| R093-P2-C001 | The original Federal Register instrument identifies itself as a final bulletin and was published January 14, 2005, at 70 FR 2664–2677. That publication date is distinct from the issuance date stated in its summary. | S001, heading, ACTION and SUMMARY, P2664/I0.
govinfo.gov |
| R093-P2-C002 | The summary states that OMB, in consultation with OSTP, issued the final Bulletin to heads of departments and agencies on December 16, 2004. This is an issuance statement, not an express definition of publication for XI. | S001, SUMMARY, P2664/I0.
govinfo.gov |
| R093-P2-C003 | M-05-03 independently authenticates the dated transmittal and its statement of issuance that day. Its attached operative XI already contains the relative publication-based periods. These are formats and stages of the same Bulletin, not separate legal corroboration. | S002, complete transmittal; attached XI, P45/I44.
georgewbush-whitehouse.archives.gov
+2 |
| R093-P2-C004 | The standalone official archived final-titled copy displays December 15, 2004 and contains the same material relative XI wording. The displayed date alone does not authenticate its original public-release event or establish a different phase-in date. | S003, P1/I0; XI, P40–41/I39–40.
georgewbush-whitehouse.archives.gov
+1 |
| R093-P2-C005 | DATES expressly applies requirements other than V to otherwise covered information disseminated on or after June 16, 2005, subject to the stated prior-supply exception. | S001, complete DATES, P2664/I0.
govinfo.gov |
| R093-P2-C006 | DATES expressly makes V’s requirements concerning highly influential scientific assessments effective June 16, 2005. This is a planning-category date. | S001, DATES, P2664/I0.
govinfo.gov |
| R093-P2-C007 | DATES expressly makes V’s requirements concerning influential scientific information effective December 16, 2005. This does not erase the separately stated earlier highly-influential-assessment phase. | S001, DATES, P2664/I0; III.1–III.2.
govinfo.gov
+1 |
| R093-P2-C008 | Operative XI applies the non-V requirements to information disseminated on or after six months following publication of the Bulletin. It does not name a calendar date in that sentence. | S001, XI first sentence, P2677/I13; S002, XI, P45/I44.
govinfo.gov
+1 |
| R093-P2-C009 | The general-phase exception requires that an agency already have provided both a draft report and an associated charge to peer reviewers. It is located in the non-V applicability sentence; it is not stated there as a blanket cancellation of V planning. The precise reference event for “already” is not separately specified. | S001, DATES and XI first sentence; S002, XI.
govinfo.gov
+2 |
| R093-P2-C010 | XI requires existing peer-review mechanisms mandated by law to be employed in a manner as consistent as possible with the Bulletin’s practices and procedures. Both the legal mandate and the consistency qualification matter. | S001, XI second sentence, P2677/I13.
govinfo.gov |
| R093-P2-C011 | XI’s highly-influential-assessment planning clause uses within six months of publication and expressly links the category to III. That wording differs from the general dissemination clause’s onset formulation. | S001, XI third sentence, P2677/I13; III.1.
govinfo.gov
+1 |
| R093-P2-C012 | XI’s other stated planning formulation applies V to documents subject to II one year after publication. The sentence does not itself identify the publication date or a counting convention. | S001, XI final sentence, P2677/I13.
govinfo.gov |
| R093-P2-C013 | I.1 defines the Administrator as the OIRA Administrator in OMB. I.2 incorporates the meaning of agency from 44 U.S.C. 3502(1). The incorporation is authenticated, but the complete external definition was not reopened in this timing pass. | S001, I.1–I.2, P2674/I10. No fresh entity-scope conclusion follows.
govinfo.gov |
| R093-P2-C014 | I.3 uses agency-initiated or sponsored public distribution as its dissemination concept, with express exclusions. These cover restricted employee/contractor/grantee distribution, intra/interagency sharing, responses under the named records-access laws, and the listed limited correspondence, press-release, archival, filing, subpoena and adjudicative categories. Compliant pre-dissemination peer review has a specified disclaimer condition. Government-funded research not representing agency views has a separate exclusion and stated disclaimer qualification. The referenced 5 CFR 1320.3(d) was not reopened. | S001, complete I.3, P2674–2675/I10–11. This identifies why “disseminated” cannot be replaced by any publication or circulation event.
govinfo.gov |
| R093-P2-C015 | I.5’s scientific-information definition reaches factual inputs, data, models, analyses, technical information and assessments in the listed scientific fields and media. It includes agency-disseminated web information, excludes mere hyperlinks to others’ dissemination, and excludes clearly presented opinion rather than fact or agency views. | S001, complete I.5, P2675/I11. No actual information is classified.
govinfo.gov |
| R093-P2-C016 | I.6 defines influential scientific information through an agency’s reasonable determination that the scientific information will have or does have a clear and substantial impact on important public policies or private-sector decisions. | S001, complete I.6, P2675/I11. The definition does not itself establish that any document qualifies.
govinfo.gov |
| R093-P2-C017 | I.7 defines a scientific assessment as evaluation of a body of scientific or technical knowledge, typically synthesizing multiple inputs and/or using professional judgment to bridge uncertainty; its listed assessment types are illustrative. | S001, complete I.7, P2675/I11. This category remains separate from an actual assessment determination.
govinfo.gov |
| R093-P2-C018 | III.1 applies to influential scientific information that the agency or Administrator determines is a scientific assessment meeting either alternative: potential impact greater than $500 million in any year, or novelty, controversy, precedent-setting character, or significant interagency interest. The financial alternative is not required when the other alternative is met. | S001, complete III.1, P2675/I11. No impact amount, year or classification is supplied.
govinfo.gov |
| R093-P2-C019 | II.1 and III.2 retain their qualification based on what law permits. III.2 requires the Section II requirements plus the additional Section III requirements. Thus III is not a wholly disjoint category. III.2 also generally presumes that principal findings, conclusions and recommendations in official National Academy of Sciences reports falling under III do not require additional review. | S001, II.1, P2675/I11; complete III.2, P2675–2676/I11–12. The full substantive III regime was not investigated.
govinfo.gov
+1 |
| R093-P2-C020 | II.2 separately addresses adequacy of prior review. Its assessment takes account of novelty and complexity, decision importance, extent of earlier review, and expected benefits and costs of additional review; it contains its own general presumption concerning the specified official National Academy of Sciences report material. This adequacy inquiry is different from XI’s already-supplied draft-and-charge exception. | S001, complete II.2, P2675/I11, compared with XI, P2677/I13.
govinfo.gov
+1 |
| R093-P2-C021 | V concerns planning: an agency agenda for planned and ongoing influential scientific information subject to the Bulletin, links to documents made public, individual plan descriptions, and a public-comment mechanism with consideration of comments. V.2 includes category and review-timing information. V.1 separately requires updating at least every six months. None of this proves completion of an actual review or dissemination. | S001, complete V.1–V.3, P2676–2677/I12–13. Other plan-content details were read but are not converted into an operational checklist here.
govinfo.gov |
| R093-P2-C022 | The preamble’s XI explanation uses a broader description of review already underway and describes the existing-law relationship with “should”; operative XI supplies the specific draft-and-charge predicate and uses “shall” for existing legally mandated mechanisms. The explanation is not substituted for the operative wording. | S001, preamble XI, P2674/I10, and operative XI, P2677/I13; S002, preamble XI, P34/I33, and operative XI, P45/I44.
govinfo.gov
+2 |
| R093-P2-C023 | XII states the Bulletin’s internal-management purpose and disclaims creation by that Bulletin of substantive or procedural rights or benefits enforceable at law or equity against the United States, its agencies or other entities, officers or employees, or any other person. This is not a fresh determination of every judicial-review route or the legal effect of the separate 2002 guidelines. | S001, complete XII, P2677/I13; S002, complete XII, P45/I44.
govinfo.gov
+1 |
| R093-P2-C024 | Response-to-comments item 6 explains that implementation time motivated the planning phase-in and repeats six months for highly influential assessments and one year for influential scientific information. It does not expressly define the calendar publication event or issue a correcting instruction. | S004, complete item 6, P3–4/I2–3.
georgewbush-whitehouse.archives.gov |
| R093-P2-C025 | The selected 2006 OMB paragraph repeats June 16, 2005 for peer-review effectiveness and discusses both planning categories as of December 16, 2005. It is later explanatory evidence of the dates OMB used, not an adopted amendment or proof here of any actual agency’s compliance. | S005, Chapter IV, selected complete paragraph, P43–44/I48–49.
obamawhitehouse.archives.gov |
| R093-P2-C026 | The archived OMB index distinguishes the issuance, Federal Register notice and response-to-comments dates. Its frozen historical status prevents treating its availability as a currentness certification. | S006, archive banner and selected Bulletin entries.
The White House |
| R093-P2-C027 | The bounded searches and selected sources did not authenticate an instruction correcting XI or an express definition identifying its publication event. They also did not establish a month/year counting convention or a separate calendar reference for “already.” This is a limited research result, not proof of universal absence. | S001–S006 within the registered bounds; search log below. |
| R093-P2-C028 | The old relative-period description remains textually supportable, but is incomplete without the original notice’s explicit dates and distinctions among issuance, publication and planning categories. Bulletin-specific timing coverage should be partial, with explicit-date authentication answered and the residual reference-event question unresolved. | Comparison of C001–C012, C024–C027 with the supplied immutable M032–M033 and coverage 9a. This is the supplement’s research classification. |
| R093-P2-C029 | Original Federal Register PDF and official archived issuance materials were accessible. The current-host transmittal path failed. Findings rely on the specified parsed text/HTML, not a claim of complete pixel inspection or whole-instrument review. | S001–S007 and read/failure log. |
| R093-P2-C030 | Complete external agency/sponsorship definitions, all Bulletin exemptions and waivers, all later history, actual application and broader judicial/remedy questions remain outside this bounded reconciliation. The supplement makes no actual compliance or operational determination. | Express read bounds; S001 I.2–I.3, XI–XII; user-defined scope. No substantive rule about an actual actor is inferred. |