What should you know about New Hampshire utility arrears, disconnection, and payment arrangements?
What to know
A utility shutoff problem calls for the account status, notice dates, service type, and any medical, winter, tenant, or assistance protection. A billing dispute and a repayment arrangement can follow different routes.
The cited New Hampshire rules address ordinary and special disconnection procedures, deposits, charges, complaint handling, language access, and restoration. They do not promise continued service or an assistance award in an individual case.
Research recorded November 12, 2026. Each section preserves the source’s scope, dates and exceptions.
Notices, payment arrangements, and complaints
New Hampshire general residential utility arrears, disconnection and reconnection
Research recorded November 12, 2026
The New Hampshire General Court posts these provisions as Chapter En 1200, Document #13986 effective May 30, 2024. En 1201.02 generally covers public electric, gas, sewer and water utilities, excluding limited electrical energy producers under RSA 362-A and subject to section-specific limits. En 1203.11 expressly excludes sewer disconnections and directs them to En 703.03. En 1201.02 lists En 1203.07 and .11 among exceptions to the general exclusion for rural electric cooperatives with a filed deregulation certificate. En 1203.13 does not appear in that list.
Source: gc.nh.gov · en1200 (source 1)
Under En 1203.07(a), when a residential customer cannot pay the total arrearage, the utility must continue service if the customer agrees to pay a mutually agreed reasonable portion, pay the remaining arrears in mutually agreed reasonable installments and pay current and future bills by their due dates, subject to the separate medical branch. For the specified meter and estimated-bill errors under subsection (d), the arrangement must run at least as long as the rebilled period. A utility may require intervals shorter than monthly for arrangements made in lieu of disconnection or upon reconnection without a deposit.
Source: gc.nh.gov · en1200 (source 1)
Under En 1203.07(g)–(j), the utility must confirm each arrangement in writing and issue a copy by mail or hand delivery within five business days. The confirmation must state possible disconnection for noncompliance and identify the Department consumer division and its toll-free number for disagreements. The utility cannot disconnect for noncompliance with an arrangement that was not timely confirmed in writing and received. Receipt of a mailed confirmation is presumed three calendar days after mailing, or is the actual delivery date when known.
Source: gc.nh.gov · en1200 (source 1)
Under En 1203.07(k)–(p), after arrangement default a new written disconnection notice is required when the previous notice was delivered more than 45 days before the proposed disconnection. The mailed notice must be postmarked at least 14 calendar days before that date. A properly confirmed arrangement otherwise permits disconnection without additional notice, subject to the winter and medical rules. The utility must advise the customer at the end of negotiations about Department review of reasonableness and give its toll-free number. After review, the consumer division must waive the requirement to pay the agreed reasonable portion of arrears, the on-time-payment requirement for current and future bills, or both where necessary based on finances, amount due and payment history.
Source: gc.nh.gov · en1200 (source 1)
Under En 1203.11(b), subject to its stated exceptions, ordinary disconnection notice is written and postmarked 14 calendar days before the proposed date. The notice must identify the customer and account, date and reason, possible consequences, utility and Department contacts, payment-arrangement and contest options and the prescribed medical-emergency warning. It must prominently state that the customer may disregard the notice if a current En 1203.07 arrangement has been negotiated.
Source: gc.nh.gov · en1200 (source 1)
En 1203.11(c) permits disconnection without customer notice on four stated grounds: unauthorized or fraudulent service, clear abandonment demonstrated by 60 calendar days of vacancy and nonoccupancy, danger to others’ health, safety or utility service, or clear and present danger to life, health or physical property. It requires Department notice within 48 hours, with an exception for disconnection at the request of state or municipal officials. The rule does not impose a duty to know of or guard against the dangerous condition and says the winter and medical provisions do not limit subsection (c).
Source: gc.nh.gov · en1200 (source 1)
Subject to En 1203.11(h) and the winter and medical rules, subsection (g) allows post-notice residential disconnection for unpaid arrears after proper demand, failure to satisfy the specified deposit or alternatives requirement, failure both to pay and to enter a payment arrangement by the bill due date, or refusal of needed access to utility property. Subsection (h) prohibits both notice and disconnection when arrears are both under 60 calendar days old and under $100, when the unpaid bill is for nonutility service, or when a municipal welfare office has guaranteed the average monthly bill and the customer agrees to a reasonable repayment arrangement.
Source: gc.nh.gov · en1200 (source 1)
For prior residential service in someone else’s name, En 1203.11(h)(4) prohibits notice and disconnection unless four conditions are met. The current customer and the other person lived together where the arrears were incurred, both benefited from that utility service, both currently live together at the current service address and benefit from current service, and the person other than the customer of record refuses an En 1203.07 arrangement.
Source: gc.nh.gov · en1200 (source 1)
Absent special arrangements, En 1203.11(j) restricts residential disconnection to 8 a.m. through 3:30 p.m. Monday through Thursday. Subsection (k) excludes state or federal holidays, days the Department is closed to the public and the day before either. Subsection (n) allows eight business days from the proposed disconnection date to carry it out. Except as limited by En 1205.05, the employee must notify an adult resident or leave written notice if no adult is present. That notice must give reconnection procedures and utility and Department contact information.
Source: gc.nh.gov · en1200 (source 1)
When an employee is sent to disconnect residential service and the customer tenders the entire past-due amount, En 1203.11(q) requires acceptance, a receipt and continued service if the employee knows the full amount and need not make change or negotiate an arrangement. Otherwise the employee must leave service connected and direct immediate payment at the closest utility office or payment agency. Tariff-authorized collection charges may apply. The utility need not follow the on-site tender procedure more than twice in 12 months.
Source: gc.nh.gov · en1200 (source 1)
Under En 1203.13(a)–(b), the utility must reconnect on request when the cause is removed. After an arrears disconnection it must reconnect on request when all arrears are paid, the customer agrees to an En 1203.07 arrangement, or the customer supplies evidence of an eligible welfare or social-service commitment to pay an amount equal to the average monthly bill and agrees to an En 1203.07 arrangement.
Source: gc.nh.gov · en1200 (source 1)
The utility must endeavor to reconnect during regular business hours the day of the request. The rule calls for an after-hours attempt when requested and states that the utility has no obligation to make that attempt unless a medical emergency exists. The Department must order after-hours reconnection if it determines a medical emergency, potential property damage or other significant risk requiring immediate reconnection. En 1203.13(e) specifies a tariff fee with exceptions for a cause of disconnection outside the named rule requirements or Department-ordered after-hours reconnection.
Source: gc.nh.gov · en1200 (source 1)
Source scope and limits
NH Document #13986 ordinary rules. Preserve exact scope, confirmation and disconnection clocks, tender and reconnection exceptions, and printed cross-reference mismatch as held.
New Hampshire mediation of utility complaints other than disconnection
Research recorded November 12, 2026
The New Hampshire General Court posts En 1203.17 in Document #13986, effective May 30, 2024. En 1201.02 generally covers public electric, gas, sewer and water utilities, excluding limited electrical energy producers under RSA 362-A and subject to the chapter’s terms. En 1203.17 is outside the exceptions to the general exclusion of rural electric cooperatives with a deregulation certificate on file.
Source: gc.nh.gov · en1200 (source 1)
Under En 1202.03, a complaint is customer dissatisfaction the utility has not resolved to the customer’s satisfaction after supervisory intervention or a request for such intervention. En 1202.04 defines a conference as a meeting in person or by telephone with the customer, utility and Department staff. Under En 1203.17(a), a conference may be held among the customer, utility and Department consumer division after their prior discussions fail to resolve the complaint satisfactorily.
Source: gc.nh.gov · en1200 (source 1)
Under En 1203.17(b)–(c), the utility or customer may request a conference, and the utility must tell the customer about their right to request one with Department staff. The consumer division must deny a request if there is no violation of Department rules or the utility’s tariff, or if efforts to otherwise mediate are inappropriate, as the rule states.
Source: gc.nh.gov · en1200 (source 1)
Under En 1203.17(d)–(e), a granted conference must be held at the customer’s convenience during normal business hours within 15 business days after the request. Department staff must prepare and provide the conference outcome report to all parties within ten business days after the conference.
Source: gc.nh.gov · en1200 (source 1)
A customer or utility dissatisfied with the mediation outcome or the consumer division’s refusal to grant a conference may file a formal complaint with the Department under RSA 365:1. The current published statute requires a written petition alleging a listed violation by an entity subject to Department or Commission jurisdiction, a prior same or substantially similar complaint to the Department’s consumer services division and exhaustion of all available remedies there. The statute’s latest printed amendment took effect September 30, 2025.
Source: gc.nh.gov · 365 1 (source 2) gc.nh.gov · en1200 (source 1)
En 1203.17(g) bars disconnection for nonpayment of a disputed amount until the customer exhausts all remedies before the Department and, when the Commission has jurisdiction, the Commission.
Source: gc.nh.gov · en1200 (source 1)
Source scope and limits
Preserve En 1203.17 Document #13986 effective May 30, 2024 and RSA 365:1 September 30, 2025 amendment separately. Preserve utility coverage and exclusions, conference denial conditions, 15 and 10 business-day clocks, formal complaint prerequisites and disconnection protection for disputed amounts through applicable exhaustion. Actual case and jurisdiction held.
New Hampshire utility bill contents, arrears terms and billing dispute referrals
Research recorded November 12, 2026
The General Court posts En 1203.06 under Document #13986 effective May 30, 2024. The chapter generally covers public electric, gas, sewer and water utilities, with limited electrical energy producers excluded under RSA 362-A and subject to section-specific terms. En 1203.06 is outside the exceptions to the general exclusion of rural electric cooperatives with a deregulation certificate on file. Bills must be rendered at regular intervals.
Source: gc.nh.gov · en1200 (source 1)
Under En 1203.06(b), a metered bill must show at least the date and value of the current meter reading, the prior reading, any applicable penalty date, the approximate date of the next meter reading, the factors needed to compute the charges, the charges and the utility customer-service phone number.
Source: gc.nh.gov · en1200 (source 1)
Under En 1203.06(c), a non-metered bill must show at least the current billing period’s start and end dates, any applicable penalty date, the next billing period’s start and end dates, the factors needed to compute the charges, the charges and the utility customer-service phone number.
Source: gc.nh.gov · en1200 (source 1)
Metered and non-metered bills must direct customers to the utility with billing questions and state that customers may call the Department for more help after first trying to resolve a dispute with the utility. The statement must include the Department’s toll-free number.
Source: gc.nh.gov · en1200 (source 1)
Residential and nonresidential bills must include either a summary of the current applicable rate or notice that a printed copy of that rate will be furnished on request. Bills must be delivered by first-class mail or electronically if the utility offers electronic billing and the customer elects it.
Source: gc.nh.gov · en1200 (source 1)
The utility must keep an accurate account of each customer’s service charges and maintain information sufficient to compute each bill. When a customer requests it, the utility must provide a clear, concise statement of the customer’s actual consumption for each billing period in the preceding year.
Source: gc.nh.gov · en1200 (source 1)
En 1202.01 defines an arrearage as an amount due to the utility for utility service that remains unpaid after the date printed as due on the original bill. En 1202.05 defines the current bill by utility service rendered in the latest billing period, including applicable state and federal taxes. En 1203.06(b)–(c) lists the required charges and calculation information and does not enumerate a separate arrearage or disputed-amount field.
Source: gc.nh.gov · en1200 (source 1)
Source scope and limits
New Hampshire En 1203.06, Document #13986 effective May 30, 2024. Preserve separate metered and non-metered minimums, applicable penalty date, computation factors and charges, utility contact and Department toll-free assistance after attempting utility resolution. Preserve rate summary or printed copy notice, first-class mail or offered and elected electronic delivery, billing records and prior-year consumption on request. Separate arrearage and disputed-amount fields are absent from the enumerated minimums of (b) and (c) only. Other rules, tariffs, actual bills and individual dispute effects remain held.
New Hampshire utility complaint investigation and two-year records
Research recorded November 12, 2026
The General Court posts En 1203.09 in Document #13986, effective May 30, 2024. En 1201.02 generally covers public electric, gas, sewer and water utilities, excludes limited electrical energy producers under RSA 362-A and provides section-specific terms. En 1203.09 is outside the listed exceptions to the general exclusion for rural electric cooperatives with a deregulation certificate on file.
Source: gc.nh.gov · en1200 (source 1)
En 1202.03 defines a complaint as customer dissatisfaction the utility has failed to resolve to the customer’s satisfaction after supervisory intervention or a request for such intervention. En 1203.09(a) requires the utility to fully and promptly investigate a customer complaint made either directly to the utility or through the Department.
Source: gc.nh.gov · en1200 (source 1)
Under En 1203.09(b)–(c), the utility must keep complaint records for at least two years. Each record must show the complainant’s name, address and phone number, if known and available, the complaint’s date and character, its resolution if any, and the Department’s resolution if any.
Source: gc.nh.gov · en1200 (source 1)
Source scope and limits
En 1203.09 Document #13986 effective May 30, 2024. Preserve chapter applicability, supervisory-intervention definition, full and prompt investigation through either complaint route, two-year minimum and required record contents with conditional resolutions. Individual application and an exact investigation deadline held.
New Hampshire utility customer disclosures and language access
Research recorded November 12, 2026
The General Court posts En 1203.02 in Document #13986 effective May 30, 2024. En 1201.02 generally covers public electric, gas, sewer and water utilities, excludes limited electrical energy producers under RSA 362-A and provides section-specific terms. En 1203.02 is outside the listed exceptions to the general exclusion of rural electric cooperatives with a deregulation certificate on file.
Source: gc.nh.gov · en1200 (source 1)
For a new-service request, En 1203.02(a) specifies information on potentially advantageous rates and the current default energy service rate. It requires the utility to explain the utility and competitive supplier options and give the Department’s webpage address for choosing an energy supplier.
Source: gc.nh.gov · en1200 (source 1)
Under En 1203.02(b), upon request the utility must provide a written description of how it reads meters and derives the bill from those readings.
Source: gc.nh.gov · en1200 (source 1)
A utility applying to the Commission for a general rate change must send each customer a clear, concise statement of the proposed rate schedules and identify those applicable to that customer. They must distribute the statement no later than 45 calendar days from filing and include the Department consumer division’s toll-free number.
Source: gc.nh.gov · en1200 (source 1)
On application for service and at least annually, each customer must receive the existing rate schedules or notice of how to obtain them. The utility may send the schedules by bill insert or separate mail. It may send the availability notice by bill message, bill insert or separate mail. Electric and gas utilities must identify whether the schedules have periodic adjustment clauses and how often rates can change under them. The statement must include the Department consumer division’s toll-free number.
Source: gc.nh.gov · en1200 (source 1)
Except for sewer utilities, utilities must put medical-emergency certification notice on or with bills at least twice a year. The notice must be consistent with the statement specified in En 1203.11(b)(2)l.
Source: gc.nh.gov · en1200 (source 1)
When at least 25% of the population in a utility’s franchise area speaks a particular foreign language as its primary language, the utility must also provide all information required by En 1203.02 in that language. The Department determines the percentage using data from the state agency responsible for the state data center.
Source: gc.nh.gov · en1200 (source 1)
Electric and gas utilities must prominently display the Department’s consumer rights and responsibilities pamphlet on their websites and provide a free printed copy to anyone requesting one. At least three times each year, they must give notice of website and printed availability in or on all residential bills.
Source: gc.nh.gov · en1200 (source 1)
The rule allocates electric and gas pamphlet printing and distribution costs by each utility’s gross revenue share of total gas and electric utility gross revenues. It treats additional costs independently incurred to distribute copies or give notice more often than required as appropriate operating expenses.
Source: gc.nh.gov · en1200 (source 1)
Water and sewer utilities must prominently display the pamphlet if they maintain a website. They must put notice of availability on the Department site and their own site where applicable in or on all residential bills at least twice each year.
Source: gc.nh.gov · en1200 (source 1)
Source scope and limits
En 1203.02 Document #13986 effective May 30, 2024. Preserve new-service rates and choice, written meter explanation on request, general-rate filing 45-calendar-day clock, service-start and annual notices, sewer exception to twice-yearly medical notice, 25% primary-language threshold and Department determination, and distinct electric/gas versus water/sewer pamphlet duties and costs. Actual utility, rate, delivery and application held.
New Hampshire utility disconnection conferences and Department complaints
Research recorded November 12, 2026
The General Court posts En 1203.16 under Document #13986 effective May 30, 2024. En 1201.02 generally applies to New Hampshire public electric, gas, sewer and water utilities with stated exceptions and excludes limited electrical energy producers under RSA 362-A. It lists En 1203.16 among provisions excepted from the general exclusion for rural electric cooperatives with a filed deregulation certificate.
Source: gc.nh.gov · en1200 (source 1)
After receiving a disconnection notice, a customer may request a utility conference before the proposed disconnection date. Under En 1203.16(a), a request on the proposed disconnection date may be granted at the utility’s discretion. A request one or two days before the proposed date entitles the customer to a conference within three business days of the request. Service must continue until at least the latest of five business days after the conference, five business days after the postmark of the utility’s written decision or the proposed disconnection date on the notice.
Source: gc.nh.gov · en1200 (source 1)
Under En 1203.16(b)–(d), the utility conference consists of a telephone meeting about the notice and an agreement on a date certain by which the utility will notify the customer of its resolution. The utility must record each outcome in a memorandum, inform the customer of the right to request a Department staff conference if dissatisfied, and send a copy of the memorandum to the Department and customer if that conference is requested.
Source: gc.nh.gov · en1200 (source 1)
En 1203.16(e) provides for a Department staff conference request in writing, in person or by telephone. The rule states the request is due before the proposed disconnection date or within five business days after issuance of the utility’s resolution notice, whichever is later. Subsection (f) states that failing to request a Department staff conference within five business days of issuance results in implementation of the utility decision. Both formulations are preserved as printed.
Source: gc.nh.gov · en1200 (source 1)
Under En 1203.16(g)–(i), the Department staff conference must occur during normal business hours at the customer’s convenience and within 15 business days after the request. Staff must send a report to all parties within ten business days after the conference. When the customer requests a Department staff conference, the utility must continue service until staff determines whether disconnection is justified.
Source: gc.nh.gov · en1200 (source 1)
Under En 1203.16(j)–(k), the utility or customer may file a formal RSA 365:1 complaint with the Department commissioner within five business days after receiving the staff report if dissatisfied. A utility may not disconnect service for nonpayment of disputed amounts until the customer has exhausted all remedies before the Department.
Source: gc.nh.gov · en1200 (source 1)
The current published RSA 365:1, whose latest printed amendment took effect September 30, 2025, provides for a written Department petition alleging an act or omission by an entity subject to the Department’s or Commission’s jurisdiction that violates a listed law, rule, condition, or order. The person must first make the same or a substantially similar complaint to the Department’s consumer services division and exhaust all available remedies there. The statute excludes RSA 541-A:29 and :29-a from informal and formal complaints filed with the Department.
Source: gc.nh.gov · 365 1 (source 2)
Source scope and limits
NH En 1203.16 and separately dated RSA 365:1. Preserve printed (e)/(f) timing interaction as held, business-day clocks, remedies exhaustion and actual application limits.
Winter, medical, tenant, and assistance safeguards
New Hampshire tenant utility notice and service when the landlord holds the account
Research recorded November 12, 2026
Under New Hampshire’s En 1203.12, Document #13986 effective May 30, 2024, the residential tenant notice rule covers utilities other than sewer utilities when the landlord is customer of record. The section defines tenant to include someone renting and occupying a room in a rooming house or a dwelling unit in another person’s building or mobile home park with adjoining living, sleeping, kitchen and bathroom facilities used exclusively by that person and the household, and excludes short-term, vacation and recreational rentals. En 1201.02 expressly lists this section among the exceptions to its general exclusion for rural electric cooperatives with a filed deregulation certificate.
Source: gc.nh.gov · en1200 (source 1)
Subject to En 1203.12(e), a utility must give written notice to known qualifying residential tenants benefiting from any part of the service before disconnection. The notice must give the proposed date or earliest date, explain that the reason is a utility-landlord dispute and direct the tenant to the landlord for more information. It must explain the tenant’s own-name service right if the service benefits only that tenant, and give utility contact details and the Department consumer division’s toll-free number.
Source: gc.nh.gov · en1200 (source 1)
En 1203.12(g) requires delivery at least 10 calendar days before proposed disconnection. The utility must post conspicuous notice in a common or similarly visible area at least 10 calendar days ahead and also deliver a written notice to each dwelling by door posting, sliding it under the door, or mailing it. The mail method requires a postmark at least 14 calendar days ahead and addressing to the named tenant or the occupant of each affected unit.
Source: gc.nh.gov · en1200 (source 1)
En 1203.12(e) identifies the necessity to avoid danger to life, health or property and an order by a duly constituted public authority in its no-notice clause. Under subsection (f), a utility learning a tenant was mistakenly disconnected without notice must immediately reconnect service at no cost to the tenant and proceed with proper notice.
Source: gc.nh.gov · en1200 (source 1)
Under En 1203.12(h), a utility must provide service in the requesting tenant’s name if the utility knows the meter serves only that tenant, subject to the utility tariff and chapter requirements. It cannot require the tenant to pay any part of the landlord’s past-due balance as a condition of obtaining that service.
Source: gc.nh.gov · en1200 (source 1)
Separately, RSA 363-B:3 permits a public electric or gas utility to notify a property owner or associated condominium association before terminating residential service to a tenant or condominium owner if the termination falls between November 1 and April 30, inclusive, and the owner or association has requested notice for itself or its agents.
Source: gc.nh.gov · 363 B mrg (source 3)
Source scope and limits
NH En 1203.12 and separate RSA 363-B:3. Preserve 10/14-day notice, exclusive meter and landlord balance rule, printed and in subsection (e), separate November–April owner notice. Actual facts held.
New Hampshire winter utility disconnection, arrears and payment arrangements
Research recorded November 12, 2026
New Hampshire’s General Court posts Department of Energy Chapter En 1200, adopted as Document #13986 effective May 30, 2024. The former Puc 1200 was repealed effective September 4, 2025 in Document #14362. The separate former rate-change provision was adopted as Part Puc 1606 in Document #14030 effective July 25, 2024.
Source: gc.nh.gov · en1200 (source 1) gc.nh.gov · puc1200 (source 4)
The winter period runs from November 15 through March 31, inclusive. En 1204 applies to residential customers of New Hampshire public gas or electric utilities and excludes limited electrical energy producers defined in RSA 362-A. Its rules supplement En 1203.11 and .12, and En 1205 controls when both winter and medical-emergency rules apply. The general chapter scope provision lists En 1204.01–.05 among exceptions to its exclusion of rural electric cooperatives that have filed a certificate of deregulation.
Source: gc.nh.gov · en1200 (source 1)
For a primary residence, En 1204.02 and .03 require unpaid service arrears to exceed $125 for gas non-heating customers, $225 for electric non-heating customers or $450 for electric and gas heating customers before the utility can send a disconnection notice under this winter rule. Prewinter arrears may count alone or together with winter arrears toward the applicable threshold. During winter, the utility must seek Department approval before disconnecting a residential customer it knows is at least 65, and may not disconnect a residential customer for failure to pay all or part of a deposit.
Source: gc.nh.gov · en1200 (source 1)
Under En 1204.04(a)(1), the winter arrangement for a customer without financial hardship must include a commitment to pay the current bill by its due date and allow equal arrears installments over the winter period and six months following it. For a customer with financial hardship, unless the customer requests otherwise, subsection (a)(2) describes either a 12-month plan with monthly payments equal to one-twelfth of the balance plus one-twelfth of the projected bills for the 12 months, or winter-period monthly payments of 10% of the monthly total balance due.
Source: gc.nh.gov · en1200 (source 1)
Under En 1204.04(b)–(d), a utility need not change an existing arrangement to meet the winter terms unless the customer requests it. At the end of winter, a customer with arrears and no existing arrangement must be offered the En 1203.07 arrangement with equal arrears installments over the next six months in addition to current bills. Customers claiming financial hardship must supply annual evidence. En 1202.10 ties hardship to evidence supplied to the utility of the customer’s or household’s current enrollment in a named assistance program, a successor program or a qualifying government or government-funded program for low-income households.
Source: gc.nh.gov · en1200 (source 1)
En 1204.05 adds winter notice to an adult resident in person or by telephone from two through eight business days before the proposed disconnection. If the utility cannot give that notice, it must seek Department approval before disconnecting and provide the listed information on household composition, arrears, the six most recent payments and bills, prior medical certifications and known hardship. The Department must withhold approval when the customer has financial hardship and has made a good-faith payment effort. A customer claiming hardship under this section must provide evidence annually.
Source: gc.nh.gov · en1200 (source 1)
RSA 363-B:1 generally requires a public gas or electric utility to establish good cause and give at least 10 days’ written notice by regular mail or hand delivery, identifying the proposed termination date, reason and contest procedure. The statute defines good cause as a violation of a then-effective approved tariff or past-due charges still unpaid after proper demand. The statute allows termination without advance customer or Department notice for unauthorized or fraudulent use or procurement, a danger to others’ health, safety or utility service, clear and present danger to life, health or physical property, or clear abandonment. It requires Department notice afterward for those grounds and excludes a customer-requested termination.
Source: gc.nh.gov · 363 B mrg (source 3)
Under En 1204.06, for a nonpayment disconnection from April 15 through October 15 with the account inactive on November 1, the utility must mail the prescribed letter first class to the last known customer of record at that service address by November 7. The utility must also post October website notice about hardship and medical-emergency reconnection. If a customer contacts the utility, it must offer an arrangement compliant with En 1204.04(a) under which payment of 10% of the outstanding balance suffices to restore service upon evidence of financial hardship. The utility must provide local assistance agency details when the customer cannot make the minimum payment.
Source: gc.nh.gov · en1200 (source 1)
For the prewinter process under En 1204.06(f), if the customer indicates a household member has a qualifying medical emergency, the utility must explain En 1205 rights and restore service upon oral notification under En 1205.02(d) and establishment of an En 1203.07 arrangement. The utility must report the number of letters mailed and customers restored to the Department by December 10 each year.
Source: gc.nh.gov · en1200 (source 1)
Source scope and limits
NH Document #13986 effective May 30, 2024 and statutory baseline. Preserve winter scope, thresholds, distinct clocks and approval, hardship and medical predicates. Later changes and actual outcomes held.
New Hampshire utility social-service assistance and disconnection safeguards
Research recorded November 12, 2026
Under En 1203.14(a), a covered utility must give customers who are having difficulty paying their bills the names and addresses of local social-service organizations in its franchise area that the utility knows might help. The General Court identifies Document #13986 effective May 30, 2024. En 1201.02’s general scope is public electric, gas, sewer and water utilities with limited electrical energy producers excluded. The chapter excludes deregulated rural electric cooperatives except for listed provisions, and En 1203.14 is outside that exception list.
Source: gc.nh.gov · en1200 (source 1)
Under En 1203.14(b), the utility must arrange with organizations that might assist so it receives notice by phone or in writing within four business days of the customer applying for aid that the organization will agree to pay an amount equal to the customer’s average bill.
Source: gc.nh.gov · en1200 (source 1)
Under En 1203.14(c), the utility must continue service for ten calendar days after the customer or organization notifies it that an appointment is scheduled to review the customer’s eligibility for utility-bill assistance.
Source: gc.nh.gov · en1200 (source 1)
Under En 1203.14(d)–(f), when a social-service organization notifies the utility it will pay the customer’s current bill each month, the utility must treat the organization as responsible for payment. While it makes payments, the utility must send the customer a monthly accounting of billing and payments. The utility cannot send a disconnection notice to a customer receiving monthly bill assistance unless it has determined that the aid is fully spent down or no longer available for current bills.
Source: gc.nh.gov · en1200 (source 1)
The assistance rules operate with separately specified municipal guarantee and reconnection gates. Under En 1203.11(h)(3), the utility may neither send a disconnection notice nor disconnect when a municipal welfare office has guaranteed the average monthly bill under RSA 165 and the customer agrees to reasonable repayment of arrears under En 1203.07. After an arrears disconnection, En 1203.13(b)(3) provides a reconnection route on request when the customer shows an agreement with a municipal welfare official under RSA 165 or a social-service agency under En 1203.14 to pay the average monthly bill and agrees to an En 1203.07 arrears arrangement. These cross-references explain the application of the assistance conditions alongside E138C’s ordinary rules.
Source: gc.nh.gov · en1200 (source 1)
RSA 165:1 provides the municipal public-welfare framework. The town’s overseers must provide relief under the chapter to a person in town who is poor and unable to support themselves, and municipalities must adopt written general-assistance guidelines. Under subsection IV(a), upon adoption by the local governing body, the municipality sets allowable basic cost amounts using prevailing local costs by household size, reviews them annually and adjusts them as necessary. Any local eligibility or guarantee determination requires the relevant municipal rules and facts.
Source: gc.nh.gov · 165 1 (source 5)
Source scope and limits
NH Document #13986 and RSA 165. Preserve four business versus ten calendar days, actual assistance predicates, and separate reconnection and municipal conditions. Individual facts held.
New Hampshire utility account changes and owner responsibility after a meter-access notice
Research recorded November 12, 2026
The New Hampshire General Court posts En 1203.10 and .18 as part of Document #13986, effective May 30, 2024. En 1201.02 generally covers public electric, gas, sewer and water utilities, excluding limited electrical energy producers under RSA 362-A and subject to the rule’s terms. Sections .10 and .18 are outside the listed exceptions to the general exclusion for rural electric cooperatives with a filed deregulation certificate. En 1202.06 defines the customer as the person or listed entity that contracted with a utility for the service.
Source: gc.nh.gov · en1200 (source 1)
Under En 1203.18(a), when a utility receives a request to change an account from one customer to another or add a name, it must give the new customer timely notice and may require written confirmation from that person. Subsection (b) defines timely notice as notice to the new customer within five business days of the utility receiving a request to change the service account from one customer to another.
Source: gc.nh.gov · en1200 (source 1)
Under En 1203.18(c), the original customer of record remains liable for account charges until timely notice is given under subsection (a)(1) or the new customer gives confirmation under subsection (a)(2). The rule states the two events in the alternative.
Source: gc.nh.gov · en1200 (source 1)
Under En 1202.16, termination is permanent closure of the account as a bookkeeping function. En 1203.10(a) allows the utility to require reasonable notice of the customer’s intent to terminate service. Its tariff must state the notice period, which may be no longer than four business days. The customer remains responsible for service charges until the later of expiration of the notice period or the requested termination.
Source: gc.nh.gov · en1200 (source 1)
Under En 1203.10(b)–(c), the customer requesting termination must make reasonable efforts to give meter access. If the customer cannot provide access, the utility must send the owner a written meter-access request. The request must tell the owner that failure to provide access within ten calendar days from its postmark will transfer responsibility for the utility service to the owner.
Source: gc.nh.gov · en1200 (source 1)
Source scope and limits
New Hampshire Document #13986, effective May 30, 2024. Preserve the five-business-day definition for a request to change customers and the alternative notice or confirmation triggers for original-customer liability. For termination preserve the tariff notice ceiling of four business days, the later-of rule and the conditional ten-calendar-day meter-access window from postmark. Actual utility, tariff, customer liability and service facts held.
New Hampshire utility medical-emergency certification and disconnection safeguards
Research recorded November 12, 2026
Under Document #13986 effective May 30, 2024, En 1205 covers residential electric, gas and water service at the customer’s primary residence. For a minor with a medical emergency certification, primary residence includes the primary residences of any parent or guardian with shared residential responsibility. En 1205 supplements En 1203.11 and .12 and controls when both the winter and medical emergency rules apply. The rule directs telephone-service cases to En 410.04.
Source: gc.nh.gov · en1200 (source 1)
En 1202.12 defines the medical emergency as a certified physical or mental health condition of the customer or household member that would endanger that person’s physical or mental health without utility service. En 1205.02 sets a certificate term designated by an authorized physician, advanced practice registered nurse, physician’s assistant or mental health practitioner, at least 90 days and at most one year. Renewal is unlimited in number and each renewal must meet the duration and content rules.
Source: gc.nh.gov · en1200 (source 1)
Under En 1205.02(d), customer oral notification protects the account if qualifying certification is received within 15 calendar days and any earlier oral notification in the previous 12 months was documented through certification. The clinician’s certification must state the risk of disconnection, include licensing information and identify medical necessity for and use of any life support equipment. It may be written or electronic, or telephoned with written or electronic confirmation received within 15 calendar days of the telephoned certification. A utility form or another format meeting the same content rule may be used.
Source: gc.nh.gov · en1200 (source 1)
After receiving medical emergency notification under En 1205.02(d) or (e), the utility must notify the customer in writing of continuing payment duties, the required payment arrangement and consequence of default, the third-party contact option, timely renewal and outage planning. If certification is missing 15 days after oral notice, it must send a reminder requiring certification within 15 days of the reminder date and naming a disconnection date at least 16 days after the reminder. If the reminder contains En 1203.11(b)(2) information, it can replace the separate notice. If written or electronic certification remains missing after that period, the utility may disconnect under En 1203.11.
Source: gc.nh.gov · en1200 (source 1)
A medical emergency certificate together with an En 1203.07 arrangement for past-due balances protects the account while the customer complies and renews the certificate as required. When a residential customer cannot pay the total arrearage and the utility has received medical emergency notice, En 1203.07(b) requires the utility to continue service if the customer agrees to an arrangement with added flexibility, which can include a flat monthly amount for arrears and current and future bills. En 1203.07(c) requires the parties to consider the amount and age of arrears, estimated bills, payment history, reasons for arrears and whether they will persist, and ability to pay.
Source: gc.nh.gov · en1200 (source 1)
Under En 1205.03, if the customer fails to enter into or comply with the negotiated arrangement, the utility may seek Department permission to disconnect. It must give the Department the listed customer and account details, proposed date, certificate history, arrears, last 12 payments and 12 months of billing, proposed arrangement, collection activity, known household ages and annually documented hardship if known. It must notify the customer of the request in writing and send a copy of the request at the same time.
Source: gc.nh.gov · en1200 (source 1)
Under En 1205.03(e)–(h), the Department cannot approve disconnection when the customer has a current certificate and has made a good-faith effort to pay. It must allow the customer to respond. Its decision must be written and sent to both parties, and the rule says it is valid through November 15 of the year issued. On approval, the utility must give the En 1203.11 notice before disconnecting.
Source: gc.nh.gov · en1200 (source 1)
En 1205.04 requires a reminder 30 days before certificate expiry with the renewal deadline, and on expiration a notice of lost medical protection, any balance due and direction to contact the utility immediately if the condition continues. If the utility already submitted a disconnection permission request when the certificate expires, it must withdraw the request from the Department before undertaking any disconnection activity.
Source: gc.nh.gov · en1200 (source 1)
En 1205.05 requires the additional notice and contact steps one time within nine months after certificate expiry. The notice must comply with the specified En 1203.11 issuance and content rules and provide utility and Department contact details. The rule requires personal contact with the customer or an adult resident in person or by phone two through eight calendar days before proposed disconnection. If contact fails, it must follow the field visit and supervisor review requirements. If no adult resident is home on the field visit, it must leave conspicuous notice and leave without shutting off service. If an adult is home it must ask whether the emergency continues and explain certification. If no medical emergency exists, it may proceed under En 1203.11.
Source: gc.nh.gov · en1200 (source 1)
The En 1205.05 no-adult field notice must explain the expired certificate, unpaid balance, that the utility came to disconnect, that the customer should contact it for a payment arrangement, and that it will return the next week if the customer does not contact it. The rule’s referenced eight-business-day limit runs from that field notice. A supervisor must review before the utility disconnects a customer it did not personally contact.
Source: gc.nh.gov · en1200 (source 1)
Under En 1205.06, each utility must report medical emergency certifications, due and past-due amounts, disconnections and specified errors to the Department by August 15 each year and provide a copy to the office of the consumer advocate. The rule includes June 30 snapshots and July through June reporting measures.
Source: gc.nh.gov · en1200 (source 1)
RSA 363-B:2 allows a customer contesting an RSA 363-B:1 notice to request a utility conference before the noticed date and choose in-person, written or telephone conference. If dissatisfied, the customer may request a Department staff conference within three days after an in-person utility conference or within five days after a written or telephone one. The customer may choose a written or telephone Department conference. The utility must explain that right and provide the request form at an in-person conference or mail it the same day as a written or telephone conference.
Source: gc.nh.gov · 363 B mrg (source 3)
After the utility conference request, RSA 363-B:2 requires continued service until the later of the noticed termination date and three days after an in-person utility conference or five days after a written or telephone one. If a Department staff conference is requested, service continues until the staff member or Department determines termination is justified.
Source: gc.nh.gov · 363 B mrg (source 3)
Source scope and limits
NH En 1205 and separate RSA 363-B conference scope. Preserve certification, calendar versus business days, renewal, Department review and residuals.
Deposits, fees, and new service
New Hampshire residential utility deposits, installments and dispute protection
Research recorded November 12, 2026
The General Court posts En 1203.03 in Document #13986, effective May 30, 2024. En 1201.02 generally covers public electric, gas, sewer and water utilities, with limited electrical energy producers excluded under RSA 362-A and subject to the chapter’s terms. En 1203.03 is outside the listed exceptions to the general exclusion for rural electric cooperatives with a deregulation certificate on file.
Source: gc.nh.gov · en1200 (source 1)
For new residential service, En 1203.03(a) permits a deposit or qualifying alternative for an undisputed overdue balance incurred in the last three years on a prior account with the utility or a similar utility, a judgment any utility obtained against the customer in the past two years for nonpayment of a utility-service account, or disconnection by the utility in the last three years for interference with or diversion of its service. A fourth ground concerns lack of satisfactory evidence of intent to remain for 12 consecutive months, with an exception if the customer proves 12 months of non-delinquency on similar utility accounts.
Source: gc.nh.gov · en1200 (source 1)
For the residence-intent branch, En 1203.03(b) accepts a deed, lease or landlord letter within 30 days of the deposit request, and a similar utility representative’s written statement as proof of non-delinquency. Under subsection (c), gas and electric utilities are similar to each other, and water and sewer each use the same utility type. The utility must request a deposit as a condition of new residential service within 30 calendar days of initiating service.
Source: gc.nh.gov · en1200 (source 1)
For existing residential service, En 1203.03(e) permits a deposit or qualifying alternative after four nonpayment disconnection notices for monthly billing or two for quarterly billing within 12 months, after disconnection for nonpayment, after disconnection by the utility for interference or diversion, or after an accepted bankruptcy filing listing the utility as creditor. For the bankruptcy ground, the deposit must comply with 11 U.S.C. §366.
Source: gc.nh.gov · en1200 (source 1)
In every residential deposit request, En 1203.03(g) requires oral and written notice of the hardship waiver, annual hardship evidence and the guarantor option or direct debit if offered. The utility must waive the deposit when the customer provides hardship evidence unless the customer previously interfered with or diverted the service. En 1202.10 defines hardship by evidence supplied to the utility of current customer or household enrollment in a named or successor program or a qualifying government or government-funded low-income assistance program.
Source: gc.nh.gov · en1200 (source 1)
En 1203.03(i)–(j) requires the utility to accept an irrevocable written guarantee in lieu of a deposit from a responsible party, such as a social-service organization, municipal welfare agency, bank or utility customer in good standing. Good standing for this purpose means no disconnection notices in the prior 12 months. The written guarantee must state a maximum and limit liability to it unless a separate written agreement provides otherwise. Utility and customer may instead agree to a monthly automatic direct debit.
Source: gc.nh.gov · en1200 (source 1)
For a residential customer, the guarantor is released from liability and no further deposit is required when all bills have been paid without delinquency for 12 consecutive months. Where direct debit is used in place of a deposit, the utility may request a deposit if the automatic withdrawal fails in two successive months because the bank account has insufficient funds.
Source: gc.nh.gov · en1200 (source 1)
Under En 1203.03(m)(1), the deposit has a $10 minimum and a maximum of twice the average monthly bill. For a new customer, the utility estimates the average using prior-customer information for the service address and characteristics of the new customer. For a current customer, the utility uses actual bills from the preceding 12 months, or the estimate method when the customer has fewer than 12 months of actual service.
Source: gc.nh.gov · en1200 (source 1)
The rule requires simple annual interest from deposit through termination at the prime rate, with interest credited to the current bill at least annually if the deposit has been held more than 12 months. En 1202.14 defines the prime rate using the Wall Street Journal rate on the first business day of the month before the start of each calendar quarter, or the average of rates reported that day.
Source: gc.nh.gov · en1200 (source 1)
For residential service, the utility must refund the entire deposit with accrued interest when all bills have been paid without arrearage for 12 consecutive months. The utility may apply the deposit and interest to current bills with the customer’s agreement. At termination it must refund the deposit plus interest, less amounts owed, within 60 calendar days of termination.
Source: gc.nh.gov · en1200 (source 1)
The utility must offer deposit installments. Unless different terms are negotiated, En 1203.03(m)(11) sets three monthly installments: the first upon demand, the second within 30 calendar days and the final within 60 calendar days. The first installment cannot exceed the average monthly bill and the rest is split equally. The utility may negotiate a period longer than three months and the customer may negotiate a shorter one. Current bills still have to be paid on time.
Source: gc.nh.gov · en1200 (source 1)
The utility must keep the specified deposit and interest records for three years after refund and give each customer a receipt by mail or in person, including customer, service location, payment date and amount, and deposit and interest terms.
Source: gc.nh.gov · en1200 (source 1)
Under En 1203.03(n), the utility may require a residential deposit or guarantee for new or continued service only under this section. It may not base that requirement on income, home ownership, residential location, race, color, creed, sex, gender identity, sexual orientation, marital status, age, national origin or disability.
Source: gc.nh.gov · en1200 (source 1)
A customer dissatisfied with a deposit request may ask for a Department staff conference within seven calendar days of receiving the request. Disconnections resulting from enforcement of En 1203.03 must be delayed pending Department resolution of that request. With each deposit request the utility must inform the customer orally and in writing of the conference rights and responsibilities.
Source: gc.nh.gov · en1200 (source 1)
Source scope and limits
Document #13986 effective May 30, 2024. Preserve new versus existing triggers and lookbacks, bankruptcy section 366 qualifier, annual hardship proof and prior interference/diversion exception, guarantee and debit conditions, $10 minimum and twice-average cap, interest, 12-month arrearage-free refund and 60-calendar-day termination refund. Preserve three-installment default, 30/60 calendar-day schedule, and seven-calendar-day conference request with related disconnection held pending resolution. Actual customer, eligibility, tariff, rates and outcomes held.
New Hampshire utility late payment and returned payment charges
Research recorded November 12, 2026
The General Court posts En 1203.08 in Document #13986, effective May 30, 2024. En 1201.02 generally covers public electric, gas, sewer and water utilities, excludes limited electrical energy producers under RSA 362-A and supplies section-specific terms. En 1203.08 is outside the exceptions to the general exclusion of rural electric cooperatives with a deregulation certificate on file.
Source: gc.nh.gov · en1200 (source 1)
En 1203.08(a) permits a utility to charge and collect a late payment charge on overdue bills of customers without financial hardship, subject to the section’s conditions. The utility may impose the charge only after the due date printed on the bill. The date the customer pays an authorized agent counts as the payment date. En 1202.11 defines a late payment by payment to the utility or its authorized agent after the printed due date.
Source: gc.nh.gov · en1200 (source 1)
A customer claiming financial hardship under En 1203.08 must provide evidence annually. En 1202.10 defines hardship through evidence supplied to the utility of current enrollment by the residential customer or household in an identified or successor program or a qualifying government or government-funded program providing low-income assistance based on a written eligibility determination.
Source: gc.nh.gov · en1200 (source 1)
En 1203.08(b) caps the late payment charge at the amount in the utility tariff approved by the Commission. En 1202.15 defines tariff more generally as the utility’s filed current schedule of rates, charges, terms and conditions that is Commission-approved or effective by operation of law.
Source: gc.nh.gov · en1200 (source 1)
When seeking Commission approval of a late payment charge, the utility must also give the Department aggregate carrying and administrative cost information plus other relevant information in the aggregate or by customer class.
Source: gc.nh.gov · en1200 (source 1)
En 1203.08(d)–(e) permits a utility to charge an account when the institution rejects a check or draft presented for utility service payment. The charge cannot exceed the amount in the utility’s tariff.
Source: gc.nh.gov · en1200 (source 1)
Source scope and limits
En 1203.08 Document #13986 effective May 30, 2024. Preserve chapter coverage and exceptions, late charge only after the printed due date, authorized agent payment date, annual hardship evidence and qualifying enrollment, Commission-approved tariff ceiling and cost information to the Department. Rejected check or draft charge has its own tariff ceiling. Actual tariff, amount, authorized-agent receipt, eligibility and account outcome held.
New Hampshire utility new-service denial and prior arrears
Research recorded November 12, 2026
The General Court posts En 1203.15 in Document #13986 effective May 30, 2024. The chapter generally covers public electric, gas, sewer and water utilities, subject to the limited electrical energy producer exclusion and its provision-specific terms. En 1203.15 is outside the chapter’s list of exceptions to exclusion for rural electric cooperatives with a filed deregulation certificate. En 1202.01 defines an arrearage as a utility-service amount still unpaid after the due date on the original bill.
Source: gc.nh.gov · en1200 (source 1)
For chapter purposes, En 1202.18 covers systems or parts owned, operated or managed by individuals or businesses determined to be public utilities under New Hampshire law and municipal authorities providing the stated services outside their boundaries, subject to the RSA 362:4 municipal exemption. En 1202.19 defines utility service by the filed and approved tariff or, for a rural electric cooperative with a filed deregulation certificate, its service terms and conditions. En 1201.02 separately determines whether En 1203.15 applies to that cooperative.
Source: gc.nh.gov · en1200 (source 1)
En 1203.15(a) allows a utility to deny new service over outstanding arrears for prior service with that same utility if the relevant limitations period has not run. After the period has run, subsection (b) permits denial on that basis if the utility pursued recovery through the courts. Under subsection (c), the utility may not deny new residential service to an applicant if a reasonable En 1203.07 arrangement can be made or the utility has a current En 1203.07 arrangement with that applicant.
Source: gc.nh.gov · en1200 (source 1)
Under En 1203.01(d)–(e), a utility must make reasonable efforts at the service request to determine whether the applicant has an outstanding balance with it. A residential applicant cannot be held responsible for a balance in another person’s name unless the two lived together when the balance was incurred and will continue living together where new service is requested.
Source: gc.nh.gov · en1200 (source 1)
Under the residential other-name provision in En 1203.15(d)(1), denial requires prior shared residence at the arrears address, both people benefiting from the prior service, both benefiting from the applied-for service, and the applicant refusing a reasonable En 1203.07 arrangement for arrears for which the applicant is responsible under the section. Under subsection (e), if that applicant disputes transfer of responsibility, the utility must provide the Department consumer division’s toll-free number.
Source: gc.nh.gov · en1200 (source 1)
For nonresidential other-name arrears, En 1203.15(d)(2) uses a business gate: the two were principals of a business at the arrears address, or the same business continues there without evidence of a change in majority ownership or effective control. Both must have benefited from the prior service and both must benefit from the new service.
Source: gc.nh.gov · en1200 (source 1)
En 1203.01(l) bars denial of service to an otherwise qualified applicant based on income, home ownership, race, color, creed, sex, gender identity, sexual orientation, marital status, age except for unemancipated minors, national origin or disability.
Source: gc.nh.gov · en1200 (source 1)
En 1203.15(f) requires utilities to keep records of the annual number of application denials and the reasons for denial.
Source: gc.nh.gov · en1200 (source 1)
Source scope and limits
NH En 1203.15 and incorporated scope and applicant provisions. Preserve same-utility arrears, court pursuit after limitations, repayment alternatives, distinct other-name residential/business gates and regulator number. Actual limitations and denial held.
Sources and research notes
Source links appear beside the statements they support. A recorded date identifies the saved research, not a new check of every source or a conclusion about an individual account.
Source documents
Original research and recorded qualifications
- New Hampshire general residential utility arrears, disconnection and reconnection 2026-11-12
- New Hampshire tenant utility notice and service when the landlord holds the account 2026-11-12
- New Hampshire mediation of utility complaints other than disconnection 2026-11-12
- New Hampshire winter utility disconnection, arrears and payment arrangements 2026-11-12
- New Hampshire utility social-service assistance and disconnection safeguards 2026-11-12
- New Hampshire utility account changes and owner responsibility after a meter-access notice 2026-11-12
- New Hampshire utility bill contents, arrears terms and billing dispute referrals 2026-11-12
- New Hampshire utility complaint investigation and two-year records 2026-11-12
- New Hampshire utility customer disclosures and language access 2026-11-12
- New Hampshire residential utility deposits, installments and dispute protection 2026-11-12
- New Hampshire utility disconnection conferences and Department complaints 2026-11-12
- New Hampshire utility late payment and returned payment charges 2026-11-12
- New Hampshire utility medical-emergency certification and disconnection safeguards 2026-11-12
- New Hampshire utility new-service denial and prior arrears 2026-11-12
Explore this subject: Utilities and telecom debt Assistance waivers and forgiveness