What should you know about Canada Division I disputed payments, claim reserves and unclaimed dividends?
What to know
A disputed claim reserve, a withheld payment and an unclaimed dividend involve different reasons why a creditor may not have received money.
The selected procedures below distinguish proof deadlines and court-ordered reserves from payment disputes and a later search or claim for unclaimed dividends. Funding a proposal does not itself prove that every creditor has been paid.
Research recorded November 15, 2026. Each section preserves the source’s scope, dates and exceptions.
Canada BIA Division I proposal unclaimed dividend search and individual creditor claims
Research recorded November 15, 2026
OSB directs creditors seeking an undelivered Division I proposal dividend to its unclaimed dividends database. OSB says the public lookup is free and includes dividends it received from April 1, 1994 onward. For earlier receipts it directs users to contact OSB. The creditor field uses the name supplied by the trustee, and OSB suggests trying the debtor’s name if the creditor name cannot be found. The search guidance identifies a Proof of Claim filed with the licensed insolvency trustee as a prerequisite for entitlement to a dividend or fund in a proposal.
Source: Government of Canada · unclaimed dividends search how search (source 1) Government of Canada · you are owed money division i proposals (source 2)
OSB’s individual creditor package calls for the claim form, an affidavit, two acceptable ID copies and evidence connecting the person to the address in the database. The two ID documents must show the name and address on one and the name and birth date on the other. A filed Proof of Claim or a utility bill may establish the database-address connection. If evidence is unavailable despite reasonable efforts, OSB may rely on the declaration of residence in affidavit item 8. The claim form separately asks for the current address and the estate name or number shown in the database.
Source: Government of Canada · unclaimed dividends claim form individual creditor (source 3) Government of Canada · unclaimed dividends search how submit claim (source 4) Government of Canada · Unclaimed Funds Claim Form Individual Final EN (source 5)
The individual affidavit identifies the estate and amount, states the claimant acts as creditor or legal representative, includes a statement on absence of third-party reimbursement and an indemnity, and is sworn before a Commissioner for Oaths. OSB asks both the claimant and commissioner to initial handwriting added to the affidavit. For an authorized third party the instructions request a notarized power of attorney or will establishing authority. The individual claim form specifies the original or a true certified copy of the authority document.
Source: Government of Canada · unclaimed dividends search how submit claim (source 4) Government of Canada · 3 Affidavit Individual Final EN (source 6) Government of Canada · Unclaimed Funds Claim Form Individual Final EN (source 5)
OSB asks for a certified English or French translation of supporting documents in other languages. The translator must be a member in good standing of a recognized Canadian provincial or territorial translator and interpreter professional association, order or regulator.
Source: Government of Canada · unclaimed dividends search how submit claim (source 4)
The individual form directs the claimant to mail the package to the OSB Trust Fund Administrator in Ottawa. It offers payment by cheque or optional direct deposit. The direct deposit option asks for banking details and a void cheque or copy of a blank cheque.
Source: Government of Canada · unclaimed dividends claim form individual creditor (source 3) Government of Canada · unclaimed dividends search how submit claim (source 4) Government of Canada · Unclaimed Funds Claim Form Individual Final EN (source 5)
Source scope and limits
E199V-C002–C003 already covers statutory remittance, the entitlement mechanism for the proper dividend on the remitted list, the CAD 30 fee per dividend, business documentation and discretion to request more proof or to refuse insufficient claims. E200N adopts incremental OSB search and individual documentation procedure and cites the Division I landing page for applicability. No calculation is necessary. The official instructions and official form are published procedural material. Paper-mail instructions do not establish the availability or exclusivity of an electronic route, processing turnaround, or the outcome of an application. No claimant record was queried. The database coverage date describes public search coverage and does not establish a claim cutoff. The supporting procedure concerns the listed unclaimed dividend and does not resolve ownership of undistributed funds or eligibility for a particular claimant. The wider R029 assignment remains open. Scope is OSB search and an individual creditor’s documentation and paper submission in Division I. April 1, 1994 is public database coverage for OSB receipts and does not establish a claim cutoff. The declaration-based substitute for database address proof is discretionary. Follow the representative instructions and form together for authority documentation. Cheque and optional direct deposit refer to disbursement and are separate from the previously covered filing fee. Preserve holds on electronic availability or exclusivity, timing, ownership of undistributed funds and claimant-specific eligibility or decision. No claimant record was queried.
Canada BIA Division I creditor payment dispute after proposal funding
Research recorded November 15, 2026
Under BIA subsection 60(2), proposal money is paid to the trustee, which distributes it to creditors after paying the proper fees and expenses. Subsection 60(4) applies the section 147 levy to these distributions. In 1482241 Ontario Limited, amended proposal paragraph 6.1(b) tied performance of the debtor’s obligation to payment of the proposal proceeds to the trustee and separately provided for trustee distributions on proven claims. Paragraphs 6.4 and 6.6 gave the ordinary creditor payment formula and preserved the specified default fund until the required payments were made, even if a certificate had issued. This is a file-specific illustration of why evidence of debtor funding alone does not establish an individual creditor’s payment.
Source: Justice Canada · FullText (source 7) crowe.com · 1482241 ontario limited mr of 1482241 ontario limited feb072022 (source 8)
In 1482241 Ontario Limited, the Tenth Report described a court-guided process for resolving disputes over creditor claims and reported that counsel held the sale proceeds. The trustee requested authority to pay six remaining claims in full. On February 7, 2022, Justice Conway recorded that the motion was unopposed and that debtor’s counsel lacked instructions to oppose full payment. Paragraphs 8–10 of the signed order authorized paying the six listed amounts from sale proceeds less the applicable levy, allowed payment of the levy, and directed distribution of the remaining proceeds to debtor’s counsel after the authorized payments. The listed claims totaled $307,421.32 before levy. The endorsement and order establish unopposed payment authorization and no contested determination of the six claims on their merits.
Source: crowe.com · 1482241 ontario limited dist and do feb072022 (source 9) crowe.com · 1482241 ontario limited endt in the matter of the bkr of 1482241 ontario limited (source 10) crowe.com · 1482241 ontario limited mr of 1482241 ontario limited feb072022 (source 8)
In this file, the Tenth Report identified addressing the disputed claims as the final step before certifying full performance and proposed completing the distributions before filing the proposal completion certificate. BIA section 65.3 provides for a prescribed certificate to the debtor and official receiver when the proposal is fully performed. Paragraph 11 of the February 7 order made the trustee’s discharge conditional on the authorized payments and filing a separate Schedule A Discharge Certificate with the court. The public record therefore supports a payment dispute after trustee receipt of sale proceeds used to fund the proposal. It does not establish that the dispute arose after actual section 65.3 certification or that the authorized amounts were ultimately received.
Source: Justice Canada · FullText (source 7) crowe.com · 1482241 ontario limited dist and do feb072022 (source 9) crowe.com · 1482241 ontario limited mr of 1482241 ontario limited feb072022 (source 8)
BIA subsection 148(2) requires sufficient funds to be retained for a claim whose validity remains undetermined, to cover payment if it is admitted. Subsection 148(3) bars an action for a dividend against the trustee and permits a court order for payment and potentially personal interest and costs on a creditor’s application when the trustee has refused or failed to pay after inspectors directed payment. Section 66(1) imports other BIA provisions into Division I only insofar as applicable and with necessary modifications. The 1482241 Ontario Limited payment authorization does not establish that this particular statutory route was invoked or that it is available in every proposal.
Source: Justice Canada · FullText (source 7) crowe.com · 1482241 ontario limited dist and do feb072022 (source 9)
Source scope and limits
Screened R029 scoped reviews and task findings and the claim, coverage and expansion indexes for 1482241, 31-2303814, Hussaini, the amount, and the dividend provisions. E199N and E199R cover performance certification and Form 46. E199V covers retained balances and unclaimed dividends, E198W covers expense taxation and accounts, E196N covers proof disallowance appeals under section 135, E195I covers default and annulment, E200F covers trustee directions under section 34 and E200J covers trustee release and discharge. E200R adds a specific funded-proposal payment dispute and signed distribution order, and the statutory dividend withholding route as a qualified comparator. Hold any assertion that the 2022 payment order followed issuance of a section 65.3 certificate. Tenth Report paragraphs 18 and 35 put addressing the remaining claims and proposed distributions before certification. The record does not verify the date of full debtor performance, the issued statutory certificate, actual payment or clearance for each creditor, or filing of Schedule A and effective discharge. Hold the procedure and effect of an actual post-certification or post-discharge payment dispute pending the issued certificate, court orders, proposal terms, payment records and authority on remedy, limitations and reopening. The court authorized an unopposed motion in this file. Hold generalization of the file-specific fund, approval timetable, payment amounts, or release. Hold whether subsection 148(2) or (3) applies in a particular Division I file, including the proposal terms, inspector authority and direction, timing, and court orders. No such application was verified in the 1482241 Ontario Limited order. The public motion record and Tenth Report establish the proposal terms, funds held in the proceeding and the requested sequence. The signed order and endorsement establish unopposed authorization on February 7, 2022. Independently summed all six gross order entries to $307,421.32. Preserve holds on actual section 65.3 certification or its date, receipt of payments, filing of Schedule A and effective trustee discharge, and remedies for an actual post-certification or post-discharge dispute. Section 148 is a qualified statutory comparator via section 66(1), with its use in this file and applicability in other files held.
Canada BIA Division I court-ordered disputed-claim reserves and proof deadlines
Research recorded November 15, 2026
In the proposal of 1482241 Ontario Limited, the signed July 27, 2020 consent order of Justice Conway directed the Proposal Trustee to retain in trust the full amounts of the remaining contested claims pending further court order. Separate paragraphs directed releases of $200,000 in trust to Allevio’s lawyers and $6,500 to Daiken’s lawyers. A separate $236,000 release was directed to the debtor’s lawyers, with the order describing it by reference to the uncontested portions and the levy. Paragraph 7 preserved the proposal terms and the parties’ obligations.
Source: crowe.com · 1482241 ontario limited mr of 1482241 ontario limited feb072022 (source 8)
The Ninth Report’s December interim schedule allocated separate lines for undisputed creditors, disputed creditors, the Allevio claim, professional fees, a $350,000 return to the debtor and a remaining estate holdback. Allevio’s entire $486,050.06 asserted claim appears in the proposed schedule, although the report describes a $201,903.98 partial disallowance under appeal. The disputed-creditor subtotal printed in paragraph 24 differs by $0.18 from paragraph 10. The seven entries in paragraph 10 sum to $319,775.01, which reconciles to the displayed $157,808.05 residual.
Source: crowe.com · 1482241 ontario limited mr of 1482241 ontario limited feb072022 (source 8) crowe.com · 1482241 ontario limited mr of the p ttee incl 9rpt rtn dec062019 (source 11)
In the same proceeding, the signed December 6, 2019 Pattillo order approved the Ninth Report paragraph 17 procedure for disputed claims and scheduled a January 17, 2020 attendance. Paragraph 17 called for the debtor to notify the disputed creditors of its position by December 13, 2019 and for those creditors to respond by January 6, 2020 to preserve their claims. It also contemplated case scheduling for the objections, including the Allevio appeal. The order separately authorized specified distributions and later amounts agreed in writing by the trustee, debtor and applicable creditor.
Source: crowe.com · 1482241 ontario limited mr of 1482241 ontario limited feb072022 (source 8) crowe.com · 1482241 ontario limited mr of the p ttee incl 9rpt rtn dec062019 (source 11)
Article 4.3 of the amended proposal filed in the same case calls for a BIA section 149 notice promptly after the implementation date. It ties the proof deadline to 30 days after mailing, specifies a final dividend and states that the bar is subject to subsections 149(2)–(4). Article 4.1 requires proof for voting or distribution. The article 4.3 proof deadline and the Pattillo order’s deadline to respond to the debtor’s objection use separate triggers and address different stages of a claim.
Source: crowe.com · 1482241 ontario limited mr of 1482241 ontario limited feb072022 (source 8) crowe.com · 1482241 ontario limited mr of the p ttee incl 9rpt rtn dec062019 (source 11)
Source scope and limits
E201D-C001–C003 cover BIA sections 149–150, Rule 6 proof of sending, statutory exclusion and tax reserves, and eligible late proof following declaration. E201D-C004–C006 cover Rule 112 admission notice, OSB interim sheet fields, and the May proposal and June 6, 2019 Conway order. E201D expressly holds later orders. E200R-C001–C004 cover the February 7, 2022 distribution order, performance and discharge limits, and subsections 148(2)–(3) as qualified comparators. E201I’s incremental claims concern the December schedule, December contested-claim process, July signed reserve direction, and the distinct operation of the proposal’s proof notice provision in the record. Screened R029 reviews and task material, the claim and coverage indexes and expansion queue for Adjudication Process Order, December 2019 response/forfeiture, July 27/Allevio, and the distinctive reserve amounts. E196N covers section 135 proof disallowance and appeal. E194M covers general distribution duties, E199V/E200N retained funds and unclaimed dividends at closeout, E198W fee taxation, E200V/E200Z levy terms and remittance, and E200F court directions. The July order supplies direct case-specific proof of the holdback under that order. The packet holds any generalization or finding that a particular statutory section compelled it. Hold actual transfer, receipt, collection and segregation of funds, the amount retained for any individual unresolved claim, the calculation supporting the $236,000 and its levy, and universal application of a full-face reserve. The order supplies case-specific authority and does not cite BIA subsection 148(2). Hold the actual booked reserve, bank balances, whether either subtotal was corrected, the effect of later settlements and the final accounting. The paragraph 24 schedule is a trustee proposal. The July 2020 signed order is the independently identified holdback direction. Hold particular service or response dates, creditor-specific forfeiture and any later scheduling orders. The Allevio appeal appears in the scheduling clause. Hold any application of the response-forfeiture clause to that appellant or to a person outside the order’s covered creditors. The Appendix C transcription anomalously reads ‘has been filed or proved’ in the description of recipients. Hold the exact recipient wording pending image verification and avoid treating it as proof of any mailing. Hold notice content and sending, implementation and calendar dates, any extensions or exceptions, actual claim treatment under BIA sections 149–150 and whether a late claimant recovered. The general late-proof rule is addressed in E201D. Verified signed December 6, 2019 Pattillo and July 27, 2020 Conway order captures and distinct deadlines and scope. The seven Ninth Report paragraph 10 entries total CAD 319,775.01, which is CAD 0.18 less than paragraph 24. Substitution reconciles to CAD 157,808.05, while the printed subtotal gives CAD 157,807.87. These are reconciliations of proposed figures only. Preserve holds on actual reserves, transfer, levy calculation, specific service or forfeiture, statutory application and the anomalous article 4.3 recipient wording. The proof notice trigger is separate from responding to claim objections.
Canada BIA Division I disputed-claim holdbacks and payment triggers
Research recorded November 15, 2026
Justice Walker’s entered order approved the April 13, 2021 further amended proposal for Malone’s Social Lounge and Taphouse Inc. Schedule B §3.3 withheld distribution on a disputed unsecured claim until and to the extent it became a Proven Claim through agreement or the claims process. Pending resolution by agreement or court order, the trustee was required to keep the amount payable under the proposal if the disputed claim were proven. It then had 10 days from the determination to distribute the appropriate payment to the extent proven. The proposal directs that withheld amounts for claims that do not become Proven Claims be dealt with in accordance with the BIA.
Source: cfcanada.fticonsulting.com · Entered Order Approving Proposal MSLT (source 12)
The Guo Law Corporation proposal trustee reported in May 2021 that counsel had advised it of funds sufficient to pay the proven unsecured claims in full. The trustee reported that the proposal required a reserve for disputed claims out of distributions, so those funds could not pay the proven claims in full without an amendment or resolution of the disputes. The same report identified one disputed claim, Sun’s, as disallowed and appealed, with the appeal generally adjourned by agreement and no further resolution activity reported to that point.
Source: cfcanada.fticonsulting.com · Third Report Final with Exhibits Mat 17 21 (source 13)
The entered Malone’s order makes the proposal effective as of its Implementation Date. Schedule B §§5.1(d) and 5.2 require a granted, unstayed sanction order as a nonwaivable condition. Section 195 of the BIA addresses proceedings under an appealed court order or judgment, subject to provisional execution and the Court of Appeal’s or its judge’s power to vary or cancel the stay or provisional execution order. This supplies a separate implementation question from the §3.3 holdback during adjudication of an individual proof.
Source: cfcanada.fticonsulting.com · Entered Order Approving Proposal MSLT (source 12) Justice Canada · FullText (source 14)
Where it applies through BIA subsection 66(1), subsection 148(2) measures the trustee’s reserve by what is sufficient to provide for payment if the claim of undetermined validity is admitted. In the approved Malone’s proposal, §3.3 supplies a case-specific measure and a release trigger, and §7.2 uses the BIA claims procedure. BIA subsection 135(4) addresses finality of a trustee determination or disallowance and the recipient’s appeal to the court. Its text supplies no reserve calculation, no distribution date and no direction that filing that appeal itself authorizes payment.
Source: cfcanada.fticonsulting.com · Entered Order Approving Proposal MSLT (source 12) Justice Canada · section 135 (source 15) Justice Canada · section 148 (source 16) Justice Canada · section 66 (source 17)
Source scope and limits
The standing-spool E201L reservation calls for a distinct statutory claims reserve or payment pending appeal beyond E201I. Screened R029 findings, claims, prior candidates and exact case-name, file-number, and provisional-execution terms. E201I covers the Toronto proceeding’s July 2020 full-amount trust order, December 2019 trustee schedule and procedure, and proposal proof notice. E201D covers §§149–150 and notice/late proofs. E200R-C004 already records §§66(1) and 148(2)–(3), E196N records §135 proof adjudication and appeal, and E197M-C003 records §195. E200F-C004 uses the same Guo report for subsection 34(1) directions and requested sale/funds relief. E201L adds the Malone’s approved proposal’s distribution-based holdback, release deadline and unstayed sanction condition, and the Guo trustee’s historical linkage of the proposal reserve to funds for proven claims plus its contemporaneous report of an adjourned disallowance appeal. Hold direct standalone subsection 148(2) application in a Division I adjudication to a proof already disallowed but pending court appeal, its application in either cited proceeding, and any general appeal-triggered statutory payment rule. The two records support authority under their proposal terms and the trustee’s explicitly attributed account. Section 149 tax reserves and late-proved claims are outside this increment. The sources do not document a creditor-level reserve transaction, payment receipt, actual chronology of a further appellate stay, or a general threshold for finality. The wider R029 task, Canada coverage and publication remain open. Verified the May 14, 2021 Justice Walker order in B-210092 approving the April 13 further amended Malone’s proposal and incorporating Schedule B. The section 3.3 reserve is the distributable amount if proven, and the ten-day timer runs from determination to the extent proven. Sections 5.1(d) and 5.2 govern the unstayed sanction condition. Guo is attributed to the May 2021 trustee report. Preserve holds on direct section 148(2) application to an appealed disallowance, whether this statute was applied to either case, creditor-level transactions, appellate chronology and general finality.
Sources and research notes
Source links appear beside the statements they support. A recorded date identifies the saved research, not a new check of every source or a conclusion about an individual account.
Source documents
- Government of Canada · unclaimed dividends search how search
- Government of Canada · you are owed money division i proposals
- Government of Canada · unclaimed dividends claim form individual creditor
- Government of Canada · unclaimed dividends search how submit claim
- Government of Canada · Unclaimed Funds Claim Form Individual Final EN
- Government of Canada · 3 Affidavit Individual Final EN
- Justice Canada · FullText
- crowe.com · 1482241 ontario limited mr of 1482241 ontario limited feb072022
- crowe.com · 1482241 ontario limited dist and do feb072022
- crowe.com · 1482241 ontario limited endt in the matter of the bkr of 1482241 ontario limited
- crowe.com · 1482241 ontario limited mr of the p ttee incl 9rpt rtn dec062019
- cfcanada.fticonsulting.com · Entered Order Approving Proposal MSLT
- cfcanada.fticonsulting.com · Third Report Final with Exhibits Mat 17 21
- Justice Canada · FullText
- Justice Canada · section 135
- Justice Canada · section 148
- Justice Canada · section 66
Original research and recorded qualifications
- Canada BIA Division I proposal unclaimed dividend search and individual creditor claims 2026-11-15
- Canada BIA Division I creditor payment dispute after proposal funding 2026-11-15
- Canada BIA Division I court-ordered disputed-claim reserves and proof deadlines 2026-11-15
- Canada BIA Division I disputed-claim holdbacks and payment triggers 2026-11-15
Explore this subject: Business restructuring and insolvency Settlement completion records Consumer debt outside the US