What should you know about solar leases and power purchase agreements?
What to know
A solar lease, power purchase agreement and ownership loan create different payment and transfer obligations. The agreement and current servicer determine what must be checked.
This guide organizes the selected Palmetto, Sunnova, legacy SunPower, Sunrun and Tesla evidence. It preserves distinctions between legacy contracts, servicing continuity, property transfers and owned systems.
Research recorded November 12, 2026 – November 13, 2026. Each section preserves the source’s scope, dates and exceptions.
Palmetto LightReach solar lease and PPA billing and transfer
Research recorded November 13, 2026
Palmetto describes LightReach Energy Plans as equipment leases or PPAs with third-party ownership, system warranty and maintenance coverage, and a predictable monthly amount based on average forecast production. Its installer guide distinguishes PPA escalation applied to the per-kWh rate from lease escalation applied to the monthly lease amount. It describes the production guarantee with a Florida exception. Rates, escalators and product availability depend on the applicable agreement and market.
Source: help.palmetto.finance · 8284466 solar energy plans overview (source 1) palmetto.com · get lightreach (source 2)
The LightReach installer guide says a first bill typically arrives about 15 days after permission to operate with meaningful production measured and first payment typically is due around 30 days after permission to operate. It describes 30-day billing cycles, 15-day payment terms and possible delay if the installer submits activation approval late. It identifies ACH as a notice-to-proceed requirement and says a post-activation exception for extenuating circumstances may remove the $15 monthly discount. The guide says late fees or deactivation may apply after 60 or more days and describes no general payment deferral while allowing case-specific support.
Source: help.palmetto.finance · 8284527 solar energy plan prepping to sell setting expectations (source 3)
The standard March 2026 options guide describes system purchase at or after the fifth anniversary of interconnection, upon home sale during the lease term, or at the end of the 25-year term. It specifies written notice within 60 days of the applicable date, payment within 30 days of invoice, fair-market valuation by a third-party appraiser and homeowner responsibility for subsequent repairs and maintenance. These are guide terms, with pricing, timing and any special conditions governed by the contract.
Source: help.palmetto.finance · 8312929 solar energy plan pre pay purchase options (source 4)
The standard guide describes prepayment after activation with a 5% discount from the remaining Energy Plan payments, generally shown in Exhibit F and adjusted for payments already made. Prepayment retains Energy Plan coverage, while equipment purchase ends the plan-specific coverage and transfers future repairs and maintenance to the buyer. The guide lists no-cost removal, fair-market-value purchase or extension at a new rate among end-of-term choices, subject to the contract and renewal response.
Source: help.palmetto.finance · 8312929 solar energy plan pre pay purchase options (source 4)
For a home sale, the standard guide describes buyer qualification and a signed transfer agreement. It says a seller can consider system purchase or prepayment if the buyer does not qualify and describes possible UCC-1 release on purchase or transfer upon assignment. The public consumer site offers a moving or refinancing inquiry route. Neither establishes transfer approval, release of the original customer, priority of any filing or actual sale outcomes.
Source: help.palmetto.finance · 8312929 solar energy plan pre pay purchase options (source 4) palmetto.com · lightreach system transfer (source 5)
The separate New Community guide distinguishes contracted GAF projects from Palmetto LightReach contracts. It describes no prepayment option, a purchase after activation with 30 days written notice and good standing, and a transfer with at least 30 days notice for its GAF branch. Its LightReach branch describes a 5% discounted prepayment after permission to operate if payments are current, a purchase request after at least five years installed, and a transfer with at least 15 days notice and buyer qualification/signature. The New Community guide is contract-specific and its timing triggers are preserved separately from the standard interconnection-anniversary guide.
Source: help.palmetto.finance · 8312929 solar energy plan pre pay purchase options (source 4) newcommunity.palmetto.finance · 12694759 new community pre payment transfer purchase process (source 6)
Source scope and limits
Actual agreement type, owner or assignee, quote, billing date and charge, escrow, escalator, term, buyout amount and deadline, coverage, UCC release and seller liability remain individually unverified. No account, signed customer contract or form submission was used as evidence. The California PPA sample linked by the public installer guide returned a cache miss. No unchanged retry was made. The native failure contained an expiring signed download URL, so the report preserves the failure class and originating source pin without saving the signed URL. A public regulatory search surfaced a customer-specific New York form; it was excluded from the evidence packet and contributes no claim. No general early cancellation, contract refund, hardship approval or specific settlement term was established. Guide descriptions of possible late fees, deactivation and case-specific support do not determine individual eligibility or legal remedies. Preserve LightReach third-party ownership and lease/PPA terms, standard versus New Community and GAF branches, exact notice triggers, purchase versus prepayment and seller release limits. No individual lender, owner, price or rights inferred.
Sunnova U.S. solar agreements and SunStrong servicing
Research recorded November 13, 2026
The September 2025 transaction announcement says Solaris Assets, LLC and affiliates acquired substantially all Sunnova assets and business operations, including the servicing and operations platform and solar portfolio, with SunStrong Management, LLC as asset manager for Solaris’s leases, loans and PPAs. Sunnova’s November 2, 2025 notice says it ceased independent operations and SunStrong took on billing, collections and support for acquired in-service accounts, described as most such systems. This corporate scope does not establish an individual agreement’s owner or servicer.
Source: businesswire.com · Solaris Completes Acquisition of Sunnova to Secure Long Term Continuity of Operations and Solar Asset Management (source 7) sunnova.com · solar production guarantee (source 8)
Sunnova’s transition notice says affected customers should continue payment arrangements until SunStrong sends updated instructions, and identifies a separate GoodLeap route for certain qualifying installations still in progress. SunStrong’s current public billing page provides separate Sunnova payment links for lease/PPA and loan. Its help center describes transition instructions and billing continuity, with agreement escalators and changes to sales tax expressly preserved in its guidance.
Source: sunstrongmanagement.com · help center (source 9) sunstrongmanagement.com · account (source 10) sunnova.com · solar production guarantee (source 8)
Sunnova’s 2024 Form 10-K describes Easy Plan equipment lease payments as fixed monthly amounts typically subject to annual escalation, LeasePlus and Solar Benefits Agreement as fixed without escalation, and Prepaid LeasePlus as prepaid upfront. It describes lease and PPA monthly obligations and possible additional renewal terms, and reports that approximately 41% of lease and PPA agreements had annual escalators ranging 0.9% to 3.9% as of December 31, 2024. It describes Sunnova owning, operating and maintaining lease and PPA systems under these historical terms.
Source: SEC · nova 20241231 (source 11)
The same filing distinguishes variable Easy Plan PPA bills based on actual output at a per-kWh rate, balanced bills based on an annual production estimate and subject to true-up, and a new-home fixed-rate PPA without annual escalation. For the balanced plan the filing describes a bill credit when estimated annual output exceeds actual and potential later treatment of overproduction. The filing separately describes performance credits or refunds in most lease and Easy Own agreements when specified guarantees are missed. These are historical program descriptions and do not determine current account credits.
Source: SEC · nova 20241231 (source 11)
For the historical Easy Own Plan, the 2024 filing describes equipment purchase from a dealer using Sunnova financing, purchase of the agreement from the dealer, monthly repayment of the amount financed plus a finance charge over 10, 15 or 25 years, and part or full principal prepayment without penalty. The legacy transfer brochure distinguishes Sunnova ownership under a lease or PPA from a security interest under Easy Own and describes Easy Own payoff or credit-qualified assumption in connection with a home sale. The historic financing and servicing description does not establish a present holder or contract.
Source: SEC · nova 20241231 (source 11) sunnova.com · Sunnova Transfer of Service Brochure 12042023 FINAL 20 (source 12)
The 2024 filing describes home-sale reassignment under prescribed procedures with credit conditions and names exceptions with no credit check for specific products including Easy Plan equipment lease and certain new-home offerings. It describes seller prepayment or a prospective buyer’s cash deposit where credit criteria are not met or the buyer declines inquiry, subject to agreement or policy. The legacy brochure describes both parties signing, effectiveness after closing confirmation, seller payment responsibility until all transfer steps are satisfied, and a separate prepaid or paid-off warranty-transfer branch. The historical terms are not current SunStrong eligibility or seller release evidence.
Source: SEC · nova 20241231 (source 11) sunnova.com · Sunnova Transfer of Service Brochure 12042023 FINAL 20 (source 12)
Sunnova’s historical buyer guide distinguishes a financed system loan payoff from a leased or PPA system and presents the latter’s purchase option as something to verify for the specific agreement. The legacy brochure similarly treats financed Easy Own equipment payoff as distinct from moving the system or transferring the remaining loan. No current uniform SunStrong buyout right, price, purchase date or closing timeline was established.
Source: sunnova.com · Sunnova Transfer of Service Brochure 12042023 FINAL 20 (source 12) sunnova.com · transfer faq.ashx (source 13)
Source scope and limits
Actual asset ownership, lender or servicing role, agreement and coverage, account payment direction, billing and sales tax, escalators and project eligibility remain individually unverified. The Solaris announcement and Sunnova notice do not cover every portfolio or agreement. Legacy SEC and consumer guides describe distinct historical product, plan and transfer conditions. They do not establish current qualification, inquiry type, deposit, buyout or prepayment right, fee, seller release, closing treatment or lien action. Current purchase or early termination price and timing, uncompleted-project relief, hardship and ordinary refund allocation remain held. No current general buyout schedule or product-specific relief terms were identified in the targeted public sources. No private account, executed agreement, customer notice, court docket or active case was opened. Transaction status relies on first-party public statements. Preserve Solaris acquisition and SunStrong asset management and servicing scope, GoodLeap in-progress exception and current payment routes. Keep historical Easy Plan, Easy Own, PPA, prepaid and reassignment branches tied to original sources. Individual holder, buyout and transfer held.
Legacy SunPower U.S. solar agreements and servicing continuity
Research recorded November 13, 2026
SunPower Inc., formerly Complete Solaria, says its September 30, 2024 transaction acquired certain Blue Raven Solar, New Homes and Non-Installing Dealer assets plus the SunPower brand and related intellectual property. It says the asset purchase did not include interests in legacy customer PPAs, leases, or systems and equipment installed before that acquisition date. It directs legacy pre-acquisition cash or loan customers to the lender where applicable and lease/PPA customers to their financier or SunStrong. That is the purchaser’s published acquisition and support scope, without a particular account determination.
Source: us.sunpower.com · acquisition announcement (source 14) us.sunpower.com · warranty and resources (source 15)
HASI’s 2024 annual note says SunStrong special purpose entities owned individual residential solar assets and that legacy SunPower performed billing, collections, operations and maintenance and other services for those entities. It says a third party purchased SunPower’s interests in those entities in October 2024 and that HASI arranged replacement service providers for continuity. SunStrong’s corporate timeline separately says it assumed management of over 110,000 former SunPower customers and assets. The documented investor and servicing events do not establish universal ownership or servicing.
Source: sunstrongmanagement.com · company (source 16) SEC · source document (source 17)
SunStrong’s current homeowner account page lists one third-party billing route for the former SunPower lease, loan and PPA categories. Its help center says transferred customers can identify account management from the transition notice or a post-transfer bill and describes payment continuity unless updated instructions, with existing contractual escalators and possible sales-tax changes preserved. Its former SunPower monitoring app is separately described from billing, with basic and premium functions and included premium features for lease customers.
Source: sunstrongmanagement.com · help center (source 9) sunstrongmanagement.com · account (source 10)
Legacy SunPower’s June 2020 SEC correspondence describes a historical branded loan option with a separate third-party lender financing agreement and monthly payments to that lender. Its July 2023 Form 10-Q describes 20-year agreements entered with third-party leasing partners, and separate arrangements to sell solar loan receivables to a SunStrong joint venture special purpose entity or a trust owned by KKR Credit affiliates. These records distinguish a system sale or installation from an origination, lease and receivables funding route. They do not establish the lender or payee on a specific loan.
Source: SEC · filename1 (source 18) SEC · spwr 20230702 (source 19)
Current SunPower Inc. New Homes support lists separate SunPower/Launch lease, LightReach/Palmetto lease and purchased-system technical support branches. These are named support categories in that channel and do not identify the servicer for all legacy SunPower leases. For systems installed and energized by Blue Raven Solar or Complete Solar, SunPower separately describes support under the installation agreement’s warranties. Maxeon’s own warranty page limits its legacy SunPower panel coverage to panels installed before August 5, 2024 and self-registered with Maxeon before December 31, 2024. Manufacturer and installation support does not itself establish financing or payment relief.
Source: us.sunpower.com · nh contacts (source 20) us.sunpower.com · warranty and resources (source 15) maxeon.com · warranty (source 21)
Source scope and limits
Actual contract type, installation date, lender, loan buyer, owner, servicer, assignment or transition notice, payment schedule, payoff, buyout, transfer, seller release, security filing and account outcomes remain individually unverified. The July 2023 capital transactions and 2024 asset transfers do not determine every agreement. No universal contract cancellation, refund, payment suspension, hardship or settlement option was verified. Monitoring features and warranties are distinct from lease, PPA and loan obligations and do not determine actual warranty eligibility. No login, private documents, payment portal access, outreach, case docket or account investigation was performed. Public notice links to case material were not opened. Preserve SunPower acquisition scope, HASI ownership and servicing history, SunStrong transition and support branches. Actual account owner, holder and servicer held.
Sunrun U.S. solar lease, power purchase and ownership terms
Research recorded November 12, 2026
Sunrun’s public FAQ describes a solar lease as a fixed monthly payment for use of the system and a generation-based power purchase agreement as a price per generated kilowatt-hour. In its fixed monthly subscription billing explanation, the monthly base solar charge uses estimated annual kilowatt-hours times the solar rate divided by 12. The 2025 Form 10-K says Customer Agreement rates may remain fixed or escalate by a predetermined percentage annually. These are different billing arrangements; a quoted rate and escalation schedule depend on the agreement.
Source: SEC · run 20251231 (source 22) sunrun.com · solar faq (source 23)
Sunrun’s filings describe typical initial Customer Agreement terms of 20 or 25 years and operation, monitoring and maintenance during the term. The 2026 quarterly filing says Sunrun owns most projects and sells certain systems under Customer Agreements to third-party investors. The homeowner FAQ describes a 25-year fully prepaid subscription with no monthly Sunrun bill or annual escalator and continued monitoring and maintenance. The 2025 annual report separately describes customized upfront amounts that reduce monthly bills and possible full prepayment of 20- or 25-year contracts.
Source: SEC · run 20251231 (source 22) SEC · run 20260930 (source 24) sunrun.com · solar faq (source 23)
Sunrun’s public billing FAQ describes a standard subscription first bill about 30 days after activation and due roughly two months after activation, Flex billing on the first day of each month, and prepaid payment due on installation. It also says the recurring due date on its activation-date cycle can be adjusted once a year and autopay is processed on the last business day before the due date. Any actual late charge, discount, paper-billing charge, date and utility bill remain agreement or account facts.
Sunrun says customers may purchase solar equipment outright, can change from lease or PPA to purchase before installation, and after installation can exercise purchase only at the times defined in their agreement. At lease end its public FAQ describes fair-market-value purchase, annual renewal or removal. Its 2025 filing describes a typical renewal option and purchase at fair market value or removal, while its third-quarter 2026 filing says Customer Agreements typically automatically renew annually or for a five-year term. These descriptions do not establish a particular contract’s renewal notice requirements, purchase price or timing.
Source: SEC · run 20251231 (source 22) SEC · run 20260930 (source 24) sunrun.com · solar faq (source 23)
For home sale with a lease or PPA, Sunrun describes a transfer request, information for buyer and escrow, signed transfer agreement, soft buyer credit application and completion after escrow. The buyer guide excludes fully prepaid contracts from that credit application step. The annual filing says assignment requires the buyer to satisfy credit requirements and agree to the existing terms; it says a seller can prepay some or all remaining payments, and Sunrun may negotiate with the buyer or seek remaining payments from the original customer if the customer does not buy the system or assign the agreement.
Source: SEC · run 20251231 (source 22) sunrun.com · service transfer buying a sunrun solar home (source 25) sunrun.com · solar faq (source 23) sunrun.com · moving made easy (source 26)
A purchased system is described separately from the solar service agreement, with homeowner ownership and maintenance responsibility outside applicable warranty. Sunrun’s public moving guidance distinguishes a system bought upfront or with a solar loan from a subscription and separately discusses prepaying a service agreement if the buyer does not take it over. Its annual filing describes customer purchases in cash or with third-party financing. These public materials do not identify loan payoff, assumption rights, rates or a lender for an individual purchase.
Source: SEC · run 20251231 (source 22) sunrun.com · service transfer buying a sunrun solar home (source 25) sunrun.com · solar faq (source 23) sunrun.com · moving made easy (source 26)
Source scope and limits
Executed agreement, term, recurring amount, payment type, escalation schedule, anniversary, incentives, purchase dates and price, notice and renewal, late-fee amounts and any release remain unverified. Typical SEC practice and public FAQs can differ by product or vintage. No individual lender, servicing or loan security, transfer eligibility, purchaser approval, seller release, title filing, final invoice, payoff, removal or account result was inspected. No universal early termination, refund, hardship, settlement or relief entitlement was established. Prepayment of a service contract, equipment purchase and loan payoff are distinct mechanisms with separate governing documents. Separate Sunrun lease, production-based PPA, fixed subscriptions, prepaid plans and purchased systems. Preserve annual and quarterly filing vintages, billing and transfer differences, and individual renewal, purchase and financing terms held.
Tesla U.S. solar financing, leases and legacy agreements
Research recorded November 13, 2026
Tesla’s purchasing and billing guidance describes cash and Tesla financing as ownership paths, with cash billed once after inspection and Tesla solar financing through a retail installment contract signed before installation scheduling. It describes a first Tesla financing payment 35 days after permission to operate and subsequent monthly payments on the same date, with amount and due date in the contract. For third-party solar financing it directs the customer to their solar financier. These solar statements do not identify any individual lender or apply to vehicle financing.
Source: tesla.com · billing (source 27) tesla.com · purchasing solar (source 28) tesla.com · tesla solar financing (source 29)
Tesla’s solar financing FAQ describes principal payments to shorten the loan and a distinct contract-limited partial principal payment that may reduce eligible customers’ future payments by paying the estimated incentive-linked amount by the contractual date. It states there is no prepayment penalty and all or part can be prepaid, but the customer may owe the difference if the stated minimum finance charge of $25 to $75, based on original amount financed, exceeds the earned finance charge. The eligible amount and timing are contract facts and do not establish tax qualification.
Tesla’s current lease description for solar-only or solar plus Powerwall specifies a 25-year term, annual 3% escalation and monthly payments starting at permission to operate after inspection. Its process describes a $100 refundable order deposit, $500 progress payment at approvals and Tesla equipment ownership, maintenance, service and monitoring. It lists renewal for five years at a new rate, fair-market-value purchase or Tesla removal with cost at term end. The Powerwall-only term and upfront amount are separate.
Source: tesla.com · leasing solar (source 30) tesla.com · purchasing solar (source 28)
Tesla’s legacy PPA billing FAQ calculates a varying monthly charge using prior-calendar-month generated kilowatt-hours times the contract rate and says the PPA is no longer offered for new systems. The same support page distinguishes fixed monthly lease billing and supports separate account billing access. The current lease page explicitly states annual 3% changes for its named products. Legacy billing language does not establish the escalator on an existing contract.
Source: tesla.com · billing (source 27) tesla.com · leasing solar (source 30)
Tesla’s transfer guidance offers a service-agreement transfer route for a PPA, lease, MyPower loan or subscription and describes signatures, escrow confirmation and a final lease or PPA invoice within two billing cycles for amounts through closing. It distinguishes Tesla solar installment financing, which it says is not transferable and must be paid in full before system transfer, from third-party financing, for which the applicable loan provider handles the loan agreement. The solar agreement or equipment transfer does not itself transfer a separate loan.
Source: tesla.com · transferring ownership (source 31) tesla.com · tesla solar financing (source 29)
Tesla’s September 2026 lease-buyout guide describes a standard opportunity after five full years, a possible earlier higher-price sale-related buyout, and an optional buyer-paid independent appraisal with final price the lower of the contract estimate or appraised fair market value. It says Tesla releases its UCC-1 filing after completed purchase. The separate real-estate support page describes a $150 document processing fee for a temporary release or subordination for its PPA, lease, MyPower or subscription branch, and temporary Tesla-loan release with refiling after 30 days if the loan is not paid in full. Contract dates, filing type, scope and individual outcome were not established by this research.
Source: tesla.com · tesla solar lease buyout guide (source 32) tesla.com · transferring ownership (source 31) tesla.com · leasing solar (source 30)
The Tesla solar FAQ permits order cancellation and a full refund if eligible under its linked terms. The public Energy Order Terms state either party can cancel in writing before materials are delivered for installation, and distinguish Tesla-responsible cancellation with refund of paid deposits and upfront fees from customer cancellation or customer-caused cancellation with those amounts nonrefundable. The current lease page separately calls its $100 order deposit refundable. The sources do not establish which terms govern an individual order, lease termination or refund.
Source: digitalassets.tesla.com · energy order terms (source 33) tesla.com · frequently asked questions (source 34) tesla.com · leasing solar (source 30)
Source scope and limits
Actual signed sale, lease, PPA, MyPower, subscription, loan or order edition, lender/holder/servicer, statement, APR, finance charge, dates, rates and tax qualification remain unverified. No account was accessed. No public universal hardship, forbearance, payment extension, post-installation cancellation or refund-allocation program was verified. Pre-installation order cancellation and separate equipment buyout are different mechanisms. Actual UCC filing, title release, fee, assignment approval, escrow payoff, transfer and final bill remain held. Historical PPA terms and the current offer-specific lease terms require separate verification on a given agreement. The linked order terms describe deposit nonrefundability for customer cancellation, while the current leasing page describes its deposit as refundable. Product and signed terms determine applicability. Preserve current Tesla solar retail installment, solar lease, legacy PPA and MyPower branches. Current lease calls $100 order deposit refundable while general Energy Order Terms distinguish cancellation responsibility and nonrefundable customer cancellation. Governing agreement, lender, refund and transfer held.
Sources and research notes
Source links appear beside the statements they support. A recorded date identifies the saved research, not a new check of every source or a conclusion about an individual account.
Source documents
- help.palmetto.finance · 8284466 solar energy plans overview
- palmetto.com · get lightreach
- help.palmetto.finance · 8284527 solar energy plan prepping to sell setting expectations
- help.palmetto.finance · 8312929 solar energy plan pre pay purchase options
- palmetto.com · lightreach system transfer
- newcommunity.palmetto.finance · 12694759 new community pre payment transfer purchase process
- businesswire.com · Solaris Completes Acquisition of Sunnova to Secure Long Term Continuity of Operations and Solar Asset Management
- sunnova.com · solar production guarantee
- sunstrongmanagement.com · help center
- sunstrongmanagement.com · account
- SEC · nova 20241231
- sunnova.com · Sunnova Transfer of Service Brochure 12042023 FINAL 20
- sunnova.com · transfer faq.ashx
- us.sunpower.com · acquisition announcement
- us.sunpower.com · warranty and resources
- sunstrongmanagement.com · company
- SEC · source document
- SEC · filename1
- SEC · spwr 20230702
- us.sunpower.com · nh contacts
- maxeon.com · warranty
- SEC · run 20251231
- sunrun.com · solar faq
- SEC · run 20260930
- sunrun.com · service transfer buying a sunrun solar home
- sunrun.com · moving made easy
- tesla.com · billing
- tesla.com · purchasing solar
- tesla.com · tesla solar financing
- tesla.com · leasing solar
- tesla.com · transferring ownership
- tesla.com · tesla solar lease buyout guide
- digitalassets.tesla.com · energy order terms
- tesla.com · frequently asked questions
Original research and recorded qualifications
- Palmetto LightReach solar lease and PPA billing and transfer 2026-11-13
- Sunnova U.S. solar agreements and SunStrong servicing 2026-11-13
- Legacy SunPower U.S. solar agreements and servicing continuity 2026-11-13
- Sunrun U.S. solar lease, power purchase and ownership terms 2026-11-12
- Tesla U.S. solar financing, leases and legacy agreements 2026-11-13
Put this information to use
- Match the product, lender, current servicer and account status to the source section that applies to your agreement.
- Ask for the proposed payment, interest or fees, maturity date, credit-reporting treatment and consequences of a missed arrangement payment in writing.
- Compare the proposed arrangement with your essential bills and keep copies of the agreement, notices and payment confirmations.
Explore this subject: Everyday bills and service contracts Loan agreements and account terms Service contracts consent and privacy Creditor collector and buyer profiles