A solar loan’s funding, payment schedule and servicing can be separate from the installer’s work. A servicing change or contractor problem does not by itself explain what happens to the loan balance.
The selected Dividend/Fifth Third, EnFin, GoodLeap, Mosaic and Sunlight records distinguish lender, servicer, loan and PPA roles. Use the contract and account notice to identify the obligation before requesting a payment change.
Research recorded November 12, 2026 – November 13, 2026. Each section preserves the source’s scope, dates and exceptions.
Dividend Finance and Fifth Third U.S. solar loans
Research recorded November 12, 2026
Fifth Third Bancorp announced completion of its Dividend Finance acquisition on May 10, 2022. Dividend’s homeowner page identifies it as a Fifth Third Bank division. Its public installer guide identifies Fifth Third Bank, National Association, as originator in the guide’s program and Dividend as its trade name for solar and certain home improvement loans. Dividend’s home-sale page provides a Loan Servicing Department payoff route. These sources do not determine current ownership or servicing on an individual loan.
Source: resources.dividendfinance.com · Dividend Solar+ Guidelines (source 1) 53.com · press release 2022 05 10 (source 2) dividendfinance.com · homeowners (source 3) dividendfinance.com · homesale (source 4) dividendfinance.com · Dividend Loan Transfer Guide Final (source 5)
Fifth Third Bancorp’s Form 10-Q for the quarter ended September 30, 2026 states it paused originations of new loans in its solar energy installation loan portfolio in July 2026. That filing addresses the Bancorp portfolio, while Dividend’s public website describes the product and servicing guidance. The filing does not establish permanent discontinuation or treatment of a particular application.
Source: SEC · fitb 20260930 (source 6)
Dividend’s homeowner guidance describes notice to proceed after signing and clearing financing stipulations, then disbursement to the installer after it confirms system installation. The welcome call follows disbursement and reviews completion, due date and payment information. For customers enrolled in its Installer Bill Coverage program, the homeowner guidance describes installer coverage up to nine months or until permission to operate if achieved within that period. The homeowner FAQ discusses a possible first payment before permission to operate; separate installer training says first payment after permission to operate. These statements preserve the scope difference and establish no universal due-date trigger.
Source: resources.dividendfinance.com · Dividend Solar+ Guidelines (source 1) dividendfinance.com · homeowners (source 3)
Dividend’s homeowner FAQ says the APR may be lowered by 0.5% through automatic payments and that it charges no prepayment penalty. It describes up to two additional re-amortizations after the initial Incentive Investment re-amortization, each requiring a minimum $1,000 principal payment, a minimum $5,000 loan balance, and current account status. The separate installer training illustrates levelized payment assuming 30% of principal has been paid down by month 16, which does not establish an account-specific target or a tax benefit.
Source: resources.dividendfinance.com · Dividend Solar+ Guidelines (source 1) dividendfinance.com · homeowners (source 3)
The public homeowner FAQ says Dividend charges no loan cancellation fee and distinguishes the installer’s solar agreement, under which the installer may charge cancellation fees. It does not give the legal or contractual cancellation right, notice method, time window, or refund allocation.
Dividend’s public home-sale page describes a payoff quote using the sale closing date, or a buyer assumption subject to credit approval and satisfaction of the full Incentive Investment payment. Its 2023 guide describes signatures and acceptance, closing before the transfer, responsibility for payments due during the transfer process and 15 days after closing, possible recording or filing fees, retention of original terms on transfer, and removal of its recorded solar equipment lien after full payoff. Those are guide statements subject to the executed agreement and current approvals.
Source: dividendfinance.com · homesale (source 4) dividendfinance.com · Dividend Loan Transfer Guide Final (source 5)
Fifth Third’s current public payment-assistance page lists a Dividend-specific category for short-term assistance, long-term assistance, FEMA disaster assistance and settlements, with a qualification inquiry to the payment-assistance team. The listed categories are evidence of the published review route, without stated eligibility, financial terms or approval.
Source: 53.com · hardship assistance (source 7) dividendfinance.com · contact (source 8)
Source scope and limits
No executed note, installer agreement, payment history, funding record, actual current holder or servicer, permission to operate, first due date, security filing, settlement, recast or transfer outcome was accessed. Confirm product and vintage with applicable documents. The 10-Q pause applies to the Bancorp solar installation portfolio and does not determine current home-improvement originations, permanent availability, or action on an earlier approval. Public sources support a Dividend no-cancellation-fee statement and potential separate installer fees. No general rescission deadline, procedure, merchant refund, principal/interest allocation or litigation outcome was verified. Public assistance categories are explicit. Eligibility, relief amount and duration, forbearance or settlement terms, interest, fees, reporting and actual qualification remain unverified. Preserve 2022 acquisition, 2026 Bancorp solar origination pause, guide-specific lender and payment timing conflict. Preserve re-amortization predicates, cancellation fee versus rights, home-sale transfer and separate assistance categories. Individual loan ownership, eligibility and outcomes held.
EnFin by Qcells U.S. solar loans and levelized PPAs
Research recorded November 13, 2026
For EnFin-serviced loans, the public homeowner FAQ describes no early payoff fees or penalties, with prepayments credited first to accrued interest and then to principal. It lists an active ACH autopay APR reduction of 0.25%, with separate online and phone account-payment methods. It directs a borrower asking about canceling a recently signed loan to the signed agreement’s notification-of-cancellation section and provides a public contact route for further inquiries.
EnFin’s Levelized PPA FAQ specifies a 25-year agreement, EnFin ownership and a monthly payment based on modeled annual production divided by 12. It describes no upfront payment or deposit before service, the first payment 30 days after placement in service, and stated annual escalation options of 0%, 2.99% or 3.5% as applicable to the agreement. It lists debit-card and ACH payments and a small autopay discount without stating its amount. EnFin identifies the arrangement as a power purchase agreement despite the levelized bill. The separately offered lease and loan do not inherit these PPA details.
Source: enfin.com · what is a solar loan understanding solar financing options (source 10) enfin.com · homeowners (source 9)
For a move during the Levelized PPA, EnFin describes transferring the agreement, buying the system if five years have elapsed since placement in service, or prepaying all remaining monthly payments while EnFin keeps ownership and monitoring. It requests contact at least 30 days before escrow and gives quotes by system. At the end of the term it lists buyout, a new agreement, or removal at no cost. The FAQ says the customer is responsible for system servicing after a buyout.
EnFin’s separate Puerto Rico electric-service disclosure says a bill dispute can be filed by the due date and must first be submitted to EnFin before escalation to the Puerto Rico Energy Bureau. The notice identifies a 33-day electric-service billing cycle, payment prerequisites tied to previous undisputed bills, and ongoing payment of future bills. It describes continuity of service while a dispute is submitted, with Demand Response disputes addressed separately. This jurisdiction- and service-specific provider disclosure does not establish U.S. solar-loan dispute procedures or a ruling.
Source: enfin.com · about (source 11) enfin.com · PREB Informal Process for Disputes Disclsoure 20260522 v2 (source 12)
Source scope and limits
Exact loan milestone draws, initial payment due date, borrower loan re-amortization schedules, servicing-transfer policy and funding authorization terms remain unverified. General application and quick funding descriptions establish no draw deadline. Only the recently signed loan cancellation contact and agreement reference were verified. Actual cancellation rights, deadline and merchant refund procedure, adjustment, amount or posting remain unverified. Product-specific hardship and settlement terms remain held. Levelized PPA billing, buyout and transfer descriptions remain bounded to that FAQ. No primary proof of the separate lease’s exact rates, notice periods, buyout terms or a specific customer’s PPA quote, agreement and system dates was obtained. No account or individual record was accessed. Actual creditor, holder, servicer, loan terms, filing, escrow, approval, product applicability, tax treatment, dispute or relief outcome remain held. Preserve Qcells/EnFin and Hatch origination and servicing statements with solicitation limitation. Distinguish loan payoff, transfer and filing from 25-year Levelized PPA pricing, escalation, purchase and service. Puerto Rico 33-day electric-service disclosure and dispute prerequisites remain service- and territory-specific. Actual account and outcomes held.
GoodLeap U.S. residential solar loan funding and servicing
Research recorded November 12, 2026
GoodLeap identifies GoodLeap, LLC, formerly Loanpal, NMLS 30336. A SolarMax Technology prospectus filed under Rule 424(b)(4) describes its own October 12, 2021 program agreement, replacing a January 2020 agreement. It identifies GoodLeap as providing financing for SolarMax customers who meet its criteria, paying SolarMax the purchase price less a program fee, and entering the financing agreement with the customer. This is evidence of the named historical installer route, and the public GoodLeap directory describes payment, balance and payoff support without identifying an individual loan’s holder or servicer.
Source: goodleap.com · solar and storage (source 13) goodleap.com · contact us (source 14) SEC · solarmax 424b4 (source 15)
GoodLeap’s FAQ says it sets first-payment dates after project installation, with timing varying by financing type and product. For most of its loans it describes interest starting on the funding date and refers to the loan documents for the specific date. It says credit approval runs 180 days from the initial credit run and funding later requires credit revalidation. Its August 2026 educational article says solar-loan proceeds typically go directly to the contractor after approval and installation. These sources do not establish exact draw stages or installment-specific disbursement deadlines.
Source: goodleap.com · solar loans everything you need to know (source 16) goodleap.com · source document (source 17)
GoodLeap describes some solar loan structures with lower payments in the first 18 months and re-amortization afterward. More principal reduction may keep the subsequent monthly payment level or reduce it, while less reduction may increase it. The FAQ describes additional first-18-month payments even without tax credit funds and directs customers to the loan agreement and account target balance/date for product specifics. This describes a payment structure and does not establish tax eligibility or an account’s target amount.
GoodLeap’s public FAQ states that a payment due date can be changed once every two years to the first through the 28th day of a month, with a payment in each calendar month. It states it charges no prepayment fee or penalty and describes payoff statements with a total and breakdown. It also says disabling autopay may remove a discount or add non-autopay fees depending on the agreement.
GoodLeap’s account FAQ gives a hardship contact for situation-specific review and says its team can explore possible solutions. The separate support directory distinguishes application and project funding support from payment, balance and payoff support. Public eligibility, forbearance, modification, fee and interest terms remain unverified.
Source: goodleap.com · contact us (source 14) goodleap.com · source document (source 17)
For a home sale, GoodLeap’s public FAQ describes payoff or a prospective buyer applying to assume the solar loan, subject to underwriting and GoodLeap approval, with payoff needed if assumption is not approved. It describes the provider’s UCC-1 and county fixture filings as securing the solar equipment. This is the lender’s description of its own practice; actual filings and loan rights depend on the documents and applicable law.
GoodLeap separately describes balanced-billing lease or PPA payment increases at the account anniversary according to the stated agreement percentage. Its residential solar page describes GoodLeap ownership and maintenance and a possible transfer, purchase after five years and monthly ACH discount in the lease/PPA section. GoodLeap’s solar-loan explanation instead describes homeowner system ownership after installation and loan funding. Lease or PPA terms do not establish solar loan terms.
Source: goodleap.com · solar loans everything you need to know (source 16) goodleap.com · source document (source 17) goodleap.com · residential solar (source 18)
Source scope and limits
No public general borrower cancellation procedure, installer refund routing, credit allocation, dispute timing or effect on balance, interest or re-amortization was verified. Individual records and complaint or case reports surfaced in discovery were excluded and not opened. The general FAQ and named installer filing do not establish progress draws, a particular project’s funding status, current partner terms, or the operative milestone and loan delivery requirements. Actual installation and funding dates remain held. Public hardship contact and discretionary review are evidenced. Exact hardship eligibility, terms, interest and reporting effects, forbearance and approval remain unverified. Actual lender, owner, servicer, agreement edition, rates, payment target, promotions, UCC filings, security rights, buyer assumption and tax eligibility remain individually unverified. No account or individual transaction was accessed. Separate GoodLeap public loan, historical SolarMax program and lease/PPA terms. Preserve installation and funding scope, 18-month re-amortization conditions, account servicing and home-sale assumption contingencies. Individual agreement, title, tax and relief held.
Mosaic U.S. solar financing and Solar Servicing transition
Research recorded November 12, 2026
Forbright announced September 22, 2025 that its wholly owned Solar Servicing LLC completed the acquisition of Solar Mosaic LLC’s loan servicing operations. Solar Servicing identifies itself as NMLS 2744383, says it services for most borrowers, and says collections are remitted to loan owners. Its transition FAQ says an investor that previously purchased a loan could instead choose an alternative servicer, with that provider’s contact information in the transition letter. The acquisition and published general payment continuity do not establish ownership or the servicer for every loan.
Source: ir.forbrightbank.com · solar mosaics loan servicing operations transition solar (source 19) solarservicingllc.com · corp info faqs (source 20)
Solar Servicing’s transition notice says unfunded opportunities were closed unless Mosaic otherwise agreed, loans partially funded when Mosaic filed were assigned a pipeline team to support installers and loan owners in seeking resolution, and Mosaic no longer originates new loans. Solar Servicing says it is a servicing company only. Mosaic’s September 2024 installer guidance described historical platform originations by Solar Mosaic LLC or a lending or financing partner.
Source: ir.forbrightbank.com · solar mosaics loan servicing operations transition solar (source 19) joinmosaic.com · MOS WELCOME CALL OVERVIEW (source 21) solarservicingllc.com · corp info faqs (source 20)
Solar Servicing’s homeowner FAQ describes monthly payments on nonpromotional loans starting three months after funding or 15 days after confirmed permission to operate, whichever is earlier. For promotional loans it says the period starts at first installer disbursement and monthly payments begin after expiry if the loan was not paid off. It says interest accrues on disbursed funds from the initial disbursement and directs borrowers to their agreements for product-specific re-amortization. The FAQ does not establish a particular borrower’s rates or any promotional interest waiver.
The servicer FAQ says ACH autopay can reduce the rate and that canceling ACH increases the rate and monthly payment, subject to the loan agreement. It also says there are no prepayment penalties and that early payoff includes interest already accrued. It describes payoff demand letters or specific-date payoff amounts up to ten calendar days in the future.
Solar Servicing’s public FAQ currently states it does not offer home-sale borrower loan transfers or refinancing and describes payoff for active loans it services. The same FAQ describes its UCC-1 state and county filings as securing installed solar equipment and related personal property. This is the servicer’s description of its practice. The executed note, actual filing, governing law and any third-party servicer’s policy are individually unverified.
The March 2023 program addendum sets provider-defined funding stages and participant and/or customer stage-completion evidence. It describes net funding in installments within ten business days of notified stage achievement, subject to section 4 and written changes. It allows discretionary early funding before an applicable statutory cancellation period expires for an emergency only with the specified handwritten, signed and dated customer waiver compliant with applicable law, copy within three business days of request, and three-year participant retention. Missing or inadequate waiver may trigger cancellation and participant remedies. These are historical participant requirements and do not establish whether a statutory cancellation right applies to a particular borrower.
Source: solarservicingllc.com · 2023 03 23 Mosaic Loan Program Addendum (source 23)
The March 2023 participation agreement requires immediate participant notice of cancellation or intent to cancel and prompt written reporting within five calendar days of specified customer inquiries or complaints. For material participant nonperformance or noncompliance, section 2.7 permits discretionary withholding, setoff, participant refunds or chargeback up to the loan amount plus covered customer-dispute losses, and cancellation with a $350 charge plus applicable accrued unpaid interest in the participant-remedy provision. The solar supplement adds staged completion deadlines and discretionary step-in; on final completion it describes returning qualifying setoff or debit amounts to the participant less specified amounts and expenses. These are participant-side remedies and amounts, not an automatic consumer refund or a borrower cancellation fee.
Source: solarservicingllc.com · 2023 03 23 Mosaic Program Participation Agreement (source 24) solarservicingllc.com · 2023 03 23 Mosaic Solar Energy Supplement (source 25)
The September 2024 Mosaic installer guide describes a welcome call after signing in which a homeowner who elects not to continue is marked failed and the opportunity returns to credit-app-approved status. It also describes holding countersignature when the homeowner cannot be reached. This is a historical pre-funding workflow and does not establish how a funded loan is canceled.
Source: joinmosaic.com · MOS WELCOME CALL OVERVIEW (source 21)
Source scope and limits
Actual lender, loan owner or assignee, current servicing entity, notices, collateral, hardship eligibility, payoff amount, refinance or assumption rights and account outcomes remain individually unverified. Forbright’s acquisition was for servicing operations; the public sources report a separate investor-chosen servicer exception. Actual disbursements, project completion, installer performance, treatment of a partially funded project, refunds credited to the borrower, allocation, charge timing and rights under the executed note or law were not verified. Historical participant remedies and emergency waiver conditions do not establish current program terms or consumer entitlement. No borrower-specific hardship, modification or forbearance option was verified. The historical participant contract mentions possible relief in its allocation of participant obligations, without terms or eligibility. No individual record, portal, claims-agent site or case material was accessed. The undated homeowner FAQ is evidence of the servicer’s current public statement at capture. It does not determine contractual rights or override a specific note, later notice, filing or governing law. Preserve 2025 Forbright servicing acquisition and investor-selected alternatives versus ownership and originator roles. Preserve FAQ payment clocks, ACH, payoff and UCC scope. Historical March 2023 participant funding, emergency waiver, complaint and remedies and September 2024 pre-funding workflow do not determine borrower rights or current funded-loan outcomes.
Sunlight Financial U.S. solar loan origination, funding and payments
Research recorded November 12, 2026
Sunlight Financial LLC describes a multi-lender facilitation model and says the funding lender depends on location, product and credit profile. Its public help article directs the customer to the loan agreement and, for home-improvement financing, the bill. The contractor FAQ names Cross River Bank for certain loans. A historical SEC filing says direct-channel banks or credit unions generally chose to service loans they originated, while certain indirect-channel loans were funded through Cross River Bank and pooled for sale to indirect capital providers. The statements do not identify an individual current holder, servicer or payment destination.
Source: sunlightfinancial.com · frequently asked questions (source 26) sunlightfinancial.helpjuice.com · questions about capital providerslenders (source 27) SEC · slfh10 k2022x424b3 (source 28)
Sunlight’s April 22, 2022 prospectus describes a solar workflow in which installation and photographs preceded the contractor funding request, with generally 24-hour prefunding less dealer fees and a possible holdback until grid interconnection evidence. It describes loan booking and interest accrual at installation funding and an initial borrower payment due 60 days after funding. Its currently accessible solar contractor page instead advertises initial payment 90 days after installation, so the descriptions must stay tied to their sources and applicable loan documents.
Source: sunlightfinancial.com · solar (source 29) SEC · tm2210897 3 424b3 (source 30)
Sunlight’s public contractor help describes installation milestone M1 requiring a final design matching the system installed, including inverter and panel details, system layout and size and the customer address matching the loan agreement. The 2022 prospectus distinguishes short-term milestone advances for qualifying contractors’ upfront equipment and other costs, typically recovered from contractor loan funding, from contractor prefunding advances reimbursed by capital providers. That contractor financing disclosure is not an individual borrower draw schedule.
Source: sunlightfinancial.helpjuice.com · what is the final design document that is required for installation approval (source 31) SEC · tm2210897 3 424b3 (source 30)
The capital-provider help article describes 90 days from customer initial-payment authorization for its labeled multi-draw home-improvement branch and 30 days for the labeled single-draw branch, with the date in the lender welcome package. The historical SEC filing distinguishes secured fixed-rate closed-end solar loans from unsecured home-improvement loans and describes up to two progress payments only for qualifying home-improvement contractors and projects. Those non-solar progress-payment terms are not assumed to apply to solar loans.
Source: sunlightfinancial.helpjuice.com · questions about capital providerslenders (source 27) SEC · tm2210897 3 424b3 (source 30) SEC · slfh10 k2022x424b3 (source 28)
Sunlight’s historical solar portal walkthrough shows a one-time re-amortization example at month 18. Assuming all monthly payments, it illustrates a 26% voluntary paydown maintaining the payment, more reducing it and less increasing it; extra payments do not change the minimum before the re-amortization in that example. Its public capital-provider help states Sunlight loans have no prepayment penalty and says the lender can provide payoff information. The historical illustration does not establish current tax eligibility, product thresholds or an individual borrower’s contract.
Source: sunlightfinancial.com · faqs (source 32) sunlightfinancial.helpjuice.com · questions about capital providerslenders (source 27)
The historical walkthrough describes a possible transfer to a buyer who meets the lender’s credit requirements and signs a loan agreement for the outstanding amount. It describes the lender’s solar-system security interest and possible UCC-1 and fixture filing. The current Sunlight contact page lists homeowner and payment/payoff support, without documenting current assumption eligibility, project dispute remedies or hardship terms.
Source: sunlightfinancial.com · faqs (source 32) sunlightfinancial.com · contact (source 33)
Source scope and limits
No exact operative cancellation or withdrawal procedure was verified: the official support index lists a relevant article, but its public link returned a cache miss. No unchanged retry was made. Merchant refund routing, borrower credit allocation, dispute deadlines, late fees and case outcomes remain unverified. No public product-specific hardship, forbearance, modification, accrual, reporting or eligibility terms were verified. Homeowner and payoff contacts only are established. Current solar first-payment date and re-amortization thresholds depend on applicable terms. The 2022 investor narrative, historical walkthrough and undated current marketing text describe differing timing or trigger language. No private account, tax eligibility, note, lien, named capital-provider assignment, particular funding milestones or home-sale transfer outcome was investigated. Preserve Sunlight multilateral lender channels and historical SEC workflow versus current marketing, 60 versus 90 day timing and loan document control. Distinguish contractor advances, solar and home-improvement branches, re-amortization example and actual servicing and rights.
Sources and research notes
Source links appear beside the statements they support. A recorded date identifies the saved research, not a new check of every source or a conclusion about an individual account.
Source documents
- resources.dividendfinance.com · Dividend Solar+ Guidelines
- 53.com · press release 2022 05 10
- dividendfinance.com · homeowners
- dividendfinance.com · homesale
- dividendfinance.com · Dividend Loan Transfer Guide Final
- SEC · fitb 20260930
- 53.com · hardship assistance
- dividendfinance.com · contact
- enfin.com · homeowners
- enfin.com · what is a solar loan understanding solar financing options
- enfin.com · about
- enfin.com · PREB Informal Process for Disputes Disclsoure 20260522 v2
- goodleap.com · solar and storage
- goodleap.com · contact us
- SEC · solarmax 424b4
- goodleap.com · solar loans everything you need to know
- goodleap.com · source document
- goodleap.com · residential solar
- ir.forbrightbank.com · solar mosaics loan servicing operations transition solar
- solarservicingllc.com · corp info faqs
- joinmosaic.com · MOS WELCOME CALL OVERVIEW
- solarservicingllc.com · homeowner faqs
- solarservicingllc.com · 2023 03 23 Mosaic Loan Program Addendum
- solarservicingllc.com · 2023 03 23 Mosaic Program Participation Agreement
- solarservicingllc.com · 2023 03 23 Mosaic Solar Energy Supplement
- sunlightfinancial.com · frequently asked questions
- sunlightfinancial.helpjuice.com · questions about capital providerslenders
- SEC · slfh10 k2022x424b3
- sunlightfinancial.com · solar
- SEC · tm2210897 3 424b3
- sunlightfinancial.helpjuice.com · what is the final design document that is required for installation approval
- sunlightfinancial.com · faqs
- sunlightfinancial.com · contact
Original research and recorded qualifications
- Dividend Finance and Fifth Third U.S. solar loans 2026-11-12
- EnFin by Qcells U.S. solar loans and levelized PPAs 2026-11-13
- GoodLeap U.S. residential solar loan funding and servicing 2026-11-12
- Mosaic U.S. solar financing and Solar Servicing transition 2026-11-12
- Sunlight Financial U.S. solar loan origination, funding and payments 2026-11-12
Put this information to use
- Match the product, lender, current servicer and account status to the source section that applies to your agreement.
- Ask for the proposed payment, interest or fees, maturity date, credit-reporting treatment and consequences of a missed arrangement payment in writing.
- Compare the proposed arrangement with your essential bills and keep copies of the agreement, notices and payment confirmations.
Explore this subject: Personal loans and bank debts Everyday bills and service contracts Direct creditor hardship Creditor collector and buyer profiles