
Obtain actual contract, authority and settlement documents separately.

Recorded coordinator check boundaries

coordinator acceptance
scoped_supported_or_hold_with_prior_information_audit_clock_repairs_pending
coordinator review status
scoped_two_bounded_repairs_pending
coordinator review scope
Wholeanswer/all12tables;6freshselectedprimaryfamilies+2datedreuse/math;notindependent/allsource/currentconsolidationcertification.
coverage-110 Saved research record

D22 Prescription and interruption

Recorded check status: recorded; no individual primary acceptance inferred

#
D22
Deferred family
Prescription and interruption
Exact remaining action
PASS-05 remains unreviewed and unadopted.

Recorded coordinator check boundaries

coordinator acceptance
scoped_supported_or_hold_with_prior_information_audit_clock_repairs_pending
coordinator review status
scoped_two_bounded_repairs_pending
coordinator review scope
Wholeanswer/all12tables;6freshselectedprimaryfamilies+2datedreuse/math;notindependent/allsource/currentconsolidationcertification.
coverage-111 Saved research record

D23 General collection communications and conduct

Recorded check status: recorded; no individual primary acceptance inferred

#
D23
Deferred family
General collection communications and conduct
Exact remaining action
Research separately from positive payment history.

Recorded coordinator check boundaries

coordinator acceptance
scoped_supported_or_hold_with_prior_information_audit_clock_repairs_pending
coordinator review status
scoped_two_bounded_repairs_pending
coordinator review scope
Wholeanswer/all12tables;6freshselectedprimaryfamilies+2datedreuse/math;notindependent/allsource/currentconsolidationcertification.
coverage-112 Saved research record

D24 Secured credit, collateral and guaranties

Recorded check status: recorded; no individual primary acceptance inferred

#
D24
Deferred family
Secured credit, collateral and guaranties
Exact remaining action
Apply product and security-specific law.

Recorded coordinator check boundaries

coordinator acceptance
scoped_supported_or_hold_with_prior_information_audit_clock_repairs_pending
coordinator review status
scoped_two_bounded_repairs_pending
coordinator review scope
Wholeanswer/all12tables;6freshselectedprimaryfamilies+2datedreuse/math;notindependent/allsource/currentconsolidationcertification.
coverage-113 Saved research record

D25 Tax, government, student and support claims

Recorded check status: recorded; no individual primary acceptance inferred

#
D25
Deferred family
Tax, government, student and support claims
Exact remaining action
Apply specific public/program law.

Recorded coordinator check boundaries

coordinator acceptance
scoped_supported_or_hold_with_prior_information_audit_clock_repairs_pending
coordinator review status
scoped_two_bounded_repairs_pending
coordinator review scope
Wholeanswer/all12tables;6freshselectedprimaryfamilies+2datedreuse/math;notindependent/allsource/currentconsolidationcertification.
coverage-114 Saved research record

D26 Insolvency, recuperação and falência

Recorded check status: recorded; no individual primary acceptance inferred

#
D26
Deferred family
Insolvency, recuperação and falência
Exact remaining action
Analyze effect of the actual proceeding and plan.

Recorded coordinator check boundaries

coordinator acceptance
scoped_supported_or_hold_with_prior_information_audit_clock_repairs_pending
coordinator review status
scoped_two_bounded_repairs_pending
coordinator review scope
Wholeanswer/all12tables;6freshselectedprimaryfamilies+2datedreuse/math;notindependent/allsource/currentconsolidationcertification.
coverage-115 Saved research record

D27 Sector-specific utility, telecom, insurance and lending rules

Recorded check status: recorded; no individual primary acceptance inferred

#
D27
Deferred family
Sector-specific utility, telecom, insurance and lending rules
Exact remaining action
Identify source sector and read its current regulations.

Recorded coordinator check boundaries

coordinator acceptance
scoped_supported_or_hold_with_prior_information_audit_clock_repairs_pending
coordinator review status
scoped_two_bounded_repairs_pending
coordinator review scope
Wholeanswer/all12tables;6freshselectedprimaryfamilies+2datedreuse/math;notindependent/allsource/currentconsolidationcertification.
coverage-116 Saved research record

D28 Tax treatment of data, settlement or write-offs

Recorded check status: recorded; no individual primary acceptance inferred

#
D28
Deferred family
Tax treatment of data, settlement or write-offs
Exact remaining action
No tax conclusion from positive-history law.

Recorded coordinator check boundaries

coordinator acceptance
scoped_supported_or_hold_with_prior_information_audit_clock_repairs_pending
coordinator review status
scoped_two_bounded_repairs_pending
coordinator review scope
Wholeanswer/all12tables;6freshselectedprimaryfamilies+2datedreuse/math;notindependent/allsource/currentconsolidationcertification.
coverage-117 Saved research record

D29 Complaints, Procon procedure and administrative sanctions

Recorded check status: recorded; no individual primary acceptance inferred

#
D29
Deferred family
Complaints, Procon procedure and administrative sanctions
Exact remaining action
Read actual federal/state/local procedure; no complaint filed.

Recorded coordinator check boundaries

coordinator acceptance
scoped_supported_or_hold_with_prior_information_audit_clock_repairs_pending
coordinator review status
scoped_two_bounded_repairs_pending
coordinator review scope
Wholeanswer/all12tables;6freshselectedprimaryfamilies+2datedreuse/math;notindependent/allsource/currentconsolidationcertification.
coverage-118 Saved research record

D30 Civil damages, causation and limitation

Recorded check status: recorded; no individual primary acceptance inferred

#
D30
Deferred family
Civil damages, causation and limitation
Exact remaining action
Full remedy and current precedent review required.

Recorded coordinator check boundaries

coordinator acceptance
scoped_supported_or_hold_with_prior_information_audit_clock_repairs_pending
coordinator review status
scoped_two_bounded_repairs_pending
coordinator review scope
Wholeanswer/all12tables;6freshselectedprimaryfamilies+2datedreuse/math;notindependent/allsource/currentconsolidationcertification.
coverage-119 Saved research record

D31 Representative authority and authentication standards

Recorded check status: recorded; no individual primary acceptance inferred

#
D31
Deferred family
Representative authority and authentication standards
Exact remaining action
Obtain actual mandate and manager procedure.

Recorded coordinator check boundaries

coordinator acceptance
scoped_supported_or_hold_with_prior_information_audit_clock_repairs_pending
coordinator review status
scoped_two_bounded_repairs_pending
coordinator review scope
Wholeanswer/all12tables;6freshselectedprimaryfamilies+2datedreuse/math;notindependent/allsource/currentconsolidationcertification.
coverage-120 Saved research record

D32 Reopening notice requirement

Recorded check status: recorded; no individual primary acceptance inferred

#
D32
Deferred family
Reopening notice requirement
Exact remaining action
Locate express current authority; do not infer.

Recorded coordinator check boundaries

coordinator acceptance
scoped_supported_or_hold_with_prior_information_audit_clock_repairs_pending
coordinator review status
scoped_two_bounded_repairs_pending
coordinator review scope
Wholeanswer/all12tables;6freshselectedprimaryfamilies+2datedreuse/math;notindependent/allsource/currentconsolidationcertification.
coverage-121 Saved research record

D33 State/DF/municipal implementation

Recorded check status: recorded; no individual primary acceptance inferred

#
D33
Deferred family
State/DF/municipal implementation
Exact remaining action
All 27 branches remain individually deferred below.

Recorded coordinator check boundaries

coordinator acceptance
scoped_supported_or_hold_with_prior_information_audit_clock_repairs_pending
coordinator review status
scoped_two_bounded_repairs_pending
coordinator review scope
Wholeanswer/all12tables;6freshselectedprimaryfamilies+2datedreuse/math;notindependent/allsource/currentconsolidationcertification.
coverage-122 Saved research record

D34 Foreign law, recognition and overseas data access

Recorded check status: recorded; no individual primary acceptance inferred

#
D34
Deferred family
Foreign law, recognition and overseas data access
Exact remaining action
No foreign-law premise adopted.

Recorded coordinator check boundaries

coordinator acceptance
scoped_supported_or_hold_with_prior_information_audit_clock_repairs_pending
coordinator review status
scoped_two_bounded_repairs_pending
coordinator review scope
Wholeanswer/all12tables;6freshselectedprimaryfamilies+2datedreuse/math;notindependent/allsource/currentconsolidationcertification.
coverage-123 Saved research record

D35 Actual records, reports, scores and consultant decisions

Recorded check status: recorded; no individual primary acceptance inferred

#
D35
Deferred family
Actual records, reports, scores and consultant decisions
Exact remaining action
None obtained or searched.

Recorded coordinator check boundaries

coordinator acceptance
scoped_supported_or_hold_with_prior_information_audit_clock_repairs_pending
coordinator review status
scoped_two_bounded_repairs_pending
coordinator review scope
Wholeanswer/all12tables;6freshselectedprimaryfamilies+2datedreuse/math;notindependent/allsource/currentconsolidationcertification.
coverage-124 Saved research record

D36 Full Brazil, A097/A098, parent-program and publication acceptance

Recorded check status: recorded; no individual primary acceptance inferred

#
D36
Deferred family
Full Brazil, A097/A098, parent-program and publication acceptance
Exact remaining action
HOLD pending same-coordinator review and every outstanding branch.

Recorded coordinator check boundaries

coordinator acceptance
scoped_supported_or_hold_with_prior_information_audit_clock_repairs_pending
coordinator review status
scoped_two_bounded_repairs_pending
coordinator review scope
Wholeanswer/all12tables;6freshselectedprimaryfamilies+2datedreuse/math;notindependent/allsource/currentconsolidationcertification.
coverage-125 Saved research record

Acre (AC) No local body read

Recorded check status: recorded; no individual primary acceptance inferred

State / DF
Acre (AC)
PASS-07 status
No local body read
Exact remaining local issue
AC consumer authority, Procon, court procedure, accessibility and municipal implementation.

Recorded coordinator check boundaries

coordinator acceptance
scoped_supported_or_hold_with_prior_information_audit_clock_repairs_pending
coordinator review status
scoped_two_bounded_repairs_pending
coordinator review scope
Wholeanswer/all12tables;6freshselectedprimaryfamilies+2datedreuse/math;notindependent/allsource/currentconsolidationcertification.
coverage-126 Saved research record

Alagoas (AL) No local body read

Recorded check status: recorded; no individual primary acceptance inferred

State / DF
Alagoas (AL)
PASS-07 status
No local body read
Exact remaining local issue
AL consumer enforcement, court remedies, municipal channels and local procedure.

Recorded coordinator check boundaries

coordinator acceptance
scoped_supported_or_hold_with_prior_information_audit_clock_repairs_pending
coordinator review status
scoped_two_bounded_repairs_pending
coordinator review scope
Wholeanswer/all12tables;6freshselectedprimaryfamilies+2datedreuse/math;notindependent/allsource/currentconsolidationcertification.
coverage-127 Saved research record

Amapá (AP) No local body read

Recorded check status: recorded; no individual primary acceptance inferred

State / DF
Amapá (AP)
PASS-07 status
No local body read
Exact remaining local issue
AP Procon, courts, accessibility and local positive-history enforcement.

Recorded coordinator check boundaries

coordinator acceptance
scoped_supported_or_hold_with_prior_information_audit_clock_repairs_pending
coordinator review status
scoped_two_bounded_repairs_pending
coordinator review scope
Wholeanswer/all12tables;6freshselectedprimaryfamilies+2datedreuse/math;notindependent/allsource/currentconsolidationcertification.
coverage-128 Saved research record

Amazonas (AM) No local body read

Recorded check status: recorded; no individual primary acceptance inferred

State / DF
Amazonas (AM)
PASS-07 status
No local body read
Exact remaining local issue
AM consumer agencies, remote-access issues, courts and municipalities.

Recorded coordinator check boundaries

coordinator acceptance
scoped_supported_or_hold_with_prior_information_audit_clock_repairs_pending
coordinator review status
scoped_two_bounded_repairs_pending
coordinator review scope
Wholeanswer/all12tables;6freshselectedprimaryfamilies+2datedreuse/math;notindependent/allsource/currentconsolidationcertification.
coverage-129 Saved research record

Bahia (BA) No local body read

Recorded check status: recorded; no individual primary acceptance inferred

State / DF
Bahia (BA)
PASS-07 status
No local body read
Exact remaining local issue
BA Procon, court and municipal implementation.

Recorded coordinator check boundaries

coordinator acceptance
scoped_supported_or_hold_with_prior_information_audit_clock_repairs_pending
coordinator review status
scoped_two_bounded_repairs_pending
coordinator review scope
Wholeanswer/all12tables;6freshselectedprimaryfamilies+2datedreuse/math;notindependent/allsource/currentconsolidationcertification.
coverage-130 Saved research record

Ceará (CE) No local body read

Recorded check status: recorded; no individual primary acceptance inferred

State / DF
Ceará (CE)
PASS-07 status
No local body read
Exact remaining local issue
CE consumer enforcement, administrative procedure and courts.

Recorded coordinator check boundaries

coordinator acceptance
scoped_supported_or_hold_with_prior_information_audit_clock_repairs_pending
coordinator review status
scoped_two_bounded_repairs_pending
coordinator review scope
Wholeanswer/all12tables;6freshselectedprimaryfamilies+2datedreuse/math;notindependent/allsource/currentconsolidationcertification.
coverage-131 Saved research record

Distrito Federal (DF) No local body read

Recorded check status: recorded; no individual primary acceptance inferred

State / DF
Distrito Federal (DF)
PASS-07 status
No local body read
Exact remaining local issue
DF consumer authority, TJDFT, local remedies and accessibility.

Recorded coordinator check boundaries

coordinator acceptance
scoped_supported_or_hold_with_prior_information_audit_clock_repairs_pending
coordinator review status
scoped_two_bounded_repairs_pending
coordinator review scope
Wholeanswer/all12tables;6freshselectedprimaryfamilies+2datedreuse/math;notindependent/allsource/currentconsolidationcertification.
coverage-132 Saved research record

Espírito Santo (ES) No local body read

Recorded check status: recorded; no individual primary acceptance inferred

State / DF
Espírito Santo (ES)
PASS-07 status
No local body read
Exact remaining local issue
ES Procon, courts, municipalities and local evidence rules.

Recorded coordinator check boundaries

coordinator acceptance
scoped_supported_or_hold_with_prior_information_audit_clock_repairs_pending
coordinator review status
scoped_two_bounded_repairs_pending
coordinator review scope
Wholeanswer/all12tables;6freshselectedprimaryfamilies+2datedreuse/math;notindependent/allsource/currentconsolidationcertification.
coverage-133 Saved research record

Goiás (GO) No local body read

Recorded check status: recorded; no individual primary acceptance inferred

State / DF
Goiás (GO)
PASS-07 status
No local body read
Exact remaining local issue
GO consumer authorities, court procedure and municipal routes.

Recorded coordinator check boundaries

coordinator acceptance
scoped_supported_or_hold_with_prior_information_audit_clock_repairs_pending
coordinator review status
scoped_two_bounded_repairs_pending
coordinator review scope
Wholeanswer/all12tables;6freshselectedprimaryfamilies+2datedreuse/math;notindependent/allsource/currentconsolidationcertification.
coverage-134 Saved research record

Maranhão (MA) No local body read

Recorded check status: recorded; no individual primary acceptance inferred

State / DF
Maranhão (MA)
PASS-07 status
No local body read
Exact remaining local issue
MA Procon, courts, accessibility and local complaint procedure.

Recorded coordinator check boundaries

coordinator acceptance
scoped_supported_or_hold_with_prior_information_audit_clock_repairs_pending
coordinator review status
scoped_two_bounded_repairs_pending
coordinator review scope
Wholeanswer/all12tables;6freshselectedprimaryfamilies+2datedreuse/math;notindependent/allsource/currentconsolidationcertification.
coverage-135 Saved research record

Mato Grosso (MT) No local body read

Recorded check status: recorded; no individual primary acceptance inferred

State / DF
Mato Grosso (MT)
PASS-07 status
No local body read
Exact remaining local issue
MT administrative and court implementation.

Recorded coordinator check boundaries

coordinator acceptance
scoped_supported_or_hold_with_prior_information_audit_clock_repairs_pending
coordinator review status
scoped_two_bounded_repairs_pending
coordinator review scope
Wholeanswer/all12tables;6freshselectedprimaryfamilies+2datedreuse/math;notindependent/allsource/currentconsolidationcertification.
coverage-136 Saved research record

Mato Grosso do Sul (MS) No local body read

Recorded check status: recorded; no individual primary acceptance inferred

State / DF
Mato Grosso do Sul (MS)
PASS-07 status
No local body read
Exact remaining local issue
MS Procon, courts, border/remote issues and local procedures.

Recorded coordinator check boundaries

coordinator acceptance
scoped_supported_or_hold_with_prior_information_audit_clock_repairs_pending
coordinator review status
scoped_two_bounded_repairs_pending
coordinator review scope
Wholeanswer/all12tables;6freshselectedprimaryfamilies+2datedreuse/math;notindependent/allsource/currentconsolidationcertification.
coverage-137 Saved research record

Minas Gerais (MG) No local body read

Recorded check status: recorded; no individual primary acceptance inferred

State / DF
Minas Gerais (MG)
PASS-07 status
No local body read
Exact remaining local issue
MG consumer enforcement, courts and municipal implementation.

Recorded coordinator check boundaries

coordinator acceptance
scoped_supported_or_hold_with_prior_information_audit_clock_repairs_pending
coordinator review status
scoped_two_bounded_repairs_pending
coordinator review scope
Wholeanswer/all12tables;6freshselectedprimaryfamilies+2datedreuse/math;notindependent/allsource/currentconsolidationcertification.
coverage-138 Saved research record

Pará (PA) No local body read

Recorded check status: recorded; no individual primary acceptance inferred

State / DF
Pará (PA)
PASS-07 status
No local body read
Exact remaining local issue
PA Procon, courts, language/accessibility and municipalities.

Recorded coordinator check boundaries

coordinator acceptance
scoped_supported_or_hold_with_prior_information_audit_clock_repairs_pending
coordinator review status
scoped_two_bounded_repairs_pending
coordinator review scope
Wholeanswer/all12tables;6freshselectedprimaryfamilies+2datedreuse/math;notindependent/allsource/currentconsolidationcertification.
coverage-139 Saved research record

Paraíba (PB) No local body read

Recorded check status: recorded; no individual primary acceptance inferred

State / DF
Paraíba (PB)
PASS-07 status
No local body read
Exact remaining local issue
PB consumer authority, court remedies and local channels.

Recorded coordinator check boundaries

coordinator acceptance
scoped_supported_or_hold_with_prior_information_audit_clock_repairs_pending
coordinator review status
scoped_two_bounded_repairs_pending
coordinator review scope
Wholeanswer/all12tables;6freshselectedprimaryfamilies+2datedreuse/math;notindependent/allsource/currentconsolidationcertification.
coverage-140 Saved research record

Paraná (PR) No local body read

Recorded check status: recorded; no individual primary acceptance inferred

State / DF
Paraná (PR)
PASS-07 status
No local body read
Exact remaining local issue
PR Procon, courts and local implementation.

Recorded coordinator check boundaries

coordinator acceptance
scoped_supported_or_hold_with_prior_information_audit_clock_repairs_pending
coordinator review status
scoped_two_bounded_repairs_pending
coordinator review scope
Wholeanswer/all12tables;6freshselectedprimaryfamilies+2datedreuse/math;notindependent/allsource/currentconsolidationcertification.
coverage-141 Saved research record

Pernambuco (PE) No local body read

Recorded check status: recorded; no individual primary acceptance inferred

State / DF
Pernambuco (PE)
PASS-07 status
No local body read
Exact remaining local issue
PE consumer enforcement, courts and municipalities.

Recorded coordinator check boundaries

coordinator acceptance
scoped_supported_or_hold_with_prior_information_audit_clock_repairs_pending
coordinator review status
scoped_two_bounded_repairs_pending
coordinator review scope
Wholeanswer/all12tables;6freshselectedprimaryfamilies+2datedreuse/math;notindependent/allsource/currentconsolidationcertification.
coverage-142 Saved research record

Piauí (PI) No local body read

Recorded check status: recorded; no individual primary acceptance inferred

State / DF
Piauí (PI)
PASS-07 status
No local body read
Exact remaining local issue
PI Procon, judicial procedure and local accessibility.

Recorded coordinator check boundaries

coordinator acceptance
scoped_supported_or_hold_with_prior_information_audit_clock_repairs_pending
coordinator review status
scoped_two_bounded_repairs_pending
coordinator review scope
Wholeanswer/all12tables;6freshselectedprimaryfamilies+2datedreuse/math;notindependent/allsource/currentconsolidationcertification.
coverage-143 Saved research record

Rio de Janeiro (RJ) No local body read

Recorded check status: recorded; no individual primary acceptance inferred

State / DF
Rio de Janeiro (RJ)
PASS-07 status
No local body read
Exact remaining local issue
RJ consumer authority, courts and municipal procedures.

Recorded coordinator check boundaries

coordinator acceptance
scoped_supported_or_hold_with_prior_information_audit_clock_repairs_pending
coordinator review status
scoped_two_bounded_repairs_pending
coordinator review scope
Wholeanswer/all12tables;6freshselectedprimaryfamilies+2datedreuse/math;notindependent/allsource/currentconsolidationcertification.
coverage-144 Saved research record

Rio Grande do Norte (RN) No local body read

Recorded check status: recorded; no individual primary acceptance inferred

State / DF
Rio Grande do Norte (RN)
PASS-07 status
No local body read
Exact remaining local issue
RN Procon, courts and local remedies.

Recorded coordinator check boundaries

coordinator acceptance
scoped_supported_or_hold_with_prior_information_audit_clock_repairs_pending
coordinator review status
scoped_two_bounded_repairs_pending
coordinator review scope
Wholeanswer/all12tables;6freshselectedprimaryfamilies+2datedreuse/math;notindependent/allsource/currentconsolidationcertification.
coverage-145 Saved research record

Rio Grande do Sul (RS) No local body read

Recorded check status: recorded; no individual primary acceptance inferred

State / DF
Rio Grande do Sul (RS)
PASS-07 status
No local body read
Exact remaining local issue
RS consumer agencies, courts and current local interpretation.

Recorded coordinator check boundaries

coordinator acceptance
scoped_supported_or_hold_with_prior_information_audit_clock_repairs_pending
coordinator review status
scoped_two_bounded_repairs_pending
coordinator review scope
Wholeanswer/all12tables;6freshselectedprimaryfamilies+2datedreuse/math;notindependent/allsource/currentconsolidationcertification.
coverage-146 Saved research record

Rondônia (RO) No local body read

Recorded check status: recorded; no individual primary acceptance inferred

State / DF
Rondônia (RO)
PASS-07 status
No local body read
Exact remaining local issue
RO Procon, courts, remote access and municipalities.

Recorded coordinator check boundaries

coordinator acceptance
scoped_supported_or_hold_with_prior_information_audit_clock_repairs_pending
coordinator review status
scoped_two_bounded_repairs_pending
coordinator review scope
Wholeanswer/all12tables;6freshselectedprimaryfamilies+2datedreuse/math;notindependent/allsource/currentconsolidationcertification.
coverage-147 Saved research record

Roraima (RR) No local body read

Recorded check status: recorded; no individual primary acceptance inferred

State / DF
Roraima (RR)
PASS-07 status
No local body read
Exact remaining local issue
RR consumer routes, multilingual/accessibility issues and courts.

Recorded coordinator check boundaries

coordinator acceptance
scoped_supported_or_hold_with_prior_information_audit_clock_repairs_pending
coordinator review status
scoped_two_bounded_repairs_pending
coordinator review scope
Wholeanswer/all12tables;6freshselectedprimaryfamilies+2datedreuse/math;notindependent/allsource/currentconsolidationcertification.
coverage-148 Saved research record

Santa Catarina (SC) No local body read

Recorded check status: recorded; no individual primary acceptance inferred

State / DF
Santa Catarina (SC)
PASS-07 status
No local body read
Exact remaining local issue
SC Procon, courts and municipal implementation.

Recorded coordinator check boundaries

coordinator acceptance
scoped_supported_or_hold_with_prior_information_audit_clock_repairs_pending
coordinator review status
scoped_two_bounded_repairs_pending
coordinator review scope
Wholeanswer/all12tables;6freshselectedprimaryfamilies+2datedreuse/math;notindependent/allsource/currentconsolidationcertification.
coverage-149 Saved research record

São Paulo (SP) No local PASS-07 body read

Recorded check status: recorded; no individual primary acceptance inferred

State / DF
São Paulo (SP)
PASS-07 status
No local PASS-07 body read
Exact remaining local issue
SP Procon, TJSP, municipalities and local administrative procedure.

Recorded coordinator check boundaries

coordinator acceptance
scoped_supported_or_hold_with_prior_information_audit_clock_repairs_pending
coordinator review status
scoped_two_bounded_repairs_pending
coordinator review scope
Wholeanswer/all12tables;6freshselectedprimaryfamilies+2datedreuse/math;notindependent/allsource/currentconsolidationcertification.
coverage-150 Saved research record

Sergipe (SE) No local body read

Recorded check status: recorded; no individual primary acceptance inferred

State / DF
Sergipe (SE)
PASS-07 status
No local body read
Exact remaining local issue
SE consumer authority, courts and municipal routes.

Recorded coordinator check boundaries

coordinator acceptance
scoped_supported_or_hold_with_prior_information_audit_clock_repairs_pending
coordinator review status
scoped_two_bounded_repairs_pending
coordinator review scope
Wholeanswer/all12tables;6freshselectedprimaryfamilies+2datedreuse/math;notindependent/allsource/currentconsolidationcertification.
coverage-151 Saved research record

Tocantins (TO) No local body read

Recorded check status: recorded; no individual primary acceptance inferred

State / DF
Tocantins (TO)
PASS-07 status
No local body read
Exact remaining local issue
TO Procon, courts, accessibility and local implementation.

Recorded coordinator check boundaries

coordinator acceptance
scoped_supported_or_hold_with_prior_information_audit_clock_repairs_pending
coordinator review status
scoped_two_bounded_repairs_pending
coordinator review scope
Wholeanswer/all12tables;6freshselectedprimaryfamilies+2datedreuse/math;notindependent/allsource/currentconsolidationcertification.

Corrections, review and scope

Read the evidence with its boundaries. These are saved research components, including revisions. A scoped coordinator review checks selected evidence; it does not certify every claim, a complete jurisdiction, current law or individual applicability. Dates and access limits remain attached to the records.

How to read the research →

No currently queued material correction is mapped to this component. This does not remove its currentness, access, jurisdiction or application limits.

Recorded review disposition

P11legal clock count and P12actor stage provenance repairs addressed with holds

Other components in this research series

C_BRpass-01

Brazil: provider perimeter and authorization gateways

Inside: Executive determination · A–C. Substantive legal perimeter · A. The controlling distinction is the activity, not the business label

10 tables51 claim records40 source recordsScoped review · limits applyCaptured 2026-10-27
C_BRpass-02

Brazil: bank-correspondent versus debtor-agent rule-body research

Inside: Principal finding · G1. Current rule-body reconciliation · Original regulation, amendment and commencement crosswalk

12 tables26 claim records15 source recordsScoped review · limits applyCaptured 2026-10-27
C_BRpass-03

Brazil: PASS-02 source-access provenance correction

Inside: G1. Exact reusable replacement paragraph · Exact replacement paragraph · A. Source-register introductory paragraph

5 tables10 claim records0 source recordsScoped review · limits applyCaptured 2026-10-27
C_BRpass-04

Brazil: consumer-service fees, contracts, cancellation and refund framework

Inside: Executive determination · G1. Applicability, contract formation and disclosures · 1. Which engagements fall within the CDC?

12 tables49 claim records16 source recordsScoped review · limits applyCaptured 2026-10-27
C_BRpass-05

Brazil: private consumer-debt limitation and prescription

Inside: Executive determination · G1.1 Period-selection matrix · Narrow classification rule

14 tables60 claim records16 source recordsScoped review · limits applyCaptured 2026-10-27
C_BRpass-06

Brazil: negative credit-register entries, notice, duration and correction

Inside: G1.1 Covered data and excluded systems · G1.2 Actors and their distinct duties · G1.3 Consumer and business classifications

13 tables60 claim records20 source recordsScoped review · limits applyCaptured 2026-10-27
C_BRpass-08

Brazil: LGPD data roles, legal bases and data-subject rights

Inside: G1.1 Currentness and commencement crosswalk · Anonymization boundary · G1.3 Territorial triggers and exclusions

16 tables73 claim records11 source recordsCorrections to readCaptured 2026-10-27
C_BRpass-09

Ordinary private civil repayment, consensual settlement, payment allocation, receipt and release gateway

Inside: Ordinary private civil repayment, consensual settlement, payment allocation, receipt and release gateway · G1.1 Current law and narrow currentness · G1.2 Legal classification matrix

10 tables84 claim records5 source recordsScoped review · limits applyCaptured 2026-10-27
C_BRpass-10

Ordinary consumer debt-collection communications and conduct

Inside: Ordinary consumer debt-collection communications and conduct · G1.1 Consumer and supplier nexus · G1.2 Actor matrix

12 tables65 claim records9 source recordsScoped review · limits applyCaptured 2026-10-27
C_BRpass-11

Two bounded corrections to reviewed positive-history research

Inside: Two bounded corrections to reviewed PASS-07 positive-history research · 1.1 Exact operative provision · Correction determination

9 tables15 claim records3 source recordsScoped review · limits applyCaptured 2026-10-27
C_BRpass-12

One bounded provenance-only repair to

Inside: One bounded provenance-only repair to PASS-11 · Final provenance disposition

9 tables6 claim records0 source recordsScoped review · limits applyCaptured 2026-10-27
C_BRpass-13

Ordinary civil assignment, ownership, debtor notice, defenses and creditor/payment-recipient authority

Inside: Ordinary civil assignment, ownership, debtor notice, defenses and creditor/payment-recipient authority · G1.1 Controlling bodies and commencement · G1.2 What ordinary assignment does

13 tables66 claim records8 source recordsScoped review · limits applyCaptured 2026-10-27
C_BRpass-14

Ordinary civil transaction validity, nullity and annulability gateway

Inside: Ordinary civil transaction validity, nullity and annulability gateway · G1.1 Currentness and operative-text crosswalk · G1.2 Current capacity rules

15 tables86 claim records6 source recordsScoped review · limits applyCaptured 2026-10-27
C_BRpass-15

Bounded P13 payment-recipient qualification and source/claim/count traceability repair

Inside: Bounded P13 payment-recipient qualification and source/claim/count traceability repair · R1.1 Replacement for the affected portion of P13 G2.6 · Creditor or rightful representative — art. 308

16 tables8 claim records2 source recordsScoped review · limits applyCaptured 2026-10-27
C_BRpass-16

Ordinary civil surety (fiança) and solidary/joint-obligation gateway

Inside: Ordinary civil surety (fiança) and solidary/joint-obligation gateway · G1.1 Current federal bodies · G1.2 Merely joint/divided versus solidary obligations

11 tables80 claim records13 source recordsScoped review · limits applyCaptured 2026-10-27
C_BRpass-17

Bounded P14 atomic-predicate, commencement-traceability and count-unit repair

Inside: Bounded P14 atomic-predicate, commencement-traceability and count-unit repair · Replacement C_BR-P14-C006 · Replacement C_BR-P14-C027

13 tables5 claim records1 source recordsScoped review · limits applyCaptured 2026-10-27
C_BRpass-18

Ordinary civil commencement and service-of-process gateway

Inside: Ordinary civil commencement and service-of-process gateway · Principal findings · 1.1 Amendment and commencement crosswalk

14 tables80 claim records27 source recordsScoped review · limits applyCaptured 2026-10-27
C_BRpass-19

Ordinary civil revelia and ensuing merits-judgment gateway

Inside: Ordinary civil revelia and ensuing merits-judgment gateway · 1.1 Current CPC and temporal boundaries · 1.2 Preconditions, not a service rerun

13 tables77 claim records12 source recordsScoped review · limits applyCaptured 2026-10-27
C_BRpass-20

Ordinary civil apelação from a first-instance sentence

Inside: Ordinary civil apelação from a first-instance sentence · 1.1 Principal operative body · 1.2 Material amendment crosswalk

16 tables85 claim records20 source recordsScoped review · limits applyCaptured 2026-10-27
C_BRpass-21

Ordinary civil embargos de declaração: clarification, correction and limited modifying effects

Inside: Ordinary civil embargos de declaração: clarification, correction and limited modifying effects · 1.1 Operative text and commencement · 1.2 Material currentness checks

15 tables74 claim records20 source recordsScoped review · limits applyCaptured 2026-10-27
C_BRpass-22

Ordinary civil agravo de instrumento and interlocutory-review gateway

Inside: Ordinary civil agravo de instrumento and interlocutory-review gateway · 1.1 Statute and commencement · 1.2 Material amendment/status crosswalk

15 tables80 claim records17 source recordsScoped review · limits applyCaptured 2026-10-27
C_BRpass-23

Ordinary civil agravo interno against a relator’s monocratic decision

Inside: Ordinary civil agravo interno against a relator’s monocratic decision · Principal determination · Material source limitations

18 tables70 claim records28 source recordsScoped review · limits applyCaptured 2026-10-27
Record integrity

Original saved Markdown SHA-256: 9436775376cc79d7229c599cd2759740c76dddf9d9b06c247da0b7c3a0a93744. Public formatting, private-reference removal and correction annotations are separate from that immutable original.

Get debt settlement help