| B01 — P: version unknown |
Use the adopted 2024 body and its express effective date, distinguishing historical and proposed texts. C001–C006; S001 DATES/body, S002–S004. |
Exhaustive subsequent amendment and judicial-status chain. |
A newer host timestamp or old PDF proves current law in full. |
Check only later official generic revision/adoption notices for Directive No. 3. |
| B02 — A: statutory actor unknown |
Title 31 routes statistical authority through OIRA; the PRA specifies Director/Administrator responsibilities without relieving the Director. C008–C014; S005 §§102, 1104(d); S006 §§3502–3504. |
Actual lawful action/delegation facts; other applicable law. |
A generic office title proves a particular action was authorized. |
Read a necessary generic delegation or authority clause, without identifying officeholders. |
| B03 — A: designation absent |
Coverage follows Administrator designation after consultation, not importance alone. C022; S001 §1. |
Any actual designation, intentionally not sought. |
A prominent or federal statistic must be a PFEI. |
Read additional generic designation criteria or amendments to §1; keep rosters excluded. |
| B04 — A: designation review unknown |
Designations are to be reviewed annually. C023; S001 §1. |
Actual review and results. |
Annual review language proves a current roster was reviewed. |
Read only generic OMB instructions governing the review mechanism. |
| B05 — P: other federal/private statistics |
PFEI designation and statutory agency definitions are distinct scope inquiries. C011–C012, C022, C084; S001 §1; S005–S006. |
Additional authority for a different statistical category. |
All private publications or all agency outputs are covered or exempt automatically. |
Identify the generic governing directive for the category, without inspecting actual data. |
| B06 — A: compilation quality not established |
High accuracy/reliability objectives and evaluation duties apply, but do not establish observed quality. C016–C021, C061–C067; S001 introduction/§8; S006 §3504(e). |
Actual quality evidence, excluded. |
“Official” means error-free, unbiased, or causal. |
Read the exact generic methodology standard only if separately authorized. |
| B07 — P: reference-period lag |
Release should occur within 22 working days for quarterly-or-more-frequent series, alongside practicable promptness. C024–C025, C082; S001 §2. |
Working-day convention and actual reference/release events. |
Twenty-two calendar days is a universal strict deadline. |
Read official generic working-day/counting instructions applicable to §2, if any. |
| B08 — A: schedule announcements |
Last-calendar-year report, each next-release announcement, and December 15 OIRA schedule submission have separate duties. C026–C028; S001 §3. |
Actual reports, schedule, submission, and any exception. |
One announcement satisfies every scheduling obligation. |
Read generic §3 implementation instructions, without opening a calendar. |
| B09 — A: schedule change |
Special unforeseen circumstances and unavoidable-change determination trigger prompt announcement/full explanation. C029; S001 §3; C058–C060. |
Circumstances and determination, excluded. |
Any late or missing release is automatically excused—or automatically a violation. |
Read generic instructions distinguishing §3 changes from §7 exceptions. |
| B10 — P: release office and clock times |
One schedule office is recommended; one or two designated daily release times are required. C030–C031, C082; S001 §3. |
Actual times, timezone, technical clock convention. |
A familiar clock time is prescribed universally by the directive. |
Read generic time-standard instructions only; do not inspect actual schedules or contact offices. |
| B11 — A: planned method change |
A planned collection/analysis/estimation change that may affect interpretation must be announced as far ahead as possible; regular-report placement and possible public comment are recommended. C032–C033; S001 §4. |
Change category, interpretive effect, and possibility of comment. |
Every editorial update triggers an identical mandatory comment period. |
Read generic §4 guidance on interpretively material changes. |
| B12 — A: monthly/quarterly announcement |
At least three reports before the first affected report is the mandatory stated minimum. C034; S001 §4; §7 qualification. |
Report sequence and first affected report. |
Replace “reports” with months or days. |
Clarify only generic report-counting/application conventions. |
| B13 — P: weekly/annual announcement |
At least three months is the stated recommended lead time. C035, C082; S001 §4. |
Month-counting convention and actual event. |
Treat “should” as an unconditional fixed-day rule. |
Read generic month-counting or applicable exception instructions. |
| B14 — A: unforeseeable methodology change |
Special unforeseen changes require full explanation when known and in the first affected report. C037; S001 §4. |
Knowledge, special circumstances, and report event. |
An unforeseeable label eliminates explanation duties. |
Read generic instructions for the final paragraph of §4. |
| B15 — P: publication form |
Press release or other printed report is the retained wording; a press release is required where it significantly speeds dissemination. C015, C038; S001 §5; S006 §3504(d). |
Complete electronic-format implementation authority. |
A feed, website update, or printed item automatically satisfies all release requirements. |
Read narrow official generic interpretation of §5’s retained medium language. |
| B16 — A: preparation and databank security |
Prevent premature release, withhold covered material from public-use databanks until official release, and secure prepared release materials. C039–C041; S001 §5. |
Actual controls, authorization, and events. |
Physical-security wording proves a complete cybersecurity standard or actual protection. |
Read only generic security implementation rules that are indispensable. |
| B17 — A: presidential routing |
Information goes to the President through the CEA Chairman as soon as available, as expressly stated. C042, C046; S001 §5. |
Actual availability and access, excluded. |
Apply the other-recipient window indiscriminately to erase the separately stated route. |
Read narrow official explanation of the relationship between this sentence and §5(a)–(d). |
| B18 — A: other prerelease recipients |
Access is discretionary and requires all §5(a)–(d) conditions, including necessary safeguards and informed agreement. C043–C046; S001 §5(a)–(d). |
Authorization, safeguards, agreement, necessity, and timing. |
A professional role or agreement alone creates an access entitlement. |
Read generic public access-condition instructions; do not seek access lists or agreements. |
| B19 — A: embargo interval |
Within the stated access structure, an embargo cannot begin more than thirty minutes before official release; necessity may require less. C045–C046; S001 §5(c)–(d). |
Actual official time, access time, safeguards, and authorization. |
Thirty minutes is a guaranteed allowance or a postrelease rule. |
Read generic timing/embargo implementation instructions only. |
| B20 — A: recipient responsibility |
Authorized Executive Branch recipients remain responsible for no release before the official time. C047; S001 §5. |
Actual dissemination and timing. |
Authorized receipt permits redistribution. |
Read generic recipient-condition instructions without actual communications. |
| B21 — A: ordinary commentary |
Covered employees must wait at least thirty minutes after release, unless the stated technical exception applies; later commentary remains possible. C048–C050; S001 §5; responses (6)–(7). |
Speaker category, designation, nature of commentary, timing. |
The floor requires speech at expiration or validates the commentary. |
Read only generic interpretation of commentary versus technical explanation. |
| B22 — A: technical-explanation exception |
The exception requires issuing-agency staff, agency-head designation, and technical explanation. C049; S001 §5. |
Each role/content predicate. |
Any agency employee or any policy statement qualifies. |
Read narrow generic designation/content guidance; no identities or speeches. |
| B23 — A: preliminary/revised status |
Preliminary or revised figures must be clearly identified. C052, C074; S001 §6(a), (c). |
Actual version and labels, excluded. |
A newly published figure necessarily represents a new economic event. |
Read generic revision-label or version-documentation standards only. |
| B24 — A: routine revisions |
Routine revisions belong on the regular schedule and must be consolidated for simultaneous release. C053, C056; S001 §6(b), (e). |
Routine classification and any authorized exception. |
Each revision may be released ad hoc without considering the schedule. |
Read generic routine/nonroutine classification instructions. |
| B25 — P: relative preliminary error |
A large preliminary/final aggregate difference relative to average period changes requires accuracy improvement or delay until reliability. C054; S001 §6(c). |
“Large,” averaging convention, reliability criteria, actual quantities. |
Invent a universal percentage or assume all delay violates promptness. |
Read exact generic statistical criteria implementing §6(c), without a dataset. |
| B26 — P: consistent bias |
Signs of consistent bias require corrective steps; same-direction revisions are an illustration. C055; S001 §6(d). |
Pattern criteria and actual evidence. |
One revision proves systematic or intentional manipulation. |
Read generic bias-diagnostic standards; no actual-series evaluation. |
| B27 — A: nonroutine correction |
Fully explain nonroutine revisions and release as soon as corrections can be completed. C057; S001 §6(f). |
Classification, correction capability, completion event. |
A universal correction-day deadline or permission for unexplained delay. |
Read generic correction-publication instructions. |
| B28 — A: possible violation before action |
Agency-head consultation is required before action that may violate; an adverse determination permits an exception application. C058–C059; S001 §7. |
Possible violation, consultation, and determination. |
Consultation equals approval or can be omitted because an exception might exist. |
Read generic §7 consultation/application instructions only. |
| B29 — A: exception authorization |
Only §§2–6 are enumerated; authorization is discretionary and requires necessity plus consistency with purpose, satisfactory to the Administrator. C060, C014; S001 §7; S006 §3504(a)(2). |
Actual authorization and other-law constraints. |
A request grants an exception or waives unrelated law. |
Read generic exception criteria and legal limits, without an actual exception record. |
| B30 — A: evaluation cycle |
Every issuing agency must submit an evaluation for the indicator every three years on the Statistical Policy Office’s schedule. C061; S001 §8. |
Schedule and actual submission. |
Three years begins at an invented date or proves completed evaluation. |
Read generic scheduling instructions, not an actual program schedule. |
| B31 — P: accuracy/nonresponse evaluation |
Evaluation must address the specified accuracy, revision, benchmark, nonresponse, and late-response matters. C062; S001 §8(a). |
Denominators, measurement methods, benchmarks, actual evidence. |
A universal response-rate target or validated accuracy follows from the topic list. |
Read generic evaluation measurement standards only. |
| B32 — A: documentation and release performance |
Documentation accuracy/completeness/accessibility, schedule/promptness performance, and avoidance of early disclosure are separate evaluation subjects. C063–C065; S001 §8(b)–(d). |
Actual documents and performance, excluded. |
Passing one subject establishes all other subjects. |
Read generic evaluation instructions for those individual paragraphs. |
| B33 — P: additional evaluation issues |
Additional issues require written specification by the Administrator to the agency at least six months before scheduled submission. C066; S001 §8(e). |
Writing, timing, schedule, month-counting convention. |
An informal request at any time satisfies the clause. |
Read narrow generic instructions on specification and counting. |
| B34 — P: other OMB standards incorporated |
Administrator review concerns conformity with all OMB statistical policies/standards/guidelines. C067; S001 §8. |
Complete applicable external standards. |
Reading Directive No. 3 completes the whole statistical-quality regime. |
Identify and read only the next indispensable generic standard in a separately bounded component. |
| B35 — P: annual congressional-report reference |
The directive retains its summary language; §3514’s current presentation has a termination note, and §3003 has exceptions and an incorporated list. C068–C073; S001 §8; S007–S010. |
Exact incorporated legislative entry and complete applicable preservation/amendment chain. |
Unqualified statutory survival, automatic repeal of §8, or a completed-report finding. |
Read the narrow legislative incorporation and relevant preservation enactments, without actual reports. |
| B36 — A: historical alternatives |
The 2019 and 2023 instruments were solicitations/proposals; the 2024 adoption chose thirty minutes and retained the other provisions. C002–C005, C050; S001–S004. |
Broader earlier history, not needed to apply the authenticated revision text. |
“No delay” was adopted merely because it was considered. |
Read only a materially relevant adopted revision, not comments or named events. |
| B37 — P: failed source or incomplete visual read |
Failed originals remain logged; an honestly bounded official alternative can establish readable text without establishing pixels or exhaustive history. C007, C083; source/failure log. |
Visual verification and some historical effective/later-law links. |
Failure proves repeal, legal absence, or permission to bypass a gate. |
Use ordinary official copies or later public republications; preserve remaining limits. |
| B38 — U: broader economic concept/denominator |
The directive does not define nominal/real, stock/flow, count/rate, or a universal denominator. C077, C082; S001 complete body. |
Separate generic statistical definitions and methods. |
Import an economics definition or denominator without authority. |
Open the precise official generic methodological definition in a future bounded component. |
| B39 — U: privacy, enforceability, or remedy |
Authority must conform to law; sharing authority respects privacy/confidentiality; private remedies are not resolved. C014, C019, C078; S006 §3504; S001. |
Complete applicable confidentiality, review, standing, and remedy law. |
The directive creates unrestricted access, damages, or a universal absence of remedies. |
Read the exact generic statutory provision for the proposed legal consequence; no case or complaint inquiry. |
| B40 — X: actual economic/financial or empirical outcome |
Policy objectives and evaluation duties do not establish actual values, causal effects, adherence, or personal outcomes. C079–C080; S001 introduction, §§6, 8. |
All actual evidence is outside authorization. |
Infer debt trends, inflation, employment, financial suitability, or an actual violation. |
Keep actual data and financial decisions excluded; any future work needs a separately defined evidence scope. |