SettleADebt.

FIND THE EXPLANATION

Find a debt-help route outside the United States

Start with the country and, where necessary, the province or legal system. Familiar debt words can describe different procedures.

Explore Netherlands information →

This address preserves a dated source document behind the guide. The complete explanation covers the questions, comparisons and next steps for this subject.

If you came here to check a specific citation, open the original archive below. It includes its source dates and recorded qualifications.

Original source archive (optional)Original working documents, complete tables and revision history
About this archive

The explanation above is written for readers. These original working documents preserve the evidence trail, including technical language, dated passages and known corrections. They have not all received independent professional review. Use the marked limits before relying on a particular rule or figure.

DETAILED RESEARCH · EVIDENCE & LIMITS INCLUDED

CNL Netherlands Wck text reconciliation

C_NL · pass-02Captured 2026-10-2715 tables · 16 claim records · 24 source recordsScoped coordinator review completed

Read the evidence with its boundaries. These are saved research components, including revisions. A scoped coordinator review checks selected evidence; it does not certify every claim, a complete jurisdiction, current law or individual applicability. Dates and access limits remain attached to the records.

How to read the research →

SettleADebt C_NL PASS-02 — Netherlands Wck text reconciliation

Partial current-text verification — not country acceptanceResearch baseline: 22 October 2026, America/Los_Angeles Actual primary-source verification: 26 October 2026, Pacific Daylight Time; 27 October 2026, UTC and Netherlands local time Jurisdiction: European Netherlands, subject to the territorial and cross-border holds preserved from PASS-01.

1. Findings — G1 and G2

This pass establishes four material changes missing or incompletely reconciled in the PASS-01 historical-to-current comparison:

Selected provision Historical text or position Verified enacted change Effective date
Wck article 1(a)(2°)–(3°) Credit transactions involving a roerende lichamelijke zaak Removed lichamelijke, leaving roerende zaak 1 January 1992
Wck article 48(2) Delegated authority for remuneration rules Added express authority for an AMvB to require a certificaat for mediation referred to in article 48(1) 1 January 2008
Wck article 48(1)(c) Included procureurs among professional exceptions Removed procureurs 1 September 2008
Wck article 1(a) Required at least one borrower payment more than three months after the relevant advance or performance began Deleted the three-month condition, subject to an express transition for earlier credit agreements 25 May 2011

These changes are established by the actual amendment and commencement instruments, not by assuming that a current-looking website accurately reproduces the law. 1991 amendment · 2007 amendment · 2008 professional amendment · 2011 amendment. zoek.officielebekendmakingen.nl+3

G1.1 — Operative definition of krediettransactie: bounded reconstruction

The original 1990 article 1(a) covered an agreement or linked agreements involving:

  1. A money advance by or for a kredietgever to a kredietnemer, followed by one or more borrower payments.
  2. Provision of the use of movable property or a service designated by AMvB, followed by borrower payments.
  3. A money advance linked to provision of movable property or a designated service, involving the creditor, borrower and potentially a third-party supplier, followed by borrower payments.

The original text added a common condition requiring at least one payment after three months. That condition was removed by Staatsblad 2011, 246, article II(A)(1). The amendment's article VI expressly excludes credit agreements concluded before the amendment's commencement. Its article VII makes commencement depend on the Staatsblad issue date; the issue date was 24 May 2011, producing 25 May 2011 as the effective date. An older agreement must therefore be examined against the transition, not automatically analyzed under the broadened post-amendment definition. C_NL-P02-C001–C003. zoek.officielebekendmakingen.nl+2

Separately, Staatsblad 1991, 630, article I(A) removed lichamelijke from the movable-property branches, effective 1 January 1992 under article VII. It would be inaccurate to reproduce the 1990 phrase as the fully operative later definition. C_NL-P02-C002. zoek.officielebekendmakingen.nl+1

The original 1991 Besluit aanwijzing diensten Wet op het consumentenkrediet designated passenger transport or accommodation supplied under a travel agreement for the service limb of article 1(a)(2°)–(3°). This is a service-definition instrument, not an article 48(1)(d) authorization for paid debt negotiators. Its presently consolidated amendment/repeal history remains to be certified. C_NL-P02-C004. zoek.officielebekendmakingen.nl

G1.2 — Article 47: prohibition and schuldbemiddeling

The enacted article 47(1) states: Schuldbemiddeling is verboden.

Article 47(2), as read in the original enacted text, concerns services supplied in the course of a business or profession, other than by entering into a credit transaction, aimed at arranging an existing debt burden of a natural person deriving wholly or partly from one or more qualifying credit transactions.

Therefore the gateway still requires identifying:

  • the activity actually performed;
  • whether it is professional or commercial;
  • whether it aims to obtain a debt arrangement;
  • a natural-person debt burden;
  • at least one qualifying credit-derived component; and
  • the applicable version of the linked credit definition.

The selected amendments examined in this pass do not establish an express change to article 47's own wording. But an official complete consolidation as of 26 October 2026 could not be opened, and all intervening amendments were not exhaustively certified. Accordingly, the reconstructed wording is strongly supported but not certified as the complete 2026 consolidation. C_NL-P02-C005 and C015. zoek.officielebekendmakingen.nl+1

G1.3 — Article 48(1): exceptions, with corrected professional and municipal wording

The evidence supports the following reconstruction:

Paragraph Reconstructed exception Essential limitation
48(1)(a) Om niet — gratuitous mediation Indirect payment and mixed remuneration remain interpretive holds.
48(1)(b) Municipalities, municipal credit banks, and institutions acting in opdracht en voor rekening van gemeenten The last category needs evidence of both municipal instruction and performance for the municipal account.
48(1)(c) Advocaten; qualifying curatoren and bewindvoerders under the Faillissementswet or the specified Book 1 BW provisions; notarissen, deurwaarders, registeraccountants, and accountants-administratieconsulenten Professional identity does not prove an unrelated employee or corporate vehicle inherits the exception. Procureurs were removed in 2008.
48(1)(d) Natural or legal persons or categories actually designated by an operative AMvB A present qualifying designation has not been established in this pass.

The professional amendment in Staatsblad 2013, 414, article III took effect 1 April 2014 through Staatsblad 2014, 85. The municipal-contractor substitution in Staatsblad 2018, 424, article XXVIA took effect 1 January 2019 under Staatsblad 2018, 425, article II(1). Those dates are independently confirmed here. C_NL-P02-C008–C009. Overheid.nl > Officiële bekendmakingen+3

G1.4 — Article 48(2)–(3): certificate power versus actual requirement

Correction to P01-C002: The original 1990 version of article 48(2) is incomplete for later periods.

Staatsblad 2007, 192, article ID inserted authority for an AMvB to require a certificaat for mediation under article 48(1). Staatsblad 2007, 222 commenced that amendment on 1 January 2008.

The distinction matters:

  • Enacted statutory authority: verified.
  • An implementing AMvB currently imposing a certificate requirement: not established.
  • A universally required certificate for every article 48(1) actor: not established.
  • A universal paid-debt-mediator licence: not established.

The retained fee-rule delegation and article 48(3)'s rule concerning contractual departures must also be read with any actual operative implementing rules. Nothing read here automatically cancels the underlying creditor debt or invalidates a judgment. C_NL-P02-C006–C007. Overheid.nl > Officiële bekendmakingen+2

G1.5 — 2017 retained definitions and repealed chapters

Staatsblad 2016, 360, article V, effective 1 January 2017 by Staatsblad 2016, 438, removed Wck chapters I, IV and X except the opening of article 1 and its paragraphs (a) and (n).

Article 1(n)'s original definition identifies a gemeentelijke kredietbank as a credit-lending institution established by one or more municipalities. Its exact later consolidated wording has not been independently recovered.

Crucially, historical Wck articles 2–4 must not be imported as current exceptions to article 47 or article 48 merely because they appear in the 1990 source. C_NL-P02-C010. Overheid.nl > Officiële bekendmakingen+2

Currentness limitation

The official consolidated wetten.overheid.nl endpoint did not return a readable body in this research session. The official alternative was to open the enacted Staatsblad amendments and their separate commencement instruments. That establishes the particular amendments above; it does not establish that every intervening change has been captured.

There is independent recent corroboration that articles 47–48 remained the subject of operative supervision: a ministerial regulation published in Staatscourant 2025, 40669, effective 1 January 2026, appoints designated Finance Ministry officials to supervise compliance with those articles. This regulation does not authenticate every word of the underlying Wck or determine which AMvBs are in force. C_NL-P02-C014–C015. Overheid.nl > Officiële bekendmakingen

2. G2 — Original-to-later-text and commencement crosswalk

The matrix distinguishes enactment from commencement. “Reconstructed” never means that the complete 2026 consolidated text was fetched.

Provision Amendment identity and precise operation Commencement evidence Disposition
1(a)(2°)–(3°) 1991, 630, art. I(A): delete lichamelijke twice Same instrument, art. VII: 1 Jan 1992 Verified enacted and effective; complete subsequent chain held
1(a), final timing condition 2011, 246, art. II(A)(1): delete the payment-after-three-months qualification Arts VI–VII; issue 24 May 2011, effective 25 May 2011 Verified for agreements to which amendment applies; legacy transition must be tested
1(a)(2°)–(3°), designated services 1991, 515, art. 1: travel-agreement passenger transport/accommodation designation Art. 2: alongside Wck commencement Historical enacted designation verified; full 2026 instrument history held
1(n) Original municipal credit-bank definition expressly retained 2016, 360, art. V plus 2016, 438 Retention effective 1 Jan 2017; no complete 2026 word-for-word certification
47(1)–(2) Original prohibition and activity definition; no identified express replacement in selected amendments Original source plus later specific amendments and 2026 supervisory reference Reconstructed; not a full positive finding that no other amendment exists
48(1)(a), (d), (3) Original gratuitous exception, AMvB designation power and conditional contractual-invalidity rule Original 1990 law; selected amendments Historical text established; current instrument and amendment holds retained
48(1)(b) 2018, 424, art. XXVIA: municipal-contractor substitution 2018, 425, art. II(1): 1 Jan 2019 Verified
48(1)(c), procureurs 2008, 100, art. XLVI: delete named profession 2008, 274, sole article: 1 Sep 2008 Verified
48(1)(c), appointed roles 2013, 414, art. III: add BW 1:383(7) and 1:435(7) route 2014, 85, sole article: 1 Apr 2014 Verified; actual appointment/qualification remains fact-dependent
48(2), certificaat 2007, 192, art. ID: insert delegated certificate power 2007, 222, sole article: 1 Jan 2008 Power verified; activation by AMvB unresolved
Chapters I, IV, X 2016, 360, art. V: repeal except article 1 opening/(a)/(n) 2016, 438: 1 Jan 2017 Verified; original articles 2–4 cannot be current exceptions

G2 conclusion: The supplied P01 2013 and 2018 changes withstand this targeted review, but their dates must be made explicit. The previously omitted 1991, 2007, 2008 and 2011 amendments materially strengthen the definition/exception reconstruction. None of the named future proposals below is incorporated into this matrix as current law. C_NL-P02-C001–C010.

3. G3 — Article 48(1)(d) designation boundary

3.1 The only enacted designation examined in this pass was temporary

Staatsblad 1998, 454, the Tijdelijk vrijstellingsbesluit schuldbemiddelaars, actually used article 48(1)(d). Its article 2 designated qualifying registered natural/legal persons subject to conditions; article 3 dealt with remuneration; and article 4 expressly terminated the instrument two years after commencement.

The Staatsblad was issued 23 July 1998, so commencement was 24 July 1998; the decree expired under its own two-year sunset provision. Its historical registration arrangement and remuneration limits cannot establish a 2026 permission, fee cap or registration scheme. C_NL-P02-C011. Overheid.nl > Officiële bekendmakingen

3.2 The later Vrijstellingsbesluit materials examined were drafts

Material Actual status verified Why it cannot authorize current paid mediation
2013 Concept-Vrijstellingsbesluit schuldbemiddelaars consultation Published 11 July 2013; consultation closed 28 August 2013 A closed consultation is not an enacted AMvB.
July 2014 draft hosted by the Eerste Kamer Draft articles 1–6, with incomplete decree formalities and a proposed 2015 start Its proposed conditions and start date do not demonstrate promulgation or commencement.
Government communication, Kamerstuk 34 509, nr. 1 In 2016 the government described postponing further processing pending municipal-quality considerations Evidence of historical policy status in 2016, not proof about every possible later decree.

C_NL-P02-C012. internetconsultatie.nl+2

3.3 Actual 2026 proposals are not operative replacements

The government’s Wetsvoorstel schuldregelen was listed at the preparation/consultation stage. Its public 2026 draft proposes replacement legislation and, in draft article 29, repeal of the Wck and the separate Besluit aanwijzing diensten. Draft article 30 contemplates later commencement by royal decree. These are proposals, not operative repeals. Wetgevingskalender+1

A separate Implementatiewet herziene richtlijn consumentenkrediet, bill 36.924, was approved by the Tweede Kamer on 6 October 2026 but was still before the Eerste Kamer in the official status page accessed for this pass. A chamber-approved bill is not a commenced amendment merely because it has passed the lower house. C_NL-P02-C013. Eerste Kamer der Staten-Generaal

3.4 Bounded conclusion on present designation

Unresolved: current article 48(1)(d) implementing instrumentOfficial searches covered the Wck's article 48 designation terminology, enacted Staatsblad instruments, the expired 1998 decree, later consultation drafts and the 2026 legislative proposals. No presently effective article 48(1)(d) category designation was positively established from an opened, commenced official body.

That is not a finding that no designation exists. Nor can the separate statutory certificaat power be translated into a current compulsory certificate without reading an operative implementing AMvB.

The exact remaining retrieval is an official 2026-date implementing-regulations index for BWBR0004815 article 48(1)(d) and (2), followed by every linked AMvB's current body, amendments, commencement, expiry and transition. Until then, both the present designation and any implemented certificate condition remain held. C_NL-P02-C016.

4. PASS-02 source register

ID namespace: C_NL-P02-Sxxx. These IDs do not overwrite the supplied P01 S001–S006.

Access convention: All listed bodies were accessed in this pass on 26 October 2026 PDT / 27 October 2026 UTC (27 October Netherlands local time), except S022, where access was attempted but failed. These are web retrievals, not physical inspections of pre-2009 paper originals. “HTML N/A” means no PDF page index was used, not that an uninspected PDF was read. A published instrument's issue date is not automatically its effective date.

4.1 Enacted Wck and linked instruments

Source; issuer; literal direct URL Actual body read and exact pinpoint Version, status, actor/scope and limits
C_NL-P02-S001 — Kroon/legislature, Wet op het consumentenkrediet, Staatsblad 1990, 395. https://zoek.officielebekendmakingen.nl/stb-1990-395.pdf Art. 1 opening/(a), PDF indices 0–1, printed Staatsblad pp. 1–2; art. 1(n), index 1 / p. 2; arts. 47(1)–(2), 48(1)(a)–(d), (2)–(3), index 16 / p. 17. Original enacted Dutch text. Historical, not consolidated 2026 law. Credit-transaction definition, natural-person debt mediation and exceptions. Pre-July-2009 electronic facsimile; printed original not physically inspected. zoek.officielebekendmakingen.nl+1
C_NL-P02-S002 — Kroon/legislature, Wck/BW adaptation, Staatsblad 1991, 630. https://zoek.officielebekendmakingen.nl/stb-1991-630.pdf Art. I(A), PDF index 0 / printed p. 1; art. VII, index 7 / printed p. 8. Enacted amendment; relevant alteration effective 1 Jan 1992. Read limited to the selected Wck definition alteration and commencement; other provisions not audited. zoek.officielebekendmakingen.nl+1
C_NL-P02-S003 — Kroon, Besluit aanwijzing diensten Wet op het consumentenkrediet, Staatsblad 1991, 515. https://zoek.officielebekendmakingen.nl/stb-1991-515.pdf Arts. 1–3, PDF index 0 / printed p. 1; explanatory service-scope passage index 2 / printed p. 3. Original enacted AMvB identifying a category of services under Wck 1(a)(2°)/(3°), not persons designated under 48(1)(d). Effective upon Wck commencement under art. 2. Later amendment/repeal history and 2026 consolidated status not fully certified. zoek.officielebekendmakingen.nl
C_NL-P02-S004 — Kroon/legislature, Wsnp-revision amendment, Staatsblad 2007, 192. https://zoek.officielebekendmakingen.nl/stb-2007-192.html Art. ID, insertion into Wck 48(2). HTML; printed page not separately inspected; PDF index N/A. Enacted express certificate-rule delegation, effective only upon S005 commencement. Does not itself establish an operational certificate system. Overheid.nl > Officiële bekendmakingen
C_NL-P02-S005 — Kroon, commencement decree, Staatsblad 2007, 222. https://zoek.officielebekendmakingen.nl/stb-2007-222.html Enig artikel. HTML; printed page not inspected; PDF index N/A. Enacted commencement instrument: 1 Jan 2008 for S004. Read to relevant commencement. Overheid.nl > Officiële bekendmakingen
C_NL-P02-S006 — Kroon/legislature, Wet afschaffing procuraat en invoering elektronisch berichtenverkeer, Staatsblad 2008, 100. https://zoek.officielebekendmakingen.nl/stb-2008-100.html Art. XLVI removing procureurs from Wck 48(1)(c); art. LX requiring separate commencement. HTML; printed page not inspected; PDF index N/A. Enacted amendment, operative through S007. Other procedural-law provisions not studied. Overheid.nl > Officiële bekendmakingen
C_NL-P02-S007 — Kroon, commencement, Staatsblad 2008, 274. https://zoek.officielebekendmakingen.nl/stb-2008-274.html Enig artikel. HTML; printed page not inspected; PDF index N/A. Commenced S006 on 1 Sep 2008. Overheid.nl > Officiële bekendmakingen
C_NL-P02-S008 — Kroon/legislature, consumer-credit-directive implementation, Staatsblad 2011, 246. https://zoek.officielebekendmakingen.nl/stb-2011-246.html Art. II(A)(1) deleting Wck 1(a) timing phrase; arts. VI–VII transition/commencement; issue-date statement following art. VII. HTML; printed page not inspected; PDF index N/A. Enacted. Issued 24 May 2011; applicable amendment effective 25 May 2011 under conditional art. VII. Art. VI preserves a distinction for earlier credit agreements. Old amendments to Wck art. 2 are not treated as current after 2017. Overheid.nl > Officiële bekendmakingen+1
C_NL-P02-S009 — Kroon/legislature, Wet wijziging curatele, beschermingsbewind en mentorschap, Staatsblad 2013, 414. https://zoek.officielebekendmakingen.nl/stb-2013-414.html Art. III substitution within Wck 48(1)(c); arts. V–VI separate transition/commencement framework. HTML; printed page not inspected; PDF index N/A. Enacted expansion to the specified BW Book 1 appointed categories. Specific commencement from S010. Detailed professional qualification and individual appointment facts not determined. Overheid.nl > Officiële bekendmakingen+1
C_NL-P02-S010 — Kroon, commencement, Staatsblad 2014, 85. https://zoek.officielebekendmakingen.nl/stb-2014-85.html Enig artikel, expressly including S009 art. III. HTML; printed page not inspected; PDF index N/A. Relevant effective date 1 Apr 2014. Accompanying explanation discusses quality requirements and transitional appointments; this pass does not certify individual qualifications. Overheid.nl > Officiële bekendmakingen
C_NL-P02-S011 — Kroon/legislature, consumer-credit/goederenkrediet BW reform, Staatsblad 2016, 360. https://zoek.officielebekendmakingen.nl/stb-2016-360.html Art. V, Wck chapter repeal and expressly retained 1 opening/(a)/(n). HTML; printed page not inspected; PDF index N/A. Enacted repeal; commencement separately S012. Repealed Wck chapters cannot supply current exclusions. Overheid.nl > Officiële bekendmakingen
C_NL-P02-S012 — Kroon, commencement, Staatsblad 2016, 438. https://zoek.officielebekendmakingen.nl/stb-2016-438.html Enig artikel. HTML; printed page not inspected; PDF index N/A. Commenced S011 on 1 Jan 2017. Overheid.nl > Officiële bekendmakingen
C_NL-P02-S013 — Kroon/legislature, Verzamelwet SZW 2019, Staatsblad 2018, 424. https://zoek.officielebekendmakingen.nl/stb-2018-424.html Art. XXVIA, Wck 48(1)(b) old/new substitution. HTML; printed page not inspected; PDF index N/A. Enacted change to municipal-contractor words. Specific effective date depends on S014. Overheid.nl > Officiële bekendmakingen
C_NL-P02-S014 — Kroon, commencement, Staatsblad 2018, 425. https://zoek.officielebekendmakingen.nl/stb-2018-425.html Art. II(1) with exclusions checked against II(2)–(3). HTML; printed page not inspected; PDF index N/A. Art. XXVIA is not excluded; effective 1 Jan 2019. Published 22 Nov 2018, a distinct date. Overheid.nl > Officiële bekendmakingen

4.2 Designation, proposals, corroboration and failed access

Source; issuer; literal direct URL Actual body read and exact pinpoint Version, status, actor/scope and limits
C_NL-P02-S015 — Kroon, Tijdelijk vrijstellingsbesluit schuldbemiddelaars, Staatsblad 1998, 454. https://zoek.officielebekendmakingen.nl/stb-1998-454.html Arts. 1–5, especially 2 (designated categories) and 4 (commencement/sunset); selected Nota van toelichting, introductory paragraphs. HTML; printed page not inspected; PDF index N/A. Enacted historical art. 48(1)(d) designation. Issued 23 Jul 1998; commenced next day; sunset after two years. Its former registration/fee provisions are expired, not modern requirements. Overheid.nl > Officiële bekendmakingen
C_NL-P02-S016 — Dutch government internet consultation, Concept-Vrijstellingsbesluit schuldbemiddelaars. https://www.internetconsultatie.nl/vrijstellingsbesluit_schuldbemiddelaars/details Consultation title, description, dates and status fields. HTML; printed page/PDF index N/A. Consultation 11 Jul–28 Aug 2013, closed. Discovery of a proposal, not an enacted rule. internetconsultatie.nl
C_NL-P02-S017 — Government draft presented through Eerste Kamer, Besluit … houdende vrijstelling. https://www.eerstekamer.nl/overig/20140704/besluit_van_houdende_vrijstelling/document Draft arts. 1–6, PDF indices 0–2, printed pagination not independently certified; blank decree formalities and projected commencement inspected. 17-page proposal, not a promulgated Staatsblad instrument. Draft fees, professional conditions and proposed start are nonoperative. Only identity/version/proposal status used. eerstekamer.nl
C_NL-P02-S018 — Dutch government communication to Tweede Kamer, Kamerstuk 34 509, nr. 1. https://zoek.officielebekendmakingen.nl/kst-34509-1.html Section Tot slot, paragraphs discussing Vrijstellingsbesluit schuldbemiddelaars and deferral. HTML; printed page not inspected; PDF index N/A. Official 2016 policy statement, not legislation or certification of 2026 decree status. Overheid.nl > Officiële bekendmakingen
C_NL-P02-S019 — Overheid.nl legislative calendar, Wetsvoorstel schuldregelen, WGK012536. https://wetgevingskalender.overheid.nl/Regeling/WGK012536 Project summary, Voortgang, Mijlpalen en documenten; 2026 consultation dates. HTML; printed page/PDF index N/A. Official live project listing accessed this pass; preparation-stage proposal, not Wck repeal. Future updates possible. Wetgevingskalender
C_NL-P02-S020 — Government internet consultation, draft Wet schuldregelen. https://www.internetconsultatie.nl/wetschuldregelen/document/15794 Draft arts. 1–2, PDF indices 0–1; draft arts. 29–30, indices 6–7; separate printed pagination not independently established. Eight-page consultation draft, not enacted. Proposed repeal and future commencement are not operative. Concept Regeling+1
C_NL-P02-S021 — Staatssecretaris SZW, Regeling aanwijzing toezichthouder Wet op het consumentenkrediet, Staatscourant 2025, 40669. https://zoek.officielebekendmakingen.nl/stcrt-2025-40669.html Arts. 1–3 and explanatory paragraphs concerning transfer to DFEI. HTML; printed page not inspected; PDF index N/A. Enacted ministerial supervisory designation, commenced 1 Jan 2026. Strong indication of ongoing regulatory treatment of arts. 47–48 at that date, not full current-text certification or proof of an art. 48(1)(d) decree. Overheid.nl > Officiële bekendmakingen
C_NL-P02-S022 — Official wetten.overheid.nl, requested date-specific Wck consolidation. https://wetten.overheid.nl/BWBR0004815/2026-10-26 No substantive body obtained; retrieval returned an error. Printed page/PDF index N/A. Failed access — non-evidentiary. The date in the requested URL is not proof the text was read, published or certified. Official Staatsblad enactments were used as the alternative; complete amendment-index reconciliation remains outstanding.
C_NL-P02-S023 — Eerste Kamer, parliamentary dossier 36.924, Implementatiewet herziene richtlijn consumentenkrediet. https://www.eerstekamer.nl/wetsvoorstel/36924_implementatiewet_herziene?df1=all&df2=kst Stand van zaken, adopted Tweede Kamer vote 6 Oct 2026, Eerste Kamer scheduled committee step and proposed commencement. HTML; printed page/PDF index N/A. Official pending parliamentary status as accessed; not a commenced enacted amendment. Not evidence of any current article 48 designation. Eerste Kamer der Staten-Generaal
C_NL-P02-S024 — Tweede Kamer, explanatory memorandum, Kamerstuk 36 924, nr. 3. https://zoek.officielebekendmakingen.nl/kst-36924-3.html Explanatory section on schuldadviesdiensten, including its description of existing Wck 47–48 (body paragraphs around the discussion of credit banks and debt advice). HTML; printed page not separately inspected; PDF index N/A. 2026 legislative explanation, secondary to enacted text for current-law purposes. Used only as a dated governmental cross-check; not an enacted substitution or a complete 2026 Wck consolidation. Overheid.nl > Officiële bekendmakingen

Evidence classification: 15 enacted/original historical statute or decree rows (S001–S015); 8 other successfully read official proposal, policy, regulator or parliamentary rows (S016–S021, S023–S024); 1 failed consolidation row (S022). S015 is historically enacted but expired. This classification counts source records, not independent confirmation of present-day validity.

5. Atomic claim register

Every claim below is narrowly scoped. “Enacted” describes the specified legislative act; it does not certify an unread 2026 consolidation. Claim IDs are distinct from the P01 C001–C048.

New atomic claim Exact proposition, actors, conditions and consequence Supporting source and pinpoint Remaining evidence limit
C_NL-P02-C001 For credit agreements to which the 2011 Wck amendment applies, article 1(a) no longer imposes the historical condition that at least one payment occur more than three months after provision of money, property use or a designated service begins. This affects which transactions may constitute the credit-derived component of natural-person schuldbemiddeling. S001 art. 1(a), PDF indices 0–1; S008 art. II(A)(1), VII. Does not decide old agreements, exact debts, or other exclusions; complete 2026 consolidation not certified.
C_NL-P02-C002 In article 1(a)(2°)–(3°), the 1991 enacted amendment removed lichamelijke from roerende lichamelijke zaak with effect from 1 January 1992. The original 1990 adjective is not correct for the law after this amendment. S001 art. 1(a); S002 art. I(A), VII, PDF indices 0 and 7. Subsequent full definition chain remains held; particular property characterization not decided.
C_NL-P02-C003 The 2011 amendment's article VI states that its articles II and III do not apply to credit agreements entered into before those provisions commenced; because S008 was issued 24 May 2011, the relevant commencement under art. VII is 25 May 2011. S008 arts. VI–VII and issuance statement. Does not resolve every historical-debt/application conflict or judicial interpretation of article 47's reference to qualifying transactions.
C_NL-P02-C004 The 1991 Besluit aanwijzing diensten designated travel-agreement transport/accommodation services for Wck 1(a)(2°)/(3°). This is a definition-linked services designation, not an exemption designating private debt mediators under 48(1)(d). S001 art. 1(a)(2°)–(3°); S003 arts. 1–3, PDF index 0. Present consolidated status and later changes to this services instrument not fully proved.
C_NL-P02-C005 The original Wck art. 47(1) prohibits schuldbemiddeling. Its art. 47(2) defines a professional/business service directed toward arrangements for a natural person's existing debt burden arising wholly or partly from one or more credit transactions, other than concluding a new credit transaction. Each statutory element remains necessary for classification. S001 art. 47(1)–(2), PDF index 16; S024 2026 government description of Wck 47–48 is corroborative only. The complete 2026 amended text and individual scope/application are not certified.
C_NL-P02-C006 The enacted 1990 art. 48(1) contains distinct om niet, municipal, professional and AMvB-designated exceptions. Under original art. 48(3), a contractual departure from rules under 48(2) is void to the extent of the conflict. It does not state that a creditor's underlying claim is extinguished or a judgment annulled. S001 art. 48(1)(a)–(d), (2)–(3), PDF index 16. Later amendment and operative-decree requirements must be superimposed; current compensation interpretation held.
C_NL-P02-C007 The 2007 amendment enacted authority for an AMvB to impose a certificaat requirement relating to mediation under Wck 48(1), effective 1 January 2008. Enacting authority to impose a requirement is not the same as imposing it. S004 art. ID; S005 sole article; original structure S001 art. 48(2). No current implementing certificate decree, affected class or operational registration mechanism established.
C_NL-P02-C008 Wck 48(1)(c)'s separate procureurs category was deleted effective 1 September 2008. Its appointed curatoren/bewindvoerders wording was then expanded to the specified BW 1:383(7) and 1:435(7) categories effective 1 April 2014. S001 art. 48(1)(c); S006 art. XLVI; S007 sole article; S009 art. III; S010 sole article. Professional registration, court appointment, personally performed services, staffing/delegation and current qualification detail remain outside this textual finding.
C_NL-P02-C009 Since 1 January 2019, enacted Wck 48(1)(b) wording recognizes institutions performing mediation in opdracht en voor rekening van gemeenten, replacing the former municipally held-institution wording. S001 historical 48(1)(b); S013 art. XXVIA; S014 art. II(1) checked against exclusions. Whether any actual arrangement satisfies both instruction and municipal-account conditions remains untested; no municipal contractor searched.
C_NL-P02-C010 Effective 1 January 2017, Wck chapters I, IV and X were repealed except the article 1 opening and subparagraphs (a) and (n). Historical Wck articles 2–4 therefore cannot be used as current gateway exemptions. S011 art. V; S012 sole article; S001 historical 1(a), 1(n), 2–4. Not a complete amendment search for the retained definition or later articles 47–48.
C_NL-P02-C011 The temporary 1998 art. 48(1)(d) decree designated qualifying registered mediators during its limited life but expressly expired two years after commencing on 24 July 1998. Its scheme cannot authorize conduct in 2026. S015 arts. 2–4, issue-date statement. Does not establish whether some entirely different later designation exists.
C_NL-P02-C012 A 2013 consultation and unsigned 2014 draft proposed a later Vrijstellingsbesluit, and a 2016 government statement deferred further processing. None of those bodies, as read, establishes an enacted and commenced later exemption. S016 status/dates; S017 draft arts. 1–6 and blank formalities; S018 Tot slot paragraphs. Subsequent legislative/instrument history after 2016 not fully certified; no nonexistence inference.
C_NL-P02-C013 The 2026 Wetsvoorstel schuldregelen project and consultation draft propose Wck repeal/replacement but are not operative enactments in the bodies examined. Separately, bill 36.924 had passed the Tweede Kamer but remained in Eerste Kamer proceedings at this check. S019 project stage; S020 draft arts. 29–30; S023 Stand van zaken. Later legislative developments and future commencement are open; proposed terms are not 2026 Wck text.
C_NL-P02-C014 A ministerial regulation appointed designated DFEI officials to supervise Wck arts. 47–48 effective 1 January 2026, providing recent official evidence of regulatory continuity. S021 arts. 1–2 and explanation. The regulation is not a current Wck consolidation and does not establish a certificate or 48(1)(d) designation. Subsequent changes to this supervisory instrument not fully searched.
C_NL-P02-C015 A readable official 26 October 2026 consolidated Wck body was not obtained. The source-backed reconstruction establishes the enumerated enacted amendments but cannot certify the whole text, full intervening chain or absence of undiscovered changes. Failed S022; reconstructed material S001–S014; limited cross-check S021/S024. Methodological/access finding, not an affirmative claim about what every current provision says.
C_NL-P02-C016 The bounded official review established one expired 48(1)(d) AMvB and later draft proposals, but did not establish a presently operative 48(1)(d) designation or activated certificate requirement. S001 art. 48(1)(d)/(2); S004–S005 certificate power; S015–S020 historical designation/proposal record; access hold S022. An evidence-bound unresolved result, not proof that no other operative instrument or lawful capacity exists.

Claim counts: 16 new atomic claims, C_NL-P02-C001 through C_NL-P02-C016. Their assertions are restricted to the specified actors, agreement periods, provisions and evidence limits. No claim has been designated A097/A098-accepted.

6. G4 — Exact targeted disposition of supplied P01 claims

The supplied original claim texts are retained. This table specifies the proposed overlay; it does not silently replace other P01 claims.

Original claim and supplied proposition Disposition and exact bounded correction New claims and sources Retained hold
P01-C001 — Article 47 prohibition/definition and qualifying natural-person credit debt Strengthen limitation; supplement the linked definition. Keep article 47's element-by-element test. Replace reliance on unmodified 1990 article 1(a) with the 1991 movable-property amendment and 2011 removal of the three-month condition, explicitly subject to art. VI legacy agreements. C_NL-P02-C001–C005, C015; S001–S003, S008, S022 Complete 2026 consolidation, pre-2011 agreement application, particular debts, nexus.
P01-C002 — Article 48 exceptions, fee-rule delegation and partial contractual invalidity Material additive correction. Article 48(2) also contains the 2007-inserted power for an AMvB certificate requirement. Do not describe a compulsory current certificate without an active decree. Preserve the limited reading of 48(3). C_NL-P02-C006–C007, C016; S001, S004–S005, S015–S020 Currently operative designation/certificate AMvB, fee application, indirect remuneration.
P01-C003 — Municipal-contractor wording in force from 2019 Retain the supplied conclusion. Independently reconfirm the precise statutory substitution and 1 January 2019 commencement. C_NL-P02-C009, C015; S013–S014 Actual opdracht and voor rekening documents, contract interpretation, full subsequent amendments.
P01-C008 — 2017 repeal/retention and historical articles 2–4 trap Retain and expand the definition-version warning. Correctly excludes historical arts. 2–4; add the 1991 and 2011 changes to retained article 1(a), particularly the express legacy-agreement transition. C_NL-P02-C001–C004, C010, C015; S001–S003, S008, S011–S012 Exhaustive definition amendment chain and historical contract application.
P01-C012 — Named professional and appointed-role exceptions Strengthen chronological/name precision. Confirm procureurs deletion effective 1 September 2008, and Book 1 appointed-role expansion effective 1 April 2014. The P01 description of qualifying categories remains substantially intact. C_NL-P02-C008, C015; S001, S006–S007, S009–S010 Individual admission/appointment, work personally undertaken versus staff delegation, later professional-law changes.
P01-C044 — No blanket paid-private commercial licence proved Retain as a bounded negative, with a stronger express hold. Statute contains AMvB designation and certificate-rule powers; the examined historical designation is expired, and current implementing instruments have not been certified. Do not recast this as proof that no lawful route exists. C_NL-P02-C007, C011–C016; S004–S005, S015–S023 Complete current implementing regulations and legislative history; no provider-specific determination.

Old-to-new source identity preservation

Original P01 authority Original material retained New reconciliation source
P01-S001, Staatsblad 1990, 395 The authentic historical base text; not replaced as a historical record P02-S001, supplemented by P02-S002, S004, S006, S008 for changes missing from a 1990-only reading
P01-S002, Staatsblad 2016, 360 Art. V retained definitions/repealed chapters P02-S011
P01-S003, Staatsblad 2016, 438 Commencement 1 Jan 2017 P02-S012
P01-S004, Staatsblad 2013, 414 Professional BW Book 1 amendment P02-S009, paired explicitly with P02-S010 commencement
P01-S005, Staatsblad 2018, 424 Municipal-contractor amendment P02-S013
P01-S006, Staatsblad 2018, 425 Municipal amendment commencement P02-S014

No renumbering or overwriting of the other 42 P01 claims is authorized. Their findings, qualifications and review status remain as previously recorded.

7. Granular G1–G4 coverage register

Status definitions

  • answered: The specifically identified amendment, enactment, commencement, expiration or historical proposition was verified. This does not imply full 2026 consolidation certification.
  • partial: A material proposition is supported, but a source-version, linked-rule or interpretive predicate remains.
  • unresolved: Evidence does not support the requested determination.
  • excluded_with_reason: Outside the expressly narrowed PASS-02 remit.

G1 — Current-definition and exception reconstruction

Coverage ID Exact subissue Status Finding / exact new claim IDs Missing evidence and next focused action
K001 Official Wck consolidation as of 26 Oct 2026 unresolved §1 currentness; C_NL-P02-C015 Official body inaccessible. Obtain the government amendment-information table and 2026 consolidated arts. 1(a)/(n), 47, 48.
K002 Article 1(a)(1°), money-advance branch partial §1.1; C_NL-P02-C001, C005, C015 Original branch read; complete subsequent wording not certified. Reconcile all article 1(a) amendments from official history.
K003 Article 1(a)(2°)–(3°), movable-property adjective answered §1.1; C_NL-P02-C002 1991 change/date proved. Separately certify subsequent version history before using a complete present-text quotation.
K004 Historical three-month credit-definition condition answered §1.1; C_NL-P02-C001 Deletion and commencement proved. Must not extrapolate to every earlier agreement.
K005 Pre-commencement credit agreements partial §1.1; C_NL-P02-C003 Statutory transition read. Next: separately analyze the applicable agreement date and the cross-time article 47 interpretation; no individual contract reviewed.
K006 Services designated for Wck 1(a)(2°)/(3°) partial §1.1; C_NL-P02-C004 Original 1991 AMvB read; retrieve 2026 consolidation and all modifications/commencement.
K007 Retained article 1(n), gemeentelijke kredietbank partial §1.5; C_NL-P02-C010, C015 Original definition and 2017 retention established; check later changes to its wording.
K008 Article 47(1) prohibition partial §1.2; C_NL-P02-C005, C014–C015 Original text and 2026 supervisory continuity read; verify complete amended text.
K009 Article 47(2) professional activity/natural-person/credit-derived elements partial §1.2; C_NL-P02-C001–C005, C015 Linked definition corrected; current complete body and judicial application held.
K010 Article 48(1)(a), om niet partial §1.3; C_NL-P02-C006, C015 Original exception read. Indirect benefit, third-party payment and mixed-fee interpretation explicitly held.
K011 Article 48(1)(b), municipal contractor answered §1.3; C_NL-P02-C009 Exact 2019 amendment proved. Municipal instructions, expense account and individual contractor documents not examined.
K012 Article 48(1)(c), professions/appointments answered §1.3; C_NL-P02-C008 Exact 2008 and 2014 word changes proved. Professional admission, appointments and delegation remain separate.
K013 Article 48(1)(d), operative designated classes unresolved §3.4; C_NL-P02-C016 Locate and read every presently operative linked AMvB, if any, with commencement and expiry.
K014 Article 48(2), certificate-enabling language answered §1.4; C_NL-P02-C007 Statutory authority verified. Separate implementing requirement unresolved.
K015 Article 48(2), fee-rule delegation partial §1.4; C_NL-P02-C006–C007, C016 Historical delegation understood; operative conditions not verified. Consumer fee amounts/timing/caps remain excluded.
K016 Article 48(3), contractual departures partial §1.4; C_NL-P02-C006, C015 Historical conditional rule read. No current implementing rule or particular contract examined.
K017 Historical Wck arts. 2–4 after 2017 repeal answered §1.5; C_NL-P02-C010 Repeal established. Other statutes' exclusions require separate research; old Wck provisions must not be revived by implication.

G2 — Amendment and commencement

Coverage ID Exact subissue Status Finding / exact new claim IDs Missing evidence and next focused action
K018 1991 movable-property amendment and start answered §2; C_NL-P02-C002 Art. I(A) and VII read. No further action for these enactment facts.
K019 2007 certificate-power amendment and start answered §2; C_NL-P02-C007 Art. ID and separate 2008 commencement read. Implementing decree is K031.
K020 2008 procureurs deletion and start answered §2; C_NL-P02-C008 Art. XLVI and 1 Sep 2008 decree read.
K021 2011 three-month deletion, issue date, transition and start answered §2; C_NL-P02-C001, C003 Relevant enacted clauses checked. Case-level interpretation still held separately at K005.
K022 2013 professional wording and actual commencement answered §2; C_NL-P02-C008 2013 art. III and 2014 commencement read.
K023 2016 retained definitions/chapter repeal and start answered §2; C_NL-P02-C010 Act and commencement read. Does not certify every retained-definition change.
K024 2018 municipal substitution and 2019 start answered §2; C_NL-P02-C009 Act plus exceptions in commencement decree read.
K025 Exhaustive post-1990/post-2019 amendment chain unresolved §1 currentness; C_NL-P02-C015 Retrieve full official Wck amendment index, amending articles, corrections, commencement orders and consolidations through the access date.
K026 2026 proposed Wet schuldregelen repeal/reform answered §3.3; C_NL-P02-C013 Current proposal status, draft repeal and future-start mechanism verified. Monitor future enactment/commencement separately.
K027 2026 consumer-credit implementation bill 36.924 answered §3.3; C_NL-P02-C013 Official pending parliamentary status verified. Any later enacted text and commencement require a new check.

G3 — Current designation gateway

Coverage ID Exact subissue Status Finding / exact new claim IDs Missing evidence and next focused action
K028 1998 temporary designation and expiry answered §3.1; C_NL-P02-C011 Enacted articles, commencement trigger and self-expiry read. No basis to apply former fee rules in 2026.
K029 2013 consultation, 2014 draft, 2016 deferral answered §3.2; C_NL-P02-C012 Historical proposal status proved. This does not answer whether another later instrument exists.
K030 Present operative 48(1)(d) designation unresolved §3.4; C_NL-P02-C016 Obtain official linked subordinate instruments as of Oct 2026 and confirm every operative designation provision.
K031 Present certificate requirement, category or certification authority unresolved §3.4; C_NL-P02-C007, C016 Locate implementing AMvB, if any; read its conditions, scope, start, amendments and expiry before asserting a requirement.

G4 — Bounded disposition and excluded application questions

Coverage ID Exact subissue Status Finding / exact new claim IDs Missing evidence and next focused action
K032 Six identified P01 claim replacements/limitations answered §6; C_NL-P02-C001–C016, individually mapped to P01-C001/C002/C003/C008/C012/C044 This is researcher reconciliation, not coordinator acceptance. Do not alter the remaining 42 claim records.
K033 Application issues outside current-text reconciliation excluded_with_reason §§1–3; C_NL-P02-C015–C016 establish the source/instrument holds, not application conclusions Indirect remuneration, staff delegation, actual contractor contracts, cross-border nexus, creditor response, debtor funds, fees/remedies and judicial interpretation belong to other scoped work.

Separately targeted original coverage rows

The task packet supplies the following eight A-row identifiers, but not their verbatim P01 coverage-row bodies. Unlike the six original claim rows, there is no supplied statement to compare word-for-word. I therefore cannot truthfully assert an exact old-to-new text replacement for any particular A-row. Each remains open for a read-only comparison with its saved original row, using the subject-specific claims established above.

This prevents an unsupported assumption that, for example, A07 necessarily represents one particular Wck exception.

Original targeted row Status Exact claim supported now Missing evidence and exact disposition action
A01 unresolved C_NL-P02-C015 establishes the cross-cutting currentness hold Read saved A01 body; identify its exact assertion and append only matching C001–C016 correction.
A02 unresolved C_NL-P02-C015 Read saved A02 body; check whether it repeats original article 1(a) wording or timing; map the specific amendment if present.
A03 unresolved C_NL-P02-C015 Read saved A03 body; test whether municipal or exception wording is asserted; preserve unchanged material.
A07 unresolved C_NL-P02-C015 Read saved A07 body; test the article 48 enabling and implementing-instrument distinction if implicated.
A08 unresolved C_NL-P02-C015 Read saved A08 body; check retained definitions and historical exclusions only if that is its actual subject.
A10 unresolved C_NL-P02-C015 Read saved A10 body; determine precise actor/exception statement before making any replacement.
A18 unresolved C_NL-P02-C015 Read saved A18 body; test professional wording and dates only if contained there.
A35 unresolved C_NL-P02-C015 Read saved A35 body; distinguish a negative registration/licence conclusion from an unverified designation or certificate instrument.

The conditional checks in this table are retrieval questions, not assertions about those original row contents. Until the verbatim bodies are reconciled, these eight rows must not be marked substantively accepted.

8. Read-only research log and limitations

Source system / search boundary Actually attempted Result and significance
wetten.overheid.nl, BWBR0004815 date-specific consolidation Direct current-version retrieval Failed to return a readable operative body. Did not repeatedly retry the inaccessible endpoint. S022.
zoek.officielebekendmakingen.nl, original Wck Original Staatsblad 1990, 395 PDF Opened article 1 and articles 47–48. Historical baseline only. S001.
zoek.officielebekendmakingen.nl, named Wck amendments and commencement instruments 1991, 2007, 2008, 2011, 2013/14, 2016/17 and 2018/19 instruments Opened actual relevant enacted bodies and commencement provisions. S002, S004–S014.
Official enacted AMvB search for artikel 48, eerste lid, onder d, schuldbemiddelaars, vrijstelling and certificaat Official search plus opened 1998 decree Expired operative historical designation established. Present designation not positively identified. S015.
Official 2013–16 later-Vrijstellingsbesluit trail Consultation, actual draft PDF and government communication Proposal and deferral established, not a commenced decree. S016–S018.
Linked article 1(a) service-definition instrument 1991 Besluit aanwijzing diensten Original designation opened. This was not mistaken for an article 48(1)(d) designation. S003.
2026 Dutch legislative monitoring Government legislative calendar, public draft, Senate parliamentary status Current identified proposal status separated from operative text. S019–S020, S023–S024.
Recent regulatory continuity 2025 designation of supervisory officials, effective 2026 Relevant current-date corroboration but not a consolidation. S021.
Unofficial republishers/search-engine snippets Discovery only Not used to certify the Wck or an exemption. No private provider/person searches.

Not performed: full official legislative citator, complete amendment graph, every linked AMvB history, every professional qualification rule, real-world contract analysis, Dutch territorial-nexus opinion, municipal-policy audit, private information access, filings, applications, payments, complaints or contacts.

Historical Staatsblad electronic copies issued before July 2009 are service facsimiles; the originally authoritative paper publications were not physically inspected. No PDF page index is claimed for an HTML-only read.

9. Researcher self-check and publication holds

PASS-02 visible register counts

Source rows

24

23 opened bodies; 1 failed consolidationNew atomic claims

16

C001–C016G1–G4 coverage rows

33

K001–K033Targeted original A-row holds

8

Plus 6 claim and 6 source mappings### Material questions still open

  1. Full current version: What does the official Wck amendment/consolidation record actually show for every change affecting articles 1(a), 1(n), 47 and 48 up to the research date?
  2. Service-designation survival: Has the 1991 Besluit aanwijzing diensten been changed or repealed by an operative later instrument?
  3. Present 48(1)(d) route: Is there a later enacted, currently commenced and unexpired AMvB designating paid private mediators, notwithstanding the expired 1998 decree and nonoperative later drafts?
  4. Certificate activation: Has any operative AMvB exercised the 2007 article 48(2) power, and for exactly which covered actors or activities?
  5. Legacy debt: How does the 2011 express credit-agreement transition interact with a later debt-mediation service concerning an agreement executed before 25 May 2011?
  6. Original coverage reconciliation: What do the saved A01/A02/A03/A07/A08/A10/A18/A35 rows actually say, and which of the newly established amendments changes their wording?

Evidence-grounded publication opportunities

After the outstanding primary-source checks, SettleADebt could usefully publish:

  • A dated, version-controlled article explaining why the Wck's 1990 credit definition is not sufficient for evaluating later mediation activity.
  • An annotated article 48 actor/exception comparison showing municipal contractors, appointed professionals, gratuitous service and designated private actors as separate branches.
  • A historical-versus-operative decree warning: the expired 1998 Tijdelijk vrijstellingsbesluit, the 2013–14 drafts and a 2026 proposal are three different legal statuses.
  • A compact source-document decision checklist: agreement execution date, type of credit transaction, debt history, service purpose, compensation description, claimed statutory capacity, municipal instruction or appointment, and claimed implementing-decree authority. No actual person or provider verification would be implied.
  • A change-monitoring field set that stores enactment, publication, commencement, repeal, transition, evidence-access and review dates separately.

Publication and operational holds

Do not publish as a certified 2026 legal gatewayThe following claims must remain withheld unless individually supported by the outstanding official text and implementing-instrument checks:

  • “All private paid debt mediation in the Netherlands requires licence X.”
  • “All article 48(1) actors must hold certificate Y.”
  • “A current article 48(1)(d) exemption definitely exists” or “definitely does not exist.”
  • “A historical 1998 or proposed 2014 fee formula governs in 2026.”
  • “A free initial consultation necessarily places a paid service outside article 47.”
  • “A foreign provider, ordinary business registration, municipal referral or professional employee automatically qualifies.”
  • “A provider's violation cancels the debt, releases security, voids a judgment or guarantees a private refund.”

Preserved boundaries: P01's unaffected findings and remaining 42 claims are not reopened. The original 128 coverage rows are not accepted or overwritten. Municipal/provincial and Kingdom-territory coverage, foreign/remote nexus, creditor obligations, compensation interpretation, contractual/funds rules, professional-staff delegation, consumer remedies and judicial precedents remain outside this pass.

Researcher-only conclusion: This pass has independently verified material amendments and their commencements, including changes the 1990-based P01 reconstruction could miss. It has not certified the full current Wck consolidation or a presently operative article 48(1)(d) designation. The eight original A-row texts were not furnished for literal reconciliation, so their exact replacements remain held.

Coordinator review must separately reopen consequential enactments, verify complete later amendments and implementing rules, and compare the saved P01 coverage cells. This is not independent review, Dutch-country completion or A097/A098 acceptance.

END C_NL PASS-02

Every captured table

Captured cells with original header handling and explicitly labeled bounded correction overlays. Downloaded JSON retains original cells. Tables may contain source limitations, historical examples and identified corrections; the complete reading supplies context.

Read the evidence with its boundaries. These are saved research components, including revisions. A scoped coordinator review checks selected evidence; it does not certify every claim, a complete jurisdiction, current law or individual applicability. Dates and access limits remain attached to the records.

How to read the research →

Captured table 01

Original headerless table; first data row retained · 5 data rows

Selected provisionHistorical text or positionVerified enacted changeEffective date
Wck article 1(a)(2°)–(3°)Credit transactions involving a roerende lichamelijke zaakRemoved lichamelijke, leaving roerende zaak1 January 1992
Wck article 48(2)Delegated authority for remuneration rulesAdded express authority for an AMvB to require a certificaat for mediation referred to in article 48(1)1 January 2008
Wck article 48(1)(c)Included procureurs among professional exceptionsRemoved procureurs1 September 2008
Wck article 1(a)Required at least one borrower payment more than three months after the relevant advance or performance beganDeleted the three-month condition, subject to an express transition for earlier credit agreements25 May 2011

Captured table 02

Original headerless table; first data row retained · 5 data rows

ParagraphReconstructed exceptionEssential limitation
48(1)(a)Om niet — gratuitous mediationIndirect payment and mixed remuneration remain interpretive holds.
48(1)(b)Municipalities, municipal credit banks, and institutions acting in opdracht en voor rekening van gemeentenThe last category needs evidence of both municipal instruction and performance for the municipal account.
48(1)(c)Advocaten; qualifying curatoren and bewindvoerders under the Faillissementswet or the specified Book 1 BW provisions; notarissen, deurwaarders, registeraccountants, and accountants-administratieconsulentenProfessional identity does not prove an unrelated employee or corporate vehicle inherits the exception. Procureurs were removed in 2008.
48(1)(d)Natural or legal persons or categories actually designated by an operative AMvBA present qualifying designation has not been established in this pass.

Captured table 03

Original headerless table; first data row retained · 12 data rows

ProvisionAmendment identity and precise operationCommencement evidenceDisposition
1(a)(2°)–(3°)1991, 630, art. I(A): delete lichamelijke twiceSame instrument, art. VII: 1 Jan 1992Verified enacted and effective; complete subsequent chain held
1(a), final timing condition2011, 246, art. II(A)(1): delete the payment-after-three-months qualificationArts VI–VII; issue 24 May 2011, effective 25 May 2011Verified for agreements to which amendment applies; legacy transition must be tested
1(a)(2°)–(3°), designated services1991, 515, art. 1: travel-agreement passenger transport/accommodation designationArt. 2: alongside Wck commencementHistorical enacted designation verified; full 2026 instrument history held
1(n)Original municipal credit-bank definition expressly retained2016, 360, art. V plus 2016, 438Retention effective 1 Jan 2017; no complete 2026 word-for-word certification
47(1)–(2)Original prohibition and activity definition; no identified express replacement in selected amendmentsOriginal source plus later specific amendments and 2026 supervisory referenceReconstructed; not a full positive finding that no other amendment exists
48(1)(a), (d), (3)Original gratuitous exception, AMvB designation power and conditional contractual-invalidity ruleOriginal 1990 law; selected amendmentsHistorical text established; current instrument and amendment holds retained
48(1)(b)2018, 424, art. XXVIA: municipal-contractor substitution2018, 425, art. II(1): 1 Jan 2019Verified
48(1)(c), procureurs2008, 100, art. XLVI: delete named profession2008, 274, sole article: 1 Sep 2008Verified
48(1)(c), appointed roles2013, 414, art. III: add BW 1:383(7) and 1:435(7) route2014, 85, sole article: 1 Apr 2014Verified; actual appointment/qualification remains fact-dependent
48(2), certificaat2007, 192, art. ID: insert delegated certificate power2007, 222, sole article: 1 Jan 2008Power verified; activation by AMvB unresolved
Chapters I, IV, X2016, 360, art. V: repeal except article 1 opening/(a)/(n)2016, 438: 1 Jan 2017Verified; original articles 2–4 cannot be current exceptions

Captured table 04

Original headerless table; first data row retained · 4 data rows

MaterialActual status verifiedWhy it cannot authorize current paid mediation
2013 Concept-Vrijstellingsbesluit schuldbemiddelaars consultationPublished 11 July 2013; consultation closed 28 August 2013A closed consultation is not an enacted AMvB.
July 2014 draft hosted by the Eerste KamerDraft articles 1–6, with incomplete decree formalities and a proposed 2015 startIts proposed conditions and start date do not demonstrate promulgation or commencement.
Government communication, Kamerstuk 34 509, nr. 1In 2016 the government described postponing further processing pending municipal-quality considerationsEvidence of historical policy status in 2016, not proof about every possible later decree.

Captured table 05

Original headerless table; first data row retained · 15 data rows

Source; issuer; literal direct URLActual body read and exact pinpointVersion, status, actor/scope and limits
C_NL-P02-S001 — Kroon/legislature, Wet op het consumentenkrediet, Staatsblad 1990, 395. https://zoek.officielebekendmakingen.nl/stb-1990-395.pdfArt. 1 opening/(a), PDF indices 0–1, printed Staatsblad pp. 1–2; art. 1(n), index 1 / p. 2; arts. 47(1)–(2), 48(1)(a)–(d), (2)–(3), index 16 / p. 17.Original enacted Dutch text. Historical, not consolidated 2026 law. Credit-transaction definition, natural-person debt mediation and exceptions. Pre-July-2009 electronic facsimile; printed original not physically inspected. zoek.officielebekendmakingen.nl +1
C_NL-P02-S002 — Kroon/legislature, Wck/BW adaptation, Staatsblad 1991, 630. https://zoek.officielebekendmakingen.nl/stb-1991-630.pdfArt. I(A), PDF index 0 / printed p. 1; art. VII, index 7 / printed p. 8.Enacted amendment; relevant alteration effective 1 Jan 1992. Read limited to the selected Wck definition alteration and commencement; other provisions not audited. zoek.officielebekendmakingen.nl +1
C_NL-P02-S003 — Kroon, Besluit aanwijzing diensten Wet op het consumentenkrediet, Staatsblad 1991, 515. https://zoek.officielebekendmakingen.nl/stb-1991-515.pdfArts. 1–3, PDF index 0 / printed p. 1; explanatory service-scope passage index 2 / printed p. 3.Original enacted AMvB identifying a category of services under Wck 1(a)(2°)/(3°), not persons designated under 48(1)(d). Effective upon Wck commencement under art. 2. Later amendment/repeal history and 2026 consolidated status not fully certified. zoek.officielebekendmakingen.nl
C_NL-P02-S004 — Kroon/legislature, Wsnp-revision amendment, Staatsblad 2007, 192. https://zoek.officielebekendmakingen.nl/stb-2007-192.htmlArt. ID, insertion into Wck 48(2). HTML; printed page not separately inspected; PDF index N/A.Enacted express certificate-rule delegation, effective only upon S005 commencement. Does not itself establish an operational certificate system. Overheid.nl > Officiële bekendmakingen
C_NL-P02-S005 — Kroon, commencement decree, Staatsblad 2007, 222. https://zoek.officielebekendmakingen.nl/stb-2007-222.htmlEnig artikel. HTML; printed page not inspected; PDF index N/A.Enacted commencement instrument: 1 Jan 2008 for S004. Read to relevant commencement. Overheid.nl > Officiële bekendmakingen
C_NL-P02-S006 — Kroon/legislature, Wet afschaffing procuraat en invoering elektronisch berichtenverkeer, Staatsblad 2008, 100. https://zoek.officielebekendmakingen.nl/stb-2008-100.htmlArt. XLVI removing procureurs from Wck 48(1)(c); art. LX requiring separate commencement. HTML; printed page not inspected; PDF index N/A.Enacted amendment, operative through S007. Other procedural-law provisions not studied. Overheid.nl > Officiële bekendmakingen
C_NL-P02-S007 — Kroon, commencement, Staatsblad 2008, 274. https://zoek.officielebekendmakingen.nl/stb-2008-274.htmlEnig artikel. HTML; printed page not inspected; PDF index N/A.Commenced S006 on 1 Sep 2008. Overheid.nl > Officiële bekendmakingen
C_NL-P02-S008 — Kroon/legislature, consumer-credit-directive implementation, Staatsblad 2011, 246. https://zoek.officielebekendmakingen.nl/stb-2011-246.htmlArt. II(A)(1) deleting Wck 1(a) timing phrase; arts. VI–VII transition/commencement; issue-date statement following art. VII. HTML; printed page not inspected; PDF index N/A.Enacted. Issued 24 May 2011; applicable amendment effective 25 May 2011 under conditional art. VII. Art. VI preserves a distinction for earlier credit agreements. Old amendments to Wck art. 2 are not treated as current after 2017. Overheid.nl > Officiële bekendmakingen +1
C_NL-P02-S009 — Kroon/legislature, Wet wijziging curatele, beschermingsbewind en mentorschap, Staatsblad 2013, 414. https://zoek.officielebekendmakingen.nl/stb-2013-414.htmlArt. III substitution within Wck 48(1)(c); arts. V–VI separate transition/commencement framework. HTML; printed page not inspected; PDF index N/A.Enacted expansion to the specified BW Book 1 appointed categories. Specific commencement from S010. Detailed professional qualification and individual appointment facts not determined. Overheid.nl > Officiële bekendmakingen +1
C_NL-P02-S010 — Kroon, commencement, Staatsblad 2014, 85. https://zoek.officielebekendmakingen.nl/stb-2014-85.htmlEnig artikel, expressly including S009 art. III. HTML; printed page not inspected; PDF index N/A.Relevant effective date 1 Apr 2014. Accompanying explanation discusses quality requirements and transitional appointments; this pass does not certify individual qualifications. Overheid.nl > Officiële bekendmakingen
C_NL-P02-S011 — Kroon/legislature, consumer-credit/goederenkrediet BW reform, Staatsblad 2016, 360. https://zoek.officielebekendmakingen.nl/stb-2016-360.htmlArt. V, Wck chapter repeal and expressly retained 1 opening/(a)/(n). HTML; printed page not inspected; PDF index N/A.Enacted repeal; commencement separately S012. Repealed Wck chapters cannot supply current exclusions. Overheid.nl > Officiële bekendmakingen
C_NL-P02-S012 — Kroon, commencement, Staatsblad 2016, 438. https://zoek.officielebekendmakingen.nl/stb-2016-438.htmlEnig artikel. HTML; printed page not inspected; PDF index N/A.Commenced S011 on 1 Jan 2017. Overheid.nl > Officiële bekendmakingen
C_NL-P02-S013 — Kroon/legislature, Verzamelwet SZW 2019, Staatsblad 2018, 424. https://zoek.officielebekendmakingen.nl/stb-2018-424.htmlArt. XXVIA, Wck 48(1)(b) old/new substitution. HTML; printed page not inspected; PDF index N/A.Enacted change to municipal-contractor words. Specific effective date depends on S014. Overheid.nl > Officiële bekendmakingen
C_NL-P02-S014 — Kroon, commencement, Staatsblad 2018, 425. https://zoek.officielebekendmakingen.nl/stb-2018-425.htmlArt. II(1) with exclusions checked against II(2)–(3). HTML; printed page not inspected; PDF index N/A.Art. XXVIA is not excluded; effective 1 Jan 2019. Published 22 Nov 2018, a distinct date. Overheid.nl > Officiële bekendmakingen

Captured table 06

Original headerless table; first data row retained · 11 data rows

Source; issuer; literal direct URLActual body read and exact pinpointVersion, status, actor/scope and limits
C_NL-P02-S015 — Kroon, Tijdelijk vrijstellingsbesluit schuldbemiddelaars, Staatsblad 1998, 454. https://zoek.officielebekendmakingen.nl/stb-1998-454.htmlArts. 1–5, especially 2 (designated categories) and 4 (commencement/sunset); selected Nota van toelichting, introductory paragraphs. HTML; printed page not inspected; PDF index N/A.Enacted historical art. 48(1)(d) designation. Issued 23 Jul 1998; commenced next day; sunset after two years. Its former registration/fee provisions are expired, not modern requirements. Overheid.nl > Officiële bekendmakingen
C_NL-P02-S016 — Dutch government internet consultation, Concept-Vrijstellingsbesluit schuldbemiddelaars. https://www.internetconsultatie.nl/vrijstellingsbesluit_schuldbemiddelaars/detailsConsultation title, description, dates and status fields. HTML; printed page/PDF index N/A.Consultation 11 Jul–28 Aug 2013, closed. Discovery of a proposal, not an enacted rule. internetconsultatie.nl
C_NL-P02-S017 — Government draft presented through Eerste Kamer, Besluit … houdende vrijstelling. https://www.eerstekamer.nl/overig/20140704/besluit_van_houdende_vrijstelling/documentDraft arts. 1–6, PDF indices 0–2, printed pagination not independently certified; blank decree formalities and projected commencement inspected.17-page proposal, not a promulgated Staatsblad instrument. Draft fees, professional conditions and proposed start are nonoperative. Only identity/version/proposal status used. eerstekamer.nl
C_NL-P02-S018 — Dutch government communication to Tweede Kamer, Kamerstuk 34 509, nr. 1. https://zoek.officielebekendmakingen.nl/kst-34509-1.htmlSection Tot slot, paragraphs discussing Vrijstellingsbesluit schuldbemiddelaars and deferral. HTML; printed page not inspected; PDF index N/A.Official 2016 policy statement, not legislation or certification of 2026 decree status. Overheid.nl > Officiële bekendmakingen
C_NL-P02-S019 — Overheid.nl legislative calendar, Wetsvoorstel schuldregelen, WGK012536. https://wetgevingskalender.overheid.nl/Regeling/WGK012536Project summary, Voortgang, Mijlpalen en documenten; 2026 consultation dates. HTML; printed page/PDF index N/A.Official live project listing accessed this pass; preparation-stage proposal, not Wck repeal. Future updates possible. Wetgevingskalender
C_NL-P02-S020 — Government internet consultation, draft Wet schuldregelen. https://www.internetconsultatie.nl/wetschuldregelen/document/15794Draft arts. 1–2, PDF indices 0–1; draft arts. 29–30, indices 6–7; separate printed pagination not independently established.Eight-page consultation draft, not enacted. Proposed repeal and future commencement are not operative. Concept Regeling +1
C_NL-P02-S021 — Staatssecretaris SZW, Regeling aanwijzing toezichthouder Wet op het consumentenkrediet, Staatscourant 2025, 40669. https://zoek.officielebekendmakingen.nl/stcrt-2025-40669.htmlArts. 1–3 and explanatory paragraphs concerning transfer to DFEI. HTML; printed page not inspected; PDF index N/A.Enacted ministerial supervisory designation, commenced 1 Jan 2026. Strong indication of ongoing regulatory treatment of arts. 47–48 at that date, not full current-text certification or proof of an art. 48(1)(d) decree. Overheid.nl > Officiële bekendmakingen
C_NL-P02-S022 — Official wetten.overheid.nl, requested date-specific Wck consolidation. https://wetten.overheid.nl/BWBR0004815/2026-10-26No substantive body obtained; retrieval returned an error. Printed page/PDF index N/A.Failed access — non-evidentiary. The date in the requested URL is not proof the text was read, published or certified. Official Staatsblad enactments were used as the alternative; complete amendment-index reconciliation remains outstanding.
C_NL-P02-S023 — Eerste Kamer, parliamentary dossier 36.924, Implementatiewet herziene richtlijn consumentenkrediet. https://www.eerstekamer.nl/wetsvoorstel/36924_implementatiewet_herziene?df1=all&df2=kstStand van zaken, adopted Tweede Kamer vote 6 Oct 2026, Eerste Kamer scheduled committee step and proposed commencement. HTML; printed page/PDF index N/A.Official pending parliamentary status as accessed; not a commenced enacted amendment. Not evidence of any current article 48 designation. Eerste Kamer der Staten-Generaal
C_NL-P02-S024 — Tweede Kamer, explanatory memorandum, Kamerstuk 36 924, nr. 3. https://zoek.officielebekendmakingen.nl/kst-36924-3.htmlExplanatory section on schuldadviesdiensten, including its description of existing Wck 47–48 (body paragraphs around the discussion of credit banks and debt advice). HTML; printed page not separately inspected; PDF index N/A.2026 legislative explanation, secondary to enacted text for current-law purposes. Used only as a dated governmental cross-check; not an enacted substitution or a complete 2026 Wck consolidation. Overheid.nl > Officiële bekendmakingen

Captured table 07

Original headerless table; first data row retained · 17 data rows

New atomic claimExact proposition, actors, conditions and consequenceSupporting source and pinpointRemaining evidence limit
C_NL-P02-C001For credit agreements to which the 2011 Wck amendment applies, article 1(a) no longer imposes the historical condition that at least one payment occur more than three months after provision of money, property use or a designated service begins. This affects which transactions may constitute the credit-derived component of natural-person schuldbemiddeling.S001 art. 1(a), PDF indices 0–1; S008 art. II(A)(1), VII.Does not decide old agreements, exact debts, or other exclusions; complete 2026 consolidation not certified.
C_NL-P02-C002In article 1(a)(2°)–(3°), the 1991 enacted amendment removed lichamelijke from roerende lichamelijke zaak with effect from 1 January 1992. The original 1990 adjective is not correct for the law after this amendment.S001 art. 1(a); S002 art. I(A), VII, PDF indices 0 and 7.Subsequent full definition chain remains held; particular property characterization not decided.
C_NL-P02-C003The 2011 amendment's article VI states that its articles II and III do not apply to credit agreements entered into before those provisions commenced; because S008 was issued 24 May 2011, the relevant commencement under art. VII is 25 May 2011.S008 arts. VI–VII and issuance statement.Does not resolve every historical-debt/application conflict or judicial interpretation of article 47's reference to qualifying transactions.
C_NL-P02-C004The 1991 Besluit aanwijzing diensten designated travel-agreement transport/accommodation services for Wck 1(a)(2°)/(3°). This is a definition-linked services designation, not an exemption designating private debt mediators under 48(1)(d).S001 art. 1(a)(2°)–(3°); S003 arts. 1–3, PDF index 0.Present consolidated status and later changes to this services instrument not fully proved.
C_NL-P02-C005The original Wck art. 47(1) prohibits schuldbemiddeling. Its art. 47(2) defines a professional/business service directed toward arrangements for a natural person's existing debt burden arising wholly or partly from one or more credit transactions, other than concluding a new credit transaction. Each statutory element remains necessary for classification.S001 art. 47(1)–(2), PDF index 16; S024 2026 government description of Wck 47–48 is corroborative only.The complete 2026 amended text and individual scope/application are not certified.
C_NL-P02-C006The enacted 1990 art. 48(1) contains distinct om niet, municipal, professional and AMvB-designated exceptions. Under original art. 48(3), a contractual departure from rules under 48(2) is void to the extent of the conflict. It does not state that a creditor's underlying claim is extinguished or a judgment annulled.S001 art. 48(1)(a)–(d), (2)–(3), PDF index 16.Later amendment and operative-decree requirements must be superimposed; current compensation interpretation held.
C_NL-P02-C007The 2007 amendment enacted authority for an AMvB to impose a certificaat requirement relating to mediation under Wck 48(1), effective 1 January 2008. Enacting authority to impose a requirement is not the same as imposing it.S004 art. ID; S005 sole article; original structure S001 art. 48(2).No current implementing certificate decree, affected class or operational registration mechanism established.
C_NL-P02-C008Wck 48(1)(c)'s separate procureurs category was deleted effective 1 September 2008. Its appointed curatoren/bewindvoerders wording was then expanded to the specified BW 1:383(7) and 1:435(7) categories effective 1 April 2014.S001 art. 48(1)(c); S006 art. XLVI; S007 sole article; S009 art. III; S010 sole article.Professional registration, court appointment, personally performed services, staffing/delegation and current qualification detail remain outside this textual finding.
C_NL-P02-C009Since 1 January 2019, enacted Wck 48(1)(b) wording recognizes institutions performing mediation in opdracht en voor rekening van gemeenten, replacing the former municipally held-institution wording.S001 historical 48(1)(b); S013 art. XXVIA; S014 art. II(1) checked against exclusions.Whether any actual arrangement satisfies both instruction and municipal-account conditions remains untested; no municipal contractor searched.
C_NL-P02-C010Effective 1 January 2017, Wck chapters I, IV and X were repealed except the article 1 opening and subparagraphs (a) and (n). Historical Wck articles 2–4 therefore cannot be used as current gateway exemptions.S011 art. V; S012 sole article; S001 historical 1(a), 1(n), 2–4.Not a complete amendment search for the retained definition or later articles 47–48.
C_NL-P02-C011The temporary 1998 art. 48(1)(d) decree designated qualifying registered mediators during its limited life but expressly expired two years after commencing on 24 July 1998. Its scheme cannot authorize conduct in 2026.S015 arts. 2–4, issue-date statement.Does not establish whether some entirely different later designation exists.
C_NL-P02-C012A 2013 consultation and unsigned 2014 draft proposed a later Vrijstellingsbesluit, and a 2016 government statement deferred further processing. None of those bodies, as read, establishes an enacted and commenced later exemption.S016 status/dates; S017 draft arts. 1–6 and blank formalities; S018 Tot slot paragraphs.Subsequent legislative/instrument history after 2016 not fully certified; no nonexistence inference.
C_NL-P02-C013The 2026 Wetsvoorstel schuldregelen project and consultation draft propose Wck repeal/replacement but are not operative enactments in the bodies examined. Separately, bill 36.924 had passed the Tweede Kamer but remained in Eerste Kamer proceedings at this check.S019 project stage; S020 draft arts. 29–30; S023 Stand van zaken.Later legislative developments and future commencement are open; proposed terms are not 2026 Wck text.
C_NL-P02-C014A ministerial regulation appointed designated DFEI officials to supervise Wck arts. 47–48 effective 1 January 2026, providing recent official evidence of regulatory continuity.S021 arts. 1–2 and explanation.The regulation is not a current Wck consolidation and does not establish a certificate or 48(1)(d) designation. Subsequent changes to this supervisory instrument not fully searched.
C_NL-P02-C015A readable official 26 October 2026 consolidated Wck body was not obtained. The source-backed reconstruction establishes the enumerated enacted amendments but cannot certify the whole text, full intervening chain or absence of undiscovered changes.Failed S022; reconstructed material S001–S014; limited cross-check S021/S024.Methodological/access finding, not an affirmative claim about what every current provision says.
C_NL-P02-C016The bounded official review established one expired 48(1)(d) AMvB and later draft proposals, but did not establish a presently operative 48(1)(d) designation or activated certificate requirement.S001 art. 48(1)(d)/(2); S004–S005 certificate power; S015–S020 historical designation/proposal record; access hold S022.An evidence-bound unresolved result, not proof that no other operative instrument or lawful capacity exists.

Captured table 08

Original headerless table; first data row retained · 7 data rows

Original claim and supplied propositionDisposition and exact bounded correctionNew claims and sourcesRetained hold
P01-C001 — Article 47 prohibition/definition and qualifying natural-person credit debtStrengthen limitation; supplement the linked definition. Keep article 47's element-by-element test. Replace reliance on unmodified 1990 article 1(a) with the 1991 movable-property amendment and 2011 removal of the three-month condition, explicitly subject to art. VI legacy agreements.C_NL-P02-C001–C005, C015; S001–S003, S008, S022Complete 2026 consolidation, pre-2011 agreement application, particular debts, nexus.
P01-C002 — Article 48 exceptions, fee-rule delegation and partial contractual invalidityMaterial additive correction. Article 48(2) also contains the 2007-inserted power for an AMvB certificate requirement. Do not describe a compulsory current certificate without an active decree. Preserve the limited reading of 48(3).C_NL-P02-C006–C007, C016; S001, S004–S005, S015–S020Currently operative designation/certificate AMvB, fee application, indirect remuneration.
P01-C003 — Municipal-contractor wording in force from 2019Retain the supplied conclusion. Independently reconfirm the precise statutory substitution and 1 January 2019 commencement.C_NL-P02-C009, C015; S013–S014Actual opdracht and voor rekening documents, contract interpretation, full subsequent amendments.
P01-C008 — 2017 repeal/retention and historical articles 2–4 trapRetain and expand the definition-version warning. Correctly excludes historical arts. 2–4; add the 1991 and 2011 changes to retained article 1(a), particularly the express legacy-agreement transition.C_NL-P02-C001–C004, C010, C015; S001–S003, S008, S011–S012Exhaustive definition amendment chain and historical contract application.
P01-C012 — Named professional and appointed-role exceptionsStrengthen chronological/name precision. Confirm procureurs deletion effective 1 September 2008, and Book 1 appointed-role expansion effective 1 April 2014. The P01 description of qualifying categories remains substantially intact.C_NL-P02-C008, C015; S001, S006–S007, S009–S010Individual admission/appointment, work personally undertaken versus staff delegation, later professional-law changes.
P01-C044 — No blanket paid-private commercial licence provedRetain as a bounded negative, with a stronger express hold. Statute contains AMvB designation and certificate-rule powers; the examined historical designation is expired, and current implementing instruments have not been certified. Do not recast this as proof that no lawful route exists.C_NL-P02-C007, C011–C016; S004–S005, S015–S023Complete current implementing regulations and legislative history; no provider-specific determination.

Captured table 09

Original headerless table; first data row retained · 7 data rows

Original P01 authorityOriginal material retainedNew reconciliation source
P01-S001, Staatsblad 1990, 395The authentic historical base text; not replaced as a historical recordP02-S001, supplemented by P02-S002, S004, S006, S008 for changes missing from a 1990-only reading
P01-S002, Staatsblad 2016, 360Art. V retained definitions/repealed chaptersP02-S011
P01-S003, Staatsblad 2016, 438Commencement 1 Jan 2017P02-S012
P01-S004, Staatsblad 2013, 414Professional BW Book 1 amendmentP02-S009, paired explicitly with P02-S010 commencement
P01-S005, Staatsblad 2018, 424Municipal-contractor amendmentP02-S013
P01-S006, Staatsblad 2018, 425Municipal amendment commencementP02-S014

Captured table 10

Original headerless table; first data row retained · 18 data rows

Coverage IDExact subissueStatusFinding / exact new claim IDsMissing evidence and next focused action
K001Official Wck consolidation as of 26 Oct 2026unresolved§1 currentness; C_NL-P02-C015Official body inaccessible. Obtain the government amendment-information table and 2026 consolidated arts. 1(a)/(n), 47, 48.
K002Article 1(a)(1°), money-advance branchpartial§1.1; C_NL-P02-C001, C005, C015Original branch read; complete subsequent wording not certified. Reconcile all article 1(a) amendments from official history.
K003Article 1(a)(2°)–(3°), movable-property adjectiveanswered§1.1; C_NL-P02-C0021991 change/date proved. Separately certify subsequent version history before using a complete present-text quotation.
K004Historical three-month credit-definition conditionanswered§1.1; C_NL-P02-C001Deletion and commencement proved. Must not extrapolate to every earlier agreement.
K005Pre-commencement credit agreementspartial§1.1; C_NL-P02-C003Statutory transition read. Next: separately analyze the applicable agreement date and the cross-time article 47 interpretation; no individual contract reviewed.
K006Services designated for Wck 1(a)(2°)/(3°)partial§1.1; C_NL-P02-C004Original 1991 AMvB read; retrieve 2026 consolidation and all modifications/commencement.
K007Retained article 1(n), gemeentelijke kredietbankpartial§1.5; C_NL-P02-C010, C015Original definition and 2017 retention established; check later changes to its wording.
K008Article 47(1) prohibitionpartial§1.2; C_NL-P02-C005, C014–C015Original text and 2026 supervisory continuity read; verify complete amended text.
K009Article 47(2) professional activity/natural-person/credit-derived elementspartial§1.2; C_NL-P02-C001–C005, C015Linked definition corrected; current complete body and judicial application held.
K010Article 48(1)(a), om nietpartial§1.3; C_NL-P02-C006, C015Original exception read. Indirect benefit, third-party payment and mixed-fee interpretation explicitly held.
K011Article 48(1)(b), municipal contractoranswered§1.3; C_NL-P02-C009Exact 2019 amendment proved. Municipal instructions, expense account and individual contractor documents not examined.
K012Article 48(1)(c), professions/appointmentsanswered§1.3; C_NL-P02-C008Exact 2008 and 2014 word changes proved. Professional admission, appointments and delegation remain separate.
K013Article 48(1)(d), operative designated classesunresolved§3.4; C_NL-P02-C016Locate and read every presently operative linked AMvB, if any, with commencement and expiry.
K014Article 48(2), certificate-enabling languageanswered§1.4; C_NL-P02-C007Statutory authority verified. Separate implementing requirement unresolved.
K015Article 48(2), fee-rule delegationpartial§1.4; C_NL-P02-C006–C007, C016Historical delegation understood; operative conditions not verified. Consumer fee amounts/timing/caps remain excluded.
K016Article 48(3), contractual departurespartial§1.4; C_NL-P02-C006, C015Historical conditional rule read. No current implementing rule or particular contract examined.
K017Historical Wck arts. 2–4 after 2017 repealanswered§1.5; C_NL-P02-C010Repeal established. Other statutes' exclusions require separate research; old Wck provisions must not be revived by implication.

Captured table 11

Original headerless table; first data row retained · 11 data rows

Coverage IDExact subissueStatusFinding / exact new claim IDsMissing evidence and next focused action
K0181991 movable-property amendment and startanswered§2; C_NL-P02-C002Art. I(A) and VII read. No further action for these enactment facts.
K0192007 certificate-power amendment and startanswered§2; C_NL-P02-C007Art. ID and separate 2008 commencement read. Implementing decree is K031.
K0202008 procureurs deletion and startanswered§2; C_NL-P02-C008Art. XLVI and 1 Sep 2008 decree read.
K0212011 three-month deletion, issue date, transition and startanswered§2; C_NL-P02-C001, C003Relevant enacted clauses checked. Case-level interpretation still held separately at K005.
K0222013 professional wording and actual commencementanswered§2; C_NL-P02-C0082013 art. III and 2014 commencement read.
K0232016 retained definitions/chapter repeal and startanswered§2; C_NL-P02-C010Act and commencement read. Does not certify every retained-definition change.
K0242018 municipal substitution and 2019 startanswered§2; C_NL-P02-C009Act plus exceptions in commencement decree read.
K025Exhaustive post-1990/post-2019 amendment chainunresolved§1 currentness; C_NL-P02-C015Retrieve full official Wck amendment index, amending articles, corrections, commencement orders and consolidations through the access date.
K0262026 proposed Wet schuldregelen repeal/reformanswered§3.3; C_NL-P02-C013Current proposal status, draft repeal and future-start mechanism verified. Monitor future enactment/commencement separately.
K0272026 consumer-credit implementation bill 36.924answered§3.3; C_NL-P02-C013Official pending parliamentary status verified. Any later enacted text and commencement require a new check.

Captured table 12

Original headerless table; first data row retained · 5 data rows

Coverage IDExact subissueStatusFinding / exact new claim IDsMissing evidence and next focused action
K0281998 temporary designation and expiryanswered§3.1; C_NL-P02-C011Enacted articles, commencement trigger and self-expiry read. No basis to apply former fee rules in 2026.
K0292013 consultation, 2014 draft, 2016 deferralanswered§3.2; C_NL-P02-C012Historical proposal status proved. This does not answer whether another later instrument exists.
K030Present operative 48(1)(d) designationunresolved§3.4; C_NL-P02-C016Obtain official linked subordinate instruments as of Oct 2026 and confirm every operative designation provision.
K031Present certificate requirement, category or certification authorityunresolved§3.4; C_NL-P02-C007, C016Locate implementing AMvB, if any; read its conditions, scope, start, amendments and expiry before asserting a requirement.

Captured table 13

Original headerless table; first data row retained · 3 data rows

Coverage IDExact subissueStatusFinding / exact new claim IDsMissing evidence and next focused action
K032Six identified P01 claim replacements/limitationsanswered§6; C_NL-P02-C001–C016, individually mapped to P01-C001/C002/C003/C008/C012/C044This is researcher reconciliation, not coordinator acceptance. Do not alter the remaining 42 claim records.
K033Application issues outside current-text reconciliationexcluded_with_reason§§1–3; C_NL-P02-C015–C016 establish the source/instrument holds, not application conclusionsIndirect remuneration, staff delegation, actual contractor contracts, cross-border nexus, creditor response, debtor funds, fees/remedies and judicial interpretation belong to other scoped work.

Captured table 14

Original headerless table; first data row retained · 9 data rows

Original targeted rowStatusExact claim supported nowMissing evidence and exact disposition action
A01unresolvedC_NL-P02-C015 establishes the cross-cutting currentness holdRead saved A01 body; identify its exact assertion and append only matching C001–C016 correction.
A02unresolvedC_NL-P02-C015Read saved A02 body; check whether it repeats original article 1(a) wording or timing; map the specific amendment if present.
A03unresolvedC_NL-P02-C015Read saved A03 body; test whether municipal or exception wording is asserted; preserve unchanged material.
A07unresolvedC_NL-P02-C015Read saved A07 body; test the article 48 enabling and implementing-instrument distinction if implicated.
A08unresolvedC_NL-P02-C015Read saved A08 body; check retained definitions and historical exclusions only if that is its actual subject.
A10unresolvedC_NL-P02-C015Read saved A10 body; determine precise actor/exception statement before making any replacement.
A18unresolvedC_NL-P02-C015Read saved A18 body; test professional wording and dates only if contained there.
A35unresolvedC_NL-P02-C015Read saved A35 body; distinguish a negative registration/licence conclusion from an unverified designation or certificate instrument.

Captured table 15

Original headerless table; first data row retained · 10 data rows

Source system / search boundaryActually attemptedResult and significance
wetten.overheid.nl, BWBR0004815 date-specific consolidationDirect current-version retrievalFailed to return a readable operative body. Did not repeatedly retry the inaccessible endpoint. S022.
zoek.officielebekendmakingen.nl, original WckOriginal Staatsblad 1990, 395 PDFOpened article 1 and articles 47–48. Historical baseline only. S001.
zoek.officielebekendmakingen.nl, named Wck amendments and commencement instruments1991, 2007, 2008, 2011, 2013/14, 2016/17 and 2018/19 instrumentsOpened actual relevant enacted bodies and commencement provisions. S002, S004–S014.
Official enacted AMvB search for artikel 48, eerste lid, onder d, schuldbemiddelaars, vrijstelling and certificaatOfficial search plus opened 1998 decreeExpired operative historical designation established. Present designation not positively identified. S015.
Official 2013–16 later-Vrijstellingsbesluit trailConsultation, actual draft PDF and government communicationProposal and deferral established, not a commenced decree. S016–S018.
Linked article 1(a) service-definition instrument1991 Besluit aanwijzing dienstenOriginal designation opened. This was not mistaken for an article 48(1)(d) designation. S003.
2026 Dutch legislative monitoringGovernment legislative calendar, public draft, Senate parliamentary statusCurrent identified proposal status separated from operative text. S019–S020, S023–S024.
Recent regulatory continuity2025 designation of supervisory officials, effective 2026Relevant current-date corroboration but not a consolidation. S021.
Unofficial republishers/search-engine snippetsDiscovery onlyNot used to certify the Wck or an exemption. No private provider/person searches.

Find the assertion and its boundaries

Read the evidence with its boundaries. These are saved research components, including revisions. A scoped coordinator review checks selected evidence; it does not certify every claim, a complete jurisdiction, current law or individual applicability. Dates and access limits remain attached to the records.

How to read the research →

C_NL-P02-C001 Saved research record

For credit agreements to which the 2011 Wck amendment applies, article 1(a) no longer imposes the historical condition that at least one payment occur more than three months after provision of money, property use or a designated service begins. This affects which transactions may constitute the credit-derived component of natural-person schuldbemiddeling.

Recorded check status: selected enactment or precisely dated reuse supported full currentness held

New atomic claim
C_NL-P02-C001
Supporting source and pinpoint
S001 art. 1(a), PDF indices 0–1; S008 art. II(A)(1), VII.
Remaining evidence limit
Does not decide old agreements, exact debts, or other exclusions; complete 2026 consolidation not certified.

Recorded coordinator check boundaries

coordinator review
Fresh/source-reuse scope recorded separately. Selected enacted change is not an exhaustive current consolidation, implementing decree or fact-specific permission.
C_NL-P02-C002 Saved research record

In article 1(a)(2°)–(3°), the 1991 enacted amendment removed lichamelijke from roerende lichamelijke zaak with effect from 1 January 1992. The original 1990 adjective is not correct for the law after this amendment.

Recorded check status: selected enactment or precisely dated reuse supported full currentness held

New atomic claim
C_NL-P02-C002
Supporting source and pinpoint
S001 art. 1(a); S002 art. I(A), VII, PDF indices 0 and 7.
Remaining evidence limit
Subsequent full definition chain remains held; particular property characterization not decided.

Recorded coordinator check boundaries

coordinator review
Fresh/source-reuse scope recorded separately. Selected enacted change is not an exhaustive current consolidation, implementing decree or fact-specific permission.
C_NL-P02-C003 Saved research record

The 2011 amendment's article VI states that its articles II and III do not apply to credit agreements entered into before those provisions commenced; because S008 was issued 24 May 2011, the relevant commencement under art. VII is 25 May 2011.

Recorded check status: selected enactment or precisely dated reuse supported full currentness held

New atomic claim
C_NL-P02-C003
Supporting source and pinpoint
S008 arts. VI–VII and issuance statement.
Remaining evidence limit
Does not resolve every historical-debt/application conflict or judicial interpretation of article 47's reference to qualifying transactions.

Recorded coordinator check boundaries

coordinator review
24May2011 issuance +1calendar day independently recomputed25May2011; VI legacy-agreement qualification retained; no retroactive eligibility conclusion.
C_NL-P02-C004 Saved research record

The 1991 Besluit aanwijzing diensten designated travel-agreement transport/accommodation services for Wck 1(a)(2°)/(3°). This is a definition-linked services designation, not an exemption designating private debt mediators under 48(1)(d).

Recorded check status: traceability and explicit unresolved or reported status preserved

New atomic claim
C_NL-P02-C004
Supporting source and pinpoint
S001 art. 1(a)(2°)–(3°); S003 arts. 1–3, PDF index 0.
Remaining evidence limit
Present consolidated status and later changes to this services instrument not fully proved.

Recorded coordinator check boundaries

coordinator review
Fresh/source-reuse scope recorded separately. Selected enacted change is not an exhaustive current consolidation, implementing decree or fact-specific permission.
C_NL-P02-C005 Saved research record

The original Wck art. 47(1) prohibits schuldbemiddeling. Its art. 47(2) defines a professional/business service directed toward arrangements for a natural person's existing debt burden arising wholly or partly from one or more credit transactions, other than concluding a new credit transaction. Each statutory element remains necessary for classification.

Recorded check status: selected enactment or precisely dated reuse supported full currentness held

New atomic claim
C_NL-P02-C005
Supporting source and pinpoint
S001 art. 47(1)–(2), PDF index 16; S024 2026 government description of Wck 47–48 is corroborative only.
Remaining evidence limit
The complete 2026 amended text and individual scope/application are not certified.

Recorded coordinator check boundaries

coordinator review
Fresh/source-reuse scope recorded separately. Selected enacted change is not an exhaustive current consolidation, implementing decree or fact-specific permission.
C_NL-P02-C006 Saved research record

The enacted 1990 art. 48(1) contains distinct om niet, municipal, professional and AMvB-designated exceptions. Under original art. 48(3), a contractual departure from rules under 48(2) is void to the extent of the conflict. It does not state that a creditor's underlying claim is extinguished or a judgment annulled.

Recorded check status: selected enactment or precisely dated reuse supported full currentness held

New atomic claim
C_NL-P02-C006
Supporting source and pinpoint
S001 art. 48(1)(a)–(d), (2)–(3), PDF index 16.
Remaining evidence limit
Later amendment and operative-decree requirements must be superimposed; current compensation interpretation held.

Recorded coordinator check boundaries

coordinator review
Fresh/source-reuse scope recorded separately. Selected enacted change is not an exhaustive current consolidation, implementing decree or fact-specific permission.
C_NL-P02-C007 Saved research record

The 2007 amendment enacted authority for an AMvB to impose a certificaat requirement relating to mediation under Wck 48(1), effective 1 January 2008. Enacting authority to impose a requirement is not the same as imposing it.

Recorded check status: selected enactment or precisely dated reuse supported full currentness held

New atomic claim
C_NL-P02-C007
Supporting source and pinpoint
S004 art. ID; S005 sole article; original structure S001 art. 48(2).
Remaining evidence limit
No current implementing certificate decree, affected class or operational registration mechanism established.

Recorded coordinator check boundaries

coordinator review
Fresh/source-reuse scope recorded separately. Selected enacted change is not an exhaustive current consolidation, implementing decree or fact-specific permission.
C_NL-P02-C008 Saved research record

Wck 48(1)(c)'s separate procureurs category was deleted effective 1 September 2008. Its appointed curatoren/bewindvoerders wording was then expanded to the specified BW 1:383(7) and 1:435(7) categories effective 1 April 2014.

Recorded check status: selected enactment or precisely dated reuse supported full currentness held

New atomic claim
C_NL-P02-C008
Supporting source and pinpoint
S001 art. 48(1)(c); S006 art. XLVI; S007 sole article; S009 art. III; S010 sole article.
Remaining evidence limit
Professional registration, court appointment, personally performed services, staffing/delegation and current qualification detail remain outside this textual finding.

Recorded coordinator check boundaries

coordinator review
Fresh/source-reuse scope recorded separately. Selected enacted change is not an exhaustive current consolidation, implementing decree or fact-specific permission.
C_NL-P02-C009 Saved research record

Since 1 January 2019, enacted Wck 48(1)(b) wording recognizes institutions performing mediation in opdracht en voor rekening van gemeenten, replacing the former municipally held-institution wording.

Recorded check status: selected enactment or precisely dated reuse supported full currentness held

New atomic claim
C_NL-P02-C009
Supporting source and pinpoint
S001 historical 48(1)(b); S013 art. XXVIA; S014 art. II(1) checked against exclusions.
Remaining evidence limit
Whether any actual arrangement satisfies both instruction and municipal-account conditions remains untested; no municipal contractor searched.

Recorded coordinator check boundaries

coordinator review
Fresh/source-reuse scope recorded separately. Selected enacted change is not an exhaustive current consolidation, implementing decree or fact-specific permission.
C_NL-P02-C010 Saved research record

Effective 1 January 2017, Wck chapters I, IV and X were repealed except the article 1 opening and subparagraphs (a) and (n). Historical Wck articles 2–4 therefore cannot be used as current gateway exemptions.

Recorded check status: selected enactment or precisely dated reuse supported full currentness held

New atomic claim
C_NL-P02-C010
Supporting source and pinpoint
S011 art. V; S012 sole article; S001 historical 1(a), 1(n), 2–4.
Remaining evidence limit
Not a complete amendment search for the retained definition or later articles 47–48.

Recorded coordinator check boundaries

coordinator review
Fresh/source-reuse scope recorded separately. Selected enacted change is not an exhaustive current consolidation, implementing decree or fact-specific permission.
C_NL-P02-C011 Saved research record

The temporary 1998 art. 48(1)(d) decree designated qualifying registered mediators during its limited life but expressly expired two years after commencing on 24 July 1998. Its scheme cannot authorize conduct in 2026.

Recorded check status: selected enactment or precisely dated reuse supported full currentness held

New atomic claim
C_NL-P02-C011
Supporting source and pinpoint
S015 arts. 2–4, issue-date statement.
Remaining evidence limit
Does not establish whether some entirely different later designation exists.

Recorded coordinator check boundaries

coordinator review
Fresh/source-reuse scope recorded separately. Selected enacted change is not an exhaustive current consolidation, implementing decree or fact-specific permission.
C_NL-P02-C012 Saved research record

A 2013 consultation and unsigned 2014 draft proposed a later Vrijstellingsbesluit, and a 2016 government statement deferred further processing. None of those bodies, as read, establishes an enacted and commenced later exemption.

Recorded check status: traceability and explicit unresolved or reported status preserved

New atomic claim
C_NL-P02-C012
Supporting source and pinpoint
S016 status/dates; S017 draft arts. 1–6 and blank formalities; S018 Tot slot paragraphs.
Remaining evidence limit
Subsequent legislative/instrument history after 2016 not fully certified; no nonexistence inference.

Recorded coordinator check boundaries

coordinator review
Fresh/source-reuse scope recorded separately. Selected enacted change is not an exhaustive current consolidation, implementing decree or fact-specific permission.
C_NL-P02-C013 Saved research record

The 2026 Wetsvoorstel schuldregelen project and consultation draft propose Wck repeal/replacement but are not operative enactments in the bodies examined. Separately, bill 36.924 had passed the Tweede Kamer but remained in Eerste Kamer proceedings at this check.

Recorded check status: traceability and explicit unresolved or reported status preserved

New atomic claim
C_NL-P02-C013
Supporting source and pinpoint
S019 project stage; S020 draft arts. 29–30; S023 Stand van zaken.
Remaining evidence limit
Later legislative developments and future commencement are open; proposed terms are not 2026 Wck text.

Recorded coordinator check boundaries

coordinator review
Current proposal/search/negative status remains bounded. No absolute no-law, no-designation or no-amendment finding.
C_NL-P02-C014 Saved research record

A ministerial regulation appointed designated DFEI officials to supervise Wck arts. 47–48 effective 1 January 2026, providing recent official evidence of regulatory continuity.

Recorded check status: selected enactment or precisely dated reuse supported full currentness held

New atomic claim
C_NL-P02-C014
Supporting source and pinpoint
S021 arts. 1–2 and explanation.
Remaining evidence limit
The regulation is not a current Wck consolidation and does not establish a certificate or 48(1)(d) designation. Subsequent changes to this supervisory instrument not fully searched.

Recorded coordinator check boundaries

coordinator review
Fresh/source-reuse scope recorded separately. Selected enacted change is not an exhaustive current consolidation, implementing decree or fact-specific permission.
C_NL-P02-C015 Saved research record

A readable official 26 October 2026 consolidated Wck body was not obtained. The source-backed reconstruction establishes the enumerated enacted amendments but cannot certify the whole text, full intervening chain or absence of undiscovered changes.

Recorded check status: traceability and explicit unresolved or reported status preserved

New atomic claim
C_NL-P02-C015
Supporting source and pinpoint
Failed S022; reconstructed material S001–S014; limited cross-check S021/S024.
Remaining evidence limit
Methodological/access finding, not an affirmative claim about what every current provision says.

Recorded coordinator check boundaries

coordinator review
Current proposal/search/negative status remains bounded. No absolute no-law, no-designation or no-amendment finding.
C_NL-P02-C016 Saved research record

The bounded official review established one expired 48(1)(d) AMvB and later draft proposals, but did not establish a presently operative 48(1)(d) designation or activated certificate requirement.

Recorded check status: traceability and explicit unresolved or reported status preserved

New atomic claim
C_NL-P02-C016
Supporting source and pinpoint
S001 art. 48(1)(d)/(2); S004–S005 certificate power; S015–S020 historical designation/proposal record; access hold S022.
Remaining evidence limit
An evidence-bound unresolved result, not proof that no other operative instrument or lawful capacity exists.

Recorded coordinator check boundaries

coordinator review
Current proposal/search/negative status remains bounded. No absolute no-law, no-designation or no-amendment finding.

Sources, pinpoints and access limits

Keep the source version, actual read extent and jurisdiction with the proposition. A link or researcher access claim is not a substitute for an operative primary passage.

C_NL-P02-S001 Saved research record

C_NL-P02-S001 — Kroon/legislature, Wet op het consumentenkrediet, Staatsblad 1990, 395. https://zoek.officielebekendmakingen.nl/stb-1990-395.pdf

Recorded check status: precisely dated same coordinator selected body reuse

Actual body read and exact pinpoint
Art. 1 opening/(a), PDF indices 0–1, printed Staatsblad pp. 1–2; art. 1(n), index 1 / p. 2; arts. 47(1)–(2), 48(1)(a)–(d), (2)–(3), index 16 / p. 17.
Version, status, actor/scope and limits
Original enacted Dutch text. Historical, not consolidated 2026 law. Credit-transaction definition, natural-person debt mediation and exceptions. Pre-July-2009 electronic facsimile; printed original not physically inspected. zoek.officielebekendmakingen.nl +1
Direct source URLs
https://zoek.officielebekendmakingen.nl/stb-1990-395.pdf

Recorded coordinator check boundaries

coordinator check scope
Original47/48 and retained-definition body selected in same-coordinator P01 review23:38:49Z, [internal evidence reference]; no new full-current-law read.
C_NL-P02-S002 Saved research record

C_NL-P02-S002 — Kroon/legislature, Wck/BW adaptation, Staatsblad 1991, 630. https://zoek.officielebekendmakingen.nl/stb-1991-630.pdf

Recorded check status: fresh selected primary body checked with limits

Actual body read and exact pinpoint
Art. I(A), PDF index 0 / printed p. 1; art. VII, index 7 / printed p. 8.
Version, status, actor/scope and limits
Enacted amendment; relevant alteration effective 1 Jan 1992. Read limited to the selected Wck definition alteration and commencement; other provisions not audited. zoek.officielebekendmakingen.nl +1
Direct source URLs
https://zoek.officielebekendmakingen.nl/stb-1991-630.pdf

Recorded coordinator check boundaries

coordinator check scope
I(A) deletion and VII commencement; PDF indices0/7, printed1/8.
C_NL-P02-S003 Saved research record

C_NL-P02-S003 — Kroon, Besluit aanwijzing diensten Wet op het consumentenkrediet, Staatsblad 1991, 515. https://zoek.officielebekendmakingen.nl/stb-1991-515.pdf

Recorded check status: researcher traceability only not freshly recertified

Actual body read and exact pinpoint
Arts. 1–3, PDF index 0 / printed p. 1; explanatory service-scope passage index 2 / printed p. 3.
Version, status, actor/scope and limits
Original enacted AMvB identifying a category of services under Wck 1(a)(2°)/(3°), not persons designated under 48(1)(d). Effective upon Wck commencement under art. 2. Later amendment/repeal history and 2026 consolidated status not fully certified. zoek.officielebekendmakingen.nl
Direct source URLs
https://zoek.officielebekendmakingen.nl/stb-1991-515.pdf

Recorded coordinator check boundaries

coordinator check scope
Original row, URL, subject and explicit access/proposal/currentness limits reconciled. Unopened body or current status not recertified.
C_NL-P02-S004 Saved research record

C_NL-P02-S004 — Kroon/legislature, Wsnp-revision amendment, Staatsblad 2007, 192. https://zoek.officielebekendmakingen.nl/stb-2007-192.html

Recorded check status: fresh selected primary body checked with limits

Actual body read and exact pinpoint
Art. ID, insertion into Wck 48(2). HTML; printed page not separately inspected; PDF index N/A.
Version, status, actor/scope and limits
Enacted express certificate-rule delegation, effective only upon S005 commencement. Does not itself establish an operational certificate system. Overheid.nl > Officiële bekendmakingen
Direct source URLs
https://zoek.officielebekendmakingen.nl/stb-2007-192.html

Recorded coordinator check boundaries

coordinator check scope
ArticleID certificate-enabling insertion only.
C_NL-P02-S005 Saved research record

C_NL-P02-S005 — Kroon, commencement decree, Staatsblad 2007, 222. https://zoek.officielebekendmakingen.nl/stb-2007-222.html

Recorded check status: fresh selected primary body checked with limits

Actual body read and exact pinpoint
Enig artikel. HTML; printed page not inspected; PDF index N/A.
Version, status, actor/scope and limits
Enacted commencement instrument: 1 Jan 2008 for S004. Read to relevant commencement. Overheid.nl > Officiële bekendmakingen
Direct source URLs
https://zoek.officielebekendmakingen.nl/stb-2007-222.html

Recorded coordinator check boundaries

coordinator check scope
Sole commencement article:1Jan2008.
C_NL-P02-S006 Saved research record

C_NL-P02-S006 — Kroon/legislature, Wet afschaffing procuraat en invoering elektronisch berichtenverkeer, Staatsblad 2008, 100. https://zoek.officielebekendmakingen.nl/stb-2008-100.html

Recorded check status: fresh selected primary body checked with limits

Actual body read and exact pinpoint
Art. XLVI removing procureurs from Wck 48(1)(c); art. LX requiring separate commencement. HTML; printed page not inspected; PDF index N/A.
Version, status, actor/scope and limits
Enacted amendment, operative through S007. Other procedural-law provisions not studied. Overheid.nl > Officiële bekendmakingen
Direct source URLs
https://zoek.officielebekendmakingen.nl/stb-2008-100.html

Recorded coordinator check boundaries

coordinator check scope
ArticleXLVI deletion of procureurs and LX separate-commencement requirement.
C_NL-P02-S007 Saved research record

C_NL-P02-S007 — Kroon, commencement, Staatsblad 2008, 274. https://zoek.officielebekendmakingen.nl/stb-2008-274.html

Recorded check status: fresh selected primary body checked with limits

Actual body read and exact pinpoint
Enig artikel. HTML; printed page not inspected; PDF index N/A.
Version, status, actor/scope and limits
Commenced S006 on 1 Sep 2008. Overheid.nl > Officiële bekendmakingen
Direct source URLs
https://zoek.officielebekendmakingen.nl/stb-2008-274.html

Recorded coordinator check boundaries

coordinator check scope
Sole commencement article:1Sep2008.
C_NL-P02-S008 Saved research record

C_NL-P02-S008 — Kroon/legislature, consumer-credit-directive implementation, Staatsblad 2011, 246. https://zoek.officielebekendmakingen.nl/stb-2011-246.html

Recorded check status: fresh selected primary body checked with limits

Actual body read and exact pinpoint
Art. II(A)(1) deleting Wck 1(a) timing phrase; arts. VI–VII transition/commencement; issue-date statement following art. VII. HTML; printed page not inspected; PDF index N/A.
Version, status, actor/scope and limits
Enacted. Issued 24 May 2011; applicable amendment effective 25 May 2011 under conditional art. VII. Art. VI preserves a distinction for earlier credit agreements. Old amendments to Wck art. 2 are not treated as current after 2017. Overheid.nl > Officiële bekendmakingen +1
Direct source URLs
https://zoek.officielebekendmakingen.nl/stb-2011-246.html

Recorded coordinator check boundaries

coordinator check scope
II(A)(1) deletion, VI earlier-agreement transition, VII conditional start and24May2011 issuance.
C_NL-P02-S009 Saved research record

C_NL-P02-S009 — Kroon/legislature, Wet wijziging curatele, beschermingsbewind en mentorschap, Staatsblad 2013, 414. https://zoek.officielebekendmakingen.nl/stb-2013-414.html

Recorded check status: fresh selected primary body checked with limits

Actual body read and exact pinpoint
Art. III substitution within Wck 48(1)(c); arts. V–VI separate transition/commencement framework. HTML; printed page not inspected; PDF index N/A.
Version, status, actor/scope and limits
Enacted expansion to the specified BW Book 1 appointed categories. Specific commencement from S010. Detailed professional qualification and individual appointment facts not determined. Overheid.nl > Officiële bekendmakingen +1
Direct source URLs
https://zoek.officielebekendmakingen.nl/stb-2013-414.html

Recorded coordinator check boundaries

coordinator check scope
III wording substitution and V/VI transition/separate-start context.
C_NL-P02-S010 Saved research record

C_NL-P02-S010 — Kroon, commencement, Staatsblad 2014, 85. https://zoek.officielebekendmakingen.nl/stb-2014-85.html

Recorded check status: fresh selected primary body checked with limits

Actual body read and exact pinpoint
Enig artikel, expressly including S009 art. III. HTML; printed page not inspected; PDF index N/A.
Version, status, actor/scope and limits
Relevant effective date 1 Apr 2014. Accompanying explanation discusses quality requirements and transitional appointments; this pass does not certify individual qualifications. Overheid.nl > Officiële bekendmakingen
Direct source URLs
https://zoek.officielebekendmakingen.nl/stb-2014-85.html

Recorded coordinator check boundaries

coordinator check scope
Sole article expressly includes III with1Apr2014 start.
C_NL-P02-S011 Saved research record

C_NL-P02-S011 — Kroon/legislature, consumer-credit/goederenkrediet BW reform, Staatsblad 2016, 360. https://zoek.officielebekendmakingen.nl/stb-2016-360.html

Recorded check status: precisely dated same coordinator selected body reuse

Actual body read and exact pinpoint
Art. V, Wck chapter repeal and expressly retained 1 opening/(a)/(n). HTML; printed page not inspected; PDF index N/A.
Version, status, actor/scope and limits
Enacted repeal; commencement separately S012. Repealed Wck chapters cannot supply current exclusions. Overheid.nl > Officiële bekendmakingen
Direct source URLs
https://zoek.officielebekendmakingen.nl/stb-2016-360.html

Recorded coordinator check boundaries

coordinator check scope
ArticleV selected in same dated P01primary01 packet; source identity identical, no need to refetch.
C_NL-P02-S012 Saved research record

C_NL-P02-S012 — Kroon, commencement, Staatsblad 2016, 438. https://zoek.officielebekendmakingen.nl/stb-2016-438.html

Recorded check status: precisely dated same coordinator selected body reuse

Actual body read and exact pinpoint
Enig artikel. HTML; printed page not inspected; PDF index N/A.
Version, status, actor/scope and limits
Commenced S011 on 1 Jan 2017. Overheid.nl > Officiële bekendmakingen
Direct source URLs
https://zoek.officielebekendmakingen.nl/stb-2016-438.html

Recorded coordinator check boundaries

coordinator check scope
Sole commencement in same dated P01primary01 packet; no later-chain certification.
C_NL-P02-S013 Saved research record

C_NL-P02-S013 — Kroon/legislature, Verzamelwet SZW 2019, Staatsblad 2018, 424. https://zoek.officielebekendmakingen.nl/stb-2018-424.html

Recorded check status: precisely dated same coordinator selected body reuse

Actual body read and exact pinpoint
Art. XXVIA, Wck 48(1)(b) old/new substitution. HTML; printed page not inspected; PDF index N/A.
Version, status, actor/scope and limits
Enacted change to municipal-contractor words. Specific effective date depends on S014. Overheid.nl > Officiële bekendmakingen
Direct source URLs
https://zoek.officielebekendmakingen.nl/stb-2018-424.html

Recorded coordinator check boundaries

coordinator check scope
XXVIA substitution from same-coordinator P01primary02 packet23:38:49Z; actual contracts held.
C_NL-P02-S014 Saved research record

C_NL-P02-S014 — Kroon, commencement, Staatsblad 2018, 425. https://zoek.officielebekendmakingen.nl/stb-2018-425.html

Recorded check status: precisely dated same coordinator selected body reuse

Actual body read and exact pinpoint
Art. II(1) with exclusions checked against II(2)–(3). HTML; printed page not inspected; PDF index N/A.
Version, status, actor/scope and limits
Art. XXVIA is not excluded; effective 1 Jan 2019. Published 22 Nov 2018, a distinct date. Overheid.nl > Officiële bekendmakingen
Direct source URLs
https://zoek.officielebekendmakingen.nl/stb-2018-425.html

Recorded coordinator check boundaries

coordinator check scope
II exclusions/commencement from same dated P01primary02 packet; later changes held.
C_NL-P02-S015 Saved research record

C_NL-P02-S015 — Kroon, Tijdelijk vrijstellingsbesluit schuldbemiddelaars, Staatsblad 1998, 454. https://zoek.officielebekendmakingen.nl/stb-1998-454.html

Recorded check status: fresh selected primary body checked with limits

Actual body read and exact pinpoint
Arts. 1–5, especially 2 (designated categories) and 4 (commencement/sunset); selected Nota van toelichting, introductory paragraphs. HTML; printed page not inspected; PDF index N/A.
Version, status, actor/scope and limits
Enacted historical art. 48(1)(d) designation. Issued 23 Jul 1998; commenced next day; sunset after two years. Its former registration/fee provisions are expired, not modern requirements. Overheid.nl > Officiële bekendmakingen
Direct source URLs
https://zoek.officielebekendmakingen.nl/stb-1998-454.html

Recorded coordinator check boundaries

coordinator check scope
Arts2/4 historical designation, conditional commencement and two-year sunset; no present designation proved.
C_NL-P02-S016 Saved research record

C_NL-P02-S016 — Dutch government internet consultation, Concept-Vrijstellingsbesluit schuldbemiddelaars. https://www.internetconsultatie.nl/vrijstellingsbesluit_schuldbemiddelaars/details

Recorded check status: researcher traceability only not freshly recertified

Actual body read and exact pinpoint
Consultation title, description, dates and status fields. HTML; printed page/PDF index N/A.
Version, status, actor/scope and limits
Consultation 11 Jul–28 Aug 2013, closed. Discovery of a proposal, not an enacted rule. internetconsultatie.nl
Direct source URLs
https://www.internetconsultatie.nl/vrijstellingsbesluit_schuldbemiddelaars/details

Recorded coordinator check boundaries

coordinator check scope
Original row, URL, subject and explicit access/proposal/currentness limits reconciled. Unopened body or current status not recertified.
C_NL-P02-S017 Saved research record

C_NL-P02-S017 — Government draft presented through Eerste Kamer, Besluit … houdende vrijstelling. https://www.eerstekamer.nl/overig/20140704/besluit_van_houdende_vrijstelling/document

Recorded check status: researcher traceability only not freshly recertified

Actual body read and exact pinpoint
Draft arts. 1–6, PDF indices 0–2, printed pagination not independently certified; blank decree formalities and projected commencement inspected.
Version, status, actor/scope and limits
17-page proposal, not a promulgated Staatsblad instrument. Draft fees, professional conditions and proposed start are nonoperative. Only identity/version/proposal status used. eerstekamer.nl
Direct source URLs
https://www.eerstekamer.nl/overig/20140704/besluit_van_houdende_vrijstelling/document

Recorded coordinator check boundaries

coordinator check scope
Original row, URL, subject and explicit access/proposal/currentness limits reconciled. Unopened body or current status not recertified.
C_NL-P02-S018 Saved research record

C_NL-P02-S018 — Dutch government communication to Tweede Kamer, Kamerstuk 34 509, nr. 1. https://zoek.officielebekendmakingen.nl/kst-34509-1.html

Recorded check status: researcher traceability only not freshly recertified

Actual body read and exact pinpoint
Section Tot slot, paragraphs discussing Vrijstellingsbesluit schuldbemiddelaars and deferral. HTML; printed page not inspected; PDF index N/A.
Version, status, actor/scope and limits
Official 2016 policy statement, not legislation or certification of 2026 decree status. Overheid.nl > Officiële bekendmakingen
Direct source URLs
https://zoek.officielebekendmakingen.nl/kst-34509-1.html

Recorded coordinator check boundaries

coordinator check scope
Original row, URL, subject and explicit access/proposal/currentness limits reconciled. Unopened body or current status not recertified.
C_NL-P02-S019 Saved research record

C_NL-P02-S019 — Overheid.nl legislative calendar, Wetsvoorstel schuldregelen, WGK012536. https://wetgevingskalender.overheid.nl/Regeling/WGK012536

Recorded check status: researcher traceability only not freshly recertified

Actual body read and exact pinpoint
Project summary, Voortgang, Mijlpalen en documenten; 2026 consultation dates. HTML; printed page/PDF index N/A.
Version, status, actor/scope and limits
Official live project listing accessed this pass; preparation-stage proposal, not Wck repeal. Future updates possible. Wetgevingskalender
Direct source URLs
https://wetgevingskalender.overheid.nl/Regeling/WGK012536

Recorded coordinator check boundaries

coordinator check scope
Original row, URL, subject and explicit access/proposal/currentness limits reconciled. Unopened body or current status not recertified.
C_NL-P02-S020 Saved research record

C_NL-P02-S020 — Government internet consultation, draft Wet schuldregelen. https://www.internetconsultatie.nl/wetschuldregelen/document/15794

Recorded check status: researcher traceability only not freshly recertified

Actual body read and exact pinpoint
Draft arts. 1–2, PDF indices 0–1; draft arts. 29–30, indices 6–7; separate printed pagination not independently established.
Version, status, actor/scope and limits
Eight-page consultation draft, not enacted. Proposed repeal and future commencement are not operative. Concept Regeling +1
Direct source URLs
https://www.internetconsultatie.nl/wetschuldregelen/document/15794

Recorded coordinator check boundaries

coordinator check scope
Original row, URL, subject and explicit access/proposal/currentness limits reconciled. Unopened body or current status not recertified.
C_NL-P02-S021 Saved research record

C_NL-P02-S021 — Staatssecretaris SZW, Regeling aanwijzing toezichthouder Wet op het consumentenkrediet, Staatscourant 2025, 40669. https://zoek.officielebekendmakingen.nl/stcrt-2025-40669.html

Recorded check status: fresh selected primary body checked with limits

Actual body read and exact pinpoint
Arts. 1–3 and explanatory paragraphs concerning transfer to DFEI. HTML; printed page not inspected; PDF index N/A.
Version, status, actor/scope and limits
Enacted ministerial supervisory designation, commenced 1 Jan 2026. Strong indication of ongoing regulatory treatment of arts. 47–48 at that date, not full current-text certification or proof of an art. 48(1)(d) decree. Overheid.nl > Officiële bekendmakingen
Direct source URLs
https://zoek.officielebekendmakingen.nl/stcrt-2025-40669.html

Recorded coordinator check boundaries

coordinator check scope
Arts1-3 selected supervisory designation and1Jan2026 start; not current Wck certification.
C_NL-P02-S022 Saved research record

C_NL-P02-S022 — Official wetten.overheid.nl, requested date-specific Wck consolidation. https://wetten.overheid.nl/BWBR0004815/2026-10-26

Recorded check status: failed body access remains non evidentiary

Actual body read and exact pinpoint
No substantive body obtained; retrieval returned an error. Printed page/PDF index N/A.
Version, status, actor/scope and limits
Failed access — non-evidentiary. The date in the requested URL is not proof the text was read, published or certified. Official Staatsblad enactments were used as the alternative; complete amendment-index reconciliation remains outstanding.
Direct source URLs
https://wetten.overheid.nl/BWBR0004815/2026-10-26

Recorded coordinator check boundaries

coordinator check scope
Researcher failure record preserved; coordinator did not repeat failed endpoint or certify absence of amendments.
C_NL-P02-S023 Saved research record

C_NL-P02-S023 — Eerste Kamer, parliamentary dossier 36.924, Implementatiewet herziene richtlijn consumentenkrediet. https://www.eerstekamer.nl/wetsvoorstel/36924_implementatiewet_herziene?df1=all&df2=kst

Recorded check status: researcher traceability only not freshly recertified

Actual body read and exact pinpoint
Stand van zaken, adopted Tweede Kamer vote 6 Oct 2026, Eerste Kamer scheduled committee step and proposed commencement. HTML; printed page/PDF index N/A.
Version, status, actor/scope and limits
Official pending parliamentary status as accessed; not a commenced enacted amendment. Not evidence of any current article 48 designation. Eerste Kamer der Staten-Generaal
Direct source URLs
https://www.eerstekamer.nl/wetsvoorstel/36924_implementatiewet_herziene?df1=all&df2=kst

Recorded coordinator check boundaries

coordinator check scope
Original row, URL, subject and explicit access/proposal/currentness limits reconciled. Unopened body or current status not recertified.
C_NL-P02-S024 Saved research record

C_NL-P02-S024 — Tweede Kamer, explanatory memorandum, Kamerstuk 36 924, nr. 3. https://zoek.officielebekendmakingen.nl/kst-36924-3.html

Recorded check status: researcher traceability only not freshly recertified

Actual body read and exact pinpoint
Explanatory section on schuldadviesdiensten, including its description of existing Wck 47–48 (body paragraphs around the discussion of credit banks and debt advice). HTML; printed page not separately inspected; PDF index N/A.
Version, status, actor/scope and limits
2026 legislative explanation, secondary to enacted text for current-law purposes. Used only as a dated governmental cross-check; not an enacted substitution or a complete 2026 Wck consolidation. Overheid.nl > Officiële bekendmakingen
Direct source URLs
https://zoek.officielebekendmakingen.nl/kst-36924-3.html

Recorded coordinator check boundaries

coordinator check scope
Original row, URL, subject and explicit access/proposal/currentness limits reconciled. Unopened body or current status not recertified.

What was examined—and what is still missing

The saved component-level coverage record keeps answered, partial, blank and unresolved branches distinct. A coverage label is not acceptance of a whole subject or jurisdiction.

K001 Saved research record

K001 Official Wck consolidation as of 26 Oct 2026

Recorded check status: recorded; no individual primary acceptance inferred

Coverage ID
K001
Exact subissue
Official Wck consolidation as of 26 Oct 2026
Status
unresolved
Finding / exact new claim IDs
§1 currentness; C_NL-P02-C015
Missing evidence and next focused action
Official body inaccessible. Obtain the government amendment-information table and 2026 consolidated arts. 1(a)/(n), 47, 48.

Recorded coordinator check boundaries

coordinator acceptance
explicit_partial_unresolved_or_excluded_hold_preserved
coordinator review
Actual row/claim links retained; a source-reconciliation or named word change does not clear full currentness, delegated instruments, professional practice, contracts or any country/locality.
K002 Saved research record

K002 Article 1(a)(1°), money-advance branch

Recorded check status: recorded; no individual primary acceptance inferred

Coverage ID
K002
Exact subissue
Article 1(a)(1°), money-advance branch
Status
partial
Finding / exact new claim IDs
§1.1; C_NL-P02-C001, C005, C015
Missing evidence and next focused action
Original branch read; complete subsequent wording not certified. Reconcile all article 1(a) amendments from official history.

Recorded coordinator check boundaries

coordinator acceptance
explicit_partial_unresolved_or_excluded_hold_preserved
coordinator review
Actual row/claim links retained; a source-reconciliation or named word change does not clear full currentness, delegated instruments, professional practice, contracts or any country/locality.
K003 Saved research record

K003 Article 1(a)(2°)–(3°), movable-property adjective

Recorded check status: recorded; no individual primary acceptance inferred

Coverage ID
K003
Exact subissue
Article 1(a)(2°)–(3°), movable-property adjective
Status
answered
Finding / exact new claim IDs
§1.1; C_NL-P02-C002
Missing evidence and next focused action
1991 change/date proved. Separately certify subsequent version history before using a complete present-text quotation.

Recorded coordinator check boundaries

coordinator acceptance
selected_findings_or_reported_status_scoped_not_country_acceptance
coordinator review
Actual row/claim links retained; a source-reconciliation or named word change does not clear full currentness, delegated instruments, professional practice, contracts or any country/locality.
K004 Saved research record

K004 Historical three-month credit-definition condition

Recorded check status: recorded; no individual primary acceptance inferred

Coverage ID
K004
Exact subissue
Historical three-month credit-definition condition
Status
answered
Finding / exact new claim IDs
§1.1; C_NL-P02-C001
Missing evidence and next focused action
Deletion and commencement proved. Must not extrapolate to every earlier agreement.

Recorded coordinator check boundaries

coordinator acceptance
selected_findings_or_reported_status_scoped_not_country_acceptance
coordinator review
Actual row/claim links retained; a source-reconciliation or named word change does not clear full currentness, delegated instruments, professional practice, contracts or any country/locality.
K005 Saved research record

K005 Pre-commencement credit agreements

Recorded check status: recorded; no individual primary acceptance inferred

Coverage ID
K005
Exact subissue
Pre-commencement credit agreements
Status
partial
Finding / exact new claim IDs
§1.1; C_NL-P02-C003
Missing evidence and next focused action
Statutory transition read. Next: separately analyze the applicable agreement date and the cross-time article 47 interpretation; no individual contract reviewed.

Recorded coordinator check boundaries

coordinator acceptance
explicit_partial_unresolved_or_excluded_hold_preserved
coordinator review
Actual row/claim links retained; a source-reconciliation or named word change does not clear full currentness, delegated instruments, professional practice, contracts or any country/locality.
K006 Saved research record

K006 Services designated for Wck 1(a)(2°)/(3°)

Recorded check status: recorded; no individual primary acceptance inferred

Coverage ID
K006
Exact subissue
Services designated for Wck 1(a)(2°)/(3°)
Status
partial
Finding / exact new claim IDs
§1.1; C_NL-P02-C004
Missing evidence and next focused action
Original 1991 AMvB read; retrieve 2026 consolidation and all modifications/commencement.

Recorded coordinator check boundaries

coordinator acceptance
explicit_partial_unresolved_or_excluded_hold_preserved
coordinator review
Actual row/claim links retained; a source-reconciliation or named word change does not clear full currentness, delegated instruments, professional practice, contracts or any country/locality.
K007 Saved research record

K007 Retained article 1(n), gemeentelijke kredietbank

Recorded check status: recorded; no individual primary acceptance inferred

Coverage ID
K007
Exact subissue
Retained article 1(n), gemeentelijke kredietbank
Status
partial
Finding / exact new claim IDs
§1.5; C_NL-P02-C010, C015
Missing evidence and next focused action
Original definition and 2017 retention established; check later changes to its wording.

Recorded coordinator check boundaries

coordinator acceptance
explicit_partial_unresolved_or_excluded_hold_preserved
coordinator review
Actual row/claim links retained; a source-reconciliation or named word change does not clear full currentness, delegated instruments, professional practice, contracts or any country/locality.
K008 Saved research record

K008 Article 47(1) prohibition

Recorded check status: recorded; no individual primary acceptance inferred

Coverage ID
K008
Exact subissue
Article 47(1) prohibition
Status
partial
Finding / exact new claim IDs
§1.2; C_NL-P02-C005, C014–C015
Missing evidence and next focused action
Original text and 2026 supervisory continuity read; verify complete amended text.

Recorded coordinator check boundaries

coordinator acceptance
explicit_partial_unresolved_or_excluded_hold_preserved
coordinator review
Actual row/claim links retained; a source-reconciliation or named word change does not clear full currentness, delegated instruments, professional practice, contracts or any country/locality.
K009 Saved research record

K009 Article 47(2) professional activity/natural-person/credit-derived elements

Recorded check status: recorded; no individual primary acceptance inferred

Coverage ID
K009
Exact subissue
Article 47(2) professional activity/natural-person/credit-derived elements
Status
partial
Finding / exact new claim IDs
§1.2; C_NL-P02-C001–C005, C015
Missing evidence and next focused action
Linked definition corrected; current complete body and judicial application held.

Recorded coordinator check boundaries

coordinator acceptance
explicit_partial_unresolved_or_excluded_hold_preserved
coordinator review
Actual row/claim links retained; a source-reconciliation or named word change does not clear full currentness, delegated instruments, professional practice, contracts or any country/locality.
K010 Saved research record

K010 Article 48(1)(a), om niet

Recorded check status: recorded; no individual primary acceptance inferred

Coverage ID
K010
Exact subissue
Article 48(1)(a), om niet
Status
partial
Finding / exact new claim IDs
§1.3; C_NL-P02-C006, C015
Missing evidence and next focused action
Original exception read. Indirect benefit, third-party payment and mixed-fee interpretation explicitly held.

Recorded coordinator check boundaries

coordinator acceptance
explicit_partial_unresolved_or_excluded_hold_preserved
coordinator review
Actual row/claim links retained; a source-reconciliation or named word change does not clear full currentness, delegated instruments, professional practice, contracts or any country/locality.
K011 Saved research record

K011 Article 48(1)(b), municipal contractor

Recorded check status: recorded; no individual primary acceptance inferred

Coverage ID
K011
Exact subissue
Article 48(1)(b), municipal contractor
Status
answered
Finding / exact new claim IDs
§1.3; C_NL-P02-C009
Missing evidence and next focused action
Exact 2019 amendment proved. Municipal instructions, expense account and individual contractor documents not examined.

Recorded coordinator check boundaries

coordinator acceptance
selected_findings_or_reported_status_scoped_not_country_acceptance
coordinator review
Actual row/claim links retained; a source-reconciliation or named word change does not clear full currentness, delegated instruments, professional practice, contracts or any country/locality.
K012 Saved research record

K012 Article 48(1)(c), professions/appointments

Recorded check status: recorded; no individual primary acceptance inferred

Coverage ID
K012
Exact subissue
Article 48(1)(c), professions/appointments
Status
answered
Finding / exact new claim IDs
§1.3; C_NL-P02-C008
Missing evidence and next focused action
Exact 2008 and 2014 word changes proved. Professional admission, appointments and delegation remain separate.

Recorded coordinator check boundaries

coordinator acceptance
selected_findings_or_reported_status_scoped_not_country_acceptance
coordinator review
Actual row/claim links retained; a source-reconciliation or named word change does not clear full currentness, delegated instruments, professional practice, contracts or any country/locality.
K013 Saved research record

K013 Article 48(1)(d), operative designated classes

Recorded check status: recorded; no individual primary acceptance inferred

Coverage ID
K013
Exact subissue
Article 48(1)(d), operative designated classes
Status
unresolved
Finding / exact new claim IDs
§3.4; C_NL-P02-C016
Missing evidence and next focused action
Locate and read every presently operative linked AMvB, if any, with commencement and expiry.

Recorded coordinator check boundaries

coordinator acceptance
explicit_partial_unresolved_or_excluded_hold_preserved
coordinator review
Actual row/claim links retained; a source-reconciliation or named word change does not clear full currentness, delegated instruments, professional practice, contracts or any country/locality.
K014 Saved research record

K014 Article 48(2), certificate-enabling language

Recorded check status: recorded; no individual primary acceptance inferred

Coverage ID
K014
Exact subissue
Article 48(2), certificate-enabling language
Status
answered
Finding / exact new claim IDs
§1.4; C_NL-P02-C007
Missing evidence and next focused action
Statutory authority verified. Separate implementing requirement unresolved.

Recorded coordinator check boundaries

coordinator acceptance
selected_findings_or_reported_status_scoped_not_country_acceptance
coordinator review
Actual row/claim links retained; a source-reconciliation or named word change does not clear full currentness, delegated instruments, professional practice, contracts or any country/locality.
K015 Saved research record

K015 Article 48(2), fee-rule delegation

Recorded check status: recorded; no individual primary acceptance inferred

Coverage ID
K015
Exact subissue
Article 48(2), fee-rule delegation
Status
partial
Finding / exact new claim IDs
§1.4; C_NL-P02-C006–C007, C016
Missing evidence and next focused action
Historical delegation understood; operative conditions not verified. Consumer fee amounts/timing/caps remain excluded.

Recorded coordinator check boundaries

coordinator acceptance
explicit_partial_unresolved_or_excluded_hold_preserved
coordinator review
Actual row/claim links retained; a source-reconciliation or named word change does not clear full currentness, delegated instruments, professional practice, contracts or any country/locality.
K016 Saved research record

K016 Article 48(3), contractual departures

Recorded check status: recorded; no individual primary acceptance inferred

Coverage ID
K016
Exact subissue
Article 48(3), contractual departures
Status
partial
Finding / exact new claim IDs
§1.4; C_NL-P02-C006, C015
Missing evidence and next focused action
Historical conditional rule read. No current implementing rule or particular contract examined.

Recorded coordinator check boundaries

coordinator acceptance
explicit_partial_unresolved_or_excluded_hold_preserved
coordinator review
Actual row/claim links retained; a source-reconciliation or named word change does not clear full currentness, delegated instruments, professional practice, contracts or any country/locality.
K017 Saved research record

K017 Historical Wck arts. 2–4 after 2017 repeal

Recorded check status: recorded; no individual primary acceptance inferred

Coverage ID
K017
Exact subissue
Historical Wck arts. 2–4 after 2017 repeal
Status
answered
Finding / exact new claim IDs
§1.5; C_NL-P02-C010
Missing evidence and next focused action
Repeal established. Other statutes' exclusions require separate research; old Wck provisions must not be revived by implication.

Recorded coordinator check boundaries

coordinator acceptance
selected_findings_or_reported_status_scoped_not_country_acceptance
coordinator review
Actual row/claim links retained; a source-reconciliation or named word change does not clear full currentness, delegated instruments, professional practice, contracts or any country/locality.
K018 Saved research record

K018 1991 movable-property amendment and start

Recorded check status: recorded; no individual primary acceptance inferred

Coverage ID
K018
Exact subissue
1991 movable-property amendment and start
Status
answered
Finding / exact new claim IDs
§2; C_NL-P02-C002
Missing evidence and next focused action
Art. I(A) and VII read. No further action for these enactment facts.

Recorded coordinator check boundaries

coordinator acceptance
selected_findings_or_reported_status_scoped_not_country_acceptance
coordinator review
Actual row/claim links retained; a source-reconciliation or named word change does not clear full currentness, delegated instruments, professional practice, contracts or any country/locality.
K019 Saved research record

K019 2007 certificate-power amendment and start

Recorded check status: recorded; no individual primary acceptance inferred

Coverage ID
K019
Exact subissue
2007 certificate-power amendment and start
Status
answered
Finding / exact new claim IDs
§2; C_NL-P02-C007
Missing evidence and next focused action
Art. ID and separate 2008 commencement read. Implementing decree is K031.

Recorded coordinator check boundaries

coordinator acceptance
selected_findings_or_reported_status_scoped_not_country_acceptance
coordinator review
Actual row/claim links retained; a source-reconciliation or named word change does not clear full currentness, delegated instruments, professional practice, contracts or any country/locality.
K020 Saved research record

K020 2008 procureurs deletion and start

Recorded check status: recorded; no individual primary acceptance inferred

Coverage ID
K020
Exact subissue
2008 procureurs deletion and start
Status
answered
Finding / exact new claim IDs
§2; C_NL-P02-C008
Missing evidence and next focused action
Art. XLVI and 1 Sep 2008 decree read.

Recorded coordinator check boundaries

coordinator acceptance
selected_findings_or_reported_status_scoped_not_country_acceptance
coordinator review
Actual row/claim links retained; a source-reconciliation or named word change does not clear full currentness, delegated instruments, professional practice, contracts or any country/locality.
K021 Saved research record

K021 2011 three-month deletion, issue date, transition and start

Recorded check status: recorded; no individual primary acceptance inferred

Coverage ID
K021
Exact subissue
2011 three-month deletion, issue date, transition and start
Status
answered
Finding / exact new claim IDs
§2; C_NL-P02-C001, C003
Missing evidence and next focused action
Relevant enacted clauses checked. Case-level interpretation still held separately at K005.

Recorded coordinator check boundaries

coordinator acceptance
selected_findings_or_reported_status_scoped_not_country_acceptance
coordinator review
Actual row/claim links retained; a source-reconciliation or named word change does not clear full currentness, delegated instruments, professional practice, contracts or any country/locality.
K022 Saved research record

K022 2013 professional wording and actual commencement

Recorded check status: recorded; no individual primary acceptance inferred

Coverage ID
K022
Exact subissue
2013 professional wording and actual commencement
Status
answered
Finding / exact new claim IDs
§2; C_NL-P02-C008
Missing evidence and next focused action
2013 art. III and 2014 commencement read.

Recorded coordinator check boundaries

coordinator acceptance
selected_findings_or_reported_status_scoped_not_country_acceptance
coordinator review
Actual row/claim links retained; a source-reconciliation or named word change does not clear full currentness, delegated instruments, professional practice, contracts or any country/locality.
K023 Saved research record

K023 2016 retained definitions/chapter repeal and start

Recorded check status: recorded; no individual primary acceptance inferred

Coverage ID
K023
Exact subissue
2016 retained definitions/chapter repeal and start
Status
answered
Finding / exact new claim IDs
§2; C_NL-P02-C010
Missing evidence and next focused action
Act and commencement read. Does not certify every retained-definition change.

Recorded coordinator check boundaries

coordinator acceptance
selected_findings_or_reported_status_scoped_not_country_acceptance
coordinator review
Actual row/claim links retained; a source-reconciliation or named word change does not clear full currentness, delegated instruments, professional practice, contracts or any country/locality.
K024 Saved research record

K024 2018 municipal substitution and 2019 start

Recorded check status: recorded; no individual primary acceptance inferred

Coverage ID
K024
Exact subissue
2018 municipal substitution and 2019 start
Status
answered
Finding / exact new claim IDs
§2; C_NL-P02-C009
Missing evidence and next focused action
Act plus exceptions in commencement decree read.

Recorded coordinator check boundaries

coordinator acceptance
selected_findings_or_reported_status_scoped_not_country_acceptance
coordinator review
Actual row/claim links retained; a source-reconciliation or named word change does not clear full currentness, delegated instruments, professional practice, contracts or any country/locality.
K025 Saved research record

K025 Exhaustive post-1990/post-2019 amendment chain

Recorded check status: recorded; no individual primary acceptance inferred

Coverage ID
K025
Exact subissue
Exhaustive post-1990/post-2019 amendment chain
Status
unresolved
Finding / exact new claim IDs
§1 currentness; C_NL-P02-C015
Missing evidence and next focused action
Retrieve full official Wck amendment index, amending articles, corrections, commencement orders and consolidations through the access date.

Recorded coordinator check boundaries

coordinator acceptance
explicit_partial_unresolved_or_excluded_hold_preserved
coordinator review
Actual row/claim links retained; a source-reconciliation or named word change does not clear full currentness, delegated instruments, professional practice, contracts or any country/locality.
K026 Saved research record

K026 2026 proposed Wet schuldregelen repeal/reform

Recorded check status: recorded; no individual primary acceptance inferred

Coverage ID
K026
Exact subissue
2026 proposed Wet schuldregelen repeal/reform
Status
answered
Finding / exact new claim IDs
§3.3; C_NL-P02-C013
Missing evidence and next focused action
Current proposal status, draft repeal and future-start mechanism verified. Monitor future enactment/commencement separately.

Recorded coordinator check boundaries

coordinator acceptance
selected_findings_or_reported_status_scoped_not_country_acceptance
coordinator review
Actual row/claim links retained; a source-reconciliation or named word change does not clear full currentness, delegated instruments, professional practice, contracts or any country/locality.
K027 Saved research record

K027 2026 consumer-credit implementation bill 36.924

Recorded check status: recorded; no individual primary acceptance inferred

Coverage ID
K027
Exact subissue
2026 consumer-credit implementation bill 36.924
Status
answered
Finding / exact new claim IDs
§3.3; C_NL-P02-C013
Missing evidence and next focused action
Official pending parliamentary status verified. Any later enacted text and commencement require a new check.

Recorded coordinator check boundaries

coordinator acceptance
selected_findings_or_reported_status_scoped_not_country_acceptance
coordinator review
Actual row/claim links retained; a source-reconciliation or named word change does not clear full currentness, delegated instruments, professional practice, contracts or any country/locality.
K028 Saved research record

K028 1998 temporary designation and expiry

Recorded check status: recorded; no individual primary acceptance inferred

Coverage ID
K028
Exact subissue
1998 temporary designation and expiry
Status
answered
Finding / exact new claim IDs
§3.1; C_NL-P02-C011
Missing evidence and next focused action
Enacted articles, commencement trigger and self-expiry read. No basis to apply former fee rules in 2026.

Recorded coordinator check boundaries

coordinator acceptance
selected_findings_or_reported_status_scoped_not_country_acceptance
coordinator review
Actual row/claim links retained; a source-reconciliation or named word change does not clear full currentness, delegated instruments, professional practice, contracts or any country/locality.
K029 Saved research record

K029 2013 consultation, 2014 draft, 2016 deferral

Recorded check status: recorded; no individual primary acceptance inferred

Coverage ID
K029
Exact subissue
2013 consultation, 2014 draft, 2016 deferral
Status
answered
Finding / exact new claim IDs
§3.2; C_NL-P02-C012
Missing evidence and next focused action
Historical proposal status proved. This does not answer whether another later instrument exists.

Recorded coordinator check boundaries

coordinator acceptance
selected_findings_or_reported_status_scoped_not_country_acceptance
coordinator review
Actual row/claim links retained; a source-reconciliation or named word change does not clear full currentness, delegated instruments, professional practice, contracts or any country/locality.
K030 Saved research record

K030 Present operative 48(1)(d) designation

Recorded check status: recorded; no individual primary acceptance inferred

Coverage ID
K030
Exact subissue
Present operative 48(1)(d) designation
Status
unresolved
Finding / exact new claim IDs
§3.4; C_NL-P02-C016
Missing evidence and next focused action
Obtain official linked subordinate instruments as of Oct 2026 and confirm every operative designation provision.

Recorded coordinator check boundaries

coordinator acceptance
explicit_partial_unresolved_or_excluded_hold_preserved
coordinator review
Actual row/claim links retained; a source-reconciliation or named word change does not clear full currentness, delegated instruments, professional practice, contracts or any country/locality.
K031 Saved research record

K031 Present certificate requirement, category or certification authority

Recorded check status: recorded; no individual primary acceptance inferred

Coverage ID
K031
Exact subissue
Present certificate requirement, category or certification authority
Status
unresolved
Finding / exact new claim IDs
§3.4; C_NL-P02-C007, C016
Missing evidence and next focused action
Locate implementing AMvB, if any; read its conditions, scope, start, amendments and expiry before asserting a requirement.

Recorded coordinator check boundaries

coordinator acceptance
explicit_partial_unresolved_or_excluded_hold_preserved
coordinator review
Actual row/claim links retained; a source-reconciliation or named word change does not clear full currentness, delegated instruments, professional practice, contracts or any country/locality.
K032 Saved research record

K032 Six identified P01 claim replacements/limitations

Recorded check status: recorded; no individual primary acceptance inferred

Coverage ID
K032
Exact subissue
Six identified P01 claim replacements/limitations
Status
answered
Finding / exact new claim IDs
§6; C_NL-P02-C001–C016, individually mapped to P01-C001/C002/C003/C008/C012/C044
Missing evidence and next focused action
This is researcher reconciliation, not coordinator acceptance. Do not alter the remaining 42 claim records.

Recorded coordinator check boundaries

coordinator acceptance
selected_findings_or_reported_status_scoped_not_country_acceptance
coordinator review
Actual row/claim links retained; a source-reconciliation or named word change does not clear full currentness, delegated instruments, professional practice, contracts or any country/locality.
K033 Saved research record

K033 Application issues outside current-text reconciliation

Recorded check status: recorded; no individual primary acceptance inferred

Coverage ID
K033
Exact subissue
Application issues outside current-text reconciliation
Status
excluded_with_reason
Finding / exact new claim IDs
§§1–3; C_NL-P02-C015–C016 establish the source/instrument holds, not application conclusions
Missing evidence and next focused action
Indirect remuneration, staff delegation, actual contractor contracts, cross-border nexus, creditor response, debtor funds, fees/remedies and judicial interpretation belong to other scoped work.

Recorded coordinator check boundaries

coordinator acceptance
explicit_partial_unresolved_or_excluded_hold_preserved
coordinator review
Actual row/claim links retained; a source-reconciliation or named word change does not clear full currentness, delegated instruments, professional practice, contracts or any country/locality.
coverage-34 Saved research record

A01 original targeted row reconciliation remains held

Recorded check status: recorded; no individual primary acceptance inferred

Original targeted row
A01
Status
unresolved
Exact claim supported now
C_NL-P02-C015 establishes the cross-cutting currentness hold
Missing evidence and exact disposition action
Read saved A01 body; identify its exact assertion and append only matching C001–C016 correction.

Recorded coordinator check boundaries

coordinator acceptance
literal_original_row_locally_reconciled_with_continuing_substantive_holds
coordinator review
Actual row/claim links retained; a source-reconciliation or named word change does not clear full currentness, delegated instruments, professional practice, contracts or any country/locality.
coverage-35 Saved research record

A02 original targeted row reconciliation remains held

Recorded check status: recorded; no individual primary acceptance inferred

Original targeted row
A02
Status
unresolved
Exact claim supported now
C_NL-P02-C015
Missing evidence and exact disposition action
Read saved A02 body; check whether it repeats original article 1(a) wording or timing; map the specific amendment if present.

Recorded coordinator check boundaries

coordinator acceptance
literal_original_row_locally_reconciled_with_continuing_substantive_holds
coordinator review
Actual row/claim links retained; a source-reconciliation or named word change does not clear full currentness, delegated instruments, professional practice, contracts or any country/locality.
coverage-36 Saved research record

A03 original targeted row reconciliation remains held

Recorded check status: recorded; no individual primary acceptance inferred

Original targeted row
A03
Status
unresolved
Exact claim supported now
C_NL-P02-C015
Missing evidence and exact disposition action
Read saved A03 body; test whether municipal or exception wording is asserted; preserve unchanged material.

Recorded coordinator check boundaries

coordinator acceptance
literal_original_row_locally_reconciled_with_continuing_substantive_holds
coordinator review
Actual row/claim links retained; a source-reconciliation or named word change does not clear full currentness, delegated instruments, professional practice, contracts or any country/locality.
coverage-37 Saved research record

A07 original targeted row reconciliation remains held

Recorded check status: recorded; no individual primary acceptance inferred

Original targeted row
A07
Status
unresolved
Exact claim supported now
C_NL-P02-C015
Missing evidence and exact disposition action
Read saved A07 body; test the article 48 enabling and implementing-instrument distinction if implicated.

Recorded coordinator check boundaries

coordinator acceptance
literal_original_row_locally_reconciled_with_continuing_substantive_holds
coordinator review
Actual row/claim links retained; a source-reconciliation or named word change does not clear full currentness, delegated instruments, professional practice, contracts or any country/locality.
coverage-38 Saved research record

A08 original targeted row reconciliation remains held

Recorded check status: recorded; no individual primary acceptance inferred

Original targeted row
A08
Status
unresolved
Exact claim supported now
C_NL-P02-C015
Missing evidence and exact disposition action
Read saved A08 body; check retained definitions and historical exclusions only if that is its actual subject.

Recorded coordinator check boundaries

coordinator acceptance
literal_original_row_locally_reconciled_with_continuing_substantive_holds
coordinator review
Actual row/claim links retained; a source-reconciliation or named word change does not clear full currentness, delegated instruments, professional practice, contracts or any country/locality.
coverage-39 Saved research record

A10 original targeted row reconciliation remains held

Recorded check status: recorded; no individual primary acceptance inferred

Original targeted row
A10
Status
unresolved
Exact claim supported now
C_NL-P02-C015
Missing evidence and exact disposition action
Read saved A10 body; determine precise actor/exception statement before making any replacement.

Recorded coordinator check boundaries

coordinator acceptance
literal_original_row_locally_reconciled_with_continuing_substantive_holds
coordinator review
Actual row/claim links retained; a source-reconciliation or named word change does not clear full currentness, delegated instruments, professional practice, contracts or any country/locality.
coverage-40 Saved research record

A18 original targeted row reconciliation remains held

Recorded check status: recorded; no individual primary acceptance inferred

Original targeted row
A18
Status
unresolved
Exact claim supported now
C_NL-P02-C015
Missing evidence and exact disposition action
Read saved A18 body; test professional wording and dates only if contained there.

Recorded coordinator check boundaries

coordinator acceptance
literal_original_row_locally_reconciled_with_continuing_substantive_holds
coordinator review
Actual row/claim links retained; a source-reconciliation or named word change does not clear full currentness, delegated instruments, professional practice, contracts or any country/locality.
coverage-41 Saved research record

A35 original targeted row reconciliation remains held

Recorded check status: recorded; no individual primary acceptance inferred

Original targeted row
A35
Status
unresolved
Exact claim supported now
C_NL-P02-C015
Missing evidence and exact disposition action
Read saved A35 body; distinguish a negative registration/licence conclusion from an unverified designation or certificate instrument.

Recorded coordinator check boundaries

coordinator acceptance
literal_original_row_locally_reconciled_with_continuing_substantive_holds
coordinator review
Actual row/claim links retained; a source-reconciliation or named word change does not clear full currentness, delegated instruments, professional practice, contracts or any country/locality.

Corrections, review and scope

Read the evidence with its boundaries. These are saved research components, including revisions. A scoped coordinator review checks selected evidence; it does not certify every claim, a complete jurisdiction, current law or individual applicability. Dates and access limits remain attached to the records.

How to read the research →

No currently queued material correction is mapped to this component. This does not remove its currentness, access, jurisdiction or application limits.

Recorded review disposition

targeted enactment supplements corrected currentness application held

Other components in this research series

Record integrity

Original saved Markdown SHA-256: 2a2c69ea367e31508f72ff8a5215b875b43db237b7c57b807789c9364a03add0. Public formatting, private-reference removal and correction annotations are separate from that immutable original.

Get debt settlement help