S_TN, PASS-01 — Tennessee provider market access and consumer fees
Research baseline: October 22, 2026, Pacific.
Actual public-source access/check date: October 23, 2026, Pacific.
Tennessee has statutory licensing and registration pathways for these services. The consequential finding is that its framework changed in 2026, and its older settlement-fee limits had already changed in 2014. A Tennessee fee entry that simply says “$400 or 4% setup fee” or “30% of savings” would miss those changes. The official legislative records establish both enactments, although the signed chapter PDFs for those amendments were inaccessible. Tennessee General Assembly+3
This pass establishes substantial statutory findings through the primary legislative material actually read. It does not verify the exact October 2026 inflation-adjusted consumer dollar limits under Part 55 or the complete operative June 2026 regulations. Those remain explicit holds. No CPI calculation substitutes for an administrator’s adopted and published amounts.
This is the provider-access/consumer-fees component only. It does not constitute Tennessee acceptance, A066 acceptance, independent review, or publication clearance.
Identifier convention: The tables contain the full identifiers. In the discussion, C016 means S_TN-P1-C016, and S005 means S_TN-P1-S005.
A. Substantive findings
1. Classification: what activity falls within which framework?
Two statutory frameworks must be evaluated
Part 55 — Uniform Debt-Management Services Act. Its core definition covers acting between an individual and creditors to obtain more favorable repayment terms. It reaches both ordinary concessions and principal-reduction services. The core definition does not require possession of the individual’s money.
Part 58 — Debt Resolution Services Act. The adopted enactment reaches programs represented expressly or implicitly as negotiating, settling, or otherwise changing payment or other debt terms with unsecured creditors. It expressly includes reductions in balances, interest rates, and fees. Consequently, principal reduction is not the sole classification test. Part 58’s operational provisions prohibit the licensee from receiving or controlling consumer money except earned fees. [C002–C004; S001, original §5402; S005, §§5802, 5809(c)(12), 5814(a)(5).] capitol.tn.gov
The 2009 public chapter prints its provisions as §§47-18-5401 onward; the subsequent codification places this Act in Part 55. References below distinguish the original enactment’s numbering from the corresponding codified section.
| Actual model or conduct |
Classification supported by the evidence |
Material condition or unresolved boundary |
| For-profit, noncustodial negotiation of unsecured consumer debts for reduced balances |
Falls within Part 58’s definition; a license is required before offering or providing covered services unless an exemption applies |
Fee timing and allocation are governed by §5813; complete current regulations remain unread |
| Noncustodial negotiation of lower interest or creditor fees |
Can also fall within Part 58 |
Calling the service “counseling,” “hardship assistance,” or “negotiation” does not remove the express interest/fee-concession coverage |
| Traditional DMP involving receipt and distribution of creditor payments |
Part 55 expressly supplies the historical DMP framework and remains an active registration program |
A for-profit custodial DMP also potentially intersects with Part 58’s broad concession definition and its custody prohibition; exclusive routing or overlapping obligations are held pending the full current rules/formal interpretation |
| Qualifying nonprofit DMP or settlement organization |
Part 58 contains a specified federal-organization exemption; Part 55 has no general nonprofit exemption |
Exemption from Part 58 does not establish exemption from Part 55 |
| Pure budgeting or general financial education without creditor intermediation or representations of debt alteration |
May fall outside the core service definitions |
A covered provider’s education charges have specific Part 55 rules; credit-improvement or loan-arrangement representations can raise a separate Part 10 question |
| Provider receives no compensation from consumers |
Not enough, by itself, for the Part 55 no-compensation exclusion |
Compensation from creditors or on behalf of consumers defeats that particular exclusion |
| Creditor negotiating its own receivable |
Express Part 58 creditor exclusion can apply |
Under Part 55, being the creditor rather than an intermediary supports noncoverage as an inference; the precise activities still matter |
| Entity-only business-debt workout |
The definitions examined use an individual service recipient |
That is not clearance under other business, collection, lending, or legal-practice laws |
| Individual’s sole-proprietor or personally obligated business debt |
No express personal/family/household-purpose limitation was found in these enacted definitions |
Do not infer a business-purpose exemption solely from the word “consumer”; application remains held |
[C002–C006, C008, C010–C013, C041.] capitol.tn.gov+1
Resident and remote-provider nexus
Part 55’s registration provision turns on whether the provider reasonably should know the individual resides in Tennessee when agreeing to provide services. Its exclusions address situations in which the provider has no reason to know of Tennessee residence. Part 58 likewise contains a no-reason-to-know-residence exemption.
An out-of-state office or remote delivery is not itself an exemption. Conversely, these provisions should not be rewritten as an unconditional rule covering every transaction involving a person who later moves to Tennessee. [C006; S001, original §§5403–5404; S005, §5804(a)(10).] capitol.tn.gov
2. Market access, exemptions, and the 2026 transition
Licensing and registration authority
The responsible authority is the Tennessee Department of Commerce and Insurance, acting through the Commissioner or authorized administrator.
- Part 55: registration is required for covered provision to a person whose Tennessee residence the provider reasonably should know. Employees and agents of a registered provider do not require a separate registration under the cited provision.
- Part 58: a person must obtain a license before providing or offering covered debt-resolution services. The statute specifies a primary-business-address license, nontransferability, and conditions for assumed names.
These are actual statutory pathways, not permissions inferred from a regulator’s homepage. Filing an application or paying the application fee does not establish that a license has issued. [C007; S001, original §5404; S005, §5803.] capitol.tn.gov
Exemptions are activity- and entity-specific
| Category |
Part 55 treatment |
Part 58 treatment |
| Nonprofit organization |
No general nonprofit exclusion; the Act expressly contemplates nonprofit/tax-exempt applicants |
Exempts a person meeting the Act’s specified organization condition under IRC §501(c) or §501(q); an unsupported nonprofit label is insufficient |
| Attorney |
Excludes legal services within an attorney-client relationship by a person licensed or otherwise authorized to practice in Tennessee |
Exempts Tennessee-licensed attorneys providing debt-resolution services within an attorney-client relationship |
| CPA |
Excludes accounting services within an accountant-client relationship by a Tennessee-licensed CPA |
Exempts Tennessee-licensed CPAs providing debt-resolution services within an accountant-client relationship |
| Financial planner |
A conditional exclusion depends on the administrator’s required determination by rule concerning the licensed profession and its safeguards |
No corresponding general financial-planner exemption was established in the adopted Part 58 text |
| Banks and affiliates |
Bank exclusion; a bank affiliate must satisfy the specified banking-regulation condition |
Banks and their employees are listed; the defined bank categories must be met. Do not automatically extend this to every affiliate |
| Judicial/court-related actors |
Judicial officers, persons acting under court or administrative-agency orders, and assignees for creditors, within the stated regular-course condition |
Judicial officers/persons under court direction and assignees for creditors are listed |
| Government personnel |
Apply Part 55’s definitions and exclusions to the actual actor/activity |
Listed government officers/employees must perform for the specified governmental entity and receive compensation solely from that entity |
| Dedicated-account administrator |
Its actual activities require separate classification |
Exempt only if it does not otherwise provide debt-resolution services |
| Marketer or employee |
Registered-provider employee/agent provision applies as stated |
Licensee employees and qualifying marketers receive a licensing-only exemption |
| Registered credit-services business |
Exclusion requires that it not engage in debt counseling, management, or settlement as covered by Part 55 |
A credit-services registration was not established as a substitute for Part 58 licensing |
| Incidental bill-paying business |
Specific exclusion for title insurer, escrow company, or other bill payer when debt-management services are incidental |
No matching general exclusion was established in the adopted Part 58 text |
[C008–C012, C041; S001, original §§5402–5403, 5409; S005, §§5802(4), 5804.] capitol.tn.gov
An attorney relationship must be real and satisfy the statutory conditions. A nonlawyer company does not acquire the attorney exemption merely by retaining, referring to, or affiliating with a lawyer.
Similarly, Part 58’s marketer exception requires both marketing on behalf of a licensee and not otherwise providing debt-resolution services. Express prohibitions and advertising restrictions still reach such marketers. A lead business that also performs covered services cannot assume this exception. [C009, C012; S005, §§5804(b), 5814, 5816.]
Effective date and transition
The official HB0743 history shows adoption of HA0187 and HA0188, passage, gubernatorial signature on April 24, 2025, and assignment as Public Chapter 287. The enacted legislative chain provides:
- July 1, 2025 effectiveness for rulemaking.
- January 1, 2026 effectiveness for other purposes.
- Application to conduct and license applications/renewals from the operative date.
- Preservation of specified pre-January 2026 Part 55 transactions, licenses, and resulting rights and duties.
TDCI’s current instructions say an existing debt-management licensee may continue under that license until expiration and then apply initially under Part 58 if it meets the debt-resolution criteria. That procedural statement does not, by itself, answer which substantive fee rules govern a new contract made during the remaining life of an old license. [C001, C013; S005, §5820 and §3; S006; S007; S011.] capitol.tn.gov+2
Hold: The full current rules and an authoritative interpretation are still needed for the old-license/new-agreement situation and the for-profit custodial-DMP overlap. Part 55 should not be described as wholly repealed.
3. Consumer fee structures, limits, adjustment, and historical reconciliation
A decisive historical correction: July 1, 2014
The original 2009 law contained:
- Settlement setup fees of the lesser of $400 or 4% of inception debt.
- Settlement monthly fees.
- A 17% aggregate enrolled-debt method.
- A 30%-of-savings method subject to a 20% aggregate principal-debt ceiling.
The official 2014 SB1446 record expressly shows passage without amendments and a July 1, 2014 effective date. Its actual bill text deletes the settlement setup/monthly provisions and replaces the former settlement percentage provisions with performance and allocation requirements.
Those old settlement amounts are historical. They are not established current Tennessee settlement caps. [C014; S001, original §5423(d), (f); S002, §§1–3; S003.] Tennessee General Assembly+1
Part 55 fee provisions
The following distinguishes verified statutory base amounts from an unverified current adjusted ceiling.
| Fee or charge |
Statutory structure established |
Conditions and present verification limit |
| Ordinary DMP consultation/setup |
Base maximum $50 for consultation, credit report, account setup, and similar work |
Applies to the specified finance-charge/default-fee concession plan; signed compliant agreement required; inflation adjustment unresolved |
| Ordinary DMP monthly service |
Base maximum min($10 × creditors remaining when assessed, $50 per month) |
Creditor count is measured when the fee is assessed; exact current adjusted dollars held |
| Education/counseling when the individual enters a service agreement |
Generally cannot be charged separately |
Administrator authorization based on nature/extent and the narrow statutory exceptions must be considered |
| Education/counseling without a service agreement |
Base maximum $100, or a greater amount with administrator approval |
Inflation adjustment unresolved; a subsequent agreement within the statutory 90-day interval requires refund |
| Settlement-service fee after the 2014 change |
Performance-triggered proportional allocation or consistent savings percentage |
Replacement provision states no numerical percentage ceiling; this does not establish absence of every current regulatory restriction |
| Dishonored payment |
Reasonable charge, no greater than the lower of base $25 and the amount other law permits |
Current adjusted amount and independently applicable other-law ceiling must both be established |
| Voluntary contributions |
Solicitation prohibited; accepted contributions aggregate with consumer fees during the stated period |
Aggregation extends through 30 days after plan completion/termination; calling money a donation does not create an extra consumer-fee allowance |
| Additional goods/services |
No general permission to attach unrelated charges |
Express administrator authorization is material; education required by a government-sponsored program has a narrow statutory treatment |
[C015–C022; S001, original §§5423–5424, 5428; S002, §§1–2.] capitol.tn.gov
Education-paragraph citation discrepancy: The enacted 2014 bill redesignates the former education paragraph from (d)(4) to (d)(2). The unofficial 2025 reproduction retains deleted-paragraph placeholders and places education at (d)(4), with the corresponding refund reference. The substantive refund requirement is supported by the primary amendment; the official current codifier numbering remains to be confirmed. This is not a basis to omit the refund.
Inflation adjustment: established mechanism, exact amounts held
The original provision corresponding to §47-18-5532(f)–(g) directs the administrator to:
- Adopt replacement dollar amounts by rule using CPI-U or a properly adopted substitute.
- Establish a base year.
- Adjust effective July 1 when the specified December 31 comparison reaches at least a 10% change.
- Round §5523 consumer-fee amounts to the nearest dollar, while other listed amounts use the specified $100 rounding.
- Notify registered providers and make changes public.
I did not obtain the current adopted base year and published adjusted consumer-fee schedule. The nominal $50/$10/$50/$100/$25 figures therefore remain statutory-base figures, not certified October 2026 maxima. [C019; S001, original §5432(f)–(g); S017, S019 held.]
Part 58 fee structures
The adopted §5813 establishes two permissible allocation methods for debts resolved individually:
- Proportional method:
Individual-debt fee / total program fee = that debt’s enrollment balance / total enrollment balance.
- Savings method:
A consistent percentage applied across debts to the difference between the enrollment balance and the amount actually paid to satisfy the debt.
No numerical consumer dollar or percentage ceiling appears in the adopted §5813 text. That is narrower than a finding that Tennessee permits unlimited fees: the complete June 2026 rules remain unread, and the statute imposes agreement, performance, payment, and allocation requirements. No 20%, 25%, or 30% rate in an example below is a state-approved maximum. [C023–C026; S005, §5813(a)–(b).]
The statute separately excludes qualifying dedicated-account administration charges and third-party legal-service-provider charges from its particular definition of licensee debt-resolution-service fees. These exclusions do not establish the legality of every third-party charge or an arrangement that disguises the provider’s compensation. [C027; S005, §5813(c)–(d).]
Part 58 also permits deferral of the licensee’s fee without additional expense to the consumer. Its separate language concerning arranging credit requires a separately authorized or exempt lender; that provision does not itself establish lending authority for the debt-resolution provider. [C042; S005, §5809, as renumbered to (e) by S006.]
4. When fees may be requested or received
State requirements
Part 55 ordinary DMP: The provider and individual must first sign an agreement satisfying the referenced agreement/prohibited-practice provisions before debt-management charges or payment. This state rule must be combined with any independently applicable federal timing restriction. [C015.]
Part 55 settlement after the 2014 amendment: No fee or consideration may be requested or received until the provider has obtained the required valid debt alteration, the individual has made at least one payment under the creditor/debt-collector agreement, and individual-debt allocation satisfies the proportional or savings method. [C022.]
Part 58: Section 5813 requires:
- A signed compliant provider-consumer agreement.
- At least one debt altered under the required valid consumer-creditor resolution agreement.
- At least one consumer payment under that agreement.
- The prescribed allocation for debts handled individually.
A “setup,” “membership,” or “monthly” label does not bypass the direct-and-indirect-charge language. [C023–C026.] capitol.tn.gov
Installment-settlement qualification: A first payment can satisfy the stated payment trigger. It does not mean savings equal the enrollment balance minus only that first installment. The savings definition refers to the amount paid to satisfy the debt. Exact valuation before completion, and fee consequences if an installment resolution later fails, remain held for authoritative interpretation. [C025, C040.]
Cancellation, earned fees, and refunds
Part 58: The consumer may terminate without penalty through the listed electronic, written, or recorded-telephone methods. Fees earned before receipt of termination notice may survive, but only if they satisfy §5813. Termination does not accelerate fees for unresolved debts. [C028; S005, §§5810–5811.]
There are two account-notification clauses:
- §5809(a)(5): notify the dedicated-account provider within five business days after receiving the consumer’s termination notice.
- §5810(b): advise the consumer within two business days, then notify the account provider no later than five business days after that advice, absent further instructions.
Both must be preserved. Applying the receipt-based five-business-day outside deadline satisfies the shorter express requirement; the later clause should not be represented as permission to wait seven business days. [C029.]
Part 55: The enacted provisions establish an initial cancellation right through midnight of the third business day after assent, a 30-day right where specified agreement/notice requirements are missing, and refund language accompanying cancellation. A valid emergency waiver requires the individual’s own qualifying statement; a routine preprinted waiver is insufficient. Later termination requires return of unexpended funds under the relevant provisions. [C030–C031; S001, original §§5419–5420, 5422(h), 5426.]
The residual 65% refund of an uncredited settlement setup fee appears in the original termination provisions and the unofficial current reproduction. Because the settlement setup authorization was deleted in 2014, that residual language cannot create a new setup-fee pathway. Its application requires lawful historical facts and further authoritative reconciliation. [C031.]
Federal TSR — common context, separately applicable
Where the TSR applies, 16 CFR §310.4(a)(5)(i) independently requires a qualifying debt alteration, a customer payment, and compliant proportional/savings allocation before fees are requested or received. Coverage is broader than principal reduction and can include DMP concessions. State exemptions do not themselves determine federal coverage. [C032–C033.] ecfr.gov+2
For a qualifying dedicated account, §310.4(a)(5)(ii) requires consumer ownership, institutional insurance, independence, prohibited referral-compensation safeguards, and return of funds other than properly earned fees within seven business days of the customer’s request. Tennessee’s notice-to-account-provider deadlines do not replace this federal return requirement. [C034.] ecfr.gov
The eCFR pages accessed October 23 displayed Title 16 as current through October 21, 2026. I did not silently convert that displayed currency date into October 23.
5. Actual public registration procedure and authorization lookup
The current TDCI instructions were opened and read.
| Item |
Verified public procedure |
Limit of what this establishes |
| Initial debt-management application |
“Initial Debt Management Application” through CORE; posted fee $4,000 |
Application route, not approval |
| Initial debt-resolution application |
“Initial Debt Resolution Application” through CORE; posted fee $4,000 |
Application route, not approval |
| Renewal/reapplication charges |
TDCI posts $4,000 for each program’s renewal and reapplication |
Provider-to-regulator charges; no consumer pass-through authorization |
| Debt-management renewal |
Page directs renewal every two years, 60–30 days before expiry, with no stated grace period |
Current agency instruction; full current rule verification remains open |
| Debt-resolution term |
Adopted §5805(a)(2) provides two years from issuance |
Do not import every DMP renewal procedure into Part 58 |
| Public license search |
Official route identified and opened |
Returned a title and zero readable text lines; no provider record inspected |
[C035–C038; S011–S016.] tn.gov+5
The posted application materials include:
- Debt management: bond or permitted alternative, trust-account information, insurance, jurisdiction/service-of-process materials, financial statements, accreditation, personnel certification, agreement/fee forms, and relevant background checks.
- Debt resolution: business-tax compliance, financial statements, a posted $50,000 bond requirement, accreditation, proposed agreements/cancellation materials, fee schedules, and executive-officer background checks.
The Part 58 statute authorizes a commissioner-determined bond amount not greater than $50,000; TDCI currently instructs applicants to supply $50,000. These are different propositions. [C036.]
TDCI also maintains an actual approved accreditation/certification page. Its listed program restrictions include debt-resolution-only and nonprofit-only categories. Accreditation listing does not prove that a debtor-facing provider has a Tennessee license. [C037.] tn.gov
No named provider’s current authorization was established in this pass.
6. Bounded worked examples
These are plain-text illustrations. Dollar inputs are hypothetical. They do not establish a named provider’s license or approve a contractual rate.
Example 1 — one debt resolved within a larger program
Applicable structure: Part 58 proportional allocation.
Assumptions: Proper license, compliant agreement, enforceable disclosed total fee, and all required debt-resolution and first-payment conditions satisfied for Debt A.
Inputs:
- Total enrollment debt: $20,000.
- Debt A at enrollment: $5,000.
- Debt B at enrollment: $15,000.
- Agreed total program fee: $4,000.
Operator:
- Debt A share = $5,000 / $20,000 = 0.25.
- Debt A allocated fee = $4,000 × 0.25 = $1,000.
Result:
- $1,000 is the allocation for Debt A.
- The other $3,000 is not earned merely because Debt A reached its trigger.
- Before any qualifying debt agreement/payment, permissible requested or received service fee under this pathway is $0.
Units: U.S. dollars. All calculations are exact to cents; no rounding adjustment.
The implied 20% program price is a contract assumption, not a Tennessee ceiling. [C023–C024.]
Example 2 — prior earned fee payment and later cancellation
Continue Example 1.
Additional assumptions:
- Debt A’s $1,000 fee became earned under the lawful agreement.
- The consumer already paid $250 of that earned fee.
- Debt B remains unresolved.
- Consumer then terminates.
Calculation:
- Remaining earned Debt A fee = $1,000 − $250 = $750.
- Additional fee attributable to unresolved Debt B = $0.
Result:
- Cancellation alone does not erase the assumed previously earned $750.
- Cancellation does not make the $3,000 Debt B allocation payable.
- An unlawful advance fee would not become lawful merely by relabeling it a credit against this calculation.
Consumer-owned account funds require the separate applicable return analysis. [C024, C028, C034.]
Example 3 — lower-debt savings calculation
Applicable structure: uniform savings percentage.
Assumptions: Debt fully satisfied, contractual savings rate uniformly 25%, and all state timing/agreement conditions satisfied.
Inputs:
- Enrollment debt: $1,000.
- Later balance after added interest/fees: $1,200.
- Amount actually paid to satisfy the debt: $700.
Calculation:
- Statutory savings base = $1,000 − $700 = $300.
- Fee = $300 × 25% = $75.
Result: $75.
The $1,200 later balance is not substituted for the enrollment base. The 25% rate is an assumed contract input. Exact dollar result; no rounding. [C025.]
Example 4 — installment payment is not the savings amount
Inputs:
- Enrollment debt: $10,000.
- Resolution agreement requires $6,000 in installments.
- First installment: $100.
Incorrect operation:
- $10,000 − $100 = $9,900 “savings.”
Disposition:
- That $9,900 is not established statutory savings: $100 has not satisfied the debt.
- A lawful proportional-method fee may reach its stated trigger after the required first payment.
- The exact savings-method assessment before satisfaction, and consequences of later default, remain held.
This example demonstrates a boundary without inventing a refund or valuation rule. [C023–C025, C040.]
Example 5 — DMP base-schedule arithmetic, current adjusted ceiling held
Inputs: Three creditors remain when assessed.
Calculation:
- 3 × statutory-base $10 = $30.
- min($30, statutory-base $50 monthly maximum) = $30.
If six creditors remain:
- 6 × $10 = $60.
- min($60, $50) = $50.
Units: Dollars per month; exact arithmetic.
These are demonstrations of the unadjusted statutory formula, not verified October 2026 billable maxima. Applicable indexing and federal timing must still be resolved. [C016, C019, C033.]
Example 6 — education fee refunded after conversion
Assumptions:
- An $80 education fee was lawfully paid.
- Counseling ends on Day 0.
- The individual enters the provider’s service agreement on Day 60.
Calculation:
- 60 days < 90 days.
- Refund = previously paid qualifying education fee = $80.
Result: $80 refund; it is not merely an optional future-fee credit.
The assumption that the original $80 was lawful does not establish the current adjusted education ceiling. [C017–C019.]
Example 7 — timely Part 55 initial cancellation
Assumptions:
- No valid emergency waiver.
- Consumer sends effective cancellation within the initial three-business-day period.
- Provider received a $40 service fee and $200 intended for creditors.
- None of the $200 has been disbursed.
Calculation:
- Refund = $40 + $200 = $240.
Result: $240 under the cancellation-notice refund condition, with no invented percentage deduction. [C030.]
Example 8 — custody and nonprofit boundaries
Custody: A business proposes receiving $300 monthly into its own account for creditor distributions while relying solely on a Part 58 license.
Result: The Part 58 prohibition on receiving/controlling consumer money, apart from earned fees, prevents treating that license as sufficient authority. Resolve Part 55 applicability and the overlap first. No lawful custodial-fee scenario is assumed. [C004, C013.]
Nonprofit: An organization calls itself nonprofit and charges consumers for settlement.
Result: Verify the specific Part 58 exemption condition; then separately test Part 55 registration and fees. The marketing label establishes neither exemption nor fee permission. [C008.]
7. Component disposition
The statutory classification, fee-history correction, principal fee formulas, performance triggers, and public application route are substantively answered subject to the identified source qualifications.
The current rule text, indexed dollar amounts, certain overlapping-model classifications, and specified interpretation issues remain open. The full coverage and next-evidence table appears in Section D.
B. Source register
All checks below occurred October 23, 2026, Pacific. “Read” means actual page or PDF passage retrieval, including relevant PDF-page images where used. “Discovery” means a lead only. All state sources concern Tennessee unless identified as federal.
| Source ID |
Title / issuer and direct literal URL |
Pinpoint, version, and legal-status relevance |
Actual access and limitation |
| S_TN-P1-S001 |
2009 Public Chapter 469, Tennessee General Assembly: https://capitol.tn.gov/bills/106/Chapter/PC0469.PDF |
Original §§5402–5404; 5409; 5419–5424; 5426; 5428; 5432; §3. PDF pp.3–5, 9–10, 20–28, 31–34, 38–39. Effective July 1, 2010 |
Read, including relevant page images. Historical enactment; printed Part 54 numbering subsequently codified in Part 55. Not alone a current consolidation |
| S_TN-P1-S002 |
SB1446, 108th General Assembly: https://capitol.tn.gov/Bills/108/Bill/SB1446.pdf |
Full two-page text, §§1–3; settlement-fee replacement and education refund; July 1, 2014 clause |
Read. Bill text, established by S003 as passed without amendments; not falsely described as the signed chapter |
| S_TN-P1-S003 |
SB1446 official history: https://wapp.capitol.tn.gov/apps/BillInfo/Default?BillNumber=SB1446&GA=108 |
History, no-amendments entries, PC639 assignment, effective date |
Read. Supports enacted legislative chain |
| S_TN-P1-S004 |
2014 Public Chapter 639, Secretary of State: https://publications.tnsosfiles.com/acts/108/pub/pc0639.pdf |
Final signed/published amendment sought |
Not read: 403. Final chapter authentication remains held |
| S_TN-P1-S005 |
HA0187, 114th General Assembly: https://capitol.tn.gov/Bills/114/Amend/HA0187.pdf |
§§5802–5805, 5807, 5809–5814, 5816, 5820; §3. Printed pp.1–6, 9–17, 20, 23–24 |
Read relevant operative text and page images. Adopted amendment; must be read with S006 and S007 |
| S_TN-P1-S006 |
HA0188: https://capitol.tn.gov/Bills/114/Amend/HA0188.pdf |
Entire page: changes rulemaking/administrative-fee authority, enforcement wording, and §5809 lettering |
Read. Adopted; no change to §5813’s fee formulas |
| S_TN-P1-S007 |
HB0743 official history: https://wapp.capitol.tn.gov/apps/BillInfo/Default?BillNumber=HB0743&ga=114 |
House adoption of HA0187/HA0188; Senate passage; governor signature; PC287; effective dates |
Read. SA0232 is recorded as withdrawn and is not used as enacted text |
| S_TN-P1-S008 |
2025 Public Chapter 287, Secretary of State: https://publications.tnsosfiles.com/acts/114/pub/pc0287.pdf |
Signed/published Part 58 enactment sought |
Not read: 403. Legislature-host chapter alternatives also inaccessible; findings identify the adopted-amendment chain |
| S_TN-P1-S009 |
TDCI Laws page: https://www.tn.gov/commerce/regboards/debt/rules/laws.html |
Code-routing instructions and official Lexis link |
Read. Page lists debt resolution as “47-18-48,” inconsistent with Part 58; this navigation error is not used as legal authority |
| S_TN-P1-S010 |
Official-code Lexis route linked by TDCI: https://advance.lexis.com/container?config=014CJAA5ZGVhZjA3NS02MmMzLTRlZWQtOGJjNC00YzQ1MmZlNzc2YWYKAFBvZENhdGFsb2e9zYpNUjTRaIWVfyrur9ud&crid=7e5a6b66-3044-48d4-82ee-2c71eb1113ca&prid=40d5f910-08b3-4f3a-bc03-72c9ba191ba5 |
Current official statutory consolidation sought |
Opened but no statutory text: one-line/empty shell. No claim of reading the current official code |
| S_TN-P1-S011 |
TDCI How to Get a License: https://www.tn.gov/commerce/regboards/debt/license/get.html |
Debt Management and Debt Resolution subsections; transition statement; application requirements |
Read. Current operational instructions, not a substitute for operative law |
| S_TN-P1-S012 |
TDCI Fees: https://www.tn.gov/commerce/regboards/debt/license/fees.html |
Management/resolution initial, renewal, reapply rows |
Read. Posted administrative fees; no consumer-fee authority inferred |
| S_TN-P1-S013 |
TDCI Renewal & Other Resources: https://www.tn.gov/commerce/regboards/debt/license/renewal.html |
Debt-management renewal/reapply subsections |
Read. Detailed debt-resolution renewal subsection not present in returned page |
| S_TN-P1-S014 |
TDCI Accreditation & Certification Providers: https://www.tn.gov/commerce/regboards/debt/license/providers.html |
Separate approved lists and restricted categories |
Read. Accreditation/certification approval is not provider licensure |
| S_TN-P1-S015 |
TDCI public license lookup: https://search.cloud.commerce.tn.gov/ |
Current public-search entrypoint |
Opened, zero text lines. No license record or status read |
| S_TN-P1-S016 |
TDCI application portal: https://access.cloud.commerce.tn.gov/portal |
CORE application entrypoint |
Opened, zero text lines. No application entered or filed |
| S_TN-P1-S017 |
Compiled Chapter 0780-05-18, June 2026 version, Secretary of State: https://publications.tnsosfiles.com/rules/0780/0780-05/0780-05-18.20260615.pdf |
Current management-rule compilation lead; inflation, practice, application, and exemption clauses needed |
Discovery; actual open 403. Full operative text/current legal status not verified |
| S_TN-P1-S018 |
Compiled Chapter 0780-05-19, June 2026 version: https://publications.tnsosfiles.com/rules/0780/0780-05/0780-05-19.20260615.pdf |
Resolution-rule compilation lead |
Discovery; actual open 403. Index reports June 15 effectiveness; not promoted to a full reading |
| S_TN-P1-S019 |
Rulemaking filing 03-16-26: https://publications.tnsosfiles.com/rules_filings/03-16-26.pdf |
Combined final filing lead; operative clauses, filing stamp, adoption materials needed |
Discovery; actual open 403 |
| S_TN-P1-S020 |
May 20, 2026 Joint Government Operations final agenda: https://capitol.tn.gov/Archives/Joint/committees/gov-opps/agendas/Final%20Agenda%20-%20May%202026.pdf |
Issued May 13; pp.1–3, item 12; debt-management/resolution rules and fees, packet p.471, listed June 15 date |
Read. Independently corroborates the permanent-rule package; not its operative text or a later-status guarantee |
| S_TN-P1-S021 |
May 2026 Rule Review Packet: https://capitol.tn.gov/Archives/Joint/committees/gov-opps/RulesPackets/Rule%20Review%20Packet%20-%20May%202026.pdf |
Relevant printed packet pages 471–499 |
Not read: tool returned HTTP 400, “Content length is too large: 21582300” |
| S_TN-P1-S022 |
Notice of rulemaking hearing 11-15-25: https://publications.tnsosfiles.com/rules_filings/11-15-25.pdf |
Proposed/hearing-stage material associated with January 13, 2026 hearing |
Discovery only. Not adopted authority; regulator mirror also failed retrieval |
| S_TN-P1-S023 |
Emergency filing 12-37-25: https://publications.tnsosfiles.com/rules_filings/12-37-25.pdf |
Earlier emergency resolution-rule lead |
Not read: 403. Indexed emergency period reportedly ended in June 2026; not used as October governing text |
| S_TN-P1-S024 |
16 CFR Part 310, eCFR/OFR: https://www.ecfr.gov/current/title-16/chapter-I/subchapter-C/part-310/section-310.4 ; https://www.ecfr.gov/current/title-16/chapter-I/subchapter-C/part-310/section-310.2 ; https://www.ecfr.gov/current/title-16/chapter-I/subchapter-C/part-310/section-310.6 |
§310.4(a)(5)(i)–(ii); §310.2(o); exemption context |
Federal. Read relevant fee/definition passages. Displayed currency through October 21, 2026; eCFR describes itself as authoritative but unofficial |
| S_TN-P1-S025 |
Debt Relief Services & the TSR: Guide for Business, FTC: https://www.ftc.gov/business-guidance/resources/debt-relief-services-telemarketing-sales-rule-guide-business |
Coverage, nonprofit discussion, DMP examples, fee collection and account discussion |
Read. Agency guidance; regulation controls |
| S_TN-P1-S026 |
2025 Tennessee Code reproduction, Justia, Part 55 section pages: https://law.justia.com/codes/tennessee/title-47/chapter-18/part-55/section-47-18-5502/ ; https://law.justia.com/codes/tennessee/title-47/chapter-18/part-55/section-47-18-5503/ ; https://law.justia.com/codes/tennessee/title-47/chapter-18/part-55/section-47-18-5519/ ; https://law.justia.com/codes/tennessee/title-47/chapter-18/part-55/section-47-18-5523/ ; https://law.justia.com/codes/tennessee/title-47/chapter-18/part-55/section-47-18-5526/ |
Definitions/exemptions; education paragraph numbering; residual 65% refund reference; amendment-history leads |
Secondary reproduction read for comparison/leads. Not an official October 2026 consolidation |
| S_TN-P1-S027 |
January 2017 Chapter 0780-05-18: https://publications.tnsosfiles.com/rules/0780/0780-05/0780-05-18.20170126.pdf |
Earlier rule version |
Discovery; retrieval 403. Not substituted for the 2026 compilation |
| S_TN-P1-S028 |
December 2024 Chapter 0780-05-18: https://publications.tnsosfiles.com/rules/0780/0780-05/0780-05-18.20241222.pdf |
Earlier rule version |
Retrieval 403. Not treated as current merely because other pages still reference it |
C. Claim register
Confidence terminology: “Established text” means the proposition is supported by the actual primary passages read. “Legislative chain” identifies the enacted-text reconstruction where the signed chapter was inaccessible. Neither designation claims that unread current regulations were cleared.
| Claim ID |
Precise assertion |
Sources and pinpoints |
Conditions, currentness, and confidence limit |
| S_TN-P1-C001 |
Part 58 operates from January 1, 2026, with specified Part 55 transition protection |
S005 §5820, §3; S006; S007 |
Legislative chain established; signed PC287 unread |
| S_TN-P1-C002 |
Part 55’s intermediary/concession definition covers principal and nonprincipal concessions without a custody prerequisite |
S001 original §5402(6)–(9), (15), pp.2–4 |
Established original text; read with later law |
| S_TN-P1-C003 |
Part 58 covers represented changes to unsecured debt terms, including balances, interest, and fees |
S005 §5802(8)–(10), pp.2–3 |
Legislative chain; labels do not determine coverage |
| S_TN-P1-C004 |
Part 58 does not permit consumer-fund custody except earned fees |
S005 §§5809(c)(12), 5814(a)(5), pp.13,17 |
Established adopted language; independent-account conditions remain relevant |
| S_TN-P1-C005 |
Individual/entity status must be separated from debt purpose; no broad business-purpose exemption was established |
S001 original §5402; S005 §5802 |
Text plus bounded inference; natural-person business-debt application held |
| S_TN-P1-C006 |
Tennessee-residence knowledge is material; remote location alone does not exempt |
S001 original §§5403–5404; S005 §5804(a)(10) |
Established text; facts at agreement time matter |
| S_TN-P1-C007 |
Covered provision requires Part 55 registration or applicable Part 58 license; Part 58 also covers offers |
S001 original §5404; S005 §5803 |
Exemptions and transition apply; application is not issuance |
| S_TN-P1-C008 |
Part 58’s specified nonprofit exclusion does not establish a general Part 55 nonprofit exemption |
S005 §5804(a)(1); S001 original §§5403,5409 |
Entity qualification must be proved |
| S_TN-P1-C009 |
Attorney/CPA exclusions require the stated professional authority and relationship/activity |
S001 original §5402(9)(A)–(B); S005 §5804(a)(4),(8) |
Affiliation or referral alone insufficient |
| S_TN-P1-C010 |
Part 55 institutional, no-compensation, incidental-billpayer, and financial-planner exclusions are conditional |
S001 original §§5402(9)(C),5403 |
Financial-planner implementing rule not verified; creditor compensation defeats no-compensation exclusion |
| S_TN-P1-C011 |
Part 58 lists bank, creditor, judicial, government, assignee, and account-provider exemptions |
S005 §§5802(4),5804(a) |
Each listed activity/entity condition applies |
| S_TN-P1-C012 |
Qualifying Part 58 marketers receive only a licensing exemption and remain subject to express prohibitions |
S005 §§5804(b),5814,5816 |
Must market for a licensee and not otherwise provide services |
| S_TN-P1-C013 |
Old-license/new-contract treatment and for-profit custodial-DMP overlap are not fully resolved |
S005 §5820, §3; S011 transition paragraph; S017–S019 |
Explicit hold; no invented exclusive or dual-license rule |
| S_TN-P1-C014 |
The old settlement setup/monthly and percentage-cap structure was replaced effective July 1, 2014 |
S001 original §5423(d),(f); S002 §§1–3; S003 |
Strong legislative chain; signed PC639 unread |
| S_TN-P1-C015 |
Part 55 debt-management fees require section authorization and a compliant signed agreement |
S001 original §5423(a)–(b) |
Distinguish separately permitted education services and TSR |
| S_TN-P1-C016 |
Ordinary DMP base fees are $50 setup and min($10 × remaining creditors, $50/month) |
S001 original §5423(d)(1) |
Unadjusted bases only; current adjusted ceilings held |
| S_TN-P1-C017 |
Separate education fees are restricted; no-agreement base is $100 with specified larger-fee approval |
S001 original §§5423(c),(d)(4),5428(d); S002 |
Current dollar adjustment and exact current paragraph numbering held |
| S_TN-P1-C018 |
Agreement within the specified 90-day period requires refund of the qualifying prior education fee |
S002 §2, replacement §5523(e) |
Primary substance established; codifier paragraph-number discrepancy noted |
| S_TN-P1-C019 |
Statutory CPI mechanism exists, but exact October 2026 consumer-dollar replacements were not verified |
S001 original §5432(f)–(g); S017,S019 |
No independent CPI calculation; no inference of “no adjustment” |
| S_TN-P1-C020 |
Dishonor charge is reasonable and bounded by adjusted statutory amount and other law |
S001 original §5423(g) |
Base $25; both current inputs require confirmation |
| S_TN-P1-C021 |
Donations and unrelated add-ons do not provide a general extra-fee pathway |
S001 original §§5424,5428(b)(7),(d) |
Consumer-contribution aggregation and narrow authorizations apply |
| S_TN-P1-C022 |
Post-2014 Part 55 settlement fees require qualifying alteration, first payment, and prescribed allocation |
S002 §2, replacement §5523(f) |
Applies to the stated settlement agreement category |
| S_TN-P1-C023 |
Part 58 fee requests/receipts require compliant provider agreement, qualifying resolution, and first payment |
S005 §5813(a)–(b)(3), pp.15–16 |
Includes indirect charges; timing independent of federal coverage |
| S_TN-P1-C024 |
Individual-debt proportional fees use that debt’s enrollment balance divided by total enrollment balance |
S005 §5813(b)(4)(A); S002 §2 |
One settlement does not earn unresolved-debt allocations |
| S_TN-P1-C025 |
Savings fees use a uniform percentage and enrollment debt less amount paid to satisfy it |
S005 §5813(b)(4)(B); S002 §2 |
Later inflated balance and first installment are not interchangeable with those inputs |
| S_TN-P1-C026 |
Adopted Part 58 §5813 and replacement Part 55 §5523(f) specify no numeric percentage maximum |
S005 §5813; S002 §2 |
Narrow text finding; unread current rules prevent unrestricted-fee conclusion |
| S_TN-P1-C027 |
Part 58 excludes specified account-administration and third-party legal charges from its service-fee classification |
S005 §5813(c)–(d) |
Does not clear independent law, identity, or evasion issues |
| S_TN-P1-C028 |
Part 58 cancellation is penalty-free but compliant previously earned fees can survive |
S005 §§5810–5811 |
No acceleration of unearned fees; contract facts matter |
| S_TN-P1-C029 |
Part 58 contains both receipt-based and advice-based account-notification clauses |
S005 §§5809(a)(5),5810(b) |
Preserve both; no seven-day state-notification permission inferred |
| S_TN-P1-C030 |
Part 55 establishes three-business-day cancellation, specified 30-day extension, and qualifying refund/waiver rules |
S001 original §5420, pp.22–23 |
Timely effective notice; waiver facts; current consolidation still held |
| S_TN-P1-C031 |
Part 55 termination/failure entails fund-return obligations; residual 65% language does not create setup authority |
S001 original §§5419(d),5422(h),5426; S002; S026 |
Historical-fee application and current authoritative reconciliation held |
| S_TN-P1-C032 |
TSR applicability requires separate analysis and can reach nonprincipal concessions/DMP services |
S024 §310.2(o); S025 coverage discussion |
State exemption does not decide federal coverage |
| S_TN-P1-C033 |
TSR independently restricts advance fees through alteration, payment, and allocation conditions |
S024 §310.4(a)(5)(i) |
Applies only when within federal scope |
| S_TN-P1-C034 |
TSR’s qualifying account rule includes return of unearned funds within seven business days |
S024 §310.4(a)(5)(ii) |
Distinct from Tennessee provider-notification deadlines |
| S_TN-P1-C035 |
TDCI posts $4,000 initial, renewal, and reapply charges for both programs |
S012 fee rows |
Verified current administrative posting; not consumer charges |
| S_TN-P1-C036 |
Current application instructions specify supporting materials; Part 58 term is two years |
S011; S013; S005 §§5803–5805 |
DMP renewal detail is operational evidence; adopted rule clauses unread |
| S_TN-P1-C037 |
TDCI publishes approved accreditation/certification programs with category restrictions |
S014 approved lists |
No individual provider authorization follows |
| S_TN-P1-C038 |
Official application and license-search routes exist, but no provider status was verified |
S015–S016; S011 links |
Portals returned no readable record/form content |
| S_TN-P1-C039 |
Full current official code, signed amendment chapters, and 2026 operative rules were not retrieved |
S004,S008,S010,S017–S023 |
Exact failures recorded; May agenda corroborates package, not complete rule content |
| S_TN-P1-C040 |
No controlling decision/formal interpretation was retrieved to resolve the listed application disputes |
Targeted official-court/AG searches; gaps below |
Search outcome, not a claim that no authority exists |
| S_TN-P1-C041 |
Credit-services registration is not an established substitute for debt-management/resolution authority |
S001 original §5403(c)(4); S011 Credit Services subsection |
Standalone credit-services fee/timing review remains outside this pass |
| S_TN-P1-C042 |
Part 58 permits fee deferral without added consumer expense; arranging credit has separate authorization conditions |
S005 §5809, corrected to (e) by S006 |
Does not itself confer lending authority |
D. Full component coverage and remaining evidence
| Scope component |
Disposition |
Relevant claims |
Exact missing evidence / next investigation |
| 1. Principal reduction versus ordinary concessions |
Answered at statutory-text level |
C002–C003 |
Confirm current official consolidation and any later amendment |
| 1. Custodial versus noncustodial models |
Partial |
C004,C013 |
Read current Chapters 0780-05-18 and -19; obtain authoritative treatment of for-profit custodial DMP overlap |
| 1. Individual versus business-purpose debt |
Partial |
C005 |
Controlling interpretation of natural-person business debts, guarantees, and sole-proprietor obligations; do not invent a purpose exemption |
| 1. Resident/remote-provider nexus |
Answered at text level |
C006 |
Later merits application to migration and knowledge disputes remains outside this completed text finding |
| 2. Regulator and statutory permission |
Answered with legislative-chain qualification |
C001,C007 |
Recover signed PC287 and official current Part 58 |
| 2. Nonprofit, attorney, CPA, institutional, no-compensation exclusions |
Substantially answered; fact-specific conditions retained |
C008–C011 |
Current implementing financial-planner rule and any controlling exemption interpretation |
| 2. Marketer/lead-provider boundary |
Answered at text level |
C012 |
Actual proposed duties would require separate classification; no provider facts assumed |
| 2. Transition and overlapping models |
Unresolved in specified applications |
C013 |
Formal interpretation of new transactions under unexpired pre-2026 Part 55 licenses; complete current rules |
| 3. Historical settlement caps |
Answered |
C014 |
Recover final signed PC639 to replace the explicit unamended-bill reconstruction |
| 3. DMP/setup/monthly/education/dishonor exact current dollars |
Held |
C016–C020 |
Administrator’s actual current base-year/adjusted-fee publication and operative inflation rule; no homemade CPI calculation |
| 3. Settlement fee bases/allocation |
Answered at enacted-text level |
C022–C026 |
Complete current rules before certifying absence of additional regulatory restrictions |
| 3. Donations, add-ons, account/legal charges |
Partial |
C021,C027,C042 |
Full 2026 standards-of-practice rules; actual third-party arrangements and independently applicable law |
| 4. State performance/payment triggers |
Answered |
C015,C022–C025 |
Installment-savings assessment and failed-settlement consequences remain interpretation holds |
| 4. Cancellation/refund/previous fees |
Substantially answered |
C018,C028–C031 |
Current authoritative treatment of residual 65% setup-refund language; reconcile application to actual historical transactions |
| 4. Federal common baseline |
Answered within stated scope |
C032–C034 |
Provider-specific TSR jurisdiction/exemptions not adjudicated; eCFR displayed currency ends October 21 |
| 5. Public current application instructions |
Answered as procedure |
C035–C037 |
Full adopted rule and exact current Part 55 application-amendment chain still required for legal completeness |
| 5. Actual public provider-status verification |
Unresolved |
C038 |
Read a named provider’s actual public record, including entity, license category, status, and dates; portal returned no records here |
| 6. Worked fee/boundary examples |
Answered with express assumptions |
C016–C031 |
DMP arithmetic remains unadjusted demonstration; no unsupported current-dollar billing example |
| 7. Full operative regulations/adoption history |
Held |
C039 |
First recover S019 or the official packet’s printed pp.471–499; compare against S017/S018, filing/effective stamps, and later changes/stays |
| 7. Controlling decisions/formal interpretations needed for open applications |
Unresolved |
C040 |
Targeted follow-up for overlap, natural-person business debts, installment failures, old-fee refunds, and current indexing |
| All other Tennessee dossier categories |
Excluded from this pass and remain open |
— |
Full agreements, funds handling, bonds, remedies, collections, litigation, limitations, exemptions outside this component, secured debt, sector-specific rules, local/tribal issues, contract doctrines, and broader case law require later passes |
The highest-value next source is the official March 2026 rulemaking filing or the official May packet’s printed pages 471–499. That is a concrete missing-evidence target. Its retrieval would resolve more of this component than another general Tennessee overview.
E. Researcher self-check
- Actual primary reading: Relevant operative portions of the original 2009 public chapter; the complete two-page 2014 amendment bill and its no-amendments enactment record; the adopted 2025 House amendments and official enactment history; current TDCI application, fee, renewal, and accreditation instructions; the May 2026 official rule-review agenda; and the relevant federal regulation passages.
- Actual versus reconstructed: The signed 2014 and 2025 chapter PDFs were not read. The report expressly uses the official legislative chains and does not relabel bill/amendment documents as signed chapters.
- Currentness limits: The current official Lexis code did not return statutory text. The full June 2026 rules and current indexed consumer-dollar publication were not retrieved. A webpage crawl/update date was not treated as a legal effective date.
- Secondary material: The unofficial 2025 code reproduction was used to identify codification, history, and residual-reference issues. It was not elevated into official October 2026 verification. Search snippets and commercial tables were not used as controlling authority.
- Cases and interpretations: Targeted official-court and Attorney General searches did not yield a controlling decision resolving the listed disputes. That does not establish that no such authority exists.
- Examples: Contractual percentages are assumptions, not legal ceilings. DMP dollars are marked as unadjusted statutory bases. No setup-fee permission was manufactured from residual refund language.
- Actions and environment: Public research was performed in this conversation. No other Chat conversation, application, account change, contact, purchase, publication, or local-file deliverable was created. The ChatGPT model selector was not independently inspected or changed.
- Review status: This is a researcher self-check. It is not independent review, Tennessee acceptance, A066 acceptance, or publication readiness.
END S_TN PASS-01.