What should you know about Washington utility arrears?
What to know
A utility shutoff question depends on the provider, service type, notice and household circumstances. Check payment arrangements, any protected period or medical process, and the complaint route without assuming that all utilities use the same rules.
Use this Washington guide to separate the rules that apply to your situation. Each section keeps the operative requirement together with its conditions and source, so a dollar amount, time period or legal remedy is not detached from the facts that make it apply.
Research recorded October 28, 2026. Each section preserves the source’s scope, dates and exceptions.
Who and what the rules cover
The UTC has statutory authority over covered public-service utility operations and to adopt implementing rules; the electric/gas consumer chapters expressly require commission jurisdiction.
Sources for this passage (7)
Source: app.leg.wa.gov; app.leg.wa.gov; app.leg.wa.gov; app.leg.wa.gov; app.leg.wa.gov; app.leg.wa.gov; app.leg.wa.gov. §80.01.040; §80.04.160; / -023. Actual provider/service jurisdiction is not established.
The gas chapter’s utility definition requires commission jurisdiction, a Washington gas plant and public compensated gas service. Natural gas is a defined subset of the chapter’s broader “gas” category.
Sources for this passage (20)
Source: app.leg.wa.gov; app.leg.wa.gov; app.leg.wa.gov; app.leg.wa.gov; app.leg.wa.gov; app.leg.wa.gov; app.leg.wa.gov; app.leg.wa.gov; app.leg.wa.gov; lawfilesext.leg.wa.gov; lawfilesext.leg.wa.gov; app.leg.wa.gov; lawfilesext.leg.wa.gov; lawfilesext.leg.wa.gov; lawfilesext.leg.wa.gov; lawfilesext.leg.wa.gov; lawfilesext.leg.wa.gov; lawfilesext.leg.wa.gov; commerce.wa.gov; commerce.wa.gov. §80.04.010(14)–(15); complete gas/natural-gas/utility definitions. Other fuels are not completed here.
These chapters define a business day as Monday–Friday, 8 a.m.–5 p.m., excluding official state holidays.
Sources for this passage (17)
Source: app.leg.wa.gov; app.leg.wa.gov; app.leg.wa.gov; app.leg.wa.gov; app.leg.wa.gov; app.leg.wa.gov; lawfilesext.leg.wa.gov; lawfilesext.leg.wa.gov; app.leg.wa.gov; lawfilesext.leg.wa.gov; lawfilesext.leg.wa.gov; lawfilesext.leg.wa.gov; lawfilesext.leg.wa.gov; lawfilesext.leg.wa.gov; lawfilesext.leg.wa.gov; commerce.wa.gov; commerce.wa.gov. /. This does not convert an unqualified “day” into a business day or supply every computation rule.
Covered charges must be just, fair, reasonable and sufficient; covered service and utility rules must meet the statute’s safety, adequacy and reasonableness standards.
Sources for this passage (4)
Source: app.leg.wa.gov; app.leg.wa.gov; app.leg.wa.gov; app.leg.wa.gov. §80.28.010(1)–(3), (11). No rate reasonableness or service-entitlement determination is made.
The residential “prior obligation” rule limits refusal of new/additional service because of billed debt existing at a prior nonpayment disconnection; deposits are excluded from that defined amount.
Sources for this passage (17)
Source: app.leg.wa.gov; app.leg.wa.gov; app.leg.wa.gov; app.leg.wa.gov; app.leg.wa.gov; app.leg.wa.gov; lawfilesext.leg.wa.gov; lawfilesext.leg.wa.gov; app.leg.wa.gov; lawfilesext.leg.wa.gov; lawfilesext.leg.wa.gov; lawfilesext.leg.wa.gov; lawfilesext.leg.wa.gov; lawfilesext.leg.wa.gov; lawfilesext.leg.wa.gov; commerce.wa.gov; commerce.wa.gov. (3); (2). Winter-plan-default customers are expressly excepted. Fee/deposit conditions remain subject to C017.
Bills must meet the prescribed issuance interval and identify the amount due, delinquency date, contact information, usage/read information, applicable charges and required tax/proration/estimate information.
Sources for this passage (17)
Source: app.leg.wa.gov; app.leg.wa.gov; app.leg.wa.gov; app.leg.wa.gov; app.leg.wa.gov; app.leg.wa.gov; lawfilesext.leg.wa.gov; lawfilesext.leg.wa.gov; app.leg.wa.gov; lawfilesext.leg.wa.gov; lawfilesext.leg.wa.gov; lawfilesext.leg.wa.gov; lawfilesext.leg.wa.gov; lawfilesext.leg.wa.gov; lawfilesext.leg.wa.gov; commerce.wa.gov; commerce.wa.gov. /(1). Electric units and gas units differ. Content does not prove correct usage or a lawful amount.
The ordinary bill-payment minimum is measured from mailing, with different inside/outside WA–OR–ID periods; a satisfactory reason requires accommodation of a changed due date before the next billing date.
Sources for this passage (17)
Source: app.leg.wa.gov; app.leg.wa.gov; app.leg.wa.gov; app.leg.wa.gov; app.leg.wa.gov; app.leg.wa.gov; lawfilesext.leg.wa.gov; lawfilesext.leg.wa.gov; app.leg.wa.gov; lawfilesext.leg.wa.gov; lawfilesext.leg.wa.gov; lawfilesext.leg.wa.gov; lawfilesext.leg.wa.gov; lawfilesext.leg.wa.gov; lawfilesext.leg.wa.gov; commerce.wa.gov; commerce.wa.gov. /(2)–(3). Receipt is not substituted for mailing.
A qualifying billing correction must use the rates applicable during the affected billing periods and be issued within sixty days of discovery.
Sources for this passage (17)
Source: app.leg.wa.gov; app.leg.wa.gov; app.leg.wa.gov; app.leg.wa.gov; app.leg.wa.gov; app.leg.wa.gov; lawfilesext.leg.wa.gov; lawfilesext.leg.wa.gov; app.leg.wa.gov; lawfilesext.leg.wa.gov; lawfilesext.leg.wa.gov; lawfilesext.leg.wa.gov; lawfilesext.leg.wa.gov; lawfilesext.leg.wa.gov; lawfilesext.leg.wa.gov; commerce.wa.gov; commerce.wa.gov. /(5)(a). Meter failure, malfunction, unassigned usage and other inaccurate/unbilled usage are covered as defined.
Specified interference/illegal-connection/fraud underbilling is excepted from the six-month restriction; nonresidential good-cause extensions are a separate branch; recovery of underbilling below fifty dollars may be forgone.
Sources for this passage (17)
Source: app.leg.wa.gov; app.leg.wa.gov; app.leg.wa.gov; app.leg.wa.gov; app.leg.wa.gov; app.leg.wa.gov; lawfilesext.leg.wa.gov; lawfilesext.leg.wa.gov; app.leg.wa.gov; lawfilesext.leg.wa.gov; lawfilesext.leg.wa.gov; lawfilesext.leg.wa.gov; lawfilesext.leg.wa.gov; lawfilesext.leg.wa.gov; lawfilesext.leg.wa.gov; commerce.wa.gov; commerce.wa.gov. /(7). Nonresidential flexibility is not imported into ordinary residential billing. “Below” is strict.
Corrected-bill information must explain the reason, monthly breakdown, total correction, covered period and applicable payment-arrangement availability.
Sources for this passage (17)
Source: app.leg.wa.gov; app.leg.wa.gov; app.leg.wa.gov; app.leg.wa.gov; app.leg.wa.gov; app.leg.wa.gov; lawfilesext.leg.wa.gov; lawfilesext.leg.wa.gov; app.leg.wa.gov; lawfilesext.leg.wa.gov; lawfilesext.leg.wa.gov; lawfilesext.leg.wa.gov; lawfilesext.leg.wa.gov; lawfilesext.leg.wa.gov; lawfilesext.leg.wa.gov; commerce.wa.gov; commerce.wa.gov. /(6), incorporating -138(1). An explanation does not establish that the correction is accurate.
A compliant estimated-reading true-up is not treated as a corrected bill under -178(5)(a).
Sources for this passage (17)
Source: app.leg.wa.gov; app.leg.wa.gov; app.leg.wa.gov; app.leg.wa.gov; app.leg.wa.gov; app.leg.wa.gov; lawfilesext.leg.wa.gov; lawfilesext.leg.wa.gov; app.leg.wa.gov; lawfilesext.leg.wa.gov; lawfilesext.leg.wa.gov; lawfilesext.leg.wa.gov; lawfilesext.leg.wa.gov; lawfilesext.leg.wa.gov; lawfilesext.leg.wa.gov; commerce.wa.gov; commerce.wa.gov. /(8), with (1)(i). The classification predicate must be established before applying this exception.
Additional-test charges depend on tariff authority and a finding within the incorporated accuracy tolerance; an out-of-tolerance additional test cannot be charged under this clause.
Sources for this passage (17)
Source: app.leg.wa.gov; app.leg.wa.gov; app.leg.wa.gov; app.leg.wa.gov; app.leg.wa.gov; app.leg.wa.gov; lawfilesext.leg.wa.gov; lawfilesext.leg.wa.gov; app.leg.wa.gov; lawfilesext.leg.wa.gov; lawfilesext.leg.wa.gov; lawfilesext.leg.wa.gov; lawfilesext.leg.wa.gov; lawfilesext.leg.wa.gov; lawfilesext.leg.wa.gov; commerce.wa.gov; commerce.wa.gov. /(3), -338. Full technical incorporation and actual accuracy remain held.
An excessive meter error triggers repair/replacement without customer cost and adjustment using the best available information, subject to the complete adjustment framework.
Sources for this passage (17)
Source: app.leg.wa.gov; app.leg.wa.gov; app.leg.wa.gov; app.leg.wa.gov; app.leg.wa.gov; app.leg.wa.gov; lawfilesext.leg.wa.gov; lawfilesext.leg.wa.gov; app.leg.wa.gov; lawfilesext.leg.wa.gov; lawfilesext.leg.wa.gov; lawfilesext.leg.wa.gov; lawfilesext.leg.wa.gov; lawfilesext.leg.wa.gov; lawfilesext.leg.wa.gov; commerce.wa.gov; commerce.wa.gov. /(5), -178; . The -183 payment-arrangement reference is to -138(2), while -178(6)(e) refers to -138(1).
The 2016 adoption order explains that the newer underbilling restriction also limits collection after an older meter-test rule identifies an earlier defective-meter date.
Sources for this passage (17)
Source: app.leg.wa.gov; app.leg.wa.gov; app.leg.wa.gov; app.leg.wa.gov; app.leg.wa.gov; app.leg.wa.gov; lawfilesext.leg.wa.gov; lawfilesext.leg.wa.gov; app.leg.wa.gov; lawfilesext.leg.wa.gov; lawfilesext.leg.wa.gov; lawfilesext.leg.wa.gov; lawfilesext.leg.wa.gov; lawfilesext.leg.wa.gov; lawfilesext.leg.wa.gov; commerce.wa.gov; commerce.wa.gov. ¶¶28–31, Appendix B; current /(5). Formal agency explanation established; full judicial construction and other adjustment issues remain open.
Delayed residential billing requires a payment-arrangement length equal to the delay, subject to the stated unauthorized-use exception.
Sources for this passage (17)
Source: app.leg.wa.gov; app.leg.wa.gov; app.leg.wa.gov; app.leg.wa.gov; app.leg.wa.gov; app.leg.wa.gov; lawfilesext.leg.wa.gov; lawfilesext.leg.wa.gov; app.leg.wa.gov; lawfilesext.leg.wa.gov; lawfilesext.leg.wa.gov; lawfilesext.leg.wa.gov; lawfilesext.leg.wa.gov; lawfilesext.leg.wa.gov; lawfilesext.leg.wa.gov; commerce.wa.gov; commerce.wa.gov. /(1). Its citation to -128(2)(f) is stale; that subsection now concerns detrimental equipment. Do not silently substitute a new exception pointer.
A dispatched disconnection representative must accept delinquent-account payment; change need not be supplied, but overpayment must be credited.
Sources for this passage (17)
Source: app.leg.wa.gov; app.leg.wa.gov; app.leg.wa.gov; app.leg.wa.gov; app.leg.wa.gov; app.leg.wa.gov; lawfilesext.leg.wa.gov; lawfilesext.leg.wa.gov; app.leg.wa.gov; lawfilesext.leg.wa.gov; lawfilesext.leg.wa.gov; lawfilesext.leg.wa.gov; lawfilesext.leg.wa.gov; lawfilesext.leg.wa.gov; lawfilesext.leg.wa.gov; commerce.wa.gov; commerce.wa.gov. /(4)(h). A tariff-mentioned visit fee remains subject to C017 and actual tariff authority.
Gas remote disconnection and reconnection require commission authorization under the respective rules.
Sources for this passage (16)
Source: app.leg.wa.gov; app.leg.wa.gov; app.leg.wa.gov; app.leg.wa.gov; app.leg.wa.gov; lawfilesext.leg.wa.gov; lawfilesext.leg.wa.gov; app.leg.wa.gov; lawfilesext.leg.wa.gov; lawfilesext.leg.wa.gov; lawfilesext.leg.wa.gov; lawfilesext.leg.wa.gov; lawfilesext.leg.wa.gov; lawfilesext.leg.wa.gov; commerce.wa.gov; commerce.wa.gov. (6), -133(2). No authorization or actual remote capability was investigated.
The statutory heat route permits a nonpayment-disconnected residential user to request reconnection; the utility must promptly make a reasonable attempt and may require a compliant payment plan.
Sources for this passage (4)
Source: app.leg.wa.gov; app.leg.wa.gov; app.leg.wa.gov; app.leg.wa.gov. §.010(9). The approved notice/request process and actual request are unestablished; no guaranteed physical restoration time is invented.
Both electric and gas rules require tariff conditions under which nonvoluntary disconnections cease during inclement weather.
Sources for this passage (17)
Source: app.leg.wa.gov; app.leg.wa.gov; app.leg.wa.gov; app.leg.wa.gov; app.leg.wa.gov; app.leg.wa.gov; lawfilesext.leg.wa.gov; lawfilesext.leg.wa.gov; app.leg.wa.gov; lawfilesext.leg.wa.gov; lawfilesext.leg.wa.gov; lawfilesext.leg.wa.gov; lawfilesext.leg.wa.gov; lawfilesext.leg.wa.gov; lawfilesext.leg.wa.gov; commerce.wa.gov; commerce.wa.gov. /(11). No actual tariff was read; no temperature threshold, statewide gas heat moratorium or universal winter shutdown is inferred.
The commission may require reconnection pending a dispute over the propriety of disconnection.
Sources for this passage (17)
Source: app.leg.wa.gov; app.leg.wa.gov; app.leg.wa.gov; app.leg.wa.gov; app.leg.wa.gov; app.leg.wa.gov; lawfilesext.leg.wa.gov; lawfilesext.leg.wa.gov; app.leg.wa.gov; lawfilesext.leg.wa.gov; lawfilesext.leg.wa.gov; lawfilesext.leg.wa.gov; lawfilesext.leg.wa.gov; lawfilesext.leg.wa.gov; lawfilesext.leg.wa.gov; commerce.wa.gov; commerce.wa.gov. /(3). A request or informal complaint is not itself such an order.
A complete court-overcharge recovery pathway is not established: RCW 80.04.240 contains a special exclusive procedure and deadline provisions that remain outside this pass’s limitation/court scope.
Sources for this passage (4)
Source: app.leg.wa.gov; app.leg.wa.gov; app.leg.wa.gov; app.leg.wa.gov. §.240, read to preserve this boundary. No deadline, election or cumulative-recovery conclusion.
Payment at a designated agency counts under the disconnection rule when the customer informs the utility and the utility verifies it; verification must be prompt.
Sources for this passage (17)
Source: app.leg.wa.gov; app.leg.wa.gov; app.leg.wa.gov; app.leg.wa.gov; app.leg.wa.gov; app.leg.wa.gov; lawfilesext.leg.wa.gov; lawfilesext.leg.wa.gov; app.leg.wa.gov; lawfilesext.leg.wa.gov; lawfilesext.leg.wa.gov; lawfilesext.leg.wa.gov; lawfilesext.leg.wa.gov; lawfilesext.leg.wa.gov; lawfilesext.leg.wa.gov; commerce.wa.gov; commerce.wa.gov. /(9). Dispatch, deposit of funds and verified payment are not treated as identical events.
WSR 20-16-077 expressly adopted the identified amendments with an August 29, 2020 effective date.
Source: lawfilesext.leg.wa.gov; lawfilesext.leg.wa.gov; app.leg.wa.gov. filing notice, ¶¶25–28 and selected adopted clauses. Publication in a later Register issue is not a different effective date.
WSR 16-06-038 expressly adopted the billing-correction amendments effective March 25, 2016.
Source: lawfilesext.leg.wa.gov; lawfilesext.leg.wa.gov. header, adoption/effect provisions and Appendix B. Current -178 was also separately read.
The 2023 heat/winter changes are enacted text with the session law’s stated July 23, 2023 effective date.
Sources for this passage (5)
Source: lawfilesext.leg.wa.gov; app.leg.wa.gov; app.leg.wa.gov; app.leg.wa.gov; app.leg.wa.gov. cover and §6; current . No application to an invented historical event.
Stale rule references remain visible in the current text and must not be silently repaired.
Sources for this passage (17)
Source: app.leg.wa.gov; app.leg.wa.gov; app.leg.wa.gov; app.leg.wa.gov; app.leg.wa.gov; app.leg.wa.gov; lawfilesext.leg.wa.gov; lawfilesext.leg.wa.gov; app.leg.wa.gov; lawfilesext.leg.wa.gov; lawfilesext.leg.wa.gov; lawfilesext.leg.wa.gov; lawfilesext.leg.wa.gov; lawfilesext.leg.wa.gov; lawfilesext.leg.wa.gov; commerce.wa.gov; commerce.wa.gov. /’s -128(2) reference; -138(1)’s -128(2)(f); -183(3)’s -128(9); -183(5)’s -138(2) compared with -178(6)(e)’s -138(1).
No complete federal, local, tribal, public-provider, tariff, disability or judicial-construction conclusion is supplied.
Deliberate scope boundary and B001–B030. Only the state text’s express incorporations are identified.
Agreements, records and consent
RCW 80.04.500 restricts UTC orders affecting specified city/town utility rates, charges, contracts and service; it does not declare all Title 80 provisions inapplicable to municipal utilities.
Sources for this passage (4)
Source: app.leg.wa.gov; app.leg.wa.gov; app.leg.wa.gov; app.leg.wa.gov. §.500, complete paragraph. Its separate safety wording is narrower than its rate/service wording; no complete municipal gas-safety regime is determined.
Electronic billing and related communications require the specified affirmative consent, records and format safeguards; electronic timing is treated as mailing from Washington.
Sources for this passage (17)
Source: app.leg.wa.gov; app.leg.wa.gov; app.leg.wa.gov; app.leg.wa.gov; app.leg.wa.gov; app.leg.wa.gov; lawfilesext.leg.wa.gov; lawfilesext.leg.wa.gov; app.leg.wa.gov; lawfilesext.leg.wa.gov; lawfilesext.leg.wa.gov; lawfilesext.leg.wa.gov; lawfilesext.leg.wa.gov; lawfilesext.leg.wa.gov; lawfilesext.leg.wa.gov; commerce.wa.gov; commerce.wa.gov. /(4), -179 introduction, (1)–(3). Separate services require separate affirmative consent.
Disconnection notices and specified winter-protection information cannot be delivered solely electronically. Ordinary electronic-document paper-request limits do not erase that requirement.
Sources for this passage (17)
Source: app.leg.wa.gov; app.leg.wa.gov; app.leg.wa.gov; app.leg.wa.gov; app.leg.wa.gov; app.leg.wa.gov; lawfilesext.leg.wa.gov; lawfilesext.leg.wa.gov; app.leg.wa.gov; lawfilesext.leg.wa.gov; lawfilesext.leg.wa.gov; lawfilesext.leg.wa.gov; lawfilesext.leg.wa.gov; lawfilesext.leg.wa.gov; lawfilesext.leg.wa.gov; commerce.wa.gov; commerce.wa.gov. /(4)–(6); -128(4). Specialized-format disputed billing must be understandable to the reviewer.
Undeliverable electronic information triggers corrective communication and, if unresolved, paper delivery and return to mail notification under the rule’s alternative time branches.
Sources for this passage (17)
Source: app.leg.wa.gov; app.leg.wa.gov; app.leg.wa.gov; app.leg.wa.gov; app.leg.wa.gov; app.leg.wa.gov; lawfilesext.leg.wa.gov; lawfilesext.leg.wa.gov; app.leg.wa.gov; lawfilesext.leg.wa.gov; lawfilesext.leg.wa.gov; lawfilesext.leg.wa.gov; lawfilesext.leg.wa.gov; lawfilesext.leg.wa.gov; lawfilesext.leg.wa.gov; commerce.wa.gov; commerce.wa.gov. /(7). A sent electronic message is not assumed received.
The second notice combines an electronic copy where contact information/consent exist with one authorized door, mail or telephone branch.
Sources for this passage (17)
Source: app.leg.wa.gov; app.leg.wa.gov; app.leg.wa.gov; app.leg.wa.gov; app.leg.wa.gov; app.leg.wa.gov; lawfilesext.leg.wa.gov; lawfilesext.leg.wa.gov; app.leg.wa.gov; lawfilesext.leg.wa.gov; lawfilesext.leg.wa.gov; lawfilesext.leg.wa.gov; lawfilesext.leg.wa.gov; lawfilesext.leg.wa.gov; lawfilesext.leg.wa.gov; commerce.wa.gov; commerce.wa.gov. /(4)(a)(ii). Electronic consent does not eliminate the prescribed other branch.
Telephone second notice requires at least two attempts during regular business hours, the prescribed lead time and retained call records; unsuccessful actual contact requires paper fallback.
Sources for this passage (17)
Source: app.leg.wa.gov; app.leg.wa.gov; app.leg.wa.gov; app.leg.wa.gov; app.leg.wa.gov; app.leg.wa.gov; lawfilesext.leg.wa.gov; lawfilesext.leg.wa.gov; app.leg.wa.gov; lawfilesext.leg.wa.gov; lawfilesext.leg.wa.gov; lawfilesext.leg.wa.gov; lawfilesext.leg.wa.gov; lawfilesext.leg.wa.gov; lawfilesext.leg.wa.gov; commerce.wa.gov; commerce.wa.gov. /(4)(a)(ii)(C). An attempted call alone does not complete every branch.
A qualifying verbal or written medical notification triggers a five-business-day postponement/reinstatement grace period when residential service is subject to disconnection or has been disconnected.
Sources for this passage (17)
Source: app.leg.wa.gov; app.leg.wa.gov; app.leg.wa.gov; app.leg.wa.gov; app.leg.wa.gov; app.leg.wa.gov; lawfilesext.leg.wa.gov; lawfilesext.leg.wa.gov; app.leg.wa.gov; lawfilesext.leg.wa.gov; lawfilesext.leg.wa.gov; lawfilesext.leg.wa.gov; lawfilesext.leg.wa.gov; lawfilesext.leg.wa.gov; lawfilesext.leg.wa.gov; commerce.wa.gov; commerce.wa.gov. /(8), opening paragraph. The condition must require continued electricity/gas; no condition label is treated as sufficient.
Medical/low-income status falls within account-and-usage information; utility safeguards, limited collection/use/disclosure and consent requirements apply, with express lawful-demand and other exceptions.
Sources for this passage (17)
Source: app.leg.wa.gov; app.leg.wa.gov; app.leg.wa.gov; app.leg.wa.gov; app.leg.wa.gov; app.leg.wa.gov; lawfilesext.leg.wa.gov; lawfilesext.leg.wa.gov; app.leg.wa.gov; lawfilesext.leg.wa.gov; lawfilesext.leg.wa.gov; lawfilesext.leg.wa.gov; lawfilesext.leg.wa.gov; lawfilesext.leg.wa.gov; lawfilesext.leg.wa.gov; commerce.wa.gov; commerce.wa.gov. / and -153(1)–(8). RCW 19.29A/19.255, special-contract and federal medical/disability interfaces are not fully completed. No absolute-confidentiality claim.
Amounts, fees and calculations
Present authority to collect residential deposits and identified late/disconnection/reconnection/site fees is not fully authenticated in this pass.
Source: app.leg.wa.gov; app.leg.wa.gov; lawfilesext.leg.wa.gov. Current / text; agenda; failed official suspension-announcement route F006. This is a currentness hold, not a finding that every listed charge is currently allowed or currently forbidden.
No general numerical residential late-fee, returned-payment or collection-charge amount was established from the selected generic provisions. Payment-allocation priority beyond express clauses also remains unestablished.
Sources for this passage (21)
Source: app.leg.wa.gov; app.leg.wa.gov; app.leg.wa.gov; app.leg.wa.gov; app.leg.wa.gov; app.leg.wa.gov; app.leg.wa.gov; app.leg.wa.gov; app.leg.wa.gov; app.leg.wa.gov; lawfilesext.leg.wa.gov; lawfilesext.leg.wa.gov; app.leg.wa.gov; lawfilesext.leg.wa.gov; lawfilesext.leg.wa.gov; lawfilesext.leg.wa.gov; lawfilesext.leg.wa.gov; lawfilesext.leg.wa.gov; lawfilesext.leg.wa.gov; commerce.wa.gov; commerce.wa.gov. §§.050/.080; / -178, -195; C017. Unknown amounts are not unlimited-charge permission; combined-service attribution is not a complete partial-payment allocation rule.
Electric remote nonpayment disconnection has a morning-only window, same-day payment/restoration opportunity, particular pre-disconnection visit duties and a no-site/no-fee rule.
Sources for this passage (17)
Source: app.leg.wa.gov; app.leg.wa.gov; app.leg.wa.gov; app.leg.wa.gov; app.leg.wa.gov; app.leg.wa.gov; lawfilesext.leg.wa.gov; lawfilesext.leg.wa.gov; app.leg.wa.gov; lawfilesext.leg.wa.gov; lawfilesext.leg.wa.gov; lawfilesext.leg.wa.gov; lawfilesext.leg.wa.gov; lawfilesext.leg.wa.gov; lawfilesext.leg.wa.gov; commerce.wa.gov; commerce.wa.gov. (6). Critical-infrastructure incorporation and actual implementation remain held.
The statutory winter required-payment ceiling combines seven percent of monthly income with one-twelfth of qualifying post-application arrearage.
Sources for this passage (4)
Source: app.leg.wa.gov; app.leg.wa.gov; app.leg.wa.gov; app.leg.wa.gov. §.010(4)(e). Older -143 wording uses “billings” in one sentence and “past-due amounts” in another; exact reconciliation is held rather than silently broadening the statutory base.
Agreement to pay a higher winter percentage does not make a payment below that voluntary promise a default unless it falls below the statutory threshold.
Sources for this passage (21)
Source: app.leg.wa.gov; app.leg.wa.gov; app.leg.wa.gov; app.leg.wa.gov; app.leg.wa.gov; app.leg.wa.gov; app.leg.wa.gov; app.leg.wa.gov; app.leg.wa.gov; app.leg.wa.gov; lawfilesext.leg.wa.gov; lawfilesext.leg.wa.gov; app.leg.wa.gov; lawfilesext.leg.wa.gov; lawfilesext.leg.wa.gov; lawfilesext.leg.wa.gov; lawfilesext.leg.wa.gov; lawfilesext.leg.wa.gov; lawfilesext.leg.wa.gov; commerce.wa.gov; commerce.wa.gov. §.010(4)(e); /(1)(e). No payment amount or income supplied.
Utilities must assist with winter requirements and provide the required information/plan; the WAC requires same-service-area plan transfer and recalculation when qualifying assistance is received.
Sources for this passage (21)
Source: app.leg.wa.gov; app.leg.wa.gov; app.leg.wa.gov; app.leg.wa.gov; app.leg.wa.gov; app.leg.wa.gov; app.leg.wa.gov; app.leg.wa.gov; app.leg.wa.gov; app.leg.wa.gov; lawfilesext.leg.wa.gov; lawfilesext.leg.wa.gov; app.leg.wa.gov; lawfilesext.leg.wa.gov; lawfilesext.leg.wa.gov; lawfilesext.leg.wa.gov; lawfilesext.leg.wa.gov; lawfilesext.leg.wa.gov; lawfilesext.leg.wa.gov; commerce.wa.gov; commerce.wa.gov. §.010(5); /(1)(f), (2). The statute’s transfer authorization and rule’s duty are identified separately.
A payment plan required under the heat-reconnection branch cannot require monthly payments exceeding six percent of monthly income; its May 15 target can extend as specified to preserve that ceiling.
Sources for this passage (4)
Source: app.leg.wa.gov; app.leg.wa.gov; app.leg.wa.gov; app.leg.wa.gov. §.010(10). Voluntary higher payments, the lower default threshold and later-assistance reformulation are expressly preserved.
Medical protection does not excuse delinquent or ongoing charges; the rule permits the specified ten-percent payment, remaining-balance arrangement within 120 days and ongoing-bill promise, while forbidding demands exceeding the prescribed requirements.
Sources for this passage (17)
Source: app.leg.wa.gov; app.leg.wa.gov; app.leg.wa.gov; app.leg.wa.gov; app.leg.wa.gov; app.leg.wa.gov; lawfilesext.leg.wa.gov; lawfilesext.leg.wa.gov; app.leg.wa.gov; lawfilesext.leg.wa.gov; lawfilesext.leg.wa.gov; lawfilesext.leg.wa.gov; lawfilesext.leg.wa.gov; lawfilesext.leg.wa.gov; lawfilesext.leg.wa.gov; commerce.wa.gov; commerce.wa.gov. /(8)(c). Alternate plans may be agreed. “Minimum” wording is read together with the no-more-than-prescribed sentence.
Electric disconnection/reconnection fees are prohibited by the specified clauses when no site visit is required.
Sources for this passage (17)
Source: app.leg.wa.gov; app.leg.wa.gov; app.leg.wa.gov; app.leg.wa.gov; app.leg.wa.gov; app.leg.wa.gov; lawfilesext.leg.wa.gov; lawfilesext.leg.wa.gov; app.leg.wa.gov; lawfilesext.leg.wa.gov; lawfilesext.leg.wa.gov; lawfilesext.leg.wa.gov; lawfilesext.leg.wa.gov; lawfilesext.leg.wa.gov; lawfilesext.leg.wa.gov; commerce.wa.gov; commerce.wa.gov. (6)(e), -133(2). This is an express codified no-fee rule, not permission to charge whenever a visit occurs.
The reparations statute requires investigation and specified findings of an excessive/exorbitant charge and entitlement before the commission orders the excess with interest from collection.
Sources for this passage (4)
Source: app.leg.wa.gov; app.leg.wa.gov; app.leg.wa.gov; app.leg.wa.gov. §.220. Interest rate and completed recovery procedure are not established here.
The 2026 original reenacts the operative winter/heat provisions and substitutes encouragement concerning savings from reporting removal.
Sources for this passage (5)
Source: lawfilesext.leg.wa.gov; app.leg.wa.gov; app.leg.wa.gov; app.leg.wa.gov; app.leg.wa.gov. §8 and cover; §.010(14). Effective June 11, 2026 as stated; encouragement is not an approved assistance award.
The 2026 fee/customer-notice agenda is planning material and does not prove adoption, suspension expiration or present fee authority.
Source: lawfilesext.leg.wa.gov. relevant agenda row. Projected dates are not accomplished legal events.
The current operative LIHEAP-plan threshold incorporated by the winter statute was not authenticated.
Source: commerce.wa.gov; commerce.wa.gov. guide; draft announcement; failed linked plan routes F008/F009. No guide figure substituted.
The procedure, notice and response
Ownership or operation of a cogeneration facility alone does not establish public-service-company status.
Sources for this passage (4)
Source: app.leg.wa.gov; app.leg.wa.gov; app.leg.wa.gov; app.leg.wa.gov. §80.04.010(23). This is not a blanket landlord, master-meter or private-generation exclusion.
PUD electric rate and service authority has an express statutory independence from UTC jurisdiction.
Source: app.leg.wa.gov. §54.16.040, complete section. The UTC arrears rules therefore are not transferred to PUD service merely because it is residential electricity.
The read cooperative statutes preserve locally regulated electric-utility categories and do not confer new UTC rate/service jurisdiction.
Source: app.leg.wa.gov; app.leg.wa.gov; app.leg.wa.gov. §54.48.040; §23.86.400(2)–(3); §24.06.600(2)–(3). A cooperative label alone does not finish legal classification.
Inconsistent tariff provisions are not automatically validated by filing or acceptance. Rule exemptions require the specified commission process, and statutory duties remain.
Sources for this passage (17)
Source: app.leg.wa.gov; app.leg.wa.gov; app.leg.wa.gov; app.leg.wa.gov; app.leg.wa.gov; app.leg.wa.gov; lawfilesext.leg.wa.gov; lawfilesext.leg.wa.gov; app.leg.wa.gov; lawfilesext.leg.wa.gov; lawfilesext.leg.wa.gov; lawfilesext.leg.wa.gov; lawfilesext.leg.wa.gov; lawfilesext.leg.wa.gov; lawfilesext.leg.wa.gov; commerce.wa.gov; commerce.wa.gov. / -008, -013; . RCW 80.28.010(12) separately prevents an oral/written agreement from waiving that chapter’s protections.
The filed-and-effective schedule supplies the general rate/charge baseline, subject to the statute’s express exceptions and uniform-treatment provision.
Sources for this passage (21)
Source: app.leg.wa.gov; app.leg.wa.gov; app.leg.wa.gov; app.leg.wa.gov; app.leg.wa.gov; app.leg.wa.gov; app.leg.wa.gov; app.leg.wa.gov; app.leg.wa.gov; app.leg.wa.gov; lawfilesext.leg.wa.gov; lawfilesext.leg.wa.gov; app.leg.wa.gov; lawfilesext.leg.wa.gov; lawfilesext.leg.wa.gov; lawfilesext.leg.wa.gov; lawfilesext.leg.wa.gov; lawfilesext.leg.wa.gov; lawfilesext.leg.wa.gov; commerce.wa.gov; commerce.wa.gov. §§.050, .080(1)–(2); /. Listed free/reduced-rate exceptions were read; the utility-theft damages incorporation is not a completed ordinary-arrears fee pathway.
The electric application rule permits resale only as authorized by tariff; the gas application rule prohibits customer remetering/submetering for resale.
Sources for this passage (17)
Source: app.leg.wa.gov; app.leg.wa.gov; app.leg.wa.gov; app.leg.wa.gov; app.leg.wa.gov; app.leg.wa.gov; lawfilesext.leg.wa.gov; lawfilesext.leg.wa.gov; app.leg.wa.gov; lawfilesext.leg.wa.gov; lawfilesext.leg.wa.gov; lawfilesext.leg.wa.gov; lawfilesext.leg.wa.gov; lawfilesext.leg.wa.gov; lawfilesext.leg.wa.gov; commerce.wa.gov; commerce.wa.gov. /. This is a rule for covered utility service, not a completed landlord-rebilling or tenancy analysis.
Refusal of new/additional service is governed by enumerated safety, standards, protective-device, rights-of-way and other conditions, with commission approval required for the additional refusal route.
Sources for this passage (21)
Source: app.leg.wa.gov; app.leg.wa.gov; app.leg.wa.gov; app.leg.wa.gov; app.leg.wa.gov; app.leg.wa.gov; app.leg.wa.gov; app.leg.wa.gov; app.leg.wa.gov; app.leg.wa.gov; lawfilesext.leg.wa.gov; lawfilesext.leg.wa.gov; app.leg.wa.gov; lawfilesext.leg.wa.gov; lawfilesext.leg.wa.gov; lawfilesext.leg.wa.gov; lawfilesext.leg.wa.gov; lawfilesext.leg.wa.gov; lawfilesext.leg.wa.gov; commerce.wa.gov; commerce.wa.gov. (1)–(2), (5)–(6); (1), (4)–(5); §.110. Technical incorporations and the initiative-dependent gas branch remain held.
For fractional billing periods, the default proration rules distinguish flat-rate service from metered service and the full basic/minimum charge.
Sources for this passage (17)
Source: app.leg.wa.gov; app.leg.wa.gov; app.leg.wa.gov; app.leg.wa.gov; app.leg.wa.gov; app.leg.wa.gov; lawfilesext.leg.wa.gov; lawfilesext.leg.wa.gov; app.leg.wa.gov; lawfilesext.leg.wa.gov; lawfilesext.leg.wa.gov; lawfilesext.leg.wa.gov; lawfilesext.leg.wa.gov; lawfilesext.leg.wa.gov; lawfilesext.leg.wa.gov; commerce.wa.gov; commerce.wa.gov. /(1)(h). Express tariff variation remains possible; no amount calculated.
Estimated billing must be identified, use a tariff-described method and observe the four-consecutive-month restriction unless a listed exception applies.
Sources for this passage (17)
Source: app.leg.wa.gov; app.leg.wa.gov; app.leg.wa.gov; app.leg.wa.gov; app.leg.wa.gov; app.leg.wa.gov; lawfilesext.leg.wa.gov; lawfilesext.leg.wa.gov; app.leg.wa.gov; lawfilesext.leg.wa.gov; lawfilesext.leg.wa.gov; lawfilesext.leg.wa.gov; lawfilesext.leg.wa.gov; lawfilesext.leg.wa.gov; lawfilesext.leg.wa.gov; commerce.wa.gov; commerce.wa.gov. /(1)(i): inclement weather, terrain or a previous customer arrangement.
The codified existing-customer deposit grounds are at least three delinquency notices in the prior twelve months, nonpayment disconnection, or the stated indebted prior customer living at the residence.
Sources for this passage (17)
Source: app.leg.wa.gov; app.leg.wa.gov; app.leg.wa.gov; app.leg.wa.gov; app.leg.wa.gov; app.leg.wa.gov; lawfilesext.leg.wa.gov; lawfilesext.leg.wa.gov; app.leg.wa.gov; lawfilesext.leg.wa.gov; lawfilesext.leg.wa.gov; lawfilesext.leg.wa.gov; lawfilesext.leg.wa.gov; lawfilesext.leg.wa.gov; lawfilesext.leg.wa.gov; commerce.wa.gov; commerce.wa.gov. /(1). Codified criteria only; C017 remains controlling as a hold.
The deposit installment option is half before service and the remainder in equal amounts over the next two months on mutually agreed dates; other mutually acceptable arrangements are permitted.
Sources for this passage (17)
Source: app.leg.wa.gov; app.leg.wa.gov; app.leg.wa.gov; app.leg.wa.gov; app.leg.wa.gov; app.leg.wa.gov; lawfilesext.leg.wa.gov; lawfilesext.leg.wa.gov; app.leg.wa.gov; lawfilesext.leg.wa.gov; lawfilesext.leg.wa.gov; lawfilesext.leg.wa.gov; lawfilesext.leg.wa.gov; lawfilesext.leg.wa.gov; lawfilesext.leg.wa.gov; commerce.wa.gov; commerce.wa.gov. /(4). It is not proof that a deposit may presently be demanded.
Satisfactory-payment release requires twelve consecutive months, no initiated disconnection process and no more than two delinquency notices; termination release permits the stated amount-due offset.
Sources for this passage (17)
Source: app.leg.wa.gov; app.leg.wa.gov; app.leg.wa.gov; app.leg.wa.gov; app.leg.wa.gov; app.leg.wa.gov; lawfilesext.leg.wa.gov; lawfilesext.leg.wa.gov; app.leg.wa.gov; lawfilesext.leg.wa.gov; lawfilesext.leg.wa.gov; lawfilesext.leg.wa.gov; lawfilesext.leg.wa.gov; lawfilesext.leg.wa.gov; lawfilesext.leg.wa.gov; commerce.wa.gov; commerce.wa.gov. /(10). Collection suspension does not establish that an existing held deposit has no interest/refund duties.
Deposit demand timing after service and satisfactory-payment refund methods have distinct mailing/delivery and billing-month triggers.
Sources for this passage (17)
Source: app.leg.wa.gov; app.leg.wa.gov; app.leg.wa.gov; app.leg.wa.gov; app.leg.wa.gov; app.leg.wa.gov; lawfilesext.leg.wa.gov; lawfilesext.leg.wa.gov; app.leg.wa.gov; lawfilesext.leg.wa.gov; lawfilesext.leg.wa.gov; lawfilesext.leg.wa.gov; lawfilesext.leg.wa.gov; lawfilesext.leg.wa.gov; lawfilesext.leg.wa.gov; commerce.wa.gov; commerce.wa.gov. /(8), (11). Quantities are registered below; the fifteen-day satisfactory-payment check rule is not declared a universal termination-refund deadline.
Tariff-change notice depends on classification under -194 versus -195. A -195 notice accompanying the first bill after an effective change does not independently authorize the charge.
Sources for this passage (21)
Source: app.leg.wa.gov; app.leg.wa.gov; app.leg.wa.gov; app.leg.wa.gov; app.leg.wa.gov; app.leg.wa.gov; app.leg.wa.gov; app.leg.wa.gov; app.leg.wa.gov; app.leg.wa.gov; lawfilesext.leg.wa.gov; lawfilesext.leg.wa.gov; app.leg.wa.gov; lawfilesext.leg.wa.gov; lawfilesext.leg.wa.gov; lawfilesext.leg.wa.gov; lawfilesext.leg.wa.gov; lawfilesext.leg.wa.gov; lawfilesext.leg.wa.gov; commerce.wa.gov; commerce.wa.gov. / through -197; §.060. Electric “per-occurrence” wording and gas purchased-gas-adjustment exceptions are not flattened into one rule.
Delinquent covered-service charges are a codified notice-based ground, subject to the medical and maintained winter-plan exceptions and other applicable protections.
Sources for this passage (17)
Source: app.leg.wa.gov; app.leg.wa.gov; app.leg.wa.gov; app.leg.wa.gov; app.leg.wa.gov; app.leg.wa.gov; lawfilesext.leg.wa.gov; lawfilesext.leg.wa.gov; app.leg.wa.gov; lawfilesext.leg.wa.gov; lawfilesext.leg.wa.gov; lawfilesext.leg.wa.gov; lawfilesext.leg.wa.gov; lawfilesext.leg.wa.gov; lawfilesext.leg.wa.gov; commerce.wa.gov; commerce.wa.gov. /(2)(a). Inclusion of “required deposit” does not overcome C017.
Nonregulated-service debt is not a disconnection ground under -128(3); combined gas/electric accounts require a reason attributable to the service being disconnected and distinct identification of affected services.
Sources for this passage (17)
Source: app.leg.wa.gov; app.leg.wa.gov; app.leg.wa.gov; app.leg.wa.gov; app.leg.wa.gov; app.leg.wa.gov; lawfilesext.leg.wa.gov; lawfilesext.leg.wa.gov; app.leg.wa.gov; lawfilesext.leg.wa.gov; lawfilesext.leg.wa.gov; lawfilesext.leg.wa.gov; lawfilesext.leg.wa.gov; lawfilesext.leg.wa.gov; lawfilesext.leg.wa.gov; commerce.wa.gov; commerce.wa.gov. /(3), (4)(e). Neither every fee nor every combined-account balance is classified here.
Notices must identify cause, regulated-service amount, avoidance/assistance/payment information, relevant charges and utility contact information; winter and electric-remote notices have additional content.
Sources for this passage (21)
Source: app.leg.wa.gov; app.leg.wa.gov; app.leg.wa.gov; app.leg.wa.gov; app.leg.wa.gov; app.leg.wa.gov; app.leg.wa.gov; app.leg.wa.gov; app.leg.wa.gov; app.leg.wa.gov; lawfilesext.leg.wa.gov; lawfilesext.leg.wa.gov; app.leg.wa.gov; lawfilesext.leg.wa.gov; lawfilesext.leg.wa.gov; lawfilesext.leg.wa.gov; lawfilesext.leg.wa.gov; lawfilesext.leg.wa.gov; lawfilesext.leg.wa.gov; commerce.wa.gov; commerce.wa.gov. /(4)(b); §.010(5)(a), (9)(a). No notice was prepared or evaluated.
Inaccurate/incomplete notices require correction and necessary date recalculation; failure to disconnect within the stated ten-business-day window requires restarting notices unless a payment arrangement was agreed.
Sources for this passage (17)
Source: app.leg.wa.gov; app.leg.wa.gov; app.leg.wa.gov; app.leg.wa.gov; app.leg.wa.gov; app.leg.wa.gov; lawfilesext.leg.wa.gov; lawfilesext.leg.wa.gov; app.leg.wa.gov; lawfilesext.leg.wa.gov; lawfilesext.leg.wa.gov; lawfilesext.leg.wa.gov; lawfilesext.leg.wa.gov; lawfilesext.leg.wa.gov; lawfilesext.leg.wa.gov; commerce.wa.gov; commerce.wa.gov. /(4)(c)–(d). The gas wording’s cross-reference to required information differs from the electric wording; no factual sufficiency determination follows.
Different billing/service users and master-meter occupants have additional notification protections; the specified service-user request triggers at least five extra days.
Sources for this passage (17)
Source: app.leg.wa.gov; app.leg.wa.gov; app.leg.wa.gov; app.leg.wa.gov; app.leg.wa.gov; app.leg.wa.gov; lawfilesext.leg.wa.gov; lawfilesext.leg.wa.gov; app.leg.wa.gov; lawfilesext.leg.wa.gov; lawfilesext.leg.wa.gov; lawfilesext.leg.wa.gov; lawfilesext.leg.wa.gov; lawfilesext.leg.wa.gov; lawfilesext.leg.wa.gov; commerce.wa.gov; commerce.wa.gov. /(4)(f), (i). This regulates the covered utility’s conduct, not the complete landlord/tenant relationship.
Third-party designation must be offered; specified incapacity concerns require reasonable inquiry, third-party notice and the additional delay.
Sources for this passage (17)
Source: app.leg.wa.gov; app.leg.wa.gov; app.leg.wa.gov; app.leg.wa.gov; app.leg.wa.gov; app.leg.wa.gov; lawfilesext.leg.wa.gov; lawfilesext.leg.wa.gov; app.leg.wa.gov; lawfilesext.leg.wa.gov; lawfilesext.leg.wa.gov; lawfilesext.leg.wa.gov; lawfilesext.leg.wa.gov; lawfilesext.leg.wa.gov; lawfilesext.leg.wa.gov; commerce.wa.gov; commerce.wa.gov. /(4)(k). No incapacity or responsible agency is presumed.
Listed licensed/certified medical-facility categories require notice to the specified state department and customer, with a request-dependent delay; electric remote disconnection is additionally restricted.
Sources for this passage (17)
Source: app.leg.wa.gov; app.leg.wa.gov; app.leg.wa.gov; app.leg.wa.gov; app.leg.wa.gov; app.leg.wa.gov; lawfilesext.leg.wa.gov; lawfilesext.leg.wa.gov; app.leg.wa.gov; lawfilesext.leg.wa.gov; lawfilesext.leg.wa.gov; lawfilesext.leg.wa.gov; lawfilesext.leg.wa.gov; lawfilesext.leg.wa.gov; lawfilesext.leg.wa.gov; commerce.wa.gov; commerce.wa.gov. /(4)(j). Facility status and full licensing regimes are not verified.
The without-prior/further-notice branch is confined to enumerated investigation, vacancy, hazard, dishonored-payment, broken-arrangement and unauthorized-use conditions.
Sources for this passage (17)
Source: app.leg.wa.gov; app.leg.wa.gov; app.leg.wa.gov; app.leg.wa.gov; app.leg.wa.gov; app.leg.wa.gov; lawfilesext.leg.wa.gov; lawfilesext.leg.wa.gov; app.leg.wa.gov; lawfilesext.leg.wa.gov; lawfilesext.leg.wa.gov; lawfilesext.leg.wa.gov; lawfilesext.leg.wa.gov; lawfilesext.leg.wa.gov; lawfilesext.leg.wa.gov; commerce.wa.gov; commerce.wa.gov. /(7)(a). Some branches expressly require prior compliant notice; ordinary delinquency is not transformed into immediate-action authority.
After a qualifying no-prior-notice disconnection, reasonable efforts to explain the reason and dispute route are required within five business days.
Sources for this passage (17)
Source: app.leg.wa.gov; app.leg.wa.gov; app.leg.wa.gov; app.leg.wa.gov; app.leg.wa.gov; app.leg.wa.gov; lawfilesext.leg.wa.gov; lawfilesext.leg.wa.gov; app.leg.wa.gov; lawfilesext.leg.wa.gov; lawfilesext.leg.wa.gov; lawfilesext.leg.wa.gov; lawfilesext.leg.wa.gov; lawfilesext.leg.wa.gov; lawfilesext.leg.wa.gov; commerce.wa.gov; commerce.wa.gov. /(7)(b)–(c). The subsection expressly does not eliminate civil/criminal responsibility.
Residential space-heating protection operates during the November 15–March 15 period only when the statutory conditions are met. Notice of inability should ordinarily follow within five business days of an overdue notice, but lateness does not permanently foreclose regaining protection.
Sources for this passage (21)
Source: app.leg.wa.gov; app.leg.wa.gov; app.leg.wa.gov; app.leg.wa.gov; app.leg.wa.gov; app.leg.wa.gov; app.leg.wa.gov; app.leg.wa.gov; app.leg.wa.gov; app.leg.wa.gov; lawfilesext.leg.wa.gov; lawfilesext.leg.wa.gov; app.leg.wa.gov; lawfilesext.leg.wa.gov; lawfilesext.leg.wa.gov; lawfilesext.leg.wa.gov; lawfilesext.leg.wa.gov; lawfilesext.leg.wa.gov; lawfilesext.leg.wa.gov; commerce.wa.gov; commerce.wa.gov. §.010(4)(a); /(1). Extenuating circumstances and statutory reconnection language preserved.
The winter income predicate uses prior-twelve-month household self-certification to the designated Commerce grantee and the maximum under the incorporated state energy-assistance plan.
Sources for this passage (21)
Source: app.leg.wa.gov; app.leg.wa.gov; app.leg.wa.gov; app.leg.wa.gov; app.leg.wa.gov; app.leg.wa.gov; app.leg.wa.gov; app.leg.wa.gov; app.leg.wa.gov; app.leg.wa.gov; lawfilesext.leg.wa.gov; lawfilesext.leg.wa.gov; app.leg.wa.gov; lawfilesext.leg.wa.gov; lawfilesext.leg.wa.gov; lawfilesext.leg.wa.gov; lawfilesext.leg.wa.gov; lawfilesext.leg.wa.gov; lawfilesext.leg.wa.gov; commerce.wa.gov; commerce.wa.gov. §.010(4)(b); /(1)(b). Grantee verification is permitted; current final-plan threshold remains held.
The winter route also requires applications for applicable heating assistance, commitment of assistance to current/future utility bills, and weatherization application if available for the dwelling.
Sources for this passage (21)
Source: app.leg.wa.gov; app.leg.wa.gov; app.leg.wa.gov; app.leg.wa.gov; app.leg.wa.gov; app.leg.wa.gov; app.leg.wa.gov; app.leg.wa.gov; app.leg.wa.gov; app.leg.wa.gov; lawfilesext.leg.wa.gov; lawfilesext.leg.wa.gov; app.leg.wa.gov; lawfilesext.leg.wa.gov; lawfilesext.leg.wa.gov; lawfilesext.leg.wa.gov; lawfilesext.leg.wa.gov; lawfilesext.leg.wa.gov; lawfilesext.leg.wa.gov; commerce.wa.gov; commerce.wa.gov. §.010(4)(c)–(d); /(1)(c)–(d). Availability, application and benefit approval are different predicates.
The winter plan must address continued service and payment of the past-due bill by the following October 15; nonpayment by that target affects future protection, and moving does not erase the obligation.
Sources for this passage (21)
Source: app.leg.wa.gov; app.leg.wa.gov; app.leg.wa.gov; app.leg.wa.gov; app.leg.wa.gov; app.leg.wa.gov; app.leg.wa.gov; app.leg.wa.gov; app.leg.wa.gov; app.leg.wa.gov; lawfilesext.leg.wa.gov; lawfilesext.leg.wa.gov; app.leg.wa.gov; lawfilesext.leg.wa.gov; lawfilesext.leg.wa.gov; lawfilesext.leg.wa.gov; lawfilesext.leg.wa.gov; lawfilesext.leg.wa.gov; lawfilesext.leg.wa.gov; commerce.wa.gov; commerce.wa.gov. §.010(4)(e)–(f); /(1)(e), (g). No actual future eligibility determined.
RCW 80.28.010(8) requires an approved tariff prohibiting nonpayment termination of covered residential electric service on the specified NWS heat-alert day; natural-gas service is not listed in that subsection.
Sources for this passage (6)
Source: lawfilesext.leg.wa.gov; lawfilesext.leg.wa.gov; app.leg.wa.gov; app.leg.wa.gov; app.leg.wa.gov; app.leg.wa.gov. §.010(8), complete; §6; §8. Includes issued or announced-intended alerts for the relevant area. No actual alert checked.
Certification lasts only for the certified health-endangerment period, at most sixty days unless renewed.
Sources for this passage (17)
Source: app.leg.wa.gov; app.leg.wa.gov; app.leg.wa.gov; app.leg.wa.gov; app.leg.wa.gov; app.leg.wa.gov; lawfilesext.leg.wa.gov; lawfilesext.leg.wa.gov; app.leg.wa.gov; lawfilesext.leg.wa.gov; lawfilesext.leg.wa.gov; lawfilesext.leg.wa.gov; lawfilesext.leg.wa.gov; lawfilesext.leg.wa.gov; lawfilesext.leg.wa.gov; commerce.wa.gov; commerce.wa.gov. /(8)(b). Renewal is not inferred to be automatic or indefinite.
The medical plan must be confirmed within two business days; specified certification/payment/plan failures require the prescribed second-notice process, including an additional second notice if one was previously given.
Sources for this passage (17)
Source: app.leg.wa.gov; app.leg.wa.gov; app.leg.wa.gov; app.leg.wa.gov; app.leg.wa.gov; app.leg.wa.gov; lawfilesext.leg.wa.gov; lawfilesext.leg.wa.gov; app.leg.wa.gov; lawfilesext.leg.wa.gov; lawfilesext.leg.wa.gov; lawfilesext.leg.wa.gov; lawfilesext.leg.wa.gov; lawfilesext.leg.wa.gov; lawfilesext.leg.wa.gov; commerce.wa.gov; commerce.wa.gov. /(8)(c)–(d). Failure does not itself establish an immediate lawful cutoff.
The informal commission process investigates and seeks compliance but does not result in a hearing or order; a formal proceeding ends informal processing of that subject.
Sources for this passage (4)
Source: app.leg.wa.gov; app.leg.wa.gov; app.leg.wa.gov; app.leg.wa.gov. (3)–(5). No actual complaint or debt determination.
Customer-directed termination has separate notice and usage-liability conditions, including a different electric remote-capability branch. Moving without a qualifying request does not automatically end responsibility under the rule.
Sources for this passage (17)
Source: app.leg.wa.gov; app.leg.wa.gov; app.leg.wa.gov; app.leg.wa.gov; app.leg.wa.gov; app.leg.wa.gov; lawfilesext.leg.wa.gov; lawfilesext.leg.wa.gov; app.leg.wa.gov; lawfilesext.leg.wa.gov; lawfilesext.leg.wa.gov; lawfilesext.leg.wa.gov; lawfilesext.leg.wa.gov; lawfilesext.leg.wa.gov; lawfilesext.leg.wa.gov; commerce.wa.gov; commerce.wa.gov. /(1). No move, termination request or final bill is supplied.
The read protections regulate continuation/restoration and payment conditions; they do not themselves establish cancellation of an actual service debt.
Sources for this passage (21)
Source: app.leg.wa.gov; app.leg.wa.gov; app.leg.wa.gov; app.leg.wa.gov; app.leg.wa.gov; app.leg.wa.gov; app.leg.wa.gov; app.leg.wa.gov; app.leg.wa.gov; app.leg.wa.gov; lawfilesext.leg.wa.gov; lawfilesext.leg.wa.gov; app.leg.wa.gov; lawfilesext.leg.wa.gov; lawfilesext.leg.wa.gov; lawfilesext.leg.wa.gov; lawfilesext.leg.wa.gov; lawfilesext.leg.wa.gov; lawfilesext.leg.wa.gov; commerce.wa.gov; commerce.wa.gov. Especially §.010(4)(f); /(8)(c), -133, -143. No debt validity or discharge determination.
Timing, deadlines and triggering events
Six years is the maximum period for which -178 requires overbilling adjustment.
Sources for this passage (17)
Source: app.leg.wa.gov; app.leg.wa.gov; app.leg.wa.gov; app.leg.wa.gov; app.leg.wa.gov; app.leg.wa.gov; lawfilesext.leg.wa.gov; lawfilesext.leg.wa.gov; app.leg.wa.gov; lawfilesext.leg.wa.gov; lawfilesext.leg.wa.gov; lawfilesext.leg.wa.gov; lawfilesext.leg.wa.gov; lawfilesext.leg.wa.gov; lawfilesext.leg.wa.gov; commerce.wa.gov; commerce.wa.gov. /(5)(a). This is not presented as a universally applicable suit limitation or a prohibition on every other possible refund remedy.
The initial requested meter test has a twenty-business-day test/report duty and one-free-test-in-twelve-months baseline, subject to the stated commission waiver/extension/charge route.
Sources for this passage (17)
Source: app.leg.wa.gov; app.leg.wa.gov; app.leg.wa.gov; app.leg.wa.gov; app.leg.wa.gov; app.leg.wa.gov; lawfilesext.leg.wa.gov; lawfilesext.leg.wa.gov; app.leg.wa.gov; lawfilesext.leg.wa.gov; lawfilesext.leg.wa.gov; lawfilesext.leg.wa.gov; lawfilesext.leg.wa.gov; lawfilesext.leg.wa.gov; lawfilesext.leg.wa.gov; commerce.wa.gov; commerce.wa.gov. /(1)–(2). Access and witness/sealing provisions were read; no test or access step performed.
Except danger to life or property, disconnection is barred on weekends, legal holidays and days when restoration cannot occur the same or following day.
Sources for this passage (17)
Source: app.leg.wa.gov; app.leg.wa.gov; app.leg.wa.gov; app.leg.wa.gov; app.leg.wa.gov; app.leg.wa.gov; lawfilesext.leg.wa.gov; lawfilesext.leg.wa.gov; app.leg.wa.gov; lawfilesext.leg.wa.gov; lawfilesext.leg.wa.gov; lawfilesext.leg.wa.gov; lawfilesext.leg.wa.gov; lawfilesext.leg.wa.gov; lawfilesext.leg.wa.gov; commerce.wa.gov; commerce.wa.gov. /(4)(g). No universal ordinary-disconnection hour window beyond the actual text is supplied.
The medical restoration clause uses same-day/same-business-day language for a timely request and otherwise noon the next business day; upfront reconnection/deposit payment is not a prerequisite under that clause.
Sources for this passage (17)
Source: app.leg.wa.gov; app.leg.wa.gov; app.leg.wa.gov; app.leg.wa.gov; app.leg.wa.gov; app.leg.wa.gov; lawfilesext.leg.wa.gov; lawfilesext.leg.wa.gov; app.leg.wa.gov; lawfilesext.leg.wa.gov; lawfilesext.leg.wa.gov; lawfilesext.leg.wa.gov; lawfilesext.leg.wa.gov; lawfilesext.leg.wa.gov; lawfilesext.leg.wa.gov; commerce.wa.gov; commerce.wa.gov. /(8), second paragraph. Later billing language does not establish that a fee is presently lawful; C017 remains.
The older twice-in-120-days restriction was deleted in the 2020 amendment and is absent from the current medical subsection.
Sources for this passage (17)
Source: app.leg.wa.gov; app.leg.wa.gov; app.leg.wa.gov; app.leg.wa.gov; app.leg.wa.gov; app.leg.wa.gov; lawfilesext.leg.wa.gov; lawfilesext.leg.wa.gov; app.leg.wa.gov; lawfilesext.leg.wa.gov; lawfilesext.leg.wa.gov; lawfilesext.leg.wa.gov; lawfilesext.leg.wa.gov; lawfilesext.leg.wa.gov; lawfilesext.leg.wa.gov; commerce.wa.gov; commerce.wa.gov. adopted -128 replacement; current /(8). This removes that historical restriction as a current premise; it does not establish unlimited protection regardless of other conditions.
Commission-referred informal complaints have separate two-/three-business-day reporting branches and a minimum three-year utility complaint-record retention duty.
Sources for this passage (17)
Source: app.leg.wa.gov; app.leg.wa.gov; app.leg.wa.gov; app.leg.wa.gov; app.leg.wa.gov; app.leg.wa.gov; lawfilesext.leg.wa.gov; lawfilesext.leg.wa.gov; app.leg.wa.gov; lawfilesext.leg.wa.gov; lawfilesext.leg.wa.gov; lawfilesext.leg.wa.gov; lawfilesext.leg.wa.gov; lawfilesext.leg.wa.gov; lawfilesext.leg.wa.gov; commerce.wa.gov; commerce.wa.gov. /(3)–(4). Commission extensions/specified dates are preserved.
Protected money, property and ownership
“Electrical company” and “electric plant” depend on the enacted ownership/operation/for-hire criteria, with railroad and specified cogeneration exceptions.
Sources for this passage (4)
Source: app.leg.wa.gov; app.leg.wa.gov; app.leg.wa.gov; app.leg.wa.gov. §80.04.010(4), (9), (11)–(12), (19). Cogeneration solely for own/tenant use or specified wholesale recipients is excluded on the stated conditions, unless otherwise an electrical company.
“Applicant” and “customer” include specified jointly responsible applicants; “customer” can include an involuntarily disconnected person seeking reconnection.
Sources for this passage (17)
Source: app.leg.wa.gov; app.leg.wa.gov; app.leg.wa.gov; app.leg.wa.gov; app.leg.wa.gov; app.leg.wa.gov; lawfilesext.leg.wa.gov; lawfilesext.leg.wa.gov; app.leg.wa.gov; lawfilesext.leg.wa.gov; lawfilesext.leg.wa.gov; lawfilesext.leg.wa.gov; lawfilesext.leg.wa.gov; lawfilesext.leg.wa.gov; lawfilesext.leg.wa.gov; commerce.wa.gov; commerce.wa.gov. /. These definitions do not prove actual acceptance, joint liability or a balance.
Applicant deposit criteria separately include the specified prior history, conjunctive employment/income condition, ownership/purchase condition, resident prior-customer debt and overdue residential utility balance.
Sources for this passage (17)
Source: app.leg.wa.gov; app.leg.wa.gov; app.leg.wa.gov; app.leg.wa.gov; app.leg.wa.gov; app.leg.wa.gov; lawfilesext.leg.wa.gov; lawfilesext.leg.wa.gov; app.leg.wa.gov; lawfilesext.leg.wa.gov; lawfilesext.leg.wa.gov; lawfilesext.leg.wa.gov; lawfilesext.leg.wa.gov; lawfilesext.leg.wa.gov; lawfilesext.leg.wa.gov; commerce.wa.gov; commerce.wa.gov. /(2). The employment clause is not reduced to unemployment alone. No applicant classified.
The codified residential deposit ceiling uses estimated annual billings: two-twelfths for monthly billing or three-twelfths for bimonthly billing.
Sources for this passage (17)
Source: app.leg.wa.gov; app.leg.wa.gov; app.leg.wa.gov; app.leg.wa.gov; app.leg.wa.gov; app.leg.wa.gov; lawfilesext.leg.wa.gov; lawfilesext.leg.wa.gov; app.leg.wa.gov; lawfilesext.leg.wa.gov; lawfilesext.leg.wa.gov; lawfilesext.leg.wa.gov; lawfilesext.leg.wa.gov; lawfilesext.leg.wa.gov; lawfilesext.leg.wa.gov; commerce.wa.gov; commerce.wa.gov. /(3). Customer/location wording is preserved; no new per-request allowance or actual estimate assumed. C017.
Inability to pay a deposit invokes the listed alternatives: qualifying prepayment, satisfactory guarantor, winter-program route or the conditioned similar-utility reference opportunity.
Sources for this passage (17)
Source: app.leg.wa.gov; app.leg.wa.gov; app.leg.wa.gov; app.leg.wa.gov; app.leg.wa.gov; app.leg.wa.gov; lawfilesext.leg.wa.gov; lawfilesext.leg.wa.gov; app.leg.wa.gov; lawfilesext.leg.wa.gov; lawfilesext.leg.wa.gov; lawfilesext.leg.wa.gov; lawfilesext.leg.wa.gov; lawfilesext.leg.wa.gov; lawfilesext.leg.wa.gov; commerce.wa.gov; commerce.wa.gov. /(5). Guarantor exposure is bounded by the notice/deposit terms unless an additional amount is agreed as specified.
Additional deposits require written reasons and the existing-customer criteria; deposit-plus-interest transfer/refund is subject to the old-address balance offset stated in the rule.
Sources for this passage (17)
Source: app.leg.wa.gov; app.leg.wa.gov; app.leg.wa.gov; app.leg.wa.gov; app.leg.wa.gov; app.leg.wa.gov; lawfilesext.leg.wa.gov; lawfilesext.leg.wa.gov; app.leg.wa.gov; lawfilesext.leg.wa.gov; lawfilesext.leg.wa.gov; lawfilesext.leg.wa.gov; lawfilesext.leg.wa.gov; lawfilesext.leg.wa.gov; lawfilesext.leg.wa.gov; commerce.wa.gov; commerce.wa.gov. /(6)–(7). No new numerical cap is created by an additional request. C017.
Deposit interest uses the rule’s annual one-year Treasury Constant Maturity reference and runs from deposit to refund/application.
Sources for this passage (17)
Source: app.leg.wa.gov; app.leg.wa.gov; app.leg.wa.gov; app.leg.wa.gov; app.leg.wa.gov; app.leg.wa.gov; lawfilesext.leg.wa.gov; lawfilesext.leg.wa.gov; app.leg.wa.gov; lawfilesext.leg.wa.gov; lawfilesext.leg.wa.gov; lawfilesext.leg.wa.gov; lawfilesext.leg.wa.gov; lawfilesext.leg.wa.gov; lawfilesext.leg.wa.gov; commerce.wa.gov; commerce.wa.gov. /(9). The referenced annual rate, compounding and rounding are not calculated or supplied.
Equal-payment plans use historical or projected usage; the WAC states particular refusal conditions, while RCW 80.28.010(7) contains a residential offer duty and additional low-income availability protections.
Sources for this passage (21)
Source: app.leg.wa.gov; app.leg.wa.gov; app.leg.wa.gov; app.leg.wa.gov; app.leg.wa.gov; app.leg.wa.gov; app.leg.wa.gov; app.leg.wa.gov; app.leg.wa.gov; app.leg.wa.gov; lawfilesext.leg.wa.gov; lawfilesext.leg.wa.gov; app.leg.wa.gov; lawfilesext.leg.wa.gov; lawfilesext.leg.wa.gov; lawfilesext.leg.wa.gov; lawfilesext.leg.wa.gov; lawfilesext.leg.wa.gov; lawfilesext.leg.wa.gov; commerce.wa.gov; commerce.wa.gov. /(2); §.010(7). The interaction is not treated as unconditional permission to deny a statutory option.
A qualifying winter-plan defaulter can regain protection through the statute’s amount that would have been due under the plan, absent default, at reconnection.
Sources for this passage (4)
Source: app.leg.wa.gov; app.leg.wa.gov; app.leg.wa.gov; app.leg.wa.gov. §.010(5)(d)–(e). This is not automatically the entire historical account balance. Other lawful nonpayment-independent grounds remain separate.
The 2023 original removed winter deposit/reconnection-charge wording that remains in the older WAC text.
Sources for this passage (21)
Source: app.leg.wa.gov; app.leg.wa.gov; app.leg.wa.gov; app.leg.wa.gov; app.leg.wa.gov; app.leg.wa.gov; app.leg.wa.gov; app.leg.wa.gov; app.leg.wa.gov; app.leg.wa.gov; lawfilesext.leg.wa.gov; lawfilesext.leg.wa.gov; app.leg.wa.gov; lawfilesext.leg.wa.gov; lawfilesext.leg.wa.gov; lawfilesext.leg.wa.gov; lawfilesext.leg.wa.gov; lawfilesext.leg.wa.gov; lawfilesext.leg.wa.gov; commerce.wa.gov; commerce.wa.gov. §6; §.010(4)(a), (5)(d); /(1)(a), (2)(e). Current charge collection is held; the older text is not used to restore deleted statutory conditions.
Evidence, proof and legal authority
Prior-occupant debt alone is not a refusal ground; the rule requires objective evidence of the specified cooperative fraud to use that exception.
Sources for this passage (17)
Source: app.leg.wa.gov; app.leg.wa.gov; app.leg.wa.gov; app.leg.wa.gov; app.leg.wa.gov; app.leg.wa.gov; lawfilesext.leg.wa.gov; lawfilesext.leg.wa.gov; app.leg.wa.gov; lawfilesext.leg.wa.gov; lawfilesext.leg.wa.gov; lawfilesext.leg.wa.gov; lawfilesext.leg.wa.gov; lawfilesext.leg.wa.gov; lawfilesext.leg.wa.gov; commerce.wa.gov; commerce.wa.gov. (4); (3). A deposit criterion involving a prior customer living at the premises is a different provision, not debt succession.
Dishonored payment alone is not fraud. The utility bears the stated fraud burden; first and repeated theft/tampering/fraud branches differ.
Sources for this passage (17)
Source: app.leg.wa.gov; app.leg.wa.gov; app.leg.wa.gov; app.leg.wa.gov; app.leg.wa.gov; app.leg.wa.gov; lawfilesext.leg.wa.gov; lawfilesext.leg.wa.gov; app.leg.wa.gov; lawfilesext.leg.wa.gov; lawfilesext.leg.wa.gov; lawfilesext.leg.wa.gov; lawfilesext.leg.wa.gov; lawfilesext.leg.wa.gov; lawfilesext.leg.wa.gov; commerce.wa.gov; commerce.wa.gov. /(7)(a)(i). Tariff-estimated service, resulting costs and any required deposit are source categories, not verified charges or findings here.
The 2025 original contains a specific funding condition; fulfillment was not authenticated through an enacted budget body.
Source: lawfilesext.leg.wa.gov. §26; F011/F015. No inference of either failure or fulfillment from the failed route.
Violations, enforcement and recovery
Commission notification of a meter complaint restricts alteration of the meter without commission authorization; a violation may support the customer’s dispute.
Sources for this passage (17)
Source: app.leg.wa.gov; app.leg.wa.gov; app.leg.wa.gov; app.leg.wa.gov; app.leg.wa.gov; app.leg.wa.gov; lawfilesext.leg.wa.gov; lawfilesext.leg.wa.gov; app.leg.wa.gov; lawfilesext.leg.wa.gov; lawfilesext.leg.wa.gov; lawfilesext.leg.wa.gov; lawfilesext.leg.wa.gov; lawfilesext.leg.wa.gov; lawfilesext.leg.wa.gov; commerce.wa.gov; commerce.wa.gov. /(4). This is discretionary evidentiary treatment, not an automatic adjudicated billing result.
Disconnection is prohibited while the customer pursues a remedy/appeal provided by these rules or qualifying discussions, subject to payment of undisputed amounts and correction of dangerous conditions.
Sources for this passage (17)
Source: app.leg.wa.gov; app.leg.wa.gov; app.leg.wa.gov; app.leg.wa.gov; app.leg.wa.gov; app.leg.wa.gov; lawfilesext.leg.wa.gov; lawfilesext.leg.wa.gov; app.leg.wa.gov; lawfilesext.leg.wa.gov; lawfilesext.leg.wa.gov; lawfilesext.leg.wa.gov; lawfilesext.leg.wa.gov; lawfilesext.leg.wa.gov; lawfilesext.leg.wa.gov; commerce.wa.gov; commerce.wa.gov. /(10). This is not a conclusion that every communication, lawsuit or unpaid disputed account creates an unconditional stay.
Utilities must acknowledge, investigate, report on and appropriately correct complaints, with supervisor and commission-escalation information under the stated sequence.
Sources for this passage (17)
Source: app.leg.wa.gov; app.leg.wa.gov; app.leg.wa.gov; app.leg.wa.gov; app.leg.wa.gov; app.leg.wa.gov; lawfilesext.leg.wa.gov; lawfilesext.leg.wa.gov; app.leg.wa.gov; lawfilesext.leg.wa.gov; lawfilesext.leg.wa.gov; lawfilesext.leg.wa.gov; lawfilesext.leg.wa.gov; lawfilesext.leg.wa.gov; lawfilesext.leg.wa.gov; commerce.wa.gov; commerce.wa.gov. /(1)–(2). “Promptly” is not replaced with an invented fixed deadline.
Formal complaints require the statutory/rule jurisdictional and pleading predicates; the commission’s commencement decision and final merits are separate from submission.
Sources for this passage (19)
Source: app.leg.wa.gov; app.leg.wa.gov; app.leg.wa.gov; app.leg.wa.gov; app.leg.wa.gov; app.leg.wa.gov; app.leg.wa.gov; app.leg.wa.gov; lawfilesext.leg.wa.gov; lawfilesext.leg.wa.gov; app.leg.wa.gov; lawfilesext.leg.wa.gov; lawfilesext.leg.wa.gov; lawfilesext.leg.wa.gov; lawfilesext.leg.wa.gov; lawfilesext.leg.wa.gov; lawfilesext.leg.wa.gov; commerce.wa.gov; commerce.wa.gov. §.110; -370. Only the indispensable generic interface was read, not full litigation/adjudication.
A complaint attacking the reasonableness of a rate schedule has the special statutory sponsorship threshold, distinct from an ordinary service/billing complaint.
Sources for this passage (4)
Source: app.leg.wa.gov; app.leg.wa.gov; app.leg.wa.gov; app.leg.wa.gov. §.110(1)(b): commission’s own motion, specified municipal sponsorship, at least twenty-five consumers/purchasers, or at least twenty-five percent.
The unlawful-overcharge statute permits a refund order after investigation and a finding that collection exceeded the lawful rate, with interest from collection.
Sources for this passage (4)
Source: app.leg.wa.gov; app.leg.wa.gov; app.leg.wa.gov; app.leg.wa.gov. §.230. “May” is preserved; no automatic refund from an allegation.
RCW 80.04.440 provides liability for loss caused by the stated unlawful act or required-act omission; a wilful finding permits a discretionary reasonable attorney fee in a recovery.
Sources for this passage (4)
Source: app.leg.wa.gov; app.leg.wa.gov; app.leg.wa.gov; app.leg.wa.gov. §.440, complete. Causation, recovery, wilfulness and court jurisdiction are unestablished.
Source dates and unresolved application limits
Read the source history and research limitations
S_WA PASS-14 — Regulated residential electricity and natural-gas arrears, disconnection and restoration
The Washington statutory and administrative-code framework was freshly read for this component. It establishes conditional billing, notice, payment-plan, medical and restoration protections for service within the Utilities and Transportation Commission’s jurisdiction. It does not establish a uniform rule for every Washington utility.
A material currentness hold remains on collecting residential deposits and certain fees. The current WAC still displays deposit formulas and tariff-dependent fee provisions. An official commission announcement located during research describes temporary fee and deposit suspensions, but its body was inaccessible. A freshly read 2026 rulemaking agenda concerns possible permanent changes; an agenda is not an adopted rule or proof that an earlier suspension ended. Accordingly, this report identifies the codified formulas without treating them as verified present authority to collect the affected charges. See C017, C048, C107 and B005.
Other important distinctions are:
- The statutory heat-alert provisions expressly include electric service, but do not list natural-gas service. Both administrative chapters separately require inclement-weather tariff provisions. Those are different sources and different conditions. See C078–C081.
- Winter protection concerns residential space heating and requires the statutory assistance, income-verification and payment-plan conditions. It is not an unconditional seasonal moratorium. See C069–C077.
- Medical protection has notification, certification, duration, repayment and further-notice conditions. The 2020 amendment removed an older restriction on repeat medical claims; the deleted restriction is not presented as current law. See C082–C088.
- The 2016 adoption order expressly explains how the six-month underbilling restriction interacts with the older meter-test adjustment rule. That explanation resolves a specific source-level ambiguity; it does not supply judicial construction or an actual billing determination. See C035–C045. app.leg.wa.gov
Actual public-source access: October 28, 2026, America/Los_Angeles. Access date is separate from publication, filing, effectiveness and displayed source currency.
No earlier pass supplies a substantive premise here. Earlier findings, provenance and holds remain unchanged.
Reading key and limits
The source IDs identify instruments or official publications. Different sections and formats of the same instrument retain the same source ID. In the tables:
- S008 means the selected provisions of chapter 480-100 WAC, Electric companies.
- S009 means the selected provisions of chapter 480-90 WAC, Gas companies.
- A reference such as S008/S009, -128(8) means the separately read electric and gas provisions, with their differences preserved.
- Text established means the identified public text was read and supports the bounded proposition. It does not establish actual jurisdiction, entitlement, factual compliance or the absence of an overriding order.
- Held means the identified evidence, incorporation, status or construction issue remains unresolved.
All abbreviated references such as C017, B005 and Q010 belong to this research. Their full prefixes are S_WA-P14-C, S_WA-P14-B and S_WA-P14-Q.
Source and usage register
Statutes: instruments, literal URLs and read bounds
All entries below were freshly accessed on October 28, 2026. “Current” describes the official codified rendition retrieved, subject to the expressly identified status gaps.
The jurisdiction conclusions rely on the statutory exclusions as well as the broad definitions. In particular, the inclusion of cities and towns in a definition does not erase RCW 80.04.500’s rate/service-order limitation. app.leg.wa.gov
Adopted originals and official supporting publications
The 2016 original expressly addresses the meter-test interaction; the 2020 original shows the replaced notice structure and removed medical repetition restriction. These are substantive original-text checks, not reliance on a page’s general update date. lawfilesext.leg.wa.gov
Administrative-code instruments and section-by-section usage
Section usage matrix for S008 and S009
Each row records complete operative section text and displayed credits read, except where the row expressly limits use. The two URLs represent separate electric and gas provisions; neither is assumed from the other.
| Section and title | Literal electric URL — S008 | Literal gas URL — S009 | Relevant displayed version credit and use |
|---|---|---|---|
| -003, Application of rules | https://app.leg.wa.gov/WAC/default.aspx?cite=480-100-003 | https://app.leg.wa.gov/WAC/default.aspx?cite=480-90-003 | WSR 03-24-028, filed November 24, 2003, effective January 1, 2004; earlier 2001 credits. Jurisdiction, tariffs, exemptions. |
| -008, Exemptions | https://app.leg.wa.gov/WAC/default.aspx?cite=480-100-008 | https://app.leg.wa.gov/WAC/default.aspx?cite=480-90&full=true, exact §480-90-008 | WSR 05-06-051, filed February 28, 2005, effective March 31, 2005; -07-110 incorporation read. |
| -013, Additional requirements | https://app.leg.wa.gov/WAC/default.aspx?cite=480-100-013 | https://app.leg.wa.gov/WAC/default.aspx?cite=480-90-013 | WSR 01-11-004 / 01-11-003, filed May 3, 2001, effective June 3, 2001. Statutory duties preserved. |
| -023, Definitions | https://app.leg.wa.gov/WAC/default.aspx?cite=480-100-023 | https://app.leg.wa.gov/WAC/default.aspx?cite=480-90-023 | WSR 20-16-077, effective August 29, 2020; earlier 2005/2001 credits. Privacy-law incorporations remain partly open. |
| -028, Tariffs and special contracts | https://app.leg.wa.gov/WAC/default.aspx?cite=480-100-028 | https://app.leg.wa.gov/WAC/default.aspx?cite=480-90-028 | 2001 credits above. Chapter 480-80 filing/special-contract framework not completed. |
| -103, Information to consumers | https://app.leg.wa.gov/WAC/default.aspx?cite=480-100-103 | https://app.leg.wa.gov/WAC/default.aspx?cite=480-90-103 | WSR 11-06-032, filed February 25, 2011, effective March 28, 2011; earlier 2001 credits. Generic information duties only. |
| -108, Application for service | https://app.leg.wa.gov/WAC/default.aspx?cite=480-100-108 | https://app.leg.wa.gov/WAC/default.aspx?cite=480-90-108 | 2001 credits. Used for service/application and resale boundaries; no application examined. |
| -113, Residential deposits | https://app.leg.wa.gov/WAC/default.aspx?cite=480-100-113 | https://app.leg.wa.gov/WAC/default.aspx?cite=480-90-113 | WSR 02-21-066, filed October 16, 2002, effective January 1, 2003; earlier 2001 credits. Original-access and current suspension holds apply. |
| -123, Refusal of service | https://app.leg.wa.gov/WAC/default.aspx?cite=480-100-123 | https://app.leg.wa.gov/WAC/default.aspx?cite=480-90-123 | WSR 03-24-028; earlier 01-24-076 / 01-24-077, filed December 3, 2001, effective January 3, 2002. Different subsection numbering preserved. |
| -128, Disconnection | https://app.leg.wa.gov/WAC/default.aspx?cite=480-100-128 | https://app.leg.wa.gov/WAC/default.aspx?cite=480-90-128 | Complete (1)–(11). WSR 20-16-077, filed July 29, 2020, effective August 29, 2020; earlier 2001 credits. Central notice/medical/dispute source. |
| -133, Reconnection | https://app.leg.wa.gov/WAC/default.aspx?cite=480-100-133 | https://app.leg.wa.gov/WAC/default.aspx?cite=480-90-133 | Complete (1)–(3); WSR 20-16-077. Fee/deposit currentness hold retained. |
| -138, Payment arrangements | https://app.leg.wa.gov/WAC/default.aspx?cite=480-100-138 | https://app.leg.wa.gov/WAC/default.aspx?cite=480-90-138 | Complete (1)–(3); 2001 credits. Stale -128(2)(f) reference identified. |
| -143, Winter program | https://app.leg.wa.gov/WAC/default.aspx?cite=480-100-143 | https://app.leg.wa.gov/WAC/default.aspx?cite=480-90-143 | Complete (1)–(3); 2001 credits. Must be read with newer RCW 80.28.010 and S014. |
| -153, Customer information | https://app.leg.wa.gov/WAC/default.aspx?cite=480-100-153 | https://app.leg.wa.gov/WAC/default.aspx?cite=480-90-153 | Complete (1)–(21); latest WSR 20-16-077, preceding 2011 and older privacy-rule credits. Only necessary medical/account-information safeguards used. |
| -168, Access; identification | https://app.leg.wa.gov/WAC/default.aspx?cite=480-100-168 | https://app.leg.wa.gov/WAC/default.aspx?cite=480-90&full=true, exact §480-90-168 | Complete (1)–(2); 2001 credits. No actual access authorization inferred. |
| -173, Complaints/disputes | https://app.leg.wa.gov/WAC/default.aspx?cite=480-100-173 | https://app.leg.wa.gov/WAC/default.aspx?cite=480-90-173 | Complete (1)–(4); WSR 03-24-028, earlier 2001 credits. |
| -178, Billing/payment date | https://app.leg.wa.gov/WAC/default.aspx?cite=480-100-178 | https://app.leg.wa.gov/WAC/default.aspx?cite=480-90-178 | Complete (1)–(8); WSR 20-16-077, 16-06-038, 11-06-032, earlier 2001 credits. Billing-correction original read in S015. |
| -179, Electronic information | https://app.leg.wa.gov/WAC/default.aspx?cite=480-100-179 | https://app.leg.wa.gov/WAC/default.aspx?cite=480-90-179 | Complete introduction and (1)–(7); WSR 11-06-032, effective March 28, 2011. |
| -183, Complaint meter tests | https://app.leg.wa.gov/WAC/default.aspx?cite=480-100-183 | https://app.leg.wa.gov/WAC/default.aspx?cite=480-90-183 | Complete (1)–(6); 2001 credits. Read with newer -178 and S015; stale references retained. |
| -188, Payment locations | https://app.leg.wa.gov/WAC/default.aspx?cite=480-100-188 | https://app.leg.wa.gov/WAC/default.aspx?cite=480-90-188 | Complete (1)–(4); 2001 credits. No actual location searched. |
| -193, Posting tariffs | https://app.leg.wa.gov/WAC/default.aspx?cite=480-100-193 | https://app.leg.wa.gov/WAC/default.aspx?cite=480-90-193 | Complete (1)–(2); latest 02-11-081, filed May 14, 2002, effective June 17, 2002. |
| -194, Proposed tariff changes | https://app.leg.wa.gov/WAC/default.aspx?cite=480-100-194 | https://app.leg.wa.gov/WAC/default.aspx?cite=480-90-194 | Complete electric introduction/(1)–(4) and gas introduction/(1)–(5). WSR 11-06-032, earlier 02-11-081. Gas purchased-gas-adjustment exception is separate; no actual rate proposal read. |
| -195, Other tariff-change notices | https://app.leg.wa.gov/WAC/default.aspx?cite=480-100-195 | https://app.leg.wa.gov/WAC/default.aspx?cite=480-90-195 | Complete (1)–(3); 02-11-081. Notice requirement, not independent fee authorization. |
| -197, Public-testimony notice | https://app.leg.wa.gov/WAC/default.aspx?cite=480-100-197 | https://app.leg.wa.gov/WAC/default.aspx?cite=480-90-197 | Complete (1)–(4); 02-11-081. Read because -194 incorporates its alternative notice route. |
| -338, Meter accuracy | https://app.leg.wa.gov/WAC/default.aspx?cite=480-100-338 | https://app.leg.wa.gov/WAC/default.aspx?cite=480-90-338 | Complete electric (1)–(2) and complete gas section; 2001 credits. Technical standards/incorporated ANSI material not completed; no actual accuracy classification or tolerance calculation supplied. |
The rules’ written-exemption mechanism does not make an inconsistent tariff automatically valid. Additional-requirements provisions expressly preserve statutory obligations. app.leg.wa.gov
Substantive findings and atomic claim register
Scope, jurisdiction and service categories — Questions 1 and 7
The source distinctions above prevent three erroneous transfers: municipal/PUD rules from UTC rules, landlord rent allocation from utility billing, and a tariff reference from statutory permission. app.leg.wa.gov
Billing, payment, deposits, corrections and charge boundaries — Question 2
The complete deposit rules support the formulas and return conditions as codified. The unresolved suspension issue affects present collection authority, so the formulas cannot be used as an independent permission to demand money. app.leg.wa.gov
Ordinary and exceptional disconnection — Question 3
The paper, telephone and electronic branches are source-stated alternatives and supplements. They are not operational service instructions or a conclusion that a particular notice would be effective. app.leg.wa.gov
Payment arrangements, winter and heat — Question 4
The statutory winter and heat relations are distinct. The heat repayment provision does not incorporate the winter income-eligibility ceiling merely because both use income-based payments. app.leg.wa.gov
Medical and protected-customer safeguards — Question 5
The medical-professional definition in the read rule is a licensed physician, nurse practitioner, or physician’s assistant authorized to diagnose and treat the condition without physician supervision. That is a transcription of the legal category, not a determination about any professional or household. app.leg.wa.gov
Restoration, disputes and narrow remedy boundaries — Question 6
The ordinary, medical, winter and heat restoration routes have different triggers. None is reduced here to “pay the entire balance first,” “make any partial payment,” or “file a complaint and restoration is automatic.” app.leg.wa.gov
Material category and event comparisons
| Comparison | Source-supported distinction | Claims |
|---|---|---|
| UTC-regulated service / municipal-PUD-cooperative service | Jurisdictional statutes and definitions must be satisfied before using these WAC rules. Separate public-provider protection statutes may exist; they were not completed. | C001–C008 |
| Natural gas / electricity | The consumer chapters are parallel but not identical. Electric remote-disconnection safeguards and electric heat-alert coverage cannot be copied into gas rules. | C003, C063–C064, C078–C081 |
| Utility customer / service user / landlord | The rules contain occupant and master-meter notice protections without completing landlord rent allocation, tenancy or rebilling law. | C009, C013, C058 |
| Service charge / deposit / disputed charge / nonregulated debt | Distinct billing and disconnection treatment; neither a combined bill nor a deposit criterion establishes an inherited or collectible debt. | C015–C017, C026–C034, C052, C068 |
| Codified deposit formula / current collection permission | The formula was read; current suspension and tariff conditions remain unresolved. | C017, C028, C048, C107 |
| Equal-payment budget plan / delayed-bill arrangement / winter plan / medical plan / heat plan | Different eligibility, payment base, timing and duties. No universal arrears plan or zero-payment entitlement was established. | C046–C047, C069–C087 |
| Ordinary nonpayment / fraud or dangerous-condition branch | Ordinary notice requirements cannot be bypassed by relabeling a delinquent bill. Exceptional branches have their own predicates. | C050–C067 |
| Mailing / delivery / receipt / verification | The provisions use different events. In particular, ordinary bill payment begins from mailing; medical grace begins from notification received; agency payment has a verification condition. | C021, C024, C053–C055, C082, C113 |
| Informal complaint / formal proceeding / reconnection order | Informal processing produces no order; formal initiation and a commission reconnection order are separate. | C092–C097 |
| Billing-adjustment period / suit limitation | The correction rule’s periods are not imported into the excluded limitation or special court-recovery analysis. | C035–C045, C101 |
Quantity, formula and trigger register
No financial values, calendar dates for a customer, rates, thresholds from an unverified plan, or rounding assumptions are substituted.
Symbols below describe only source relations:
- A: estimated annual billings under the deposit rule.
- D: a deposit that is otherwise lawfully required.
- Iₘ: monthly income under the applicable statutory provision, without calculating it from another income measure.
- Aₚ: the statute’s qualifying post-application arrearage.
- P: payment under the relevant plan.
These are not populated worksheet entries.
| Quantity ID | Source-stated quantity/relation | Base, trigger, boundary and exception | Authority/claims |
|---|---|---|---|
| Q001 | Business day: Monday–Friday, 8 a.m.–5 p.m. | Official state holidays excluded. No universal conversion of “days” into business days. | S008/S009 -023; C010 |
| Q002 | Bills at intervals no longer than two one-month billing cycles | Utility may establish good cause for delay. Not a disconnection-notice period. | -178(1)(a); C018 |
| Q003 | Flat-rate fractional-period charge uses the proportionate part of the service period; metered service uses metered amount with full basic/minimum charge | Default relation only; tariff can specify otherwise. No rate or rounding supplied. | -178(1)(h); C019 |
| Q004 | No more than four consecutive months of estimated billing | Inclement weather, terrain or previous arrangement exceptions; tariff method required. | -178(1)(i); C020 |
| Q005 | At least 15 days after mailing within WA/OR/ID; 18 days if mailed from outside | Mailing origin, not recipient residence, selects this branch. “Days” are not labeled business days here. | -178(2); C021 |
| Q006 | Changed due date must be before the next billing date | Satisfactory reason required. No fixed number of extra days. | -178(3); C021 |
| Q007 | Return from electronic to printed billing within two billing cycles | Customer request; electronic consent record retained. | -178(4); C022 |
| Q008 | Ordinary paper-document requests may be limited to three in twelve months while electronic delivery continues | Does not remove mandatory paper treatment of disconnection/winter material; free opt-out preserved. | -179(2)(d), (4)–(5); C023 |
| Q009 | Undeliverable electronic correction by next business day, or within five business days if bill due date is extended five business days | Trigger is returned/otherwise known undeliverable information; unresolved problem requires mail and format reversion. | -179(7); C024 |
| Q010 | Existing-customer deposit criterion: three or more notices in prior twelve months | Separate from nonpayment-disconnection and resident-prior-customer-debt grounds. Collection status held. | -113(1); C026 |
| Q011 | Applicant employment inquiry: twelve consecutive months | Lack of proof operates together with neither current employment nor regular income; not an unemployment-only test. | -113(2)(b); C027 |
| Q012 | D ≤ (2/12) × A, monthly billing; D ≤ (3/12) × A, bimonthly billing | Source says deposits for a customer/location. No new allowance per demand; no current permission inferred. | -113(3); C028 |
| Q013 | Deposit option: 50% before service, remainder equally over next two months | Mutually agreed dates; other mutually acceptable arrangement possible. | -113(4); C029 |
| Q014 | Guarantor amount: notice amount, ordinarily not exceeding the deposit ceiling | Additional agreed guarantee under the specified provision is separate. No guaranty created. | -113(5)(b), (7); C030 |
| Q015 | Deposit transfer/termination relation: deposit + accrued interest − specified amounts owing | Transfer within service territory and termination have distinct wording. No negative-refund or additional-liability formula invented. | -113(6), (10)(b); C031–C033 |
| Q016 | After-service deposit due no earlier than 5 p.m. on sixth business day after qualifying mailed notice; ninth business day for outside WA/OR/ID mailing | Personal delivery: no earlier than 5 p.m. sixth business day from delivery. Exact application and current collection held. | -113(8); C034 |
| Q017 | Interest reference: one-year Treasury Constant Maturity, published in H.15 on January 15 of each calendar year | If nonbusiness day, next following business-day rate. Runs deposit date to refund/application. Actual rate, compounding and rounding not supplied. | -113(9); C032 |
| Q018 | Satisfactory payment: twelve consecutive months, no disconnection process, no more than two delinquency notices | Conditions conjunctive. Different from the deposit-trigger threshold. | -113(10)(a); C033 |
| Q019 | Satisfactory-payment check mailed within 15 days after completion; alternative credit begins thirteenth month | Customer’s indicated method. No universal termination-refund deadline inferred from this clause. | -113(11); C034 |
| Q020 | Corrected bill issued within 60 days of discovery | Historical applicable rates; qualifying inaccurate/unbilled usage required. | -178(5)(a); C035 |
| Q021 | Ordinary underbilling collection period not greater than six months | Source phrase “from the date the error occurred”; express exceptions; no actual included months selected. | -178(5), (7); S015 ¶¶28–31; C036, C045 |
| Q022 | Mandatory overbilling adjustment period: maximum six years | Not treated as an all-purpose limitation or mandatory debt-discharge period. | -178(5)(a); C037 |
| Q023 | Utility may forgo corrected-bill recovery where underbilling is less than $50 | Strictly < $50, not ≤ $50; discretionary, not automatic forgiveness of every small balance. | -178(7)(c); C038 |
| Q024 | Initial meter test/report within 20 business days; one free test per twelve months | Commission waiver, extension or charge authorization route preserved. | -183(1); C041 |
| Q025 | Additional meter test/report within 20 business days; commission-required additional test/report within 10 business days | Different request/order predicates. Tariff/tolerance conditions govern a charge. | -183(3)–(4); C042–C043 |
| Q026 | Unknown defective-meter start: adjustment not exceeding six months in older -183 wording | Read with newer -178 and S015; known-start wording is not unlimited underbilling collection. | -183(5); C044–C045 |
| Q027 | Delayed-billing arrangement length equals length of billing delay | Stated unauthorized-use exception; stale cross-reference held. | -138(1); C046 |
| Q028 | Equal-plan refusal wording: removal for nonpayment within past six months, or more than a two-month past-due balance | More than, not at least; discretion to offer remains; statutory interaction held. | -138(2); C047 |
| Q029 | Ordinary tariff publication/notice baseline 30 days; alternative individual notice 15 days plus specified concurrent publication steps | RCW .060 commission exceptions; -194 classification and -197 suspension route. Not an arrears or disconnection clock. | S007 §.060; S008/S009 -194/-197; C049 |
| Q030 | -195 notice on or with first bill after effective change | Only changes within -195 after excluding -194; no fee authorization. | -195(1)–(2); C049 |
| Q031 | At least two separate disconnection notices | Ordinary branch; express -128(7) exceptions separate. | -128(4)(a); C053 |
| Q032 | First paper notice: at least eight business days before disconnection; outside WA/OR/ID mail wording: eleven days before | Mail or primary-door delivery; consented electronic copy contemporaneous. Mailing day excluded under (5). No conversion of eleven days to business days. | -128(4)(a)(i), (5); C053 |
| Q033 | Second notice: electronic copy, if applicable, at least two business days before; door two, mail three, outside-region mail six business days | Electronic copy supplements the chosen authorized branch. | -128(4)(a)(ii); C054 |
| Q034 | Telephone branch: at least two attempts, during regular business hours, at least three business days before | Unsuccessful conversation requires paper fallback; records retained at least 90 calendar days. No separate unstated retention-clock convention added. | -128(4)(a)(ii)(C); C055 |
| Q035 | Restart if no disconnection within ten business days from stated disconnection date | Agreed payment arrangement exception; inaccurate notice independently requires correction. | -128(4)(c)–(d); C057 |
| Q036 | Service-user/master-meter request: at least five days past original date | Source does not say business days in this clause. | -128(4)(i); C058 |
| Q037 | Listed facility or third-party branch: at least five business days past original date | Facility delay requires specified department request; third-party clause has its own notice predicate. | -128(4)(j)–(k); C061–C062 |
| Q038 | Electric remote nonpayment window 8 a.m.–noon; known low-income assistance lookback prior two years | Same-day payment/restoration opportunity; required visit branches. Critical-infrastructure clause also refers to limiting remote disconnections within a 24-hour period, without supplying a universal numerical count. | S008 -128(6); C063 |
| Q039 | No-prior-notice explanation/dispute information within five business days | Reasonable-effort duty following qualifying action. | -128(7)(b); C067 |
| Q040 | Winter period November 15 through March 15; inability notice should ordinarily be within five business days after receipt of overdue notice | Extenuating circumstances and regained protection preserved; calendar endpoints not converted into a customer deadline. | S007 §.010(4); C069 |
| Q041 | Income history prior twelve months; grantee provides the prescribed 7% household-income dollar figure within thirty days under the WAC | Grantee determination and incorporated plan required. No automatic annual-to-monthly calculation supplied; precise application of the grantee clock remains contextual. | -143(1)(b); S007 §.010(4)(b); C070 |
| Q042 | Winter required monthly amount P ≤ 0.07 × Iₘ + (1/12) × Aₚ | Aₚ is qualifying statutory post-application arrearage, not assumed total debt. Older “billings” wording held. | S007 §.010(4)(e); C072 |
| Q043 | Voluntary higher winter promise: default threshold uses P < statutory 7%-plus-one-twelfth relation | No default merely because P is below a voluntarily higher promise while meeting the statutory threshold. | Same; C073 |
| Q044 | Winter target following October 15; reconnection amount is what would be due under the plan absent default at reconnection | Later assistance requires reformulation; moving does not erase amounts owed. | S007 §.010(4)–(5); C074–C077 |
| Q045 | Heat protection attaches to any day covered by the specified issued/intended NWS alert | Area-specific predicate; no temperature number or actual weather supplied. | S007 §.010(8)–(9); C078–C079 |
| Q046 | Heat required monthly payment P ≤ 0.06 × Iₘ; voluntary higher-promise default threshold P < 0.06 × Iₘ | Applies to plan required under heat reconnection subsection, not all utility plans. | S007 §.010(10); C080 |
| Q047 | Heat plan target following May 15, or as soon after as necessary to retain the 6% ceiling | Also designed for continued service; later assistance reformulates plan. | Same; C080 |
| Q048 | Medical grace five business days after verbal/written notification received | Continued energy must be required by the condition/emergency. | -128(8); C082 |
| Q049 | Medical restoration: electric same day, gas same business day, for timely same-day request; otherwise noon next business day | Before close of business is the stated timely-contact condition. No upfront reconnect/deposit demand under this branch. | -128(8); C083 |
| Q050 | Certification may be required within five business days; validity no longer than sixty days unless renewed | Limited to certified endangerment duration; a universal starting-date convention or automatic renewal is not supplied. | -128(8)(a)–(b); C084–C085 |
| Q051 | Medical payment requirement: stated 10% of delinquent balance, agreement for remainder within 120 days, ongoing bills when due | Requirements within grace period; alternate agreement allowed; no demand beyond prescribed terms. Exact 120-day starting-event construction is not supplied beyond the clause. | -128(8)(c); C086 |
| Q052 | Medical payment-plan confirmation within two business days of agreement | Further default/certificate failure requires prescribed second notice, not automatic cutoff at grace expiration. | -128(8)(c)–(d); C087 |
| Q053 | Historical only: twice within 120 days medical-claim restriction | Deleted in 2020; not a current repetition limit. | S011; C088 |
| Q054 | Ordinary restoration: reasonable efforts within 24 hours; electric remotely disconnected service four hours; or mutually agreed other time | Conditional -133(1) triggers; not a guarantee from any partial payment. Gas has no copied four-hour remote branch. | C090 |
| Q055 | UTC-referral utility report two business days; additional information three business days or UTC-specified date; records at least three years | Extensions may be granted. Initial direct customer complaint uses promptness, not automatically the two-day rule. | -173(3)–(4); C093–C094 |
| Q056 | Rate-schedule reasonableness sponsorship: at least 25 consumers/purchasers or at least 25%, with stated governmental/commission alternatives | Not a threshold for every ordinary billing complaint. | S002 §.110(1)(b); C097 |
| Q057 | Reparations/overcharge measure: identified excess or overcharge, plus interest from collection | Required agency findings differ; no interest rate or award computed. | S002 §§.220–.230; C098–C099 |
| Q058 | Private statutory loss measure: loss/damage/injury caused by prohibited act or required-act omission; discretionary reasonable attorney fee on wilful finding in recovery | No fixed statutory amount, multiplier, fee percentage or automatic recovery established. | S002 §.440; C100 |
| Q059 | Customer-directed electric dispatched notice at least three days; electric remote-capable notice up to 24 hours; gas at least three days | Rule and tariff conditions govern end of usage responsibility; no actual termination date. | -128(1); C112 |
| Q060 | Unquantified relations retained | “Promptly,” “reasonable effort,” “satisfactory reason,” “reasonable judgment,” tariff-dependent charges, technical accuracy and undefined rounding remain source-specific. | C014, C021, C042, C079, C090, C093 |
| Q061 | Legislative/rule effective dates | Exact dates and material conditional application are recorded in S011–S016 and C102–C107. These are legal-version facts, not customer-event calculations. | Version register above |
Conditional branches and exact unresolved dependencies
| Branch ID | Missing predicate or authority | Supported consequence if the predicate is established | Adverse inference to avoid; precise next generic inquiry |
|---|---|---|---|
| B001 | Actual statutory provider/service jurisdiction | The relevant UTC chapter may govern covered service. | Do not apply it to all Washington electricity/gas. Separate generic municipal, PUD and cooperative authority must be read for those categories. |
| B002 | Master-meter, resale and landlord/service-user classification | Utility-side notice protections may apply independently of customer-of-record identity. | Do not decide rent allocation or landlord authority. Later inquiry: applicable housing/rebilling statutes and exact generic resale authorization. |
| B003 | Prior obligation versus current account debt, deposits and prior-occupant debt | Different refusal/restoration rules apply. | Do not infer debt succession or mandatory payment of every old balance. Compare -123, -113 and -133 without supplying facts. |
| B004 | Operative status/construction of initiative-dependent RCW 80.28.110 gas branch | Only a validated branch can support its particular service-obligation conclusion. | Do not declare a gas-service entitlement from codification alone. Later generic status inquiry must establish amendment/validity/application without prohibited party or case investigation. |
| B005 | Complete operative fee/deposit suspension text and present endpoint | Current collection treatment could differ from the unrepealed codified formula. | Do not infer permission, expiration or universal prohibition. Obtain a readable generic official operative suspension/superseding-rule text and its application/termination clauses. |
| B006 | Effective tariff, approved exception/order, charge category and earned basis | A charge can be assessed only within applicable authority and conditions. | A tariff mention or fee-change notice is not authorization. Actual tariffs/private policies remain excluded; generic tariff-rule/status inquiry remains open. |
| B007 | Lawfully held/required deposit, qualifying estimate and annual interest reference | Codified cap, installment, interest and release relations can be analyzed conditionally. | Do not substitute an annual estimate, H.15 rate, compounding or rounding. The incorporated annual rate remains unverified by design. |
| B008 | Partial-payment allocation and combined-service accounting rule | Express service-attribution and credit provisions still constrain disconnection. | Do not infer customer election, first-in-first-out allocation or allocation to fees before service. Exact generic allocation authority/tariff dependency remains open. |
| B009 | Corrected bill versus estimate true-up; discovery/error event; residential versus exceptional classification | -178’s correction and collection restrictions apply to their branch. | Do not convert six months/six years into universal debt limitations. S015 resolves only the identified meter-test underbilling interaction. |
| B010 | Complete technical meter standard and necessary adoption-by-reference text | Test-charge and correction consequences can follow a valid technical finding. | Do not classify a meter from a headline tolerance. Later inquiry: -338, -999 and the exact incorporated standard/version. |
| B011 | Formal correction/construction of stale references | Substantive text can be reported, but pointer-dependent exceptions remain bounded. | Do not silently change -128(2)(f) to (7)(a)(vi), or -128(9) to (10). Seek generic corrective amendment or formal interpretation. |
| B012 | Relationship between mandatory budget-plan offer and WAC refusal wording | Offer duties and stated refusal criteria must be reconciled. | Do not use -138(2)(b) as unqualified statutory-denial permission. Exact inquiry: RCW .010(7), -013, adoption explanation or formal generic interpretation. |
| B013 | Mailing origin, authorized notice branch, consent, content and applicable computation | Source-specific advance periods can be identified. | No actual notice effectiveness or calendar result. Holiday and unqualified-day computation beyond read text remain open. |
| B014 | Properly established exceptional condition and required earlier notice | -128(7) may supply a distinct branch. | Delinquency or a dishonored payment alone is not fraud. No operational immediate-disconnection conclusion. |
| B015 | Medical energy-dependence, authorized certification category and timely required steps | The medical grace/restoration framework can apply. | No diagnosis, certificate or professional qualifies merely by a label. Medical-licensing and federal/disability-law interfaces remain open. |
| B016 | Certified duration, renewal and interaction with safety conditions | Current duration and repayment provisions govern their branch. | Deleted repeat limits do not apply; absence of that limit is not an indefinite service guarantee. Exact generic renewal/safety construction remains open. |
| B017 | Third-party responsibility, listed facility status or incorporated critical-infrastructure category | Additional notice/delay/remote safeguards may apply. | Do not classify an actual protected customer/facility. Read the exact public infrastructure-plan incorporation only in a later bounded inquiry. |
| B018 | Current final Washington LIHEAP state plan and its operative eligibility provisions | Statutory winter income eligibility can be matched to the incorporated plan. | A program webpage or draft is insufficient. Retrieve the final approved plan and material 42 U.S.C. 8624 scope/application clauses. |
| B019 | Statutory “arrearage” versus older WAC “billings,” income measure and qualifying application event | The statute supplies a bounded ceiling using its own base. | Do not substitute all historical debt or divide annual household income mechanically. Seek a formal generic reconciliation of the differing text. |
| B020 | Winter reconnection fee status after 2023 amendment and any current suspension | Statutory counterfactual plan-due amount remains the identified relation. | Do not reinsert deleted statutory charge conditions from an older rule. Exact inquiry: operative amendments and generic conforming interpretation/order. |
| B021 | Covered electric-service category, qualifying alert and approved request process | Heat nontermination/requested-restoration provisions can operate. | Do not apply the listed-service statute to gas or invent a weather event. Actual tariff/process and weather facts were not examined. |
| B022 | Applicable inclement-weather tariff conditions | Both chapters require such conditions. | No temperature, duration or universal moratorium inferred. Tariff-specific terms remain expressly excluded. |
| B023 | Correct restoration branch, lawful charges and completion of specified predicates | The corresponding reasonable-effort restoration period applies. | Do not treat any payment, all-old-debt demand or informal complaint as a completed restoration trigger. |
| B024 | Complaint category, formal prerequisites and any commission action | Complaint duties and possible commission relief remain available as public-law categories. | Informal submission is not an order or discharge. Special rate-schedule sponsorship is not applied to every complaint. |
| B025 | Causation, findings, recovery procedure and interaction of specific remedies | RCW .220/.230/.440 provide different bounded powers/claims. | No automatic damages, stacking or outcome. Section .240’s exclusive procedure and clocks remain a separate inquiry. |
| B026 | 2025 funding-condition fulfillment and historical application | Only authenticated operative versions can be applied to a historical/legal branch. | Failed budget access proves neither funding nor nullity. Thermal expansion remains outside the completed electric/gas conclusions. |
| B027 | Federal energy assistance, bankruptcy, collection/reporting, disability and military scope | No positive federal outcome is stated here. | Later generic inquiries: final LIHEAP plan/42 U.S.C. 8624; applicable Bankruptcy Code utility/stay/discharge clauses; actual FDCPA/FCRA scope; applicable disability and military protections, with full exceptions. |
| B028 | Public-provider, water/sewer/telecom, thermal, local/tribal/interstate rules | Separate regimes may supply different protections. | Do not infer no protection from exclusion here. Read each applicable generic enabling/protection statute before extending this report. |
| B029 | Company contracts/tariffs, physical outage/restoration capability and actual facts | None supplied or investigated. | No operational instruction, eligibility, cutoff, reconnection, liability or outcome decision follows. |
| B030 | Later amendments, operative general orders and judicial construction outside retrieved bodies | Current code text and verified adopted originals remain bounded evidence. | No “no later change” conclusion from search silence; no case/opinion/docket investigation was performed. |
Wholly blank conceptual worksheet
All response cells are intentionally blank.
| Analytical field | Entry |
|---|---|
| Public-law service category | |
| Governing jurisdiction provision | |
| Applicable statutory definition | |
| Applicable administrative chapter | |
| Material exclusion or alternative regime | |
| Source ID and complete section | |
| Source version and effective/application clause | |
| Charge category | |
| Deposit or security distinction | |
| Disputed/undisputed distinction | |
| Payment-allocation authority | |
| Applicable notice branch | |
| Notice event and source-stated unit | |
| Payment-arrangement category | |
| Seasonal-protection authority | |
| Medical-protection authority | |
| Restoration branch | |
| Symbolic relation reference | |
| Unread incorporation | |
| Currentness or suspension dependency | |
| Construction dependency | |
| Exact next generic authority inquiry |
Granular coverage and retained scope
“Answered—text” denotes the bounded public text, not a completed actual application or acceptance of the whole component.
Read/search log
Successful section-window reads are consolidated by instrument; their complete operative bounds and URLs appear in the source register. Reopening a successful source to complete a subsection or verify a pinpoint is not treated as independent corroboration.
| Log ID | Route actually used | Result and disposition |
|---|---|---|
| R001 | Direct official RCW 80.01, 80.04 and 80.28 section/chapter reads | Jurisdiction, definitions, rates, winter/heat, complaint and narrow remedy provisions read as S001/S002/S007. |
| R002 | Direct official electric and gas WAC chapter indexes, then individual consumer-rule bodies | Selected sections completed separately for both services; source table records every relied section. Whole chapters not claimed read. |
| R003 | Generic primary searches for "20-16-077" "PERMANENT" and 2025/2026 disconnection amendments | Located adopted 2020 original and enacted 2023/2025/2026 sources. General guides remained discovery rather than operative substitutes. |
| R004 | Generic jurisdiction searches for electric cooperatives, PUDs and UTC rate/service authority | S003–S006 opened and read; no provider, roster or service territory queried. |
| R005 | Generic searches for residential late fees, deposits, disconnection protections and 2025/2026 changes | Located the official 2022 fee-suspension announcement lead and 2026 agenda. No current operative suspension conclusion obtained. |
| R006 | Exact-title alternate search for the official fee-ban announcement; ordinary official rulemaking-agenda route | No readable operative suspension text authenticated. The readable agenda resolves only its own planning-status question. |
| R007 | Commerce LIHEAP/current-plan searches, official program page and draft announcement, links to 2026 plan/2027 draft | Guidance bodies read; linked plan retrievals failed. No final current plan or income ceiling established. |
| R008 | Generic searches for 2025 c 263 funding and enacted operating-budget text | Enacted budget HTML exceeded access limits. Bill-history page was discovery/status material, not proof of the required appropriation. |
| R009 | WAC history index for -023; attempted -113 history index; exact WSR 02-21-066 search | Current deposit bodies read. Original deposit-amendment HTML and official issue-PDF routes failed; historical-original gap retained. |
| R010 | Exact WSR 16-06-038 search, filing notice, official linked later-issue HTML | PDF timed out; linked adopted HTML succeeded. Material explanation and complete Appendix B billing rules read. |
| R011 | Current -183 meter-test clauses compared with -178 and 2016 adoption paragraphs | Formal explanation found for six-month underbilling interaction. Stale pointer and other application issues retained. |
| R012 | Current -194/-195 notice clauses and their -193/-197 and RCW .060 incorporations | Material notice classifications read; no actual tariff or proposed customer rate inspected. |
| R013 | Chapter text searches for "partial payment" and "allocation" | No partial-payment phrase match; allocation hits concerned other subjects. This does not establish absence of every allocation rule. No regulatory-fee percentage was transferred to customer charges. |
| R014 | Completion/verification windows for -128, -113, -143, -153, -179, -123, -173 and current RCW .010 | Exact triggers, differences, credits and qualifications checked. No actual participant documents, certificates or notices examined. |
Discovery-only material kept separate
| Discovery item | Literal URL | Actual status/use |
|---|---|---|
| Current-rule history index for electric definitions | https://apps.leg.wa.gov/WaC/registerfiling.aspx?cite=480-100-023 | Filing index read to locate originals; not the operative consumer rule. |
| Operating-budget bill history | https://app.leg.wa.gov/billsummary/?BillNumber=5167&Year=2025 | Read history/status and attempted ordinary document link. Did not authenticate the funding clause needed by S013. |
| 2002 official Register directory | https://lawfilesext.leg.wa.gov/Law/WSR/2002/21/ | Read only to locate the published issue PDF after the individual original failed. Directory dates are not legal effective dates. |
| Official 2022 fee-ban announcement search result | https://www.utc.wa.gov/news/2022/utc-extends-customer-protections-fee-bans-energy-customers | Search result identified a suspension issue requiring verification. Body inaccessible; not registered as an operative source read. |
| Other generic guides, historical reproductions and irrelevant search hits | Not used as claim authority | No secondary wording, named-provider result, party-specific order or actual record supplies a finding. |
Read, search and failure log
Bounded access/failure log
| Failure ID | Exact attempted ordinary route | Observed result | Materially different route and disposition |
|---|---|---|---|
| F001 | https://app.leg.wa.gov/RCW/default.aspx?cite=80.04.500 | Internal/inaccessible response. | Official full chapter at https://app.leg.wa.gov/RCW/default.aspx?cite=80.04&full=true supplied complete .500. Exact body gap resolved. |
| F002 | https://app.leg.wa.gov/WAC/default.aspx?cite=480-90-008 | Internal/inaccessible response. | Official gas chapter supplied complete -008. No broader access conclusion. |
| F003 | https://app.leg.wa.gov/WAC/default.aspx?cite=480-90-168 | Internal/inaccessible response. | Official gas chapter supplied complete -168. |
| F004 | https://app.leg.wa.gov/WAC/default.aspx?cite=480-07-370 | Internal/inaccessible response. | https://app.leg.wa.gov/WAC/default.aspx?cite=480-07&full=true supplied complete -370. |
| F005 | https://app.leg.wa.gov/RCW/default.aspx?cite=80.04.440 | Internal/inaccessible response. | Complete .440 available through the already-read official chapter rendition. |
| F006 | https://www.utc.wa.gov/news/2022/utc-extends-customer-protections-fee-bans-energy-customers | 403. | Ordinary alternate official discovery did not supply a readable operative suspension/end-date instrument. Current fee/deposit authority remains unresolved in the recorded research. |
| F007 | https://www.utc.wa.gov/sites/default/files/2026-01/Jan-July%202026%20Rule%20Development%20Agenda.pdf | 403. | Official WSR 26-14-084 later-half agenda read. Resolves agenda evidence only, not an operative suspension. |
| F008 | https://deptofcommerce.box.com/s/008hcxgv860alo4gx45lxbknnb7lxywg | Server/redirect failure to the corresponding deptofcommerce.app.box.com public link. | Ordinary Commerce-source searches supplied guidance, not the final operative plan. No authenticated plan threshold. |
| F009 | https://deptofcommerce.box.com/s/5jgeglnyyzvqd0iikydlxiswsnf57pzh | Server/redirect failure to corresponding public Box rendition. | Draft-announcement body read; no final adopted-plan inference. |
| F010 | https://apps.leg.wa.gov/WaC/registerfiling.aspx?cite=480-100-113 | Internal/inaccessible response. | Exact WSR search located the original, followed by F012/F013. Current codified -113 itself was readable. |
| F011 | https://lawfilesext.leg.wa.gov/biennium/2025-26/Htm/Bills/Session%20Laws/Senate/5167-S.SL.htm | Content-too-large error on open/find in the same batch. | Official bill-history/document route did not expose the necessary operative appropriation text in the returned rendition. No funding/nullity conclusion. |
| F012 | https://lawfilesext.leg.wa.gov/law/wsr/2002/21/02-21-066.htm | Internal/inaccessible response. | Official directory located the issue-PDF alternative; see F013. Search excerpts were not treated as full original reading. |
| F013 | https://lawfilesext.leg.wa.gov/Law/WSR/2002/21/02-21.pdf | Content-too-large error. | No further retry. Deposit original remains uncompleted; codified text and displayed credits are identified separately. |
| F014 | https://lawfilesext.leg.wa.gov/law/wsr/2016/07/16-07PERM.pdf | Fetch timeout. | Filing notice’s ordinary link opened the adopted HTML at S015. Relevant original-body gap resolved without PDF pixels. |
| F015 | Additional body-window read of the S013 session-law PDF | Inaccessible response after earlier successful cover/material-section reads. | No identical retry. Earlier read bounds retained; additional tail and funding verification not claimed complete. Current 2026 §8 was separately read, without claiming it resolves every 2025 issue. |
Researcher self-check and continuation boundary
This is a researcher self-check, not independent review.
- Actually read: the selected current RCW and WAC bodies listed above; both electric and gas versions; material 2023/2026 enactment text; selected 2025 amendment/funding language; the 2020 adopted rule changes; the 2016 billing-correction original and its formal explanation; official Commerce guidance and the relevant 2026 agenda.
- Not represented as read: inaccessible suspension text, inaccessible linked LIHEAP plans, inaccessible deposit-rule original, the uncompleted enacted-budget funding clause, company tariffs, private policies, actual accounts or notices, and full incorporated technical standards.
- Newly resolved source issue: the 2016 adoption explanation supplies the specific meter-test/underbilling reconciliation identified in C045. It does not resolve other stale references or judicial construction.
- Material holds preserved: present fee/deposit collection authority; current incorporated LIHEAP threshold; tariff-dependent amounts and inclement-weather conditions; older winter-rule language versus amended statute; budget-plan interaction; technical meter incorporation; initiative-dependent gas-service status; full remedies and judicial construction.
- No numerical application: no income, bill, deposit, rate, balance, medical fact, weather event or customer date was supplied or generated. The worksheet is blank.
- No operational or acceptance conclusion: no disconnection, restoration, payment, complaint, eligibility, liability or outcome was authorized or determined. The other provider classes, sectors, federal regimes, local/tribal/interstate issues and earlier pass holds remain open.
END S_WA the recorded source review.
Read the precise rules and their qualifications
Cash payments require receipts, and designated payment-agency arrangements must provide the prescribed reasonably accessible, no-charge payment opportunity.
Sources for this passage (17)
Source: app.leg.wa.gov; app.leg.wa.gov; app.leg.wa.gov; app.leg.wa.gov; app.leg.wa.gov; app.leg.wa.gov; lawfilesext.leg.wa.gov; lawfilesext.leg.wa.gov; app.leg.wa.gov; lawfilesext.leg.wa.gov; lawfilesext.leg.wa.gov; lawfilesext.leg.wa.gov; lawfilesext.leg.wa.gov; lawfilesext.leg.wa.gov; lawfilesext.leg.wa.gov; commerce.wa.gov; commerce.wa.gov. /(3), -188. This does not establish a universal free-credit-card-payment rule.
The ordinary underbilling collection restriction is six months under the source’s “from the date the error occurred” wording, subject to express exceptions.
Sources for this passage (17)
Source: app.leg.wa.gov; app.leg.wa.gov; app.leg.wa.gov; app.leg.wa.gov; app.leg.wa.gov; app.leg.wa.gov; lawfilesext.leg.wa.gov; lawfilesext.leg.wa.gov; app.leg.wa.gov; lawfilesext.leg.wa.gov; lawfilesext.leg.wa.gov; lawfilesext.leg.wa.gov; lawfilesext.leg.wa.gov; lawfilesext.leg.wa.gov; lawfilesext.leg.wa.gov; commerce.wa.gov; commerce.wa.gov. /(5)(a), (7); ¶¶28–31. No actual first/last included billing period is selected.
Other notice-based grounds include unauthorized purpose/property, increased flat-rate use, required-access problems, rule/agreement/tariff violations and detrimental equipment, on the stated conditions.
Sources for this passage (17)
Source: app.leg.wa.gov; app.leg.wa.gov; app.leg.wa.gov; app.leg.wa.gov; app.leg.wa.gov; app.leg.wa.gov; lawfilesext.leg.wa.gov; lawfilesext.leg.wa.gov; app.leg.wa.gov; lawfilesext.leg.wa.gov; lawfilesext.leg.wa.gov; lawfilesext.leg.wa.gov; lawfilesext.leg.wa.gov; lawfilesext.leg.wa.gov; lawfilesext.leg.wa.gov; commerce.wa.gov; commerce.wa.gov. /(2)(b)–(f); -168. Access is limited to the rule’s authorized-representative, reasonable-hours and necessary-function terms.
The ordinary process requires at least two notices. The first is paper mail or primary-door delivery, with the source’s minimum timing and additional consented electronic copy.
Sources for this passage (17)
Source: app.leg.wa.gov; app.leg.wa.gov; app.leg.wa.gov; app.leg.wa.gov; app.leg.wa.gov; app.leg.wa.gov; lawfilesext.leg.wa.gov; lawfilesext.leg.wa.gov; app.leg.wa.gov; lawfilesext.leg.wa.gov; lawfilesext.leg.wa.gov; lawfilesext.leg.wa.gov; lawfilesext.leg.wa.gov; lawfilesext.leg.wa.gov; lawfilesext.leg.wa.gov; commerce.wa.gov; commerce.wa.gov. /(4)(a)(i), (5). Outside WA/OR/ID mailing uses “eleven days,” not “eleven business days.”
Certification may be required within five business days from the source-defined medical professional, with only the listed residence, aggravation explanation, expected duration and certifier information.
Sources for this passage (17)
Source: app.leg.wa.gov; app.leg.wa.gov; app.leg.wa.gov; app.leg.wa.gov; app.leg.wa.gov; app.leg.wa.gov; lawfilesext.leg.wa.gov; lawfilesext.leg.wa.gov; app.leg.wa.gov; lawfilesext.leg.wa.gov; lawfilesext.leg.wa.gov; lawfilesext.leg.wa.gov; lawfilesext.leg.wa.gov; lawfilesext.leg.wa.gov; lawfilesext.leg.wa.gov; commerce.wa.gov; commerce.wa.gov. /(8)(a). The codified professional definition is preserved; no medical-license or certification determination is made.
Ordinary restoration requires every reasonable effort within the source-stated time after the applicable charge is paid or agreed to be billed and one of the specified cause-removal/payment/arrangement branches is satisfied.
Sources for this passage (17)
Source: app.leg.wa.gov; app.leg.wa.gov; app.leg.wa.gov; app.leg.wa.gov; app.leg.wa.gov; app.leg.wa.gov; lawfilesext.leg.wa.gov; lawfilesext.leg.wa.gov; app.leg.wa.gov; lawfilesext.leg.wa.gov; lawfilesext.leg.wa.gov; lawfilesext.leg.wa.gov; lawfilesext.leg.wa.gov; lawfilesext.leg.wa.gov; lawfilesext.leg.wa.gov; commerce.wa.gov; commerce.wa.gov. /(1)(a)–(c). Electric remote restoration has a separate four-hour relation. Fee/deposit currentness and “prior obligation” distinctions remain.
Generic consumer-information and tariff-access duties exist, including descriptions of credit, deposits, billing, disconnection and disputes.
Sources for this passage (17)
Source: app.leg.wa.gov; app.leg.wa.gov; app.leg.wa.gov; app.leg.wa.gov; app.leg.wa.gov; app.leg.wa.gov; lawfilesext.leg.wa.gov; lawfilesext.leg.wa.gov; app.leg.wa.gov; lawfilesext.leg.wa.gov; lawfilesext.leg.wa.gov; lawfilesext.leg.wa.gov; lawfilesext.leg.wa.gov; lawfilesext.leg.wa.gov; lawfilesext.leg.wa.gov; commerce.wa.gov; commerce.wa.gov. / -193. No actual brochure, tariff, private policy or provider compliance was inspected.
Source versions, access and application limits
- Current codification; latest displayed credit 2007 c 234 §1, with earlier 1985/1961 credits. Historical originals not independently completed.
- §.010 latest credit 2025 c 263 §1, preceded by 2024 c 348 §1 and 2021 c 65 §93; §.110 latest 2021 c 65 §94; §§.160/.500 latest 2011 c 214 §§8/10; §§.220/.230/.240/.440 carry 1961 codification and earlier enactment credits. The 2025 funding-condition issue is retained in S013/B026.
- Current codification; latest displayed credit 1955 c 390 §5. No PUD-specific customer policy or tariff read.
- Current codification; 1969 c 102 §4. Does not itself complete every cooperative classification.
- Current; 1996 c 32 §1. Pole-attachment subject matter was not converted into retail arrears rules.
- Current; 1996 c 32 §2. Same bounded use as S005.
- Current page credits 2026 c 137 §8; 2025 c 263 §4; 2023 c 105 §6, followed by earlier enactments. Material originals are separately registered below.
- §§.050/.060/.080 latest credits 2025 c 263 §§8/9/14. Section .110 displays 2025 c 1 §2, Initiative 2066, and 2024 c 348 §6. Its initiative-dependent service branch is not given an unqualified validity/status conclusion. Emergency-power and utility-theft incorporations were not completed.
- Filed July 29, 2020; stated effective August 29, 2020. Full comment matrix and all appendices were not a substantive foundation. HTML/PDF are one instrument, not independent corroboration.
- Stated effective June 11, 2026. Section 8 reenacts RCW 80.28.010 and changes the reporting/savings provision; it does not replace the winter/heat conditions with an unconditional assistance entitlement. Parsed text, not page-pixel review.
- Cover states July 27, 2025. Section 26 contains a funding-specific null-and-void condition tied to June 30, 2025. Enacted-budget fulfillment was not authenticated. Thermal-energy expansion is not treated as completed in this electricity/natural-gas pass.
- Stated effective July 23, 2023. Material deletion of winter deposit/reconnect-charge language and addition of heat protections authenticated. Other provider regimes in the act not completed.
- Filed February 23, 2016; stated effective March 25, 2016. Formal agency adoption explanation, not a judicial decision. Proposed alternatives and commenter examples are not current rules or examples in this report.
- Filed June 29, 2026, agenda for July–December 2026. It identifies contemplated permanent fee/deposit changes and projected rulemaking milestones. Not an adoption, operative suspension, or proof of completion.
- Official program guidance, not the adopted state-plan body. Numerical guide information is not substituted for the statute’s incorporated current plan.
- Announces a 2027 draft model plan published June 29, 2026. It does not establish final adoption/approval or current operative eligibility. Linked draft retrieval failed.
The underlying research dates are retained below. Publication does not represent a fresh current-law check of every linked source.
The rules are presented within their stated actor, transaction, court, date and source-version limits. No actual account, provider authorization, case, notice or deadline has been established for a reader.
Sources and research notes
This explanation draws on the dated source passages and recorded corrections identified below. Its scope is the stated question, rather than every rule that may affect a particular account.
- app.leg.wa.gov
Source linked by the original explanatory passage; its recorded date and application limits are retained.
- app.leg.wa.gov
Source linked by the original explanatory passage; its recorded date and application limits are retained.
- app.leg.wa.gov
Source linked by the original explanatory passage; its recorded date and application limits are retained.
- app.leg.wa.gov
Source linked by the original explanatory passage; its recorded date and application limits are retained.
- app.leg.wa.gov
Source linked by the original explanatory passage; its recorded date and application limits are retained.
- app.leg.wa.gov
Source linked by the original explanatory passage; its recorded date and application limits are retained.
- app.leg.wa.gov
Source linked by the original explanatory passage; its recorded date and application limits are retained.
- app.leg.wa.gov
Source linked by the original explanatory passage; its recorded date and application limits are retained.
- app.leg.wa.gov
Source linked by the original explanatory passage; its recorded date and application limits are retained.
- app.leg.wa.gov
Source linked by the original explanatory passage; its recorded date and application limits are retained.
- app.leg.wa.gov
Source linked by the original explanatory passage; its recorded date and application limits are retained.
- lawfilesext.leg.wa.gov
Source linked by the original explanatory passage; its recorded date and application limits are retained.
- lawfilesext.leg.wa.gov
Source linked by the original explanatory passage; its recorded date and application limits are retained.
- app.leg.wa.gov
Source linked by the original explanatory passage; its recorded date and application limits are retained.
- lawfilesext.leg.wa.gov
Source linked by the original explanatory passage; its recorded date and application limits are retained.
- lawfilesext.leg.wa.gov
Source linked by the original explanatory passage; its recorded date and application limits are retained.
- lawfilesext.leg.wa.gov
Source linked by the original explanatory passage; its recorded date and application limits are retained.
- lawfilesext.leg.wa.gov
Source linked by the original explanatory passage; its recorded date and application limits are retained.
- lawfilesext.leg.wa.gov
Source linked by the original explanatory passage; its recorded date and application limits are retained.
- lawfilesext.leg.wa.gov
Source linked by the original explanatory passage; its recorded date and application limits are retained.
- commerce.wa.gov
Source linked by the original explanatory passage; its recorded date and application limits are retained.
- commerce.wa.gov
Source linked by the original explanatory passage; its recorded date and application limits are retained.
- app.leg.wa.gov
Source linked by the original explanatory passage; its recorded date and application limits are retained.
- app.leg.wa.gov
Source linked by the original explanatory passage; its recorded date and application limits are retained.
- app.leg.wa.gov
Source linked by the original explanatory passage; its recorded date and application limits are retained.
- app.leg.wa.gov
Source linked by the original explanatory passage; its recorded date and application limits are retained.
- app.leg.wa.gov
Source linked by the original explanatory passage; its recorded date and application limits are retained.
- app.leg.wa.gov
Source linked by the original explanatory passage; its recorded date and application limits are retained.
- app.leg.wa.gov
Source linked by the original explanatory passage; its recorded date and application limits are retained.
- app.leg.wa.gov
Source linked by the original explanatory passage; its recorded date and application limits are retained.
- app.leg.wa.gov
Source linked by the original explanatory passage; its recorded date and application limits are retained.
- app.leg.wa.gov
Source linked by the original explanatory passage; its recorded date and application limits are retained.
- app.leg.wa.gov
Source linked by the original explanatory passage; its recorded date and application limits are retained.
- app.leg.wa.gov
Source linked by the original explanatory passage; its recorded date and application limits are retained.
- app.leg.wa.gov
Source linked by the original explanatory passage; its recorded date and application limits are retained.
- app.leg.wa.gov
Source linked by the original explanatory passage; its recorded date and application limits are retained.
- app.leg.wa.gov
Source linked by the original explanatory passage; its recorded date and application limits are retained.
- app.leg.wa.gov
Source linked by the original explanatory passage; its recorded date and application limits are retained.
- app.leg.wa.gov
Source linked by the original explanatory passage; its recorded date and application limits are retained.
- app.leg.wa.gov
Source linked by the original explanatory passage; its recorded date and application limits are retained.
- app.leg.wa.gov
Source linked by the original explanatory passage; its recorded date and application limits are retained.
- app.leg.wa.gov
Source linked by the original explanatory passage; its recorded date and application limits are retained.
- app.leg.wa.gov
Source linked by the original explanatory passage; its recorded date and application limits are retained.
- app.leg.wa.gov
Source linked by the original explanatory passage; its recorded date and application limits are retained.
- app.leg.wa.gov
Source linked by the original explanatory passage; its recorded date and application limits are retained.
- app.leg.wa.gov
Source linked by the original explanatory passage; its recorded date and application limits are retained.
- app.leg.wa.gov
Source linked by the original explanatory passage; its recorded date and application limits are retained.
- app.leg.wa.gov
Source linked by the original explanatory passage; its recorded date and application limits are retained.
- app.leg.wa.gov
Source linked by the original explanatory passage; its recorded date and application limits are retained.
- app.leg.wa.gov
Source linked by the original explanatory passage; its recorded date and application limits are retained.
- app.leg.wa.gov
Source linked by the original explanatory passage; its recorded date and application limits are retained.
- app.leg.wa.gov
Source linked by the original explanatory passage; its recorded date and application limits are retained.
- app.leg.wa.gov
Source linked by the original explanatory passage; its recorded date and application limits are retained.
- app.leg.wa.gov
Source linked by the original explanatory passage; its recorded date and application limits are retained.
- app.leg.wa.gov
Source linked by the original explanatory passage; its recorded date and application limits are retained.
- app.leg.wa.gov
Source linked by the original explanatory passage; its recorded date and application limits are retained.
- app.leg.wa.gov
Source linked by the original explanatory passage; its recorded date and application limits are retained.
- app.leg.wa.gov
Source linked by the original explanatory passage; its recorded date and application limits are retained.
- app.leg.wa.gov
Source linked by the original explanatory passage; its recorded date and application limits are retained.
- app.leg.wa.gov
Source linked by the original explanatory passage; its recorded date and application limits are retained.
- app.leg.wa.gov
Source linked by the original explanatory passage; its recorded date and application limits are retained.
- app.leg.wa.gov
Source linked by the original explanatory passage; its recorded date and application limits are retained.
- app.leg.wa.gov
Source linked by the original explanatory passage; its recorded date and application limits are retained.
- app.leg.wa.gov
Source linked by the original explanatory passage; its recorded date and application limits are retained.
- app.leg.wa.gov
Source linked by the original explanatory passage; its recorded date and application limits are retained.
- app.leg.wa.gov
Source linked by the original explanatory passage; its recorded date and application limits are retained.
- app.leg.wa.gov
Source linked by the original explanatory passage; its recorded date and application limits are retained.
- app.leg.wa.gov
Source linked by the original explanatory passage; its recorded date and application limits are retained.
- app.leg.wa.gov
Source linked by the original explanatory passage; its recorded date and application limits are retained.
- app.leg.wa.gov
Source linked by the original explanatory passage; its recorded date and application limits are retained.
- app.leg.wa.gov
Source linked by the original explanatory passage; its recorded date and application limits are retained.
- app.leg.wa.gov
Source linked by the original explanatory passage; its recorded date and application limits are retained.
- app.leg.wa.gov
Source linked by the original explanatory passage; its recorded date and application limits are retained.
- app.leg.wa.gov
Source linked by the original explanatory passage; its recorded date and application limits are retained.
- app.leg.wa.gov
Source linked by the original explanatory passage; its recorded date and application limits are retained.
- app.leg.wa.gov
Source linked by the original explanatory passage; its recorded date and application limits are retained.
- app.leg.wa.gov
Source linked by the original explanatory passage; its recorded date and application limits are retained.
- app.leg.wa.gov
Source linked by the original explanatory passage; its recorded date and application limits are retained.
- app.leg.wa.gov
Source linked by the original explanatory passage; its recorded date and application limits are retained.
- app.leg.wa.gov
Source linked by the original explanatory passage; its recorded date and application limits are retained.
- app.leg.wa.gov
Source linked by the original explanatory passage; its recorded date and application limits are retained.
- app.leg.wa.gov
Source linked by the original explanatory passage; its recorded date and application limits are retained.
- app.leg.wa.gov
Source linked by the original explanatory passage; its recorded date and application limits are retained.
- app.leg.wa.gov
Source linked by the original explanatory passage; its recorded date and application limits are retained.
- app.leg.wa.gov
Source linked by the original explanatory passage; its recorded date and application limits are retained.
- app.leg.wa.gov
Source linked by the original explanatory passage; its recorded date and application limits are retained.
- app.leg.wa.gov
Source linked by the original explanatory passage; its recorded date and application limits are retained.
- app.leg.wa.gov
Source linked by the original explanatory passage; its recorded date and application limits are retained.
- app.leg.wa.gov
Source linked by the original explanatory passage; its recorded date and application limits are retained.
- app.leg.wa.gov
Source linked by the original explanatory passage; its recorded date and application limits are retained.
- app.leg.wa.gov
Source linked by the original explanatory passage; its recorded date and application limits are retained.
- app.leg.wa.gov
Source linked by the original explanatory passage; its recorded date and application limits are retained.
- app.leg.wa.gov
Source linked by the original explanatory passage; its recorded date and application limits are retained.
- app.leg.wa.gov
Source linked by the original explanatory passage; its recorded date and application limits are retained.
- app.leg.wa.gov
Source linked by the original explanatory passage; its recorded date and application limits are retained.
- app.leg.wa.gov
Source linked by the original explanatory passage; its recorded date and application limits are retained.
- app.leg.wa.gov
Source linked by the original explanatory passage; its recorded date and application limits are retained.
- app.leg.wa.gov
Source linked by the original explanatory passage; its recorded date and application limits are retained.
- app.leg.wa.gov
Source linked by the original explanatory passage; its recorded date and application limits are retained.
- app.leg.wa.gov
Source linked by the original explanatory passage; its recorded date and application limits are retained.
- app.leg.wa.gov
Source linked by the original explanatory passage; its recorded date and application limits are retained.
- app.leg.wa.gov
Source linked by the original explanatory passage; its recorded date and application limits are retained.
- app.leg.wa.gov
Source linked by the original explanatory passage; its recorded date and application limits are retained.
- app.leg.wa.gov
Source linked by the original explanatory passage; its recorded date and application limits are retained.
- app.leg.wa.gov
Source linked by the original explanatory passage; its recorded date and application limits are retained.
- app.leg.wa.gov
Source linked by the original explanatory passage; its recorded date and application limits are retained.
- app.leg.wa.gov
Source linked by the original explanatory passage; its recorded date and application limits are retained.
- app.leg.wa.gov
Source linked by the original explanatory passage; its recorded date and application limits are retained.
- app.leg.wa.gov
Source linked by the original explanatory passage; its recorded date and application limits are retained.
- app.leg.wa.gov
Source linked by the original explanatory passage; its recorded date and application limits are retained.
- app.leg.wa.gov
Source linked by the original explanatory passage; its recorded date and application limits are retained.
- app.leg.wa.gov
Source linked by the original explanatory passage; its recorded date and application limits are retained.
- app.leg.wa.gov
Source linked by the original explanatory passage; its recorded date and application limits are retained.
- app.leg.wa.gov
Source linked by the original explanatory passage; its recorded date and application limits are retained.
- app.leg.wa.gov
Source linked by the original explanatory passage; its recorded date and application limits are retained.
- app.leg.wa.gov
Source linked by the original explanatory passage; its recorded date and application limits are retained.
- app.leg.wa.gov
Source linked by the original explanatory passage; its recorded date and application limits are retained.
- app.leg.wa.gov
Source linked by the original explanatory passage; its recorded date and application limits are retained.
- app.leg.wa.gov
Source linked by the original explanatory passage; its recorded date and application limits are retained.
- app.leg.wa.gov
Source linked by the original explanatory passage; its recorded date and application limits are retained.
- app.leg.wa.gov
Source linked by the original explanatory passage; its recorded date and application limits are retained.
- app.leg.wa.gov
Source linked by the original explanatory passage; its recorded date and application limits are retained.
- app.leg.wa.gov
Source linked by the original explanatory passage; its recorded date and application limits are retained.
- app.leg.wa.gov
Source linked by the original explanatory passage; its recorded date and application limits are retained.
- app.leg.wa.gov
Source linked by the original explanatory passage; its recorded date and application limits are retained.
- app.leg.wa.gov
Source linked by the original explanatory passage; its recorded date and application limits are retained.
- app.leg.wa.gov
Source linked by the original explanatory passage; its recorded date and application limits are retained.
- app.leg.wa.gov
Source linked by the original explanatory passage; its recorded date and application limits are retained.
- app.leg.wa.gov
Source linked by the original explanatory passage; its recorded date and application limits are retained.
- app.leg.wa.gov
Source linked by the original explanatory passage; its recorded date and application limits are retained.
- app.leg.wa.gov
Source linked by the original explanatory passage; its recorded date and application limits are retained.
- apps.leg.wa.gov
Source linked by the original explanatory passage; its recorded date and application limits are retained.
- app.leg.wa.gov
Source linked by the original explanatory passage; its recorded date and application limits are retained.
- lawfilesext.leg.wa.gov
Source linked by the original explanatory passage; its recorded date and application limits are retained.
- utc.wa.gov
Source linked by the original explanatory passage; its recorded date and application limits are retained.
- apps.leg.wa.gov
Source linked by the original explanatory passage; its recorded date and application limits are retained.
- app.leg.wa.gov
Source linked by the original explanatory passage; its recorded date and application limits are retained.
- app.leg.wa.gov
Source linked by the original explanatory passage; its recorded date and application limits are retained.
- app.leg.wa.gov
Source linked by the original explanatory passage; its recorded date and application limits are retained.
- app.leg.wa.gov
Source linked by the original explanatory passage; its recorded date and application limits are retained.
- app.leg.wa.gov
Source linked by the original explanatory passage; its recorded date and application limits are retained.
- app.leg.wa.gov
Source linked by the original explanatory passage; its recorded date and application limits are retained.
- app.leg.wa.gov
Source linked by the original explanatory passage; its recorded date and application limits are retained.
- utc.wa.gov
Source linked by the original explanatory passage; its recorded date and application limits are retained.
- deptofcommerce.box.com
Source linked by the original explanatory passage; its recorded date and application limits are retained.
- deptofcommerce.box.com
Source linked by the original explanatory passage; its recorded date and application limits are retained.
- apps.leg.wa.gov
Source linked by the original explanatory passage; its recorded date and application limits are retained.
- lawfilesext.leg.wa.gov
Source linked by the original explanatory passage; its recorded date and application limits are retained.
- lawfilesext.leg.wa.gov
Source linked by the original explanatory passage; its recorded date and application limits are retained.
- lawfilesext.leg.wa.gov
Source linked by the original explanatory passage; its recorded date and application limits are retained.
- lawfilesext.leg.wa.gov
Source linked by the original explanatory passage; its recorded date and application limits are retained.
- app.leg.wa.gov
Source linked by the original explanatory passage; its recorded date and application limits are retained.
- app.leg.wa.gov
Source linked by the original explanatory passage; its recorded date and application limits are retained.
- app.leg.wa.gov
Source linked by the original explanatory passage; its recorded date and application limits are retained.
- app.leg.wa.gov
Source linked by the original explanatory passage; its recorded date and application limits are retained.
Original research and corrections
Explore this subject: Utilities and telecom debt Direct creditor hardship State local territorial and tribal rules